Policy Replication

← Rulemakings

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Revision of an Alternative Closure Requirement Deadline

RIN 2050-AH42 · ENVIRONMENTAL PROTECTION AGENCYMajor · 17 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

5 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 2025-10-08 · 1 document
Interim final rulenoneNo OIRA review
Final rulenoneNo OIRA review
Regulatory impact analysis2 files
Docket documents5 of 53 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (1)

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline

Proposed rule (NPRM)2025-11-28 · FR 2025-21597 · ENVIRONMENTAL PROTECTION AGENCY · 8 references
Federal Register action: Proposed rule; notice of public hearing.
In this rulemaking because: RIN printed on the document (RIN 2050-AH42) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (1)

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period

Comment period extended or reopened2026-01-07 · FR 2026-00084 · ENVIRONMENTAL PROTECTION AGENCY
Federal Register action: Proposed rule; extension of comment period.
In this rulemaking because: RIN printed on the document (RIN 2050-AH42) · high confidence

Regulatory impact analyses (2)

For the proposed rule

Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review

RIA2025-11-28 · Regulatory impact analysis · EPA · 6 references
In this rulemaking because: RIN printed on the document (RIN 2050-AH42) · high confidence

Regulatory Impact Analysis Alternative Closure Deadline F2 Extension

RIA2025-11-28 · Regulatory impact analysis · EPA · 3 references
In this rulemaking because: RIN printed on the document (RIN 2050-AH42) · high confidence

Docket documents

EPA-HQ-OLEM-2025-2864: 53 documents, 5 held · Analyses 1 (1 held), Correspondence 13, Other 3, Publications 10, Reports 22, OIRA review record 2 (2 held), Rule documents 2 (2 held)

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Extension of an Alternative Closure Requirement Deadline

Rule documentsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0001 · Proposed Rule · FR 2025-21597

2025 Summer Reliability Assessment, May 2025

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0006 · Supporting & Related Material · Report

2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0007 · Supporting & Related Material · Report

Extending the Deadline in 40 C.F.R. § 257.103(f)(2)

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0008 · Supporting & Related Material · Analysis

2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0009 · Supporting & Related Material · Report

2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0012 · Supporting & Related Material · Report

40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0013 · Supporting & Related Material · Report

2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0014 · Supporting & Related Material · Report

40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0015 · Supporting & Related Material · Report

Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0016 · Supporting & Related Material · Report

October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0018 · Supporting & Related Material · Report

2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0019 · Supporting & Related Material · Report

Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0020 · Supporting & Related Material · Report

Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0021 · Supporting & Related Material · Report

2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0022 · Supporting & Related Material · Report

2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0024 · Supporting & Related Material · Report

2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0026 · Supporting & Related Material · Report

Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0029 · Supporting & Related Material · Report

Baldwin Power Station Revised Alternative Closure Demonstration

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0034 · Supporting & Related Material · Report

Coleto Creek Power Plant Alternative Closure Demonstration

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0037 · Supporting & Related Material · Report

Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0039 · Supporting & Related Material · Report

Kincaid Power Station Revised Alternative Closure Demonstration

ReportsHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0040 · Supporting & Related Material · Report

Regulatory Impact Analysis Alternative Closure Deadline F2 Extension

AnalysesHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0046 · Supporting & Related Material · Analysis

Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review

OIRA review recordHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0047 · Supporting & Related Material · Interagency Review

Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review

OIRA review recordHeld2025-11-28 · EPA-HQ-OLEM-2025-2864-0048 · Supporting & Related Material · Interagency Review

Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential

ReportsHeld2025-12-04 · EPA-HQ-OLEM-2025-2864-0052 · Supporting & Related Material · Report

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline - Extension of Comment Period

Rule documentsHeld2026-01-07 · EPA-HQ-OLEM-2025-2864-0061 · Proposed Rule · Extension of Comment Period · FR 2026-00084

OIRA reviews (1)

Proposed Rulereceived 2025-10-08, concluded 2025-11-21 · Consistent with Change · major