Regulatory Impact Analysis Alternative Closure Deadline F2 Extension
Regulatory impact analysis2025-11-28 · EPA · regulatory_impact_analysis · EPA-HQ-OLEM-2025-2864-0046
Other documents for the same rulemaking (all, by stage)
2025-11-28 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline
2025-11-28 Regulatory impact analysisRedline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Docket documentRedline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Docket document2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA
2025-11-28 Docket documentSouthwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration
2025-11-28 Docket documentExtending the Deadline in 40 C.F.R. § 257.103(f)(2)
2025-11-28 Docket documentCoal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115
2025-11-28 Docket documentKincaid Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601
2025-11-28 Docket documentOctober 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming
2025-11-28 Docket documentBaldwin Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule
2025-11-28 Docket documentAnnual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report
2025-11-28 Docket documentAnnual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company
2025-11-28 Docket documentNewton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket documentColeto Creek Power Plant Alternative Closure Demonstration
2025-11-28 Docket document2025 Summer Reliability Assessment, May 2025
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141
2025-11-28 Docket documentResource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025
2025-11-28 Docket documentOrder No. 202-25-3
2025-11-28 Docket documentExecutive Order 25-50 by the State of Indiana
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond
2025-11-28 Docket documentNIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline
2025-11-28 Docket documentBaldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket document2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming
2025-11-28 Docket documentContinued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond
2025-12-03 Docket documentMemorandum Containing Internet Links to Certain Documents in Docket
2025-12-04 Docket documentNewton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential
2025-12-04 Docket documentCorrection of Federal Register Preamble Statement
2026-01-07 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period
2026-02-02 Docket documentVirtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule
References: 3 extracted, 0 linked to papers
the NERC identified increasing resource adequacy challenges... In the most recent LTRA released in December 2024 (2024 LTRA), the NERC identified increasing resource adequacy challenges for the upcoming 10 years
research reportNot linked to a paper · 1.2
In July 2025, the Department of Energy (DOE) published a report titled “Evaluating the Reliability and Security of the United States Electric Grid” to evaluate U.S. electric grid reliability and security (“2025 DOE Report”).
government reportNot linked to a paper · 1.2
U.S. Energy Information Administration, Electric Power Annual 2024 (October 2025). Table 4.1: Count of Electric Power Industry Power Plants, by Sector, by Predominant Energy Sources within Plant, 2014 through 2024. https://www.eia.gov/electricity/annual/
datasetNot linked to a paper · 1.3 · cited link