Baldwin Power Station Revised Alternative Closure Demonstration

Docket document2025-11-28 · EPA · report · EPA-HQ-OLEM-2025-2864-0034
RIN 2050-AH42 · Docket EPA-HQ-OLEM-2025-2864

Other documents for the same rulemaking (all, by stage)

2025-11-28 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline
2025-11-28 Regulatory impact analysisRedline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Regulatory impact analysisRegulatory Impact Analysis Alternative Closure Deadline F2 Extension
2025-11-28 Docket documentRedline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Docket document2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA
2025-11-28 Docket documentSouthwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration
2025-11-28 Docket documentExtending the Deadline in 40 C.F.R. § 257.103(f)(2)
2025-11-28 Docket documentCoal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115
2025-11-28 Docket documentKincaid Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601
2025-11-28 Docket documentOctober 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule
2025-11-28 Docket documentAnnual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report
2025-11-28 Docket documentAnnual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company
2025-11-28 Docket documentNewton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket documentColeto Creek Power Plant Alternative Closure Demonstration
2025-11-28 Docket document2025 Summer Reliability Assessment, May 2025
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141
2025-11-28 Docket documentResource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025
2025-11-28 Docket documentOrder No. 202-25-3
2025-11-28 Docket documentExecutive Order 25-50 by the State of Indiana
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond
2025-11-28 Docket documentNIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline
2025-11-28 Docket documentBaldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket document2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming
2025-11-28 Docket documentContinued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond
2025-12-03 Docket documentMemorandum Containing Internet Links to Certain Documents in Docket
2025-12-04 Docket documentNewton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential
2025-12-04 Docket documentCorrection of Federal Register Preamble Statement
2026-01-07 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period
2026-02-02 Docket documentVirtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule

References

Page 1Download these results: CSV · JSON
Resources, Champaign, IL; ISWS Contract Report 588. October 1995.
research reportNot linked to a paper · refsec
Ramboll, 2020. 2019 Annual Groundwater Monitoring and Corrective Action Report, Baldwin Bottom Ash
research reportNot linked to a paper · refsec
Pond, Baldwin Energy Complex. Ramboll, Milwaukee, Wisconsin. January 31, 2020.
research reportNot linked to a paper · refsec
USEPA, 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U‐17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.
research reportNot linked to a paper · refsec
USEPA, 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment. EPA/600/R‐07/139. National Risk Management Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.
research reportNot linked to a paper · refsec
USEPA, 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. 9283.1‐36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015. Page | 10
research reportNot linked to a paper · refsec
ASD Completion Date CMA Completion / Status Lithium (MW-370) January 7, 2019 April 8, 2019 Lithium (MW-370) July 15, 2019 October 14, 2019 Lithium (MW-370) January 22, 2020 April 21, 2020 Lithium (MW-370) July 27, 2020 [O: RAB 9/11/20; C: EJT 9/14/20] Notes:
research reportNot linked to a paper · refsec
FINAL Baldwin 601 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Baldwin Bottom Ash Pond, Baldwin Energy Complex
research reportNot linked to a paper · refsec
EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for Baldwin Bottom Ash Pond (BAP) located at Baldwin Energy Complex near Baldwin, Illinois. Groundwater is being monitored at Baldwin BAP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). The following Statistically Significant Levels (SSLs) of 40 C.F.R. Part 257 Appendix IV parameters were determined during one or more sampling events in 2019: Lithium at well MW-370 Alternate Source Demonstrations (ASDs) were completed for the SSLs referenced above and Baldwin BAP remains in the Assessment Monitoring Program. 3/10
research reportNot linked to a paper · refsec
MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the Monitoring Program status in calendar year 2019, and Baldwin
research reportNot linked to a paper · refsec
KEY ACTIONS COMPLETED IN 2019 The Assessment Monitoring Program is summarized in Table A. The groundwater monitoring system, including the CCR unit and all background and downgradient monitoring wells, is presented in Figure 1. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). In general, one groundwater sample was collected from each background and downgradient well during each monitoring event. All samples were collected and analyzed in accordance with the Sampling and Analysis Plan (SAP) (NRT/OBG, 2017a). All monitoring data obtained under 40 C.F.R. §§ 257.90 through 257.98 (as applicable) in 2019 are presented in Tables 1 and 2. Analytical data were evaluated in accordance with the Statistical Analysis Plan (NRT/OBG, 2017b) to determine any SSLs of Appendix IV parameters over Groundwater Protection Standards (GWPSs). Statistical background values are provided in Table 3 and GWPSs in Table 4. Analytical results for the June and September 2018 sampling events were provided in the 2018 Annual Groundwater Monitoring and Corrective Action Report. Potential alternate sources were evaluated as outlined in the 40 C.F.R. § 257.95(g)(3)(ii). ASDs were completed and certified by a qualified professional engineer. The dates the ASDs were completed are provided in Table A. The ASDs completed in 2019 are included in Appendix A. 6/10
datasetNot linked to a paper · refsec
FINAL Baldwin 601 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Baldwin Bottom Ash Pond, Baldwin Energy Complex Table A – 2018-2019 Assessment Monitoring Program Summary Sampling Dates Analytical Data Receipt Date Parameters Collected June 26-27, 2018 August 22, 2018 Appendix III Appendix IV September 26, 2018 October 24, 2018 April 15, 2019 October 24, 2019
datasetNot linked to a paper · refsec
ASD Completion Date Lithium (MW-370) January 7, 2019 April 8, 2019 Lithium (MW-370) July 15, 2019 October 14, 2019 Appendix III Appendix IV September 24-25, 2019
research reportNot linked to a paper · refsec
SSL(s) Determination Date Appendix III Appendix IV Detected 1 March 19-20, 2019
research reportNot linked to a paper · refsec
THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2019. Groundwater samples were collected and analyzed in accordance with the SAP (NRT/OBG, 2017a), and all data were accepted. 8/10
research reportNot linked to a paper · refsec
KEY ACTIVITIES PLANNED FOR 2020 The following key activities are planned for 2020: Continuation of the Assessment Monitoring Program with semi-annual sampling scheduled for the first and third quarters of 2020. Complete evaluation of analytical data from the downgradient wells, using GWPSs to determine whether an SSL of Appendix IV parameters has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that that SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is demonstrated to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2020 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2020 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. 9/10
research reportNot linked to a paper · refsec
REFERENCES Natural Resource Technology, an OBG Company (NRT/OBG), 2017a. Sampling and Analysis Plan, Baldwin Bottom Ash Pond, Baldwin Energy Complex, Baldwin, Illinois, Project No. 2285, Revision 0, October 17, 2017. Natural Resource Technology, an OBG Company (NRT/OBG), 2017b. Statistical Analysis Plan, Baldwin Energy Complex, Havana Power Station, Hennepin Power Station, Wood River Power
research reportNot linked to a paper · refsec
Station, Dynegy Midwest Generation, LLC, October 17, 2017. 10/10
research reportNot linked to a paper · refsec
FINAL Baldwin 601 2019 Annual Report Text.docx
research reportNot linked to a paper · refsec
LLC, January 31, 2019. OBG, PART OF RAMBOLL | APRIL
research reportNot linked to a paper · refsec
FINAL | 5 FINAL_601 ‐ Baldwin BAP 2019 ASD_190408.docx 40 CFR § 257.95(G)(3)(II): ALTERNATE SOURCE DEMONSTRATION
research reportNot linked to a paper · refsec
OBG, part of Ramboll Date: April 8, 2019 I, Jacob J. Walczak, a professional geologist in good standing in the State of Illinois, certify that the information in this report is accurate as of the date of my signature below. The content of this report is not to be used for other than its intended purpose and meaning, or for extrapolations beyond the interpretations contained herein. _____________________________________
research reportNot linked to a paper · refsec
OBG, part of Ramboll Date: April 8, 2019 OBG, PART OF RAMBOLL | APRIL
research reportNot linked to a paper · refsec
FINAL | 6 FINAL_601 ‐ Baldwin BAP 2019 ASD_190408.docx 40 CFR § 257.95(G)(3)(II): ALTERNATE SOURCE DEMONSTRATION
research reportNot linked to a paper · refsec
MW-306 MW-370 BOTTOM ASH POND MW-382 Y:\Mapping\Projects\22\2285_Baldwin\MXD\Figure 1_Baldwin_MW MAP Water Samps_ASD.mxd Author: stolzsd; Date/Time: 4/4/2019, 11:12:05 AM ! BAP** ! TPZ-164
research reportNot linked to a paper · refsec
Station, Dynegy Midwest Generation, LLC, October 17, 2017.
research reportNot linked to a paper · refsec
MW-382 MW-304 PROJECT: 169000XXXX | DATED: 4/16/2020 | DESIGNER: galarnmc Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
research reportNot linked to a paper · refsec
Generation, LLC by Natural Resource Technology, Inc. June 11, 2014.
research reportNot linked to a paper · refsec
Willman, H.B. and others. 1967. Geologic Map of Illinois. Illinois State Geological Survey. Champaign, Illinois. 601 BEC BAP - CSM & Description of Hydrogeology.docx Y:\Mapping\Projects\22\2285_Baldwin\MXD\Figure 1_Cross Section Locations.mxd
research reportNot linked to a paper · refsec
REFERENCES AECOM, December 17, 2015. 30% Design Data Report for the Dynegy Baldwin Energy Complex; West Fly Ash
research reportNot linked to a paper · refsec
Dynegy, March 22, 2013. Proposed Scope of Work – Baldwin Ash Impoundment System Kelron Environmental and NRT, May 26, 2010. Hydrogeologic Assessment and Groundwater Monitoring Plan – Baldwin Ash Pond System Kelron Environmental and NRT, June 7, 2010. Water Well Survey – Baldwin Ash Pond System Kelron Environmental, April 16, 2012. Off‐Site Groundwater Quality Results – Baldwin Energy Complex Kelron Environmental, June 30, 2012. Groundwater Quality Assessment and Initial Hydrogeologic Investigation – Baldwin Ash Pond System
research reportNot linked to a paper · refsec
NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System
research reportNot linked to a paper · refsec
NRT, March 31, 2016. Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan ‐ Baldwin Fly Ash Pond System
research reportNot linked to a paper · refsec
USEPA, 2015, Disposal of Coal Combustion Residuals from Electric Utilities, Final Rule, 40 CFR Parts 257 and 261, Hazardous and Solid Waste Management System, April 2015.
research reportNot linked to a paper · refsec
KGS Model KGS overdamped slug test analysis model (Hyder et al., 1994).
research reportNot linked to a paper · refsec
Shively Geotechnical (2010): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Geotechnology (2013): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Data source was the Groundwater Quality Assessment and Phase II Hydrogeologic Investigation (NRT, June 11, 2014) Table 1 Page 1 of 1 Table 2. Groundwater Horizontal Hydraulic Gradients and Flow Velocities Baldwin Energy Complex December 2015, January 2016, and March 2016 Hydrogeologic Monitoring Plan Area Baldwin Bottom Ash Pond ‐ East Baldwin Bottom Ash Pond ‐ West Area Baldwin Fly Ash Pond System ‐ West Area Baldwin Bottom Ash Pond ‐ East Baldwin Fly Ash Pond System ‐ West Baldwin Bottom Ash Pond ‐ West December 29, 2015 Approximate Flow Average Hydraulic Direction Conductivity (cm/s) 5E‐06 5E‐06 January 19, 2016 Approximate Flow Average Hydraulic Direction Conductivity (cm/s) 5E‐06 March 2, 2016 Approximate Flow Average Hydraulic Direction Conductivity (cm/s) 5E‐06 5E‐06 5E‐06 Note: 1) cm/sec x 2,835 = feet/day 2) Source of hydraulic conductivity values was the Groundwater Quality Assessment and Phase II Hydrogeologic Investigation (NRT, June 11, 2014) Table 2 1 of 1 Horizontal Hydraulic Gradient 0.02 0.02 Effective Porosity 0.30 0.30 Velocity (ft/day) 0.0009 0.001 Horizontal Hydraulic Gradient
datasetNot linked to a paper · refsec
AECOM, 2016. Closure and Post-Closure Care Plan for the Baldwin Fly Ash Pond System at Dynegy Midwest Generation, LLC Baldwin Energy Complex, Baldwin, Illinois, March, 2016.
research reportNot linked to a paper · refsec
D’Appolonia, D.J., and Ryan, C.R., 1979, Soil-Bentonite Slurry Trench Cut-Off Walls, Geotechnical Exhibition and Technical Conference, Chicago, Illinois. Electric Power Research Institute (EPRI), 2006. Groundwater Remediation of Inorganic Constituents at Coal Combustion Product Management Sites, Overview of Technologies, Focusing on Permeable Reactive Barriers. Electric Power Research Institute, Palo Alto, California. Final Report 1012584, October 2006.
research reportNot linked to a paper · refsec
Evanko, C.R. and D.A. Dzombak. 1997. “Remediation of Metals-Contaminated Soils and Groundwater.” Ground-Water Remediation Technologies Analysis Center, Technology Evaluation Report. October 1997.
research reportNot linked to a paper · refsec
Illinois Environmental Protection Agency, 2016. “Dynegy Midwest Generation, Inc. – Baldwin Energy Complex: Baldwin Fly Ash Pond System Closure – NPDES Permit No. IL000043”, letter from William Buscher (IEPA) to Rick Diericx (Dynegy Operating Company) dated August 16, 2016. Interstate Technology and Regulatory Council (ITRC), 2005. Permeable reactive barriers: lessons learned/new directions. Interstate Technology and Regulatory Council, Permeable Reactive Barriers Team, PRB-4, Washington, D.C., Available on the Internet at . Natural Resource Technology, Inc. 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System, Baldwin, Illinois. Prepared for Dynegy Midwest Generation, LLC by Natural Resource Technology, Inc. June 11, 2014. Natural Resource Technology, Inc. 2016. Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan, Baldwin Fly Ash Pond System, Baldwin, Illinois. Prepared for Dynegy Midwest Generation, LLC by Natural Resource Technology, Inc. March 31, 2016. Natural Resource Technology, an OBG Company (NRT/OBG), 2017, Statistical Analysis Plan, Baldwin Energy Complex, Havana Power Station, Hennepin Power Station, Wood River Power
research reportNot linked to a paper · refsec
USEPA (United States Environmental Protection Agency), 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U-17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.
government reportNot linked to a paper · refsec
USEPA (United States Environmental Protection Agency), 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment.
government reportNot linked to a paper · refsec
Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.
research reportNot linked to a paper · refsec
USEPA (United States Environmental Protection Agency), 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. Baldwin FAP CMA Rev 2 20201130.docx 22/23 Corrective Measures Assessment Revision 2 Baldwin Fly Ash Pond System 9283.1-36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015.
government reportNot linked to a paper · refsec
Willman, H.B. and others. 1967. Geologic Map of Illinois. Illinois State Geological Survey.
research reportNot linked to a paper · refsec
ASD Completion Date CMA Completion / Status Appendix III Appendix IV Detected1 Appendix III Lithium (MW-375, MW-391) January 7, 2019 September 5, 2019 (completed CMA) Appendix IV Lithium (MW-375, MW-391) July 29, 2019 ongoing Lithium Appendix III Appendix IV Detected Lithium (MW-375, MW-391) January 22, 2020
research reportNot linked to a paper · refsec
KGS Model = KGS overdamped slug test analysis model (Hyder et al., 1994)
research reportNot linked to a paper · refsec
Shively Geotechnical (2010): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Geotechnology (2013): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Data source was the Groundwater Quality Assessment and Phase II Hydrogeologic Investigation (NRT, June 11, 2014) Table C1. Summary Horiz and Vert Perm.xlsx 1 of 1 6.2E-07 8.6E-07
research reportNot linked to a paper · refsec
BALDWIN, ILLINOIS March 19, 2019 Approximate Flow Direction Average Hydraulic Conductivity (cm/s) Horizontal Hydraulic Gradient Effective Porosity Velocity (ft/day) Baldwin Bottom Ash Pond - West 5E-06 0.04 0.30 0.0017 Baldwin Fly Ash Pond System - West 5E-06 0.02 0.30 0.0008 Area September 24, 2019 Approximate Flow Direction Average Hydraulic Conductivity (cm/s) Horizontal Hydraulic Gradient Effective Porosity Velocity (ft/day) Baldwin Bottom Ash Pond - West 5E-06 0.02 0.30 0.0009 Baldwin Fly Ash Pond System - West 5E-06 0.01 0.30 0.0007 Area Note: cm/s = centimeters per second ft/day = feet per day
research reportNot linked to a paper · refsec