Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential
Other documents for the same rulemaking (all, by stage)
References
FINAL 2024 Part 257 AR NEW 501.Docx 1/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 3, 2023 Assessment Monitoring sampling event A2DR Quarter 4, 2023 Assessment Monitoring sampling event Quarter 1, 2024 Assessment Monitoring sampling event Quarter 2, 2024 Assessment Monitoring sampling event Quarter 3, 2024 Assessment Monitoring sampling event A3DR Quarter 4, 2024 Assessment Monitoring sampling event coal combustion residuals Corrective Measures Assessment
FINAL 2024 Part 257 AR NEW 501.Docx 2/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
FINAL 2024 Part 257 AR NEW 501.Docx 3/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
FINAL 2024 Part 257 AR NEW 501.Docx 4/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501) B. Provide the date when the Assessment Monitoring Program was initiated for the
CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the PAP for calendar year 2024.
FINAL 2024 Part 257 AR NEW 501.Docx 5/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
CMA for the PAP in accordance with 35 I.A.C. § 845.660. The CMA was completed and submitted to the IEPA on April 3, 2024 (Ramboll, 2024). It is anticipated that a corrective action plan will be submitted on or before April 3, 2025 that meets the requirements of both 40 C.F.R. § 257 and 35 I.A.C. § 845. Activities currently ongoing in support of developing the corrective action plan include development of a corrective action alternatives analysis, human health and ecological risk assessment, and supporting technical documents. Semiannual remedy selection progress reports are being completed as required by 40 C.F.R. § 257.97(a).
FINAL 2024 Part 257 AR NEW 501.Docx 6/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
FINAL 2024 Part 257 AR NEW 501.Docx 7/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
SSL(s) CMA Initiated February 27, 2024 6 Lithium at APW02 November 17, 2023 February 27, 2024 May 27, 2024 Lithium at APW02 Notes:
SSL: Statistically Significant Level The following background wells were sampled for each event: APW05, and APW06. The following compliance wells were sampled for each event: APW02, APW03, APW04, APW05S, APW07, APW08, APW09, APW10, APW11, APW12, APW13, APW14, APW15, APW16, APW17, and APW18. All samples were analyzed for Appendix III parameter listed in 40 C.F.R. § 257.94(e) and Appendix IV parameters listed in 40 C.F.R. § 257.95(g). Data collected in accordance with 35 I.A.C. § 845 were included for statistical calculations performed in accordance with 40 C.F.R. § 257.93; however, SSLs are reported semiannually per 40 C.F.R. § 257.95(d)(1). Laboratory reports and associated analytical data tables were included in the 2023 Annual Groundwater Monitoring and Corrective Action Report. Statistical determinations were completed in 2024. Analytical data from 2023 sampling events used in statistical determinations are included in the 2024 Annual Groundwater Monitoring and Corrective Action Report for completeness.
FINAL 2024 Part 257 AR NEW 501.Docx 8/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2024. Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted.
FINAL 2024 Part 257 AR NEW 501.Docx 9/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters). Complete evaluation of analytical data from the compliance wells to determine whether an
SSL of Appendix IV parameters above GWPSs has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that the SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is identified to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2025 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2025 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. Remedy selection will continue considering compliance with both 40 C.F.R. § 257 and 35 I.A.C. § 845; semiannual remedy selection progress reports required by 40 C.F.R. § 257.97(a) will be completed and posted to the publicly accessible website as required by 40 C.F.R. § 257.107(h)(9). Statistical limits (background) will be updated for the PAP pursuant the Multi-Site Statistical Analysis Plan (Ramboll, 2022c) prepared in accordance with the requirements of 40 C.F.R. § 257.93(f).
FINAL 2024 Part 257 AR NEW 501.Docx 10/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)
REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17, 2015. Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022a. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Statistical Analysis
Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023. Multi-Site Sampling and Analysis
Plan, Revision 1. October 10, 2023. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2024. 35 I.A.C. § 845 Corrective Measures Assessment, Primary Ash Pond, Newton Power Plant, Newton, Illinois, IEPA ID: W0798070001-01. April 3, 2024
LIMS Workorder: 24021397 Technician(s): JC, BG Groundwater Sampling Summary Newton- 1Q 2024
DTB (ft) Sampler Initials Purge Date 79.90 2/26/2024 Purging Device Well Diameter (in) Actual Volume Purged Purge Rate (mL/min) Submersible Pump 381.0 Purge Purge Start Time End Time 10:46 11:07 96.60 5445 Horseshoe Lake Road, Collinsville, IL 62234