Coleto Creek Power Plant Alternative Closure Demonstration
Other documents for the same rulemaking (all, by stage)
References
Golder, 2019. Drinking water Survey Report, Coleto Creek Power Station, Goliad County, Texas. May 24, 2019.
Golder, 2020. 2019 Annual Groundwater Monitoring and Corrective Action Report, Coleto Creek Primary Ash Pond – Fannin, Texas. January 31, 2020.
USEPA, 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U-17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.
USEPA, 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment. EPA/600/R-07/139. National Risk Management Research Laboratory, Office of Research and
Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.
USEPA, 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. 9283.1-36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015. Page | 9
CMA Completion / Status June 18-25, 2018 August 7, 2018 Appendix III Appendix IV None September 18, 2018 October 12, 2018 Appendix III Appendix IV Detected1 None June 3-5, 2019 July 12, 2019 Appendix III Appendix IV None October 2-3, 2019 November 5, 2019 Appendix III Appendix IV Detected1 None June 9, 2020 July 15, 2020 Appendix III Appendix IV None
CONSULTANT YYYY-MM-DD 2019-01-14 DESIGNED
Doering, JA. 1935. Post-Fleming surface formations of coastal southeast Texas and southern Louisiana: American Association of Petroleum Geologists Bulletin, v.19, no.5, p. 651-688.
Moore, David W. and Wermund, E.G., Jr. 1993. Quaternary Geologic Map of Austin 4° x 6° Quadrangle, United States. Quaternary Geologic Atlas of the United States. Map I-1420 (NH-14). Scale 1:1,000,000.
Nicot, Jean-Philippe, Bridget R Scanlon, Changbing Yang, and John B Gates. 2010. Geological and Geographical Attributes of the South Texas Uranium Province, Texas Commission on Environmental Quality and Bureau of Economic Geology. April 2010.
Plummer, FB. 1932. Cenozoic Systems in Texas, Part 3, in The Geology of Texas: University of Texas,
Austin, Bulletin 3232, p.729-795. Solis, Raul Fernando. 1981. Upper Tertiary and Quaternary Depositional Systems, Central Coastal Plain,
COLETO CREEK POWER STATION FANNIN, TEXAS JANUARY 24, 2018 (ORIGINAL VERSION: OCTOBER 13, 2016) Prepared for:
Texas, do hereby certify, to the best of my knowledge, information, and belief that the information contained in this assessment report has been prepared in accordance with the accepted practice of engineering. I certify, for the above referenced CCR Unit, that the information contained in the History of Construction, dated January 24, 2018, meets the requirements of 40 CFR § 257.73(c). 1/24/2018
Texas, do hereby certify, to the best of my knowledge, information, and belief that the information contained in this assessment report has been prepared in accordance with the accepted practice of engineering. I certify, for the above referenced CCR Unit, that the information contained in the Potential Hazard Classification Assessment, dated January 24, 2018, meets the requirements of 40 CFR § 257.73(a). 1/24/2018
Texas, do hereby certify, to the best of my knowledge, information, and belief that the information contained in this assessment report has been prepared in accordance with the accepted practice of engineering. I certify, for the above referenced CCR Unit, that the information contained in the Initial Structural Stability Assessment, dated January 24, 2018, meets the requirements of 40 CFR § 257.73(d). 1/24/2018
Texas, do hereby certify, to the best of my knowledge, information, and belief that the information contained in this assessment report has been prepared in accordance with the accepted practice of engineering. I certify, for the above referenced CCR Unit, that the information contained in the Initial Safety Factor Assessment, dated January 24, 2018, meets the requirements of 40 CFR § 257.73(e). 1/24/2018
Daniel B. Bullock, P.E. (TX 82596) Coal Combustion Residuals Surface Impoundment History of Construction and Initial Hazard Potential Assessment, Structural Integrity Assessment, and Safety Factor Assessment (Rev. 1) January 24, 2018
AECOM. (March 2012). Geotechnical Stability and Hydraulic Analysis of the Coleto Creek Energy Facility Primary and Secondary Ash Ponds. Green Bay, Wisconsin: AECOM Technical Services, Inc.
BBA. (2018, January 22). Letter to Mr. Robert Stevens from Mr. Dan Bullock. Coleto-Creek Power - September 2016 Primary Ash Pond and Secondary Pond Dike Inspection.
Bullock, Bennett & Associates, LLC. BBA. (January 2018). Initial Inflow Design Flood Control System Report (Original Submittal Date September 2016). Bullock, Bennett & Associates.
CDM. (March 2011). Assessment of Dam Safety of Coal Combustion Surface Impoundments
GBRA. (2013). Coleto Creek Watershed River Secments, Descriptions and Concerns. (G.-B. R.
Authority, Ed.) Retrieved from Guadalupe-Blanco River Authority Web site: http://www.gbra.org/documents/publications/basinsummary/2013j.pdf S&L. (1981). Waste Disposal Plan. Central Southwest Services, Inc. Central Power & Light Company. Coleto Creek Power Station - Units 1 and 2. Sargent & Lundy Engineers. S&L. (December 1978). Design and Construction Summary for Coal Pile and Wastewater Pond
TCEQ. (January 2007). Hydrologic and Hydraulic Guidelines for Dams in Texas. Dam Safety
URM. (1982). Evaluation and Recommendations Regarding Subsurface Drainage System at Coleto Creek Power Station for Central Power & Light Company. Underground Resource
Management, Inc. URM. (July 29, 1981). Investigation of Seepage from Primary and Secondary Settling Ponds at the Coleto Creek Power Station. Underground Resource Managment, Inc.