Kincaid Power Station Revised Alternative Closure Demonstration
Other documents for the same rulemaking (all, by stage)
References
Ramboll, 2020. 2019 Annual Groundwater Monitoring and Corrective Action Report, Kincaid Ash Pond, Kincaid Power Station. January 31, 2020.
USEPA, 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U‐17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.
USEPA, 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment. EPA/600/R‐07/139. National Risk Management Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.
USEPA, 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. 9283.1‐36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015. Page | 9
ASD Completion Date CMA Completion / Status None January 7, 2019 None July 15, 2019 None January 13, 2020 None
FINAL Kincaid 141 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Kincaid Ash Pond, Kincaid Power Station
EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for Kincaid Ash Pond (AP) located at Kincaid Power Station near Kincaid, Illinois. Groundwater is being monitored at Kincaid AP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). No Statistically Significant Levels (SSLs) of 40 C.F.R. Part 257 Appendix IV parameters were determined in 2019 and Kincaid AP remains in the Assessment Monitoring Program. 3/10
MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the Monitoring Program status in calendar year 2019, and Kincaid
KEY ACTIONS COMPLETED IN 2019 The Assessment Monitoring Program is summarized in Table A. The groundwater monitoring system, including the CCR unit and all background and downgradient monitoring wells is presented in Figure 1. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). In general, one groundwater sample was collected from each background and downgradient well during each monitoring event. All samples were collected and analyzed in accordance with the Sampling and Analysis Plan (SAP) (NRT/OBG, 2017a). All monitoring data obtained under 40 C.F.R. §§ 257.90 through 257.98 (as applicable) in 2019 are presented in Tables 1 and 2. Analytical data were evaluated in accordance with the Statistical Analysis Plan (NRT/OBG, 2017b) to determine any SSLs of Appendix IV parameters over Groundwater Protection Standards (GWPSs). Statistical background values are provided in Table 3 and GWPSs in Table 4. Analytical results for the May and August 2018 sampling events were provided in the 2018 Annual Groundwater Monitoring and Corrective Action Report. 6/10
FINAL Kincaid 141 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Kincaid Ash Pond, Kincaid Power Station Table A – 2018-2019 Assessment Monitoring Program Summary Sampling Dates Analytical Data Receipt Date Parameters Collected May 31 - June 1, 2018 July 26, 2018 Appendix III Appendix IV August 28, 2018 October 18, 2018 April 15, 2019 October 15, 2019 None January 7, 2019 None July 15, 2019 Appendix III Appendix IV August 20-21, 2019
SSL(s) Determination Date Appendix III Appendix IV Detected 1 February 14-15, 2019
THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2019. Groundwater samples were collected and analyzed in accordance with the SAP (NRT/OBG, 2017a), and all data were accepted. 8/10
KEY ACTIVITIES PLANNED FOR 2020 The following key activities are planned for 2020: Continuation of the Assessment Monitoring Program with semi-annual sampling scheduled for the first and third quarters of 2020. Complete evaluation of analytical data from the downgradient wells, using GWPSs to determine whether an SSL of Appendix IV parameters has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that that SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is demonstrated to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2020 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2020 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. 9/10
REFERENCES Natural Resource Technology, an OBG Company (NRT/OBG), 2017a. Sampling and Analysis Plan, Kincaid Ash Pond, Kincaid Power Station, Kincaid, Illinois, Project No. 2285, Revision 0, October 17, 2017. Natural Resource Technology, an OBG Company (NRT/OBG), 2017a, Statistical Analysis Plan, Kincaid Power Station, Kincaid Generation, L.L.C., October 17, 2017. 10/10
FINAL Kincaid 141 2019 Annual Report Text.docx
Sanders, L. L., 1998. A Manual of Field Hydrogeology, Prentice Hall, Inc.