Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
Regulatory impact analysis2025-11-28 · EPA · regulatory_impact_analysis · EPA-HQ-OLEM-2025-2864-0047
Other documents for the same rulemaking (all, by stage)
2025-11-28 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline
2025-11-28 Regulatory impact analysisRegulatory Impact Analysis Alternative Closure Deadline F2 Extension
2025-11-28 Docket documentRedline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Docket document2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA
2025-11-28 Docket documentSouthwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration
2025-11-28 Docket documentExtending the Deadline in 40 C.F.R. § 257.103(f)(2)
2025-11-28 Docket documentCoal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115
2025-11-28 Docket documentKincaid Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601
2025-11-28 Docket documentOctober 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming
2025-11-28 Docket documentBaldwin Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule
2025-11-28 Docket documentAnnual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report
2025-11-28 Docket documentAnnual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company
2025-11-28 Docket documentNewton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket documentColeto Creek Power Plant Alternative Closure Demonstration
2025-11-28 Docket document2025 Summer Reliability Assessment, May 2025
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141
2025-11-28 Docket documentResource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025
2025-11-28 Docket documentOrder No. 202-25-3
2025-11-28 Docket documentExecutive Order 25-50 by the State of Indiana
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond
2025-11-28 Docket documentNIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline
2025-11-28 Docket documentBaldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket document2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming
2025-11-28 Docket documentContinued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond
2025-12-03 Docket documentMemorandum Containing Internet Links to Certain Documents in Docket
2025-12-04 Docket documentNewton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential
2025-12-04 Docket documentCorrection of Federal Register Preamble Statement
2026-01-07 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period
2026-02-02 Docket documentVirtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule
References: 6 extracted, 0 linked to papers
White House Office of Management and Budget (OMB)’s Circular A-4: Regulatory Analysis economic guidance.
government reportNot linked to a paper · Chapter 1 (Introduction) fn: 'This RIA has been developed to meet the requirements of the White House Office of Management and Budget (OMB)’s Circular A-4: Regulatory Analysis economic guidance.'
https://www.epa.gov/coal-combustion-residuals/coal-combustion-residuals-ccr-part-implementation.
web pageNot linked to a paper · Chapter 2 (Affected Universe) 'EPA records the status of each demonstration on its public-facing website at: https://www.epa.gov/coal-combustion-residuals/coal-combustion-residuals-ccr-part-implementation.' · cited link
the most recent LTRA released in December 2024 (2024 LTRA)
research reportNot linked to a paper · Chapter 1 (Need for Regulatory Action) 'The most recent LTRA released in December 2024 (2024 LTRA)...'
In July 2025, the Department of Energy (DOE) published a report titled “Evaluating the Reliability and Security of the United States Electric Grid” to evaluate U.S. electric grid reliability and security (“2025 DOE Report”).
government reportNot linked to a paper · Chapter 1 (Need for Regulatory Action) 'In July 2025, the Department of Energy (DOE) published a report titled “Evaluating the Reliability and Security of the United States Electric Grid” ... (“2025 DOE Report”).'
U.S. Energy Information Administration, Electric Power Annual 2024 (October 2025). Table 4.1: Count of Electric Power Industry Power Plants, by Sector, by Predominant Energy Sources within Plant, 2014 through 2024. https://www.eia.gov/electricity/annual/
datasetNot linked to a paper · Chapter 1 (Provisions) and Chapter 3 (Potential Benefit Reductions) footnote references · cited link
The OMB implementation memo for Executive Order 13211, version dated June 2022, includes guidance on specific actions that qualify as “significant energy actions.”
government reportNot linked to a paper · Chapter 4 (Electricity Price and Energy Market Impacts) 'The OMB implementation memo for Executive Order 13211, version dated June 2022...'