2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141
Other documents for the same rulemaking (all, by stage)
References
FINAL 2024 Part 257AR KIN 141.Docx 1/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 sampling event Quarter 2, 2024 resampling event Quarter 3, 2024 sampling event A7DR Quarter 4, 2024 resampling event Ash Pond Alternative Source Demonstration coal combustion residuals Corrective Measures Assessment
FINAL 2024 Part 257AR KIN 141.Docx 2/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for the Ash Pond (AP) located at the Kincaid Power Plant (KPP) near Kincaid, Illinois. Groundwater is being monitored at the AP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. Assessment monitoring was initiated at the AP on April 9, 2018. Since no statistically significant levels (SSLs) of 40 C.F.R. § 257 Appendix IV parameters over groundwater protection standards (GWPSs) were determined in 2024, a Corrective Measures Assessment (CMA) is not required. Statistically significant increases (SSIs) of Appendix III parameters above background values were determined as discussed in Section 3; therefore, the
FINAL 2024 Part 257AR KIN 141.Docx 3/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
FINAL 2024 Part 257AR KIN 141.Docx 4/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141) B. Provide the date when the assessment monitoring program was initiated for the
CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the AP for calendar year 2024.
FINAL 2024 Part 257AR KIN 141.Docx 5/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the monitoring program status in calendar year 2024 and the AP remains in the Assessment Monitoring Program in accordance with 40 C.F.R. § 257.95.
FINAL 2024 Part 257AR KIN 141.Docx 6/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
Appendix C. During the March, May, August, and November 2024 sampling events monitoring well MW-8S went dry during purging; therefore, groundwater samples were not collected. In addition, during the November 2024 sampling event monitoring well
FINAL 2024 Part 257AR KIN 141.Docx 7/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
FINAL 2024 Part 257AR KIN 141.Docx 8/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2024. Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted.
FINAL 2024 Part 257AR KIN 141.Docx 9/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling for reporting purposes scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters). Complete evaluation of analytical data from the compliance wells to determine whether an
SSL of Appendix IV parameters above GWPSs has occurred. If an SSL is identified, potential alternative sources (i.e., a source other than the CCR unit caused the SSL or that the SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternative source is identified to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2025 Annual Groundwater Monitoring and Corrective Action Report. If an alternative source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2025 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108.
FINAL 2024 Part 257AR KIN 141.Docx 10/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17, 2015. Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022a. 40 C.F.R. § 257 Groundwater Monitoring Plan, Ash Pond, Kincaid Power Plant, Kincaid, Illinois. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Statistical Analysis
Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022d. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023. Multi-Site Sampling and Analysis