Policy Replication

2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141

Docket document2025-11-28 · EPA · report · EPA-HQ-OLEM-2025-2864-0022
RIN 2050-AH42 · Docket EPA-HQ-OLEM-2025-2864

Other documents for the same rulemaking (all, by stage)

2025-11-28 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline
2025-11-28 Regulatory impact analysisRedline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Regulatory impact analysisRegulatory Impact Analysis Alternative Closure Deadline F2 Extension
2025-11-28 Docket documentRedline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review
2025-11-28 Docket document2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA
2025-11-28 Docket documentSouthwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration
2025-11-28 Docket documentExtending the Deadline in 40 C.F.R. § 257.103(f)(2)
2025-11-28 Docket documentCoal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115
2025-11-28 Docket documentKincaid Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601
2025-11-28 Docket documentOctober 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming
2025-11-28 Docket documentBaldwin Power Station Revised Alternative Closure Demonstration
2025-11-28 Docket document2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule
2025-11-28 Docket documentAnnual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond
2025-11-28 Docket document40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report
2025-11-28 Docket documentAnnual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company
2025-11-28 Docket documentNewton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket documentColeto Creek Power Plant Alternative Closure Demonstration
2025-11-28 Docket document2025 Summer Reliability Assessment, May 2025
2025-11-28 Docket document2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA
2025-11-28 Docket documentResource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025
2025-11-28 Docket documentOrder No. 202-25-3
2025-11-28 Docket documentExecutive Order 25-50 by the State of Indiana
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond
2025-11-28 Docket documentNorthern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond
2025-11-28 Docket documentNIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline
2025-11-28 Docket documentBaldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan
2025-11-28 Docket document2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming
2025-11-28 Docket documentContinued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond
2025-11-28 Docket documentAnnual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond
2025-12-03 Docket documentMemorandum Containing Internet Links to Certain Documents in Docket
2025-12-04 Docket documentNewton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential
2025-12-04 Docket documentCorrection of Federal Register Preamble Statement
2026-01-07 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period
2026-02-02 Docket documentVirtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule

References

Page 1Download these results: CSV · JSON
FINAL 2024 Part 257AR KIN 141.Docx 1/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 sampling event Quarter 2, 2024 resampling event Quarter 3, 2024 sampling event A7DR Quarter 4, 2024 resampling event Ash Pond Alternative Source Demonstration coal combustion residuals Corrective Measures Assessment
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 2/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for the Ash Pond (AP) located at the Kincaid Power Plant (KPP) near Kincaid, Illinois. Groundwater is being monitored at the AP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. Assessment monitoring was initiated at the AP on April 9, 2018. Since no statistically significant levels (SSLs) of 40 C.F.R. § 257 Appendix IV parameters over groundwater protection standards (GWPSs) were determined in 2024, a Corrective Measures Assessment (CMA) is not required. Statistically significant increases (SSIs) of Appendix III parameters above background values were determined as discussed in Section 3; therefore, the
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 3/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 4/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141) B. Provide the date when the assessment monitoring program was initiated for the
research reportNot linked to a paper · refsec
CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the AP for calendar year 2024.
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 5/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the monitoring program status in calendar year 2024 and the AP remains in the Assessment Monitoring Program in accordance with 40 C.F.R. § 257.95.
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 6/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
Appendix C. During the March, May, August, and November 2024 sampling events monitoring well MW-8S went dry during purging; therefore, groundwater samples were not collected. In addition, during the November 2024 sampling event monitoring well
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 7/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 8/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2024. Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted.
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 9/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling for reporting purposes scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters). Complete evaluation of analytical data from the compliance wells to determine whether an
research reportNot linked to a paper · refsec
SSL of Appendix IV parameters above GWPSs has occurred. If an SSL is identified, potential alternative sources (i.e., a source other than the CCR unit caused the SSL or that the SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternative source is identified to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2025 Annual Groundwater Monitoring and Corrective Action Report. If an alternative source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2025 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108.
research reportNot linked to a paper · refsec
FINAL 2024 Part 257AR KIN 141.Docx 10/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)
research reportNot linked to a paper · refsec
REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17, 2015. Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022a. 40 C.F.R. § 257 Groundwater Monitoring Plan, Ash Pond, Kincaid Power Plant, Kincaid, Illinois. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Statistical Analysis
datasetNot linked to a paper · refsec · cited link
Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022d. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023. Multi-Site Sampling and Analysis
research reportNot linked to a paper · refsec