Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond
Other documents for the same rulemaking (all, by stage)
References
Geosyntec. 2018. Statistical Analysis Summary – Primary Bottom Ash Pond, J. Robert Welsh
Geosyntec. 2021. Statistical Analysis Plan – J. Robert Welsh Plant. Geosyntec Consultants, Inc. September.
Geosyntec. 2024. Statistical Analysis Summary – Primary Bottom Ash Pond, J. Robert Welsh Plant. Geosyntec Consultants, Inc. January.
TCEQ. 2020. Draft Technical Guidance No. 32. Coal Combustion Residuals Groundwater Monitoring and Corrective Action. Texas Commission on Environmental Quality. May Statistical Analysis Summary, Welsh PBAP July 2024
Geosyntec. 2021. Statistical Analysis Plan – J. Robert Welsh Plant. Geosyntec Consultants, Inc. December.
TCEQ. 2020. Draft Technical Guidance No. 32. Coal Combustion Residuals Groundwater Monitoring and Corrective Action. Texas Commission on Environmental Quality. May. Statistical Analysis Summary, Welsh PBAP December 2024