{"document":{"doc_id":139967,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141","date":"2025-11-28","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2025-2864-0022","source_native_id":"EPA-HQ-OLEM-2025-2864-0022","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2025-2864"],"rins":["RIN 2050-AH42"],"related":[{"doc_id":77728,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline","date":"2025-11-28"},{"doc_id":84507,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":84512,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis Alternative Closure Deadline F2 Extension","date":"2025-11-28"},{"doc_id":127424,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":139935,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)","date":"2025-11-28"},{"doc_id":139936,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA","date":"2025-11-28"},{"doc_id":139937,"source":"docket_item","org":"EPA","doc_type":"report","title":"Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139939,"source":"docket_item","org":"EPA","doc_type":"report","title":"Extending the Deadline in 40 C.F.R. § 257.103(f)(2)","date":"2025-11-28"},{"doc_id":139940,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas","date":"2025-11-28"},{"doc_id":139941,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115","date":"2025-11-28"},{"doc_id":139942,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kincaid Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139944,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601","date":"2025-11-28"},{"doc_id":139947,"source":"docket_item","org":"EPA","doc_type":"report","title":"October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139948,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":139949,"source":"docket_item","org":"EPA","doc_type":"report","title":"Baldwin Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139952,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139955,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule","date":"2025-11-28"},{"doc_id":139956,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond","date":"2025-11-28"},{"doc_id":139959,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report","date":"2025-11-28"},{"doc_id":139960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company","date":"2025-11-28"},{"doc_id":139961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":139962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coleto Creek Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139965,"source":"docket_item","org":"EPA","doc_type":"report","title":"2025 Summer Reliability Assessment, May 2025","date":"2025-11-28"},{"doc_id":139966,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA","date":"2025-11-28"},{"doc_id":147958,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025","date":"2025-11-28"},{"doc_id":153854,"source":"docket_item","org":"EPA","doc_type":"other","title":"Order No. 202-25-3","date":"2025-11-28"},{"doc_id":153855,"source":"docket_item","org":"EPA","doc_type":"other","title":"Executive Order 25-50 by the State of Indiana","date":"2025-11-28"},{"doc_id":157168,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24","date":"2025-11-28"},{"doc_id":157169,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond","date":"2025-11-28"},{"doc_id":157170,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant","date":"2025-11-28"},{"doc_id":157171,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157172,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25","date":"2025-11-28"},{"doc_id":157173,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond","date":"2025-11-28"},{"doc_id":157174,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline","date":"2025-11-28"},{"doc_id":157175,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Baldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":157176,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":157177,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Continued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond","date":"2025-11-28"},{"doc_id":157178,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157165,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum Containing Internet Links to Certain Documents in Docket","date":"2025-12-03"},{"doc_id":139931,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential","date":"2025-12-04"},{"doc_id":157164,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Correction of Federal Register Preamble Statement","date":"2025-12-04"},{"doc_id":77725,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period","date":"2026-01-07"},{"doc_id":153724,"source":"docket_item","org":"EPA","doc_type":"other","title":"Virtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule","date":"2026-02-02"}],"references":[{"citation_id":914161,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 1/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 1/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914162,"raw_reference":"ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 sampling event Quarter 2, 2024 resampling event Quarter 3, 2024 sampling event A7DR Quarter 4, 2024 resampling event Ash Pond Alternative Source Demonstration coal combustion residuals Corrective Measures Assessment","cited_authors":null,"cited_year":null,"cited_title":"ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 sampling event Quarter 2, 2024 resampling event Quarter 3, 2024 sampling event A7DR Quarter 4, 2024 resampling event Ash Pond Alternative Source Demonstration coal combustion residuals Corrective Measures Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914163,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 2/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 2/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914164,"raw_reference":"EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for the Ash Pond (AP) located at the Kincaid Power Plant (KPP) near Kincaid, Illinois. Groundwater is being monitored at the AP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. Assessment monitoring was initiated at the AP on April 9, 2018. Since no statistically significant levels (SSLs) of 40 C.F.R. § 257 Appendix IV parameters over groundwater protection standards (GWPSs) were determined in 2024, a Corrective Measures Assessment (CMA) is not required. Statistically significant increases (SSIs) of Appendix III parameters above background values were determined as discussed in Section 3; therefore, the","cited_authors":"EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for the Ash Pond (AP) located at the Kincaid Power Plant (KPP) near Kincaid, Illinois. Groundwater is being monitored at the AP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. Assessment monitoring was initiated at the AP on April 9","cited_year":"2018","cited_title":"Since no statistically significant levels (SSLs) of 40 C.F.R. § 257 Appendix IV parameters over groundwater protection standards (GWPSs) were determined in 2024, a Corrective Measures Assessment (CMA) is not required","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914165,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 3/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 3/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914166,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 4/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141) B. Provide the date when the assessment monitoring program was initiated for the","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 4/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141) B. Provide the date when the assessment monitoring program was initiated for the","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914167,"raw_reference":"CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the AP for calendar year 2024.","cited_authors":"CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the AP for calendar year","cited_year":"2024","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914168,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 5/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 5/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914169,"raw_reference":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the monitoring program status in calendar year 2024 and the AP remains in the Assessment Monitoring Program in accordance with 40 C.F.R. § 257.95.","cited_authors":null,"cited_year":null,"cited_title":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the monitoring program status in calendar year 2024 and the AP remains in the Assessment Monitoring Program in accordance with 40 C.F.R. § 257.95","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914170,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 6/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 6/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914171,"raw_reference":"Appendix C. During the March, May, August, and November 2024 sampling events monitoring well MW-8S went dry during purging; therefore, groundwater samples were not collected. In addition, during the November 2024 sampling event monitoring well","cited_authors":null,"cited_year":null,"cited_title":"Appendix C. During the March, May, August, and November 2024 sampling events monitoring well MW-8S went dry during purging; therefore, groundwater samples were not collected","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914172,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 7/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 7/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914173,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 8/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 8/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914174,"raw_reference":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2024. Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted.","cited_authors":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during","cited_year":"2024","cited_title":"Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914175,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 9/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 9/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914176,"raw_reference":"KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling for reporting purposes scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters). Complete evaluation of analytical data from the compliance wells to determine whether an","cited_authors":null,"cited_year":null,"cited_title":"KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling for reporting purposes scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914177,"raw_reference":"SSL of Appendix IV parameters above GWPSs has occurred. If an SSL is identified, potential alternative sources (i.e., a source other than the CCR unit caused the SSL or that the SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternative source is identified to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2025 Annual Groundwater Monitoring and Corrective Action Report. If an alternative source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2025 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108.","cited_authors":null,"cited_year":null,"cited_title":"SSL of Appendix IV parameters above GWPSs has occurred","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914178,"raw_reference":"FINAL 2024 Part 257AR KIN 141.Docx 10/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257AR KIN 141.Docx 10/11 2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Kincaid Power Plant Ash Pond (CCR Unit 141)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914179,"raw_reference":"REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17, 2015. Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022a. 40 C.F.R. § 257 Groundwater Monitoring Plan, Ash Pond, Kincaid Power Plant, Kincaid, Illinois. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Statistical Analysis","cited_authors":"REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17","cited_year":"2015","cited_title":"Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914180,"raw_reference":"Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022d. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023. Multi-Site Sampling and Analysis","cited_authors":"Plan, 40 C.F.R. § 257. December 28","cited_year":"2022","cited_title":"Ramboll Americas Engineering Solutions, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}