{"document":{"doc_id":139949,"source":"docket_item","org":"EPA","doc_type":"report","title":"Baldwin Power Station Revised Alternative Closure Demonstration","date":"2025-11-28","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2025-2864-0034","source_native_id":"EPA-HQ-OLEM-2025-2864-0034","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2025-2864"],"rins":["RIN 2050-AH42"],"related":[{"doc_id":77728,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline","date":"2025-11-28"},{"doc_id":84507,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":84512,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis Alternative Closure Deadline F2 Extension","date":"2025-11-28"},{"doc_id":127424,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":139935,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)","date":"2025-11-28"},{"doc_id":139936,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA","date":"2025-11-28"},{"doc_id":139937,"source":"docket_item","org":"EPA","doc_type":"report","title":"Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139939,"source":"docket_item","org":"EPA","doc_type":"report","title":"Extending the Deadline in 40 C.F.R. § 257.103(f)(2)","date":"2025-11-28"},{"doc_id":139940,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas","date":"2025-11-28"},{"doc_id":139941,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115","date":"2025-11-28"},{"doc_id":139942,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kincaid Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139944,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601","date":"2025-11-28"},{"doc_id":139947,"source":"docket_item","org":"EPA","doc_type":"report","title":"October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139948,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":139952,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139955,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule","date":"2025-11-28"},{"doc_id":139956,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond","date":"2025-11-28"},{"doc_id":139959,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report","date":"2025-11-28"},{"doc_id":139960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company","date":"2025-11-28"},{"doc_id":139961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":139962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coleto Creek Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139965,"source":"docket_item","org":"EPA","doc_type":"report","title":"2025 Summer Reliability Assessment, May 2025","date":"2025-11-28"},{"doc_id":139966,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA","date":"2025-11-28"},{"doc_id":139967,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141","date":"2025-11-28"},{"doc_id":147958,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025","date":"2025-11-28"},{"doc_id":153854,"source":"docket_item","org":"EPA","doc_type":"other","title":"Order No. 202-25-3","date":"2025-11-28"},{"doc_id":153855,"source":"docket_item","org":"EPA","doc_type":"other","title":"Executive Order 25-50 by the State of Indiana","date":"2025-11-28"},{"doc_id":157168,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24","date":"2025-11-28"},{"doc_id":157169,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond","date":"2025-11-28"},{"doc_id":157170,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant","date":"2025-11-28"},{"doc_id":157171,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157172,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25","date":"2025-11-28"},{"doc_id":157173,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond","date":"2025-11-28"},{"doc_id":157174,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline","date":"2025-11-28"},{"doc_id":157175,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Baldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":157176,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":157177,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Continued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond","date":"2025-11-28"},{"doc_id":157178,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157165,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum Containing Internet Links to Certain Documents in Docket","date":"2025-12-03"},{"doc_id":139931,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential","date":"2025-12-04"},{"doc_id":157164,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Correction of Federal Register Preamble Statement","date":"2025-12-04"},{"doc_id":77725,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period","date":"2026-01-07"},{"doc_id":153724,"source":"docket_item","org":"EPA","doc_type":"other","title":"Virtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule","date":"2026-02-02"}],"references":[{"citation_id":914078,"raw_reference":"Resources, Champaign, IL; ISWS Contract Report 588. October 1995.","cited_authors":"Resources, Champaign, IL; ISWS Contract Report 588. October","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914079,"raw_reference":"Ramboll, 2020. 2019 Annual Groundwater Monitoring and Corrective Action Report, Baldwin Bottom Ash","cited_authors":"Ramboll","cited_year":"2020","cited_title":"2019 Annual Groundwater Monitoring and Corrective Action Report, Baldwin Bottom Ash","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914080,"raw_reference":"Pond, Baldwin Energy Complex. Ramboll, Milwaukee, Wisconsin. January 31, 2020.","cited_authors":"Pond, Baldwin Energy Complex. Ramboll, Milwaukee, Wisconsin. January 31","cited_year":"2020","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914081,"raw_reference":"USEPA, 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U‐17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.","cited_authors":"USEPA","cited_year":"1999","cited_title":"Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914082,"raw_reference":"USEPA, 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment. EPA/600/R‐07/139. National Risk Management Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.","cited_authors":"USEPA","cited_year":"2007","cited_title":"Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914083,"raw_reference":"USEPA, 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. 9283.1‐36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015. Page | 10","cited_authors":"USEPA","cited_year":"2015","cited_title":"Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914084,"raw_reference":"ASD Completion Date CMA Completion / Status Lithium (MW-370) January 7, 2019 April 8, 2019 Lithium (MW-370) July 15, 2019 October 14, 2019 Lithium (MW-370) January 22, 2020 April 21, 2020 Lithium (MW-370) July 27, 2020 [O: RAB 9/11/20; C: EJT 9/14/20] Notes:","cited_authors":null,"cited_year":null,"cited_title":"ASD Completion Date CMA Completion / Status Lithium (MW-370) January 7, 2019 April 8, 2019 Lithium (MW-370) July 15, 2019 October 14, 2019 Lithium (MW-370) January 22, 2020 April 21, 2020 Lithium (MW-370) July 27, 2020 [O: RAB 9/11/20; C: EJT 9/14/20] Notes:","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914085,"raw_reference":"FINAL Baldwin 601 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Baldwin Bottom Ash Pond, Baldwin Energy Complex","cited_authors":null,"cited_year":null,"cited_title":"FINAL Baldwin 601 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Baldwin Bottom Ash Pond, Baldwin Energy Complex","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914086,"raw_reference":"EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for Baldwin Bottom Ash Pond (BAP) located at Baldwin Energy Complex near Baldwin, Illinois. Groundwater is being monitored at Baldwin BAP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). The following Statistically Significant Levels (SSLs) of 40 C.F.R. Part 257 Appendix IV parameters were determined during one or more sampling events in 2019: Lithium at well MW-370 Alternate Source Demonstrations (ASDs) were completed for the SSLs referenced above and Baldwin BAP remains in the Assessment Monitoring Program. 3/10","cited_authors":null,"cited_year":null,"cited_title":"EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for Baldwin Bottom Ash Pond (BAP) located at Baldwin Energy Complex near Baldwin, Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914087,"raw_reference":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the Monitoring Program status in calendar year 2019, and Baldwin","cited_authors":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the Monitoring Program status in calendar year","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914088,"raw_reference":"KEY ACTIONS COMPLETED IN 2019 The Assessment Monitoring Program is summarized in Table A. The groundwater monitoring system, including the CCR unit and all background and downgradient monitoring wells, is presented in Figure 1. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). In general, one groundwater sample was collected from each background and downgradient well during each monitoring event. All samples were collected and analyzed in accordance with the Sampling and Analysis Plan (SAP) (NRT/OBG, 2017a). All monitoring data obtained under 40 C.F.R. §§ 257.90 through 257.98 (as applicable) in 2019 are presented in Tables 1 and 2. Analytical data were evaluated in accordance with the Statistical Analysis Plan (NRT/OBG, 2017b) to determine any SSLs of Appendix IV parameters over Groundwater Protection Standards (GWPSs). Statistical background values are provided in Table 3 and GWPSs in Table 4. Analytical results for the June and September 2018 sampling events were provided in the 2018 Annual Groundwater Monitoring and Corrective Action Report. Potential alternate sources were evaluated as outlined in the 40 C.F.R. § 257.95(g)(3)(ii). ASDs were completed and certified by a qualified professional engineer. The dates the ASDs were completed are provided in Table A. The ASDs completed in 2019 are included in Appendix A. 6/10","cited_authors":"KEY ACTIONS COMPLETED IN 2019 The Assessment Monitoring Program is summarized in Table A. The groundwater monitoring system, including the CCR unit and all background and downgradient monitoring wells, is presented in Figure 1. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). In general, one groundwater sample was collected from each background and downgradient well during each monitoring event. All samples were collected and analyzed in accordance with the Sampling and Analysis Plan (SAP) (NRT/OBG","cited_year":"2017a","cited_title":"All monitoring data obtained under 40 C.F.R. §§ 257.90 through 257.98 (as applicable) in 2019 are presented in Tables 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914089,"raw_reference":"FINAL Baldwin 601 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Baldwin Bottom Ash Pond, Baldwin Energy Complex Table A – 2018-2019 Assessment Monitoring Program Summary Sampling Dates Analytical Data Receipt Date Parameters Collected June 26-27, 2018 August 22, 2018 Appendix III Appendix IV September 26, 2018 October 24, 2018 April 15, 2019 October 24, 2019","cited_authors":null,"cited_year":null,"cited_title":"FINAL Baldwin 601 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Baldwin Bottom Ash Pond, Baldwin Energy Complex Table A – 2018-2019 Assessment Monitoring Program Summary Sampling Dates Analytical Data Receipt Date Parameters Collected June 26-27, 2018 August 22, 2018 Appendix III Appendix IV September 26, 2018 October 24, 2018 April 15, 2019 October 24, 2019","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914090,"raw_reference":"ASD Completion Date Lithium (MW-370) January 7, 2019 April 8, 2019 Lithium (MW-370) July 15, 2019 October 14, 2019 Appendix III Appendix IV September 24-25, 2019","cited_authors":null,"cited_year":null,"cited_title":"ASD Completion Date Lithium (MW-370) January 7, 2019 April 8, 2019 Lithium (MW-370) July 15, 2019 October 14, 2019 Appendix III Appendix IV September 24-25, 2019","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914091,"raw_reference":"SSL(s) Determination Date Appendix III Appendix IV Detected 1 March 19-20, 2019","cited_authors":null,"cited_year":null,"cited_title":"SSL(s) Determination Date Appendix III Appendix IV Detected 1 March 19-20, 2019","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914092,"raw_reference":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2019. Groundwater samples were collected and analyzed in accordance with the SAP (NRT/OBG, 2017a), and all data were accepted. 8/10","cited_authors":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during","cited_year":"2019","cited_title":"Groundwater samples were collected and analyzed in accordance with the SAP (NRT/OBG, 2017a), and all data were accepted","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914093,"raw_reference":"KEY ACTIVITIES PLANNED FOR 2020 The following key activities are planned for 2020: Continuation of the Assessment Monitoring Program with semi-annual sampling scheduled for the first and third quarters of 2020. Complete evaluation of analytical data from the downgradient wells, using GWPSs to determine whether an SSL of Appendix IV parameters has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that that SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is demonstrated to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2020 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2020 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. 9/10","cited_authors":"KEY ACTIVITIES PLANNED FOR 2020 The following key activities are planned for 2020: Continuation of the Assessment Monitoring Program with semi-annual sampling scheduled for the first and third quarters of","cited_year":"2020","cited_title":"Complete evaluation of analytical data from the downgradient wells, using GWPSs to determine whether an SSL of Appendix IV parameters has occurred","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914094,"raw_reference":"REFERENCES Natural Resource Technology, an OBG Company (NRT/OBG), 2017a. Sampling and Analysis Plan, Baldwin Bottom Ash Pond, Baldwin Energy Complex, Baldwin, Illinois, Project No. 2285, Revision 0, October 17, 2017. Natural Resource Technology, an OBG Company (NRT/OBG), 2017b. Statistical Analysis Plan, Baldwin Energy Complex, Havana Power Station, Hennepin Power Station, Wood River Power","cited_authors":"REFERENCES Natural Resource Technology, an OBG Company (NRT/OBG)","cited_year":"2017a","cited_title":"Sampling and Analysis Plan, Baldwin Bottom Ash Pond, Baldwin Energy Complex, Baldwin, Illinois, Project No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914095,"raw_reference":"Station, Dynegy Midwest Generation, LLC, October 17, 2017. 10/10","cited_authors":"Station, Dynegy Midwest Generation, LLC, October 17","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914096,"raw_reference":"FINAL Baldwin 601 2019 Annual Report Text.docx","cited_authors":null,"cited_year":null,"cited_title":"FINAL Baldwin 601 2019 Annual Report Text.docx","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914097,"raw_reference":"LLC, January 31, 2019. OBG, PART OF RAMBOLL | APRIL","cited_authors":"LLC, January 31","cited_year":"2019","cited_title":"OBG, PART OF RAMBOLL | APRIL","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914098,"raw_reference":"FINAL | 5 FINAL_601 ‐ Baldwin BAP 2019 ASD_190408.docx 40 CFR § 257.95(G)(3)(II): ALTERNATE SOURCE DEMONSTRATION","cited_authors":null,"cited_year":null,"cited_title":"FINAL | 5 FINAL_601 ‐ Baldwin BAP 2019 ASD_190408.docx 40 CFR § 257.95(G)(3)(II): ALTERNATE SOURCE DEMONSTRATION","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914099,"raw_reference":"OBG, part of Ramboll Date: April 8, 2019 I, Jacob J. Walczak, a professional geologist in good standing in the State of Illinois, certify that the information in this report is accurate as of the date of my signature below. The content of this report is not to be used for other than its intended purpose and meaning, or for extrapolations beyond the interpretations contained herein. _____________________________________","cited_authors":null,"cited_year":null,"cited_title":"OBG, part of Ramboll Date: April 8, 2019 I, Jacob J. Walczak, a professional geologist in good standing in the State of Illinois, certify that the information in this report is accurate as of the date of my signature below","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914100,"raw_reference":"OBG, part of Ramboll Date: April 8, 2019 OBG, PART OF RAMBOLL | APRIL","cited_authors":null,"cited_year":null,"cited_title":"OBG, part of Ramboll Date: April 8, 2019 OBG, PART OF RAMBOLL | APRIL","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914101,"raw_reference":"FINAL | 6 FINAL_601 ‐ Baldwin BAP 2019 ASD_190408.docx 40 CFR § 257.95(G)(3)(II): ALTERNATE SOURCE DEMONSTRATION","cited_authors":null,"cited_year":null,"cited_title":"FINAL | 6 FINAL_601 ‐ Baldwin BAP 2019 ASD_190408.docx 40 CFR § 257.95(G)(3)(II): ALTERNATE SOURCE DEMONSTRATION","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914102,"raw_reference":"MW-306 MW-370 BOTTOM ASH POND MW-382 Y:\\Mapping\\Projects\\22\\2285_Baldwin\\MXD\\Figure 1_Baldwin_MW MAP Water Samps_ASD.mxd Author: stolzsd; Date/Time: 4/4/2019, 11:12:05 AM ! BAP** ! TPZ-164","cited_authors":null,"cited_year":null,"cited_title":"MW-306 MW-370 BOTTOM ASH POND MW-382 Y:\\Mapping\\Projects\\22\\2285_Baldwin\\MXD\\Figure 1_Baldwin_MW MAP Water Samps_ASD.mxd Author: stolzsd; Date/Time: 4/4/2019, 11:12:05 AM ! BAP** ! TPZ-164","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914103,"raw_reference":"Station, Dynegy Midwest Generation, LLC, October 17, 2017.","cited_authors":"Station, Dynegy Midwest Generation, LLC, October 17","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914104,"raw_reference":"MW-382 MW-304 PROJECT: 169000XXXX | DATED: 4/16/2020 | DESIGNER: galarnmc Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community","cited_authors":null,"cited_year":null,"cited_title":"MW-382 MW-304 PROJECT: 169000XXXX | DATED: 4/16/2020 | DESIGNER: galarnmc Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914105,"raw_reference":"Generation, LLC by Natural Resource Technology, Inc. June 11, 2014.","cited_authors":"Generation, LLC by Natural Resource Technology, Inc. June 11","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914106,"raw_reference":"Willman, H.B. and others. 1967. Geologic Map of Illinois. Illinois State Geological Survey. Champaign, Illinois. 601 BEC BAP - CSM & Description of Hydrogeology.docx Y:\\Mapping\\Projects\\22\\2285_Baldwin\\MXD\\Figure 1_Cross Section Locations.mxd","cited_authors":"Willman, H.B. and others","cited_year":"1967","cited_title":"Geologic Map of Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914107,"raw_reference":"REFERENCES AECOM, December 17, 2015. 30% Design Data Report for the Dynegy Baldwin Energy Complex; West Fly Ash","cited_authors":"REFERENCES AECOM, December 17","cited_year":"2015","cited_title":"30% Design Data Report for the Dynegy Baldwin Energy Complex; West Fly Ash","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914108,"raw_reference":"Dynegy, March 22, 2013. Proposed Scope of Work – Baldwin Ash Impoundment System Kelron Environmental and NRT, May 26, 2010. Hydrogeologic Assessment and Groundwater Monitoring Plan – Baldwin Ash Pond System Kelron Environmental and NRT, June 7, 2010. Water Well Survey – Baldwin Ash Pond System Kelron Environmental, April 16, 2012. Off‐Site Groundwater Quality Results – Baldwin Energy Complex Kelron Environmental, June 30, 2012. Groundwater Quality Assessment and Initial Hydrogeologic Investigation – Baldwin Ash Pond System","cited_authors":"Dynegy, March 22","cited_year":"2013","cited_title":"Proposed Scope of Work – Baldwin Ash Impoundment System Kelron Environmental and NRT, May 26, 2010","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914109,"raw_reference":"NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System","cited_authors":"NRT, June 11","cited_year":"2014","cited_title":"Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914110,"raw_reference":"NRT, March 31, 2016. Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan ‐ Baldwin Fly Ash Pond System","cited_authors":"NRT, March 31","cited_year":"2016","cited_title":"Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan ‐ Baldwin Fly Ash Pond System","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914111,"raw_reference":"USEPA, 2015, Disposal of Coal Combustion Residuals from Electric Utilities, Final Rule, 40 CFR Parts 257 and 261, Hazardous and Solid Waste Management System, April 2015.","cited_authors":"USEPA","cited_year":"2015","cited_title":"Disposal of Coal Combustion Residuals from Electric Utilities, Final Rule, 40 CFR Parts 257 and 261, Hazardous and Solid Waste Management System, April 2015","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914112,"raw_reference":"KGS Model KGS overdamped slug test analysis model (Hyder et al., 1994).","cited_authors":"KGS Model KGS overdamped slug test analysis model (Hyder et al","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914113,"raw_reference":"Shively Geotechnical (2010): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Geotechnology (2013): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Data source was the Groundwater Quality Assessment and Phase II Hydrogeologic Investigation (NRT, June 11, 2014) Table 1 Page 1 of 1 Table 2. Groundwater Horizontal Hydraulic Gradients and Flow Velocities Baldwin Energy Complex December 2015, January 2016, and March 2016 Hydrogeologic Monitoring Plan Area Baldwin Bottom Ash Pond ‐ East Baldwin Bottom Ash Pond ‐ West Area Baldwin Fly Ash Pond System ‐ West Area Baldwin Bottom Ash Pond ‐ East Baldwin Fly Ash Pond System ‐ West Baldwin Bottom Ash Pond ‐ West December 29, 2015 Approximate Flow Average Hydraulic Direction Conductivity (cm/s) 5E‐06 5E‐06 January 19, 2016 Approximate Flow Average Hydraulic Direction Conductivity (cm/s) 5E‐06 March 2, 2016 Approximate Flow Average Hydraulic Direction Conductivity (cm/s) 5E‐06 5E‐06 5E‐06 Note: 1) cm/sec x 2,835 = feet/day 2) Source of hydraulic conductivity values was the Groundwater Quality Assessment and Phase II Hydrogeologic Investigation (NRT, June 11, 2014) Table 2 1 of 1 Horizontal Hydraulic Gradient 0.02 0.02 Effective Porosity 0.30 0.30 Velocity (ft/day) 0.0009 0.001 Horizontal Hydraulic Gradient","cited_authors":"Shively Geotechnical","cited_year":"2010","cited_title":": see Appendix D of NRT, June 11, 2014","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914114,"raw_reference":"AECOM, 2016. Closure and Post-Closure Care Plan for the Baldwin Fly Ash Pond System at Dynegy Midwest Generation, LLC Baldwin Energy Complex, Baldwin, Illinois, March, 2016.","cited_authors":"AECOM","cited_year":"2016","cited_title":"Closure and Post-Closure Care Plan for the Baldwin Fly Ash Pond System at Dynegy Midwest Generation, LLC Baldwin Energy Complex, Baldwin, Illinois, March, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914115,"raw_reference":"D’Appolonia, D.J., and Ryan, C.R., 1979, Soil-Bentonite Slurry Trench Cut-Off Walls, Geotechnical Exhibition and Technical Conference, Chicago, Illinois. Electric Power Research Institute (EPRI), 2006. Groundwater Remediation of Inorganic Constituents at Coal Combustion Product Management Sites, Overview of Technologies, Focusing on Permeable Reactive Barriers. Electric Power Research Institute, Palo Alto, California. Final Report 1012584, October 2006.","cited_authors":"D’Appolonia, D.J., and Ryan, C.R","cited_year":"1979","cited_title":"Soil-Bentonite Slurry Trench Cut-Off Walls, Geotechnical Exhibition and Technical Conference, Chicago, Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914116,"raw_reference":"Evanko, C.R. and D.A. Dzombak. 1997. “Remediation of Metals-Contaminated Soils and Groundwater.” Ground-Water Remediation Technologies Analysis Center, Technology Evaluation Report. October 1997.","cited_authors":"Evanko, C.R. and D.A. Dzombak","cited_year":"1997","cited_title":"Remediation of Metals-Contaminated Soils and Groundwater","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914117,"raw_reference":"Illinois Environmental Protection Agency, 2016. “Dynegy Midwest Generation, Inc. – Baldwin Energy Complex: Baldwin Fly Ash Pond System Closure – NPDES Permit No. IL000043”, letter from William Buscher (IEPA) to Rick Diericx (Dynegy Operating Company) dated August 16, 2016. Interstate Technology and Regulatory Council (ITRC), 2005. Permeable reactive barriers: lessons learned/new directions. Interstate Technology and Regulatory Council, Permeable Reactive Barriers Team, PRB-4, Washington, D.C., Available on the Internet at . Natural Resource Technology, Inc. 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System, Baldwin, Illinois. Prepared for Dynegy Midwest Generation, LLC by Natural Resource Technology, Inc. June 11, 2014. Natural Resource Technology, Inc. 2016. Supplemental Hydrogeologic Site Characterization and Groundwater Monitoring Plan, Baldwin Fly Ash Pond System, Baldwin, Illinois. Prepared for Dynegy Midwest Generation, LLC by Natural Resource Technology, Inc. March 31, 2016. Natural Resource Technology, an OBG Company (NRT/OBG), 2017, Statistical Analysis Plan, Baldwin Energy Complex, Havana Power Station, Hennepin Power Station, Wood River Power","cited_authors":"Illinois Environmental Protection Agency","cited_year":"2016","cited_title":"Dynegy Midwest Generation, Inc. – Baldwin Energy Complex: Baldwin Fly Ash Pond System Closure – NPDES Permit No. IL000043","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914118,"raw_reference":"USEPA (United States Environmental Protection Agency), 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U-17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.","cited_authors":"USEPA (United States Environmental Protection Agency)","cited_year":"1999","cited_title":"Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914119,"raw_reference":"USEPA (United States Environmental Protection Agency), 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment.","cited_authors":"USEPA (United States Environmental Protection Agency)","cited_year":"2007","cited_title":"Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914120,"raw_reference":"Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.","cited_authors":"Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914121,"raw_reference":"USEPA (United States Environmental Protection Agency), 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. Baldwin FAP CMA Rev 2 20201130.docx 22/23 Corrective Measures Assessment Revision 2 Baldwin Fly Ash Pond System 9283.1-36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015.","cited_authors":"USEPA (United States Environmental Protection Agency)","cited_year":"2015","cited_title":"Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914122,"raw_reference":"Willman, H.B. and others. 1967. Geologic Map of Illinois. Illinois State Geological Survey.","cited_authors":"Willman, H.B. and others","cited_year":"1967","cited_title":"Geologic Map of Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914123,"raw_reference":"ASD Completion Date CMA Completion / Status Appendix III Appendix IV Detected1 Appendix III Lithium (MW-375, MW-391) January 7, 2019 September 5, 2019 (completed CMA) Appendix IV Lithium (MW-375, MW-391) July 29, 2019 ongoing Lithium Appendix III Appendix IV Detected Lithium (MW-375, MW-391) January 22, 2020","cited_authors":null,"cited_year":null,"cited_title":"ASD Completion Date CMA Completion / Status Appendix III Appendix IV Detected1 Appendix III Lithium (MW-375, MW-391) January 7, 2019 September 5, 2019 (completed CMA) Appendix IV Lithium (MW-375, MW-391) July 29, 2019 ongoing Lithium Appendix III Appendix IV Detected Lithium (MW-375, MW-391) January 22, 2020","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914124,"raw_reference":"KGS Model = KGS overdamped slug test analysis model (Hyder et al., 1994)","cited_authors":"KGS Model = KGS overdamped slug test analysis model (Hyder et al","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914125,"raw_reference":"Shively Geotechnical (2010): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Geotechnology (2013): see Appendix D of NRT, June 11, 2014. Groundwater Quality Assessment and Phase II Hydrogeologic Investigation, Baldwin Ash Pond System Data source was the Groundwater Quality Assessment and Phase II Hydrogeologic Investigation (NRT, June 11, 2014) Table C1. Summary Horiz and Vert Perm.xlsx 1 of 1 6.2E-07 8.6E-07","cited_authors":"Shively Geotechnical","cited_year":"2010","cited_title":": see Appendix D of NRT, June 11, 2014","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914126,"raw_reference":"BALDWIN, ILLINOIS March 19, 2019 Approximate Flow Direction Average Hydraulic Conductivity (cm/s) Horizontal Hydraulic Gradient Effective Porosity Velocity (ft/day) Baldwin Bottom Ash Pond - West 5E-06 0.04 0.30 0.0017 Baldwin Fly Ash Pond System - West 5E-06 0.02 0.30 0.0008 Area September 24, 2019 Approximate Flow Direction Average Hydraulic Conductivity (cm/s) Horizontal Hydraulic Gradient Effective Porosity Velocity (ft/day) Baldwin Bottom Ash Pond - West 5E-06 0.02 0.30 0.0009 Baldwin Fly Ash Pond System - West 5E-06 0.01 0.30 0.0007 Area Note: cm/s = centimeters per second ft/day = feet per day","cited_authors":null,"cited_year":null,"cited_title":"BALDWIN, ILLINOIS March 19, 2019 Approximate Flow Direction Average Hydraulic Conductivity (cm/s) Horizontal Hydraulic Gradient Effective Porosity Velocity (ft/day) Baldwin Bottom Ash Pond - West 5E-06 0.04 0.30 0.0017 Baldwin Fly Ash Pond System - West 5E-06 0.02 0.30 0.0008 Area September 24, 2019 Approximate Flow Direction Average Hydraulic Conductivity (cm/s) Horizontal Hydraulic Gradient Effective Porosity Velocity (ft/day) Baldwin Bottom Ash Pond - West 5E-06 0.02 0.30 0.0009 Baldwin Fly Ash Pond System - West 5E-06 0.01 0.30 0.0007 Area Note: cm/s = centimeters per second ft/day = feet per day","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}