{"document":{"doc_id":139942,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kincaid Power Station Revised Alternative Closure Demonstration","date":"2025-11-28","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2025-2864-0040","source_native_id":"EPA-HQ-OLEM-2025-2864-0040","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2025-2864"],"rins":["RIN 2050-AH42"],"related":[{"doc_id":77728,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline","date":"2025-11-28"},{"doc_id":84507,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":84512,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis Alternative Closure Deadline F2 Extension","date":"2025-11-28"},{"doc_id":127424,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":139935,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)","date":"2025-11-28"},{"doc_id":139936,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA","date":"2025-11-28"},{"doc_id":139937,"source":"docket_item","org":"EPA","doc_type":"report","title":"Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139939,"source":"docket_item","org":"EPA","doc_type":"report","title":"Extending the Deadline in 40 C.F.R. § 257.103(f)(2)","date":"2025-11-28"},{"doc_id":139940,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas","date":"2025-11-28"},{"doc_id":139941,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115","date":"2025-11-28"},{"doc_id":139944,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601","date":"2025-11-28"},{"doc_id":139947,"source":"docket_item","org":"EPA","doc_type":"report","title":"October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139948,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":139949,"source":"docket_item","org":"EPA","doc_type":"report","title":"Baldwin Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139952,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139955,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule","date":"2025-11-28"},{"doc_id":139956,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond","date":"2025-11-28"},{"doc_id":139959,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report","date":"2025-11-28"},{"doc_id":139960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company","date":"2025-11-28"},{"doc_id":139961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":139962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coleto Creek Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139965,"source":"docket_item","org":"EPA","doc_type":"report","title":"2025 Summer Reliability Assessment, May 2025","date":"2025-11-28"},{"doc_id":139966,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA","date":"2025-11-28"},{"doc_id":139967,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141","date":"2025-11-28"},{"doc_id":147958,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025","date":"2025-11-28"},{"doc_id":153854,"source":"docket_item","org":"EPA","doc_type":"other","title":"Order No. 202-25-3","date":"2025-11-28"},{"doc_id":153855,"source":"docket_item","org":"EPA","doc_type":"other","title":"Executive Order 25-50 by the State of Indiana","date":"2025-11-28"},{"doc_id":157168,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24","date":"2025-11-28"},{"doc_id":157169,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond","date":"2025-11-28"},{"doc_id":157170,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant","date":"2025-11-28"},{"doc_id":157171,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157172,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25","date":"2025-11-28"},{"doc_id":157173,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond","date":"2025-11-28"},{"doc_id":157174,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline","date":"2025-11-28"},{"doc_id":157175,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Baldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":157176,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":157177,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Continued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond","date":"2025-11-28"},{"doc_id":157178,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157165,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum Containing Internet Links to Certain Documents in Docket","date":"2025-12-03"},{"doc_id":139931,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential","date":"2025-12-04"},{"doc_id":157164,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Correction of Federal Register Preamble Statement","date":"2025-12-04"},{"doc_id":77725,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period","date":"2026-01-07"},{"doc_id":153724,"source":"docket_item","org":"EPA","doc_type":"other","title":"Virtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule","date":"2026-02-02"}],"references":[{"citation_id":914018,"raw_reference":"Ramboll, 2020. 2019 Annual Groundwater Monitoring and Corrective Action Report, Kincaid Ash Pond, Kincaid Power Station. January 31, 2020.","cited_authors":"Ramboll","cited_year":"2020","cited_title":"2019 Annual Groundwater Monitoring and Corrective Action Report, Kincaid Ash Pond, Kincaid Power Station","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914019,"raw_reference":"USEPA, 1999. Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites. Directive No. 9200.U‐17P. Washington, D.C.: EPA, Office of Solid Waste and Emergency Response.","cited_authors":"USEPA","cited_year":"1999","cited_title":"Use of Monitored Natural Attenuation at Superfund, RCRA Corrective Action, and Underground Storage Tank Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914020,"raw_reference":"USEPA, 2007. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment. EPA/600/R‐07/139. National Risk Management Research Laboratory, Office of Research and Development, U.S. Environmental Protection Agency, Cincinnati, Ohio. October 2007.","cited_authors":"USEPA","cited_year":"2007","cited_title":"Monitored Natural Attenuation of Inorganic Contaminants in Ground Water, Volume 1 – Technical Basis for Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914021,"raw_reference":"USEPA, 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. Directive No. 9283.1‐36. U.S. Environmental Protection Agency, Office of Solid Waste and Emergency Response. August 2015. Page | 9","cited_authors":"USEPA","cited_year":"2015","cited_title":"Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914022,"raw_reference":"ASD Completion Date CMA Completion / Status None January 7, 2019 None July 15, 2019 None January 13, 2020 None","cited_authors":null,"cited_year":null,"cited_title":"ASD Completion Date CMA Completion / Status None January 7, 2019 None July 15, 2019 None January 13, 2020 None","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914023,"raw_reference":"FINAL Kincaid 141 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Kincaid Ash Pond, Kincaid Power Station","cited_authors":null,"cited_year":null,"cited_title":"FINAL Kincaid 141 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Kincaid Ash Pond, Kincaid Power Station","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914024,"raw_reference":"EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for Kincaid Ash Pond (AP) located at Kincaid Power Station near Kincaid, Illinois. Groundwater is being monitored at Kincaid AP in accordance with the Assessment Monitoring Program requirements specified in 40 C.F.R. § 257.95. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). No Statistically Significant Levels (SSLs) of 40 C.F.R. Part 257 Appendix IV parameters were determined in 2019 and Kincaid AP remains in the Assessment Monitoring Program. 3/10","cited_authors":null,"cited_year":null,"cited_title":"EXECUTIVE SUMMARY This report has been prepared to provide the information required by Title 40 of the Code of Federal Regulations (40 C.F.R.) § 257.90(e) for Kincaid Ash Pond (AP) located at Kincaid Power Station near Kincaid, Illinois","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914025,"raw_reference":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the Monitoring Program status in calendar year 2019, and Kincaid","cited_authors":"MONITORING AND CORRECTIVE ACTION PROGRAM STATUS No changes have occurred to the Monitoring Program status in calendar year","cited_year":"2019","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914026,"raw_reference":"KEY ACTIONS COMPLETED IN 2019 The Assessment Monitoring Program is summarized in Table A. The groundwater monitoring system, including the CCR unit and all background and downgradient monitoring wells is presented in Figure 1. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). In general, one groundwater sample was collected from each background and downgradient well during each monitoring event. All samples were collected and analyzed in accordance with the Sampling and Analysis Plan (SAP) (NRT/OBG, 2017a). All monitoring data obtained under 40 C.F.R. §§ 257.90 through 257.98 (as applicable) in 2019 are presented in Tables 1 and 2. Analytical data were evaluated in accordance with the Statistical Analysis Plan (NRT/OBG, 2017b) to determine any SSLs of Appendix IV parameters over Groundwater Protection Standards (GWPSs). Statistical background values are provided in Table 3 and GWPSs in Table 4. Analytical results for the May and August 2018 sampling events were provided in the 2018 Annual Groundwater Monitoring and Corrective Action Report. 6/10","cited_authors":"KEY ACTIONS COMPLETED IN 2019 The Assessment Monitoring Program is summarized in Table A. The groundwater monitoring system, including the CCR unit and all background and downgradient monitoring wells is presented in Figure 1. No changes were made to the monitoring system in 2019 (no wells were installed or decommissioned). In general, one groundwater sample was collected from each background and downgradient well during each monitoring event. All samples were collected and analyzed in accordance with the Sampling and Analysis Plan (SAP) (NRT/OBG","cited_year":"2017a","cited_title":"All monitoring data obtained under 40 C.F.R. §§ 257.90 through 257.98 (as applicable) in 2019 are presented in Tables 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914027,"raw_reference":"FINAL Kincaid 141 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Kincaid Ash Pond, Kincaid Power Station Table A – 2018-2019 Assessment Monitoring Program Summary Sampling Dates Analytical Data Receipt Date Parameters Collected May 31 - June 1, 2018 July 26, 2018 Appendix III Appendix IV August 28, 2018 October 18, 2018 April 15, 2019 October 15, 2019 None January 7, 2019 None July 15, 2019 Appendix III Appendix IV August 20-21, 2019","cited_authors":null,"cited_year":null,"cited_title":"FINAL Kincaid 141 2019 Annual Report Text.docx 2019 Annual Groundwater Monitoring and Corrective Action Report Kincaid Ash Pond, Kincaid Power Station Table A – 2018-2019 Assessment Monitoring Program Summary Sampling Dates Analytical Data Receipt Date Parameters Collected May 31 - June 1, 2018 July 26, 2018 Appendix III Appendix IV August 28, 2018 October 18, 2018 April 15, 2019 October 15, 2019 None January 7, 2019 None July 15, 2019 Appendix III Appendix IV August 20-21, 2019","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914028,"raw_reference":"SSL(s) Determination Date Appendix III Appendix IV Detected 1 February 14-15, 2019","cited_authors":null,"cited_year":null,"cited_title":"SSL(s) Determination Date Appendix III Appendix IV Detected 1 February 14-15, 2019","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914029,"raw_reference":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2019. Groundwater samples were collected and analyzed in accordance with the SAP (NRT/OBG, 2017a), and all data were accepted. 8/10","cited_authors":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during","cited_year":"2019","cited_title":"Groundwater samples were collected and analyzed in accordance with the SAP (NRT/OBG, 2017a), and all data were accepted","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914030,"raw_reference":"KEY ACTIVITIES PLANNED FOR 2020 The following key activities are planned for 2020: Continuation of the Assessment Monitoring Program with semi-annual sampling scheduled for the first and third quarters of 2020. Complete evaluation of analytical data from the downgradient wells, using GWPSs to determine whether an SSL of Appendix IV parameters has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that that SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is demonstrated to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2020 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2020 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. 9/10","cited_authors":"KEY ACTIVITIES PLANNED FOR 2020 The following key activities are planned for 2020: Continuation of the Assessment Monitoring Program with semi-annual sampling scheduled for the first and third quarters of","cited_year":"2020","cited_title":"Complete evaluation of analytical data from the downgradient wells, using GWPSs to determine whether an SSL of Appendix IV parameters has occurred","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914031,"raw_reference":"REFERENCES Natural Resource Technology, an OBG Company (NRT/OBG), 2017a. Sampling and Analysis Plan, Kincaid Ash Pond, Kincaid Power Station, Kincaid, Illinois, Project No. 2285, Revision 0, October 17, 2017. Natural Resource Technology, an OBG Company (NRT/OBG), 2017a, Statistical Analysis Plan, Kincaid Power Station, Kincaid Generation, L.L.C., October 17, 2017. 10/10","cited_authors":"REFERENCES Natural Resource Technology, an OBG Company (NRT/OBG)","cited_year":"2017a","cited_title":"Sampling and Analysis Plan, Kincaid Ash Pond, Kincaid Power Station, Kincaid, Illinois, Project No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914032,"raw_reference":"FINAL Kincaid 141 2019 Annual Report Text.docx","cited_authors":null,"cited_year":null,"cited_title":"FINAL Kincaid 141 2019 Annual Report Text.docx","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":914033,"raw_reference":"Sanders, L. L., 1998. A Manual of Field Hydrogeology, Prentice Hall, Inc.","cited_authors":"Sanders, L. L","cited_year":"1998","cited_title":"A Manual of Field Hydrogeology, Prentice Hall, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}