2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115
Other documents for the same rulemaking (all, by stage)
References
FINAL 2024 Part 257 AR MFS 115.Docx 1/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
ACRONYMS AND ABBREVIATIONS 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 1, 2024 Assessment Monitoring sampling event Quarter 3, 2024 Assessment Monitoring sampling event Alternative Source Demonstration coal combustion residuals Corrective Measures Assessment
FINAL 2024 Part 257 AR MFS 115.Docx 2/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
FINAL 2024 Part 257 AR MFS 115.Docx 3/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
FINAL 2024 Part 257 AR MFS 115.Docx 4/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115) B. Provide the date when the assessment monitoring program was initiated for the
CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the Pond System for calendar year 2024.
FINAL 2024 Part 257 AR MFS 115.Docx 5/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
FINAL 2024 Part 257 AR MFS 115.Docx 6/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
Appendix C. Potential alternative sources were evaluated as outlined in the 40 C.F.R. § 257.94(e)(2). An ASD was completed in 2024 for the arsenic SSL in MW-6 detected during the Quarter 3, 2023 sampling event. Associated laboratory analytical data is included in the 2023 Annual Groundwater Monitoring and Corrective Action Report (Ramboll, 2024). The ASD was certified by a qualified professional engineer and is included in Appendix D. Compliance well 4A was not sampled during the September sampling event because the well was not producing water at the time of sample collection.
FINAL 2024 Part 257 AR MFS 115.Docx 7/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
SSL(s) Determination Date Date April 30, 2024 July 29, 2024
SSL(s) Arsenic at wells MW-2, MW-6, Initiated and MW-10; Cobalt at well MW-4 A7D 4 September 9-12, 2024 October 8, 2024 January 6, 2025 Arsenic at wells MW-2, MW-6, and MW-10; Cobalt at well MW-4 Notes:
FINAL 2024 Part 257 AR MFS 115.Docx 8/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
THE PROBLEMS No problems were encountered with the groundwater monitoring program during 2024. Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted.
FINAL 2024 Part 257 AR MFS 115.Docx 9/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling scheduled for the first and third quarters of 2025. Complete evaluation of analytical data from the compliance wells to determine whether an
FINAL 2024 Part 257 AR MFS 115.Docx 10/11 2024 Annual Groundwater Monitoring and Corrective Action Report Miami Fort Power Plant Pond System (CCR Unit 115)
REFERENCES Geosyntec Consultants, Inc., 2024. Alternative Source Demonstration, Pond System, Miami Fort Power Plant, Pond System (Unit ID #115), 40 C.F.R. § 257(g)(3)(ii), April.
OBG, Part of Ramboll (OBG), 2019. Corrective Measures Assessment, Miami Fort Basin A, Miami Fort Power Station, 11021 Brower Road, North Bend, Ohio, Dynegy Miami Fort, LLC, September 5, 2019. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2020a. Corrective Measures Assessment Revision 1, Miami Fort Pond System, Miami Fort Power Station, 11021 Brower Road, North Bend,
Ohio, Dynegy Miami Fort, LLC, November 12, 2020. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2020b. Corrective Measures Assessment Revision 2, Miami Fort Pond System, Miami Fort Power Station, 11021 Brower Road, North Bend,
Ohio, Dynegy Miami Fort, LLC, November 30, 2020. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022a. Multi-Site Statistical Analysis
Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023a. 40 C.F.R. § 257 Groundwater Monitoring Plan, Pond System, Miami Fort Power Plant, North Bend, Ohio. December 31, 2023. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023b. Multi-Site Sampling and Analysis
Plan, Revision 1. October 10, 2023. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2024. 2023 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend,
Ohio, CCR Unit 115. https://www.luminant.com/documents/ccr/Ohio/Miami-Fort/2023/2023-Miami%20Fort2023%20Annual%20Groundwater%20Monitoring%20and%20Corrective%20Action%20ReportPond%20System.pdf
AECOM, 2017. Hydrogeologic Characterization Report, CCR Management Units 111 (Basin A) and 112 (Basin B). Prepared for Dynegy Miami Fort, LLC by AECOM. October 11, 2017.
Dixit S. and Hering J.G. 2003. Comparison or arsenic(V) and arsenic(III) sorption onto iron oxide minerals: implications for arsenic mobility. Environ. Sci. Technol., 37 (2003), pp. 4182-4189.
Dzombak, D. A., and F. M. Morel. 1990. Surface Complexation Modeling: Hydrous Ferric Oxide. New York: Wiley-Interscience. Giménez J, Martínez M, de Pablo J, Rovira M, Duro L. Arsenic sorption onto natural hematite, magnetite, and goethite. J Hazard Mater. 2007 Mar 22;141(3):575-80. doi: 10.1016/j.jhazmat.2006.07.020. Epub 2006 Jul 15. PMID: 16978766.
Gubler R. and ThomasArrigo L.K. Ferrous iron enhances arsenic sorption and oxidation by nonstoichiometric magnetite and maghemite, J Haz Mater. Vol 402, 2021, 123425, ISSN 03043894, https://doi.org/10.1016/j.jhazmat.2020.123425.
Jiang S., Lee J.H., Kim D., Kanaly R.A., Kim M.G., and Hur H.G. 2013. Differential arsenic mobilization from As-bearing ferrihydrite by iron-respiring Shewanella strains with different arsenic-reducing activities. Environ. Sci. Technol., 47 (2013), pp. 8616-8623.
Lin, Z., Puls, R. Adsorption, desorption and oxidation of arsenic affected by clay minerals and aging process. Environmental Geology 39, 753-759 (2000), https://doi.org/10.1007/s002540050490 Ohio Environmental Protection Agency (OEPA), 2015, Evaluation of Background Metal Soil Concentrations in Hamilton County – Cincinnati Area, Developed in Support of the Ohio Voluntary Action Program, Summary Report, May 2015.
Ramboll. 2020. 40 C.F.R. § 257.95(g)(3)(ii): Alternative Source Demonstration – Revision 1. Miami Fort Pond System. Miami Fort Station, Ohio. Ramboll November.
Ramboll, 2022. Multi-Site Statistical Analysis Plan. Ramboll, December 28, 2022
Ramboll, 2024. 2023 Annual Groundwater Monitoring and Corrective Action Report. Miami Fort Pond System, Miami Fort Power Station. January.
Smedley P.L. and Kinniburgh D.G. 2002. A review of the source, behaviour and distribution of arsenic in natural waters. Appl, Geochem., 17 (2002), pp. 517-568.
8. PMID: 30039966; PMCID: PMC6429028. Tessier, A., P. G. C. Campbell, and M. Bisson. 1979. Sequential extraction procedure for the speciation of particulate trace metals. Analytical Chemistry 5(7):844–851.
MFPP ASD_Arsenic April 2024 Thomas, M.A., Schumann, T.L., and Pletsch, B.A., 2005, Arsenic in ground water in selected parts of southwestern Ohio, 2002–03: U.S. Geological Survey Scientific Investigations Report 2005–5138, 30 p.
MFPP ASD_Arsenic April 2024 TABLES Table 1 - Arsenic SEP Results Summary Miami Fort Power Plant Soil Boring Location Sample Depth (ft bgs) Location Adjacent Well Field Boring Log Description Total Arsenic
MW-13 (2015-2020) Molybdenum Concentrations Versus Boron Concentrations at Well MW-6 (2015-2020). Oxidation Reduction Potential Time-Series for Groundwater Samples Arsenic Concentrations Versus Iron Concentrations at Well MW-2 (2008-2014)
APPENDICES Appendix A Boring Logs for Monitoring Wells MW-2, MW-3A, MW-4, MW-10, and MW-11 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 1/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System
OEPA Ramboll RCRA Site SSIs SSLs USGS Title 40 of the Code of Federal Regulations Alternate Source Demonstration below ground surface Coal Combustion Residuals corrugated metal pipe Flue Gas Desulfurization formerly known as feet Groundwater Protection Standards high density polyethylene lines of evidence Miami Conservancy District micrograms per liter milligrams per kilogram milligrams per liter North American Vertical Datum of 1988 Natural Resource Technology, an OBG Company Ohio Environmental Protection Agency oxidation-reduction potential Ramboll Americas Engineering Solutions, Inc., f/k/a O’Brien & Gere Engineers, Inc. Resource Conservation and Recovery Act Miami Fort Power Station Statistically Significant Increases Statistically Significant Levels United States Geological Survey 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 2/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System
ASD does not address cobalt SSLs at downgradient monitoring wells MW-4 and 4A which is addressed by the Corrective Measures Assessment for the Pond System. 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 3/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System
MW-10, and MW-13), Pond System source water concentrations would be higher than the groundwater concentrations at those wells. Therefore, the Pond System is not the source of the arsenic in the downgradient groundwater. Figure B below provides a box-and-whisker plot of the molybdenum concentrations collected between 2015 and 2020 at Pond System monitoring wells and source water locations A-1, B-1, B-2 and B-3 (monitoring well and source water sampling locations are shown on Figure 1). 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 7/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System
LOE #2: Arsenic and Molybdenum Concentrations Associated with Monitoring Wells MW-2, MW-10 and MW-13, and MW-6, respectively, are Not Correlated with Boron Concentrations, a Common Indicator for CCR Impacts to Groundwater. Boron is a common indicator of CCR impacts to groundwater due to its leachability from CCR and mobility in groundwater. If a CCR constituent is identified as an SSL but boron is not correlated with that constituent, it is unlikely that the CCR unit is the source of the SSL. Figure C below provides a scatter plot of arsenic versus boron concentrations (collected between 2015 and 2020) in downgradient groundwater at wells with arsenic SSLs, along with the results of a Kendall correlation test for non-parametric data. The results of the test at each well are described by the p-value and tau (Kendall’s correlation coefficient) included in each plot.
Typically, a p-value greater than 0.05 is considered to be a statistically insignificant relationship. The range of tau falls between -1 and 1, with a perfect correlation equal to -1 or 1. The closer tau is to 0, the less of a correlation exists in the data. The results of the correlation analyses indicated that groundwater concentrations of arsenic observed at monitoring wells MW 2, MW-10, and MW-13 do not correlate with concentrations of boron, a common indicator of CCR impacts to groundwater. Figure C below illustrates the lack of 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 8/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System a relationship between arsenic concentrations and boron concentrations in groundwater at MW-2,
MW-2, MW-10, and MW-13 are among the monitoring wells adjacent to the riverbank, where the lowest oxidation-reduction potential (ORP) at the Site were observed. 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 10/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System Dissolved iron concentrations present in groundwater at monitoring well MW-2 correlate with dissolved arsenic concentrations. Arsenic is naturally present in groundwater and soils at variable concentrations. The arsenic is co-precipitated with iron oxyhydroxides and incorporated into the mineral structure of the soils, and can also be adsorbed to organic matter or the iron oxyhydroxides in the aquifer. Both of these sources of arsenic can be mobilized in groundwater by dissolution or desorption under reducing geochemical conditions, where organic carbon commonly acts as the reducing agent (Thomas et al., 2005; McArthur et al., 2001). Arsenic-bearing soils are known to be present in the areas near the Pond System (OEPA, 2015); and, organic matter, a source of organic carbon and potential reducing agent, was observed in the most riverbank boring logs for monitoring wells located along the banks of the Great Miami River and Ohio River (see boring logs for wells
MW-13 and MW-14 (presented in Figure E below; monitoring wells adjacent to the riverbank are illustrated with solid lines, upland wells are illustrated with dashed lines). 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 11/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System
MW-13, and MW-6, respectively, are not correlated with boron concentrations, a common indicator for CCR impacts to groundwater. 3. Naturally-occurring concentrations of arsenic are commonly found in soils and groundwater in southwestern Ohio. MW-2, MW-10 and MW-13 are located in southwestern Ohio, along the banks of the Great Miami River and Ohio River, where they are susceptible to geochemical conditions that can mobilize naturally-occurring arsenic from the soils into groundwater. This information serves as the written ASD prepared in accordance with 40 C.F.R. § 257.95(g)(3)(ii) that the SSLs for arsenic and molybdenum observed during the A3 sampling event were not due to the Pond System. Therefore, a corrective measures assessment is not required for arsenic and molybdenum at the Miami Fort Pond System. 115 - MF Pond System 2020 ASD A3 - FINAL 201112.docx 14/15 40 C.F.R. § 257.95(g)(3)(ii): Alternate Source Demonstration Miami Fort Pond System
REFERENCES AECOM, 2017. Hydrogeologic Characterization Report, CCR Management Units 111 (Basin A) and 112 (Basin B). Prepared for Dynegy Miami Fort, LLC by AECOM. October 11, 2017.
McArthur, J.M., Ravenscroft, R., Safiulla, S., and Thirwall, M.F., 2001, Arsenic in groundwater— Testing pollution mechanisms for sedimentary aquifers in Bangladesh: Water Resources
Research, v. 37, no. 1, p. 109–117. Natural Resource Technology, an OBG Company (NRT/OBG), 2017, Statistical Analysis Plan, Miami Fort Power Station, Dynegy Miami Fort, LLC, October 17, 2017. Ohio Environmental Protection Agency (OEPA), 2015, Evaluation of Background Metal Soil Concentrations in Hamilton County – Cincinnati Area, Developed in Support of the Ohio Voluntary Action Program, Summary Report, May 2015.