{"document":{"doc_id":139931,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton 2024 Annual Groundwater Monitoring and Corrective Action Report non-confidential","date":"2025-12-04","url":"https://www.regulations.gov/document/EPA-HQ-OLEM-2025-2864-0052","source_native_id":"EPA-HQ-OLEM-2025-2864-0052","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OLEM-2025-2864"],"rins":["RIN 2050-AH42"],"related":[{"doc_id":77728,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline","date":"2025-11-28"},{"doc_id":84507,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Redline RIA Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":84512,"source":"ria","org":"EPA","doc_type":"regulatory_impact_analysis","title":"Regulatory Impact Analysis Alternative Closure Deadline F2 Extension","date":"2025-11-28"},{"doc_id":127424,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Redline NPRM Alternative Closure Deadline F2 Extension proposal documenting changes made during EO 12866 interagency review","date":"2025-11-28"},{"doc_id":139935,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Long-Term Reliability Assessment, December 2024 (corrected July 11, 2025)","date":"2025-11-28"},{"doc_id":139936,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report CLECO Power LLC Brame Energy Center Lena, LA","date":"2025-11-28"},{"doc_id":139937,"source":"docket_item","org":"EPA","doc_type":"report","title":"Southwestern Electric Power Company, Welsh Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139939,"source":"docket_item","org":"EPA","doc_type":"report","title":"Extending the Deadline in 40 C.F.R. § 257.103(f)(2)","date":"2025-11-28"},{"doc_id":139940,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coal Combustion Residual Rule 2024 Annual Groundwater Monitoring and Corrective Action Report, Primary Ash Pond, Coleto Creek Power Station Fannin, Texas","date":"2025-11-28"},{"doc_id":139941,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, Pond System, Miami Fort Power Plant, North Bend, Ohio, CCR Unit 115","date":"2025-11-28"},{"doc_id":139942,"source":"docket_item","org":"EPA","doc_type":"report","title":"Kincaid Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139944,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report Bottom Ash Pond Baldwin Power Plant Baldwin, Illinois CCR Unit 601","date":"2025-11-28"},{"doc_id":139947,"source":"docket_item","org":"EPA","doc_type":"report","title":"October 2025 Annual Progress Report, Documenting the Continued Lack of Alternative Capacity and the Progress Towards the Closure of the Coal-Fired Boilers, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139948,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Report, South Ash Pond, Naughton Power Plant, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":139949,"source":"docket_item","org":"EPA","doc_type":"report","title":"Baldwin Power Station Revised Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139952,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring and Corrective Action Summary Report, Intermountain Generating Facility, Delta, Utah","date":"2025-11-28"},{"doc_id":139955,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule","date":"2025-11-28"},{"doc_id":139956,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Groundwater Monitoring Report, Southwestern Electric Power Company, Welsh Power Plant, Primary Bottom Ash Pond","date":"2025-11-28"},{"doc_id":139959,"source":"docket_item","org":"EPA","doc_type":"report","title":"40 CFR 257.103(f)(2) Alternative Closure Requirements Annual Alternative Capacity Update and Impoundment Closure Progress Report","date":"2025-11-28"},{"doc_id":139960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Annual Report- 04, Alternative Closure Requirements Primary Bottom Ash Pond, J. Robert Welsh Power Plant Southwestern Electric Power Company","date":"2025-11-28"},{"doc_id":139961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Newton Power Plant Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":139962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Coleto Creek Power Plant Alternative Closure Demonstration","date":"2025-11-28"},{"doc_id":139965,"source":"docket_item","org":"EPA","doc_type":"report","title":"2025 Summer Reliability Assessment, May 2025","date":"2025-11-28"},{"doc_id":139966,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 Annual Groundwater Monitoring Report for the Coal Combustion Residuals Rule, Cleco Power LLC Brame Energy Center Bottom Ash and Fly Ash Ponds Lena, LA","date":"2025-11-28"},{"doc_id":139967,"source":"docket_item","org":"EPA","doc_type":"report","title":"2024 40 C.F.R. § 257 Annual Groundwater Monitoring and Corrective Action Report, Ash Pond, Kincaid Power Plant, Kincaid, Illinois, CCR Unit 141","date":"2025-11-28"},{"doc_id":147958,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Resource Adequacy Report: Evaluating the Reliability and Security of the United States Electric Grid, July 2025","date":"2025-11-28"},{"doc_id":153854,"source":"docket_item","org":"EPA","doc_type":"other","title":"Order No. 202-25-3","date":"2025-11-28"},{"doc_id":153855,"source":"docket_item","org":"EPA","doc_type":"other","title":"Executive Order 25-50 by the State of Indiana","date":"2025-11-28"},{"doc_id":157168,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-24","date":"2025-11-28"},{"doc_id":157169,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Kincaid Power Plant Ash Pond","date":"2025-11-28"},{"doc_id":157170,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Miami Fort Power Plant","date":"2025-11-28"},{"doc_id":157171,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Coleto Creek Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157172,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Northern Indiana Public Service Company LLC, R.M. Schahfer Generating Station, Waste Disposal Area, 40 CFR §257.103(F)(2)(X) Part A Demonstration Annual Progress Report #01-25","date":"2025-11-28"},{"doc_id":157173,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Baldwin Power Plant Bottom Ash Pond","date":"2025-11-28"},{"doc_id":157174,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"NIPSCO email requesting extension to 40 CFR 257.103(f)(2) deadline","date":"2025-11-28"},{"doc_id":157175,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Baldwin Power Station Alternative Closure Demonstration – Update to Schedule and Closure Plan","date":"2025-11-28"},{"doc_id":157176,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"2024 Progress Report, Site-Specific Alternative to Initiate Closure, Permanent Cessation of Coal-Fired Boiler(s) by a Date Certain, Naughton Power Plant, South Ash Pond, Kemmerer, Wyoming","date":"2025-11-28"},{"doc_id":157177,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Continued Lack of Alternative Capacity and Closure Progress Report, Naughton Power Plant South Ash Pond","date":"2025-11-28"},{"doc_id":157178,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Annual Progress Report (§ 257.103(f)(2)(x)) for the Newton Power Plant Primary Ash Pond","date":"2025-11-28"},{"doc_id":157165,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum Containing Internet Links to Certain Documents in Docket","date":"2025-12-03"},{"doc_id":157164,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Correction of Federal Register Preamble Statement","date":"2025-12-04"},{"doc_id":77725,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Extension of an Alternative Closure Requirement Deadline; Extension of Comment Period","date":"2026-01-07"},{"doc_id":153724,"source":"docket_item","org":"EPA","doc_type":"other","title":"Virtual Public Hearing on Proposed CCR Alternative Closure Deadline Extension Rule","date":"2026-02-02"}],"references":[{"citation_id":913882,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 1/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 1/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913883,"raw_reference":"ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 3, 2023 Assessment Monitoring sampling event A2DR Quarter 4, 2023 Assessment Monitoring sampling event Quarter 1, 2024 Assessment Monitoring sampling event Quarter 2, 2024 Assessment Monitoring sampling event Quarter 3, 2024 Assessment Monitoring sampling event A3DR Quarter 4, 2024 Assessment Monitoring sampling event coal combustion residuals Corrective Measures Assessment","cited_authors":null,"cited_year":null,"cited_title":"ACRONYMS AND ABBREVIATIONS 35 I.A.C. Title 35 of the Illinois Administrative Code 40 C.F.R. Title 40 of the Code of Federal Regulations Quarter 3, 2023 Assessment Monitoring sampling event A2DR Quarter 4, 2023 Assessment Monitoring sampling event Quarter 1, 2024 Assessment Monitoring sampling event Quarter 2, 2024 Assessment Monitoring sampling event Quarter 3, 2024 Assessment Monitoring sampling event A3DR Quarter 4, 2024 Assessment Monitoring sampling event coal combustion residuals Corrective Measures Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913884,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 2/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 2/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913885,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 3/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 3/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913886,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 4/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501) B. Provide the date when the Assessment Monitoring Program was initiated for the","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 4/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501) B. Provide the date when the Assessment Monitoring Program was initiated for the","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913887,"raw_reference":"CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the PAP for calendar year 2024.","cited_authors":"CCR unit. Whether a remedy was selected pursuant to §257.97 during the current annual reporting period, and if so, the date of remedy selection. vi. Whether remedial activities were initiated or are ongoing pursuant to § 257.98 during the current annual reporting period. This report provides the required information for the PAP for calendar year","cited_year":"2024","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913888,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 5/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 5/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913889,"raw_reference":"CMA for the PAP in accordance with 35 I.A.C. § 845.660. The CMA was completed and submitted to the IEPA on April 3, 2024 (Ramboll, 2024). It is anticipated that a corrective action plan will be submitted on or before April 3, 2025 that meets the requirements of both 40 C.F.R. § 257 and 35 I.A.C. § 845. Activities currently ongoing in support of developing the corrective action plan include development of a corrective action alternatives analysis, human health and ecological risk assessment, and supporting technical documents. Semiannual remedy selection progress reports are being completed as required by 40 C.F.R. § 257.97(a).","cited_authors":"CMA for the PAP in accordance with 35 I.A.C. § 845.660. The CMA was completed and submitted to the IEPA on April 3, 2024 (Ramboll","cited_year":"2024","cited_title":"It is anticipated that a corrective action plan will be submitted on or before April 3, 2025 that meets the requirements of both 40 C.F.R. § 257 and 35 I.A.C. § 845","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913890,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 6/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 6/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913891,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 7/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 7/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913892,"raw_reference":"SSL(s) CMA Initiated February 27, 2024 6 Lithium at APW02 November 17, 2023 February 27, 2024 May 27, 2024 Lithium at APW02 Notes:","cited_authors":null,"cited_year":null,"cited_title":"SSL(s) CMA Initiated February 27, 2024 6 Lithium at APW02 November 17, 2023 February 27, 2024 May 27, 2024 Lithium at APW02 Notes:","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913893,"raw_reference":"SSL: Statistically Significant Level The following background wells were sampled for each event: APW05, and APW06. The following compliance wells were sampled for each event: APW02, APW03, APW04, APW05S, APW07, APW08, APW09, APW10, APW11, APW12, APW13, APW14, APW15, APW16, APW17, and APW18. All samples were analyzed for Appendix III parameter listed in 40 C.F.R. § 257.94(e) and Appendix IV parameters listed in 40 C.F.R. § 257.95(g). Data collected in accordance with 35 I.A.C. § 845 were included for statistical calculations performed in accordance with 40 C.F.R. § 257.93; however, SSLs are reported semiannually per 40 C.F.R. § 257.95(d)(1). Laboratory reports and associated analytical data tables were included in the 2023 Annual Groundwater Monitoring and Corrective Action Report. Statistical determinations were completed in 2024. Analytical data from 2023 sampling events used in statistical determinations are included in the 2024 Annual Groundwater Monitoring and Corrective Action Report for completeness.","cited_authors":"SSL: Statistically Significant Level The following background wells were sampled for each event: APW05, and APW06. The following compliance wells were sampled for each event: APW02, APW03, APW04, APW05S, APW07, APW08, APW09, APW10, APW11, APW12, APW13, APW14, APW15, APW16, APW17, and APW18. All samples were analyzed for Appendix III parameter listed in 40 C.F.R. § 257.94(e) and Appendix IV parameters listed in 40 C.F.R. § 257.95(g). Data collected in accordance with 35 I.A.C. § 845 were included for statistical calculations performed in accordance with 40 C.F.R. § 257.93; however, SSLs are reported semiannually per 40 C.F.R. § 257.95(d)(1). Laboratory reports and associated analytical data tables were included in the 2023 Annual Groundwater Monitoring and Corrective Action Report. Statistical determinations were completed in","cited_year":"2024","cited_title":"Analytical data from 2023 sampling events used in statistical determinations are included in the 2024 Annual Groundwater Monitoring and Corrective Action Report for completeness","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913894,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 8/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 8/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913895,"raw_reference":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during 2024. Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted.","cited_authors":"THE PROBLEMS No problems were encountered with the Groundwater Monitoring Program during","cited_year":"2024","cited_title":"Groundwater samples were collected and analyzed in accordance with the SAP and all data were accepted","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913896,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 9/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 9/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913897,"raw_reference":"KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters). Complete evaluation of analytical data from the compliance wells to determine whether an","cited_authors":null,"cited_year":null,"cited_title":"KEY ACTIVITIES PLANNED FOR 2025 The following key activities are planned for 2025: Continuation of the Assessment Monitoring Program with semiannual sampling scheduled for the first and third quarters of 2025 (and sampling for 35 I.A.C. § 845 scheduled for the second and fourth quarters)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913898,"raw_reference":"SSL of Appendix IV parameters above GWPSs has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that the SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is identified to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2025 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2025 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. Remedy selection will continue considering compliance with both 40 C.F.R. § 257 and 35 I.A.C. § 845; semiannual remedy selection progress reports required by 40 C.F.R. § 257.97(a) will be completed and posted to the publicly accessible website as required by 40 C.F.R. § 257.107(h)(9). Statistical limits (background) will be updated for the PAP pursuant the Multi-Site Statistical Analysis Plan (Ramboll, 2022c) prepared in accordance with the requirements of 40 C.F.R. § 257.93(f).","cited_authors":"SSL of Appendix IV parameters above GWPSs has occurred. If an SSL is identified, potential alternate sources (i.e., a source other than the CCR unit caused the SSL or that the SSL resulted from error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality) will be evaluated. If an alternate source is identified to be the cause of the SSL, a written demonstration will be completed within 90 days of SSL determination and included in the 2025 Annual Groundwater Monitoring and Corrective Action Report. If an alternate source(s) is not identified to be the cause of the SSL, the applicable requirements of 40 C.F.R. §§ 257.94 through 257.98 (e.g., assessment of corrective measures) as may apply in 2025 will be met, including associated recordkeeping/notifications required by 40 C.F.R. §§ 257.105 through 257.108. Remedy selection will continue considering compliance with both 40 C.F.R. § 257 and 35 I.A.C. § 845; semiannual remedy selection progress reports required by 40 C.F.R. § 257.97(a) will be completed and posted to the publicly accessible website as required by 40 C.F.R. § 257.107(h)(9). Statistical limits (background) will be updated for the PAP pursuant the Multi-Site Statistical Analysis Plan (Ramboll","cited_year":"2022c","cited_title":"prepared in accordance with the requirements of 40 C.F.R. § 257.93(f)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913899,"raw_reference":"FINAL 2024 Part 257 AR NEW 501.Docx 10/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_authors":null,"cited_year":null,"cited_title":"FINAL 2024 Part 257 AR NEW 501.Docx 10/11 2024 Annual Groundwater Monitoring and Corrective Action Report Newton Power Plant Primary Ash Pond (CCR Unit 501)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913900,"raw_reference":"REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17, 2015. Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022a. Multi-Site Quality Assurance Project Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022b. Multi-Site Data Management Plan. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2022c. Multi-Site Statistical Analysis","cited_authors":"REFERENCES Code of Federal Regulations, Title 40, Chapter I, Subchapter I, Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments, effective April 17","cited_year":"2015","cited_title":"Accessed from URL https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top Ramboll Americas Engineering Solutions, Inc","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ecfr.gov/current/title-40/chapter-I/subchapterI/part-257/subpart-D#page-top","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913901,"raw_reference":"Plan, 40 C.F.R. § 257. December 28, 2022. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2023. Multi-Site Sampling and Analysis","cited_authors":"Plan, 40 C.F.R. § 257. December 28","cited_year":"2022","cited_title":"Ramboll Americas Engineering Solutions, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913902,"raw_reference":"Plan, Revision 1. October 10, 2023. Ramboll Americas Engineering Solutions, Inc. (Ramboll), 2024. 35 I.A.C. § 845 Corrective Measures Assessment, Primary Ash Pond, Newton Power Plant, Newton, Illinois, IEPA ID: W0798070001-01. April 3, 2024","cited_authors":"Plan, Revision 1. October 10","cited_year":"2023","cited_title":"Ramboll Americas Engineering Solutions, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913903,"raw_reference":"LIMS Workorder: 24021397 Technician(s): JC, BG Groundwater Sampling Summary Newton- 1Q 2024","cited_authors":null,"cited_year":null,"cited_title":"LIMS Workorder: 24021397 Technician(s): JC, BG Groundwater Sampling Summary Newton- 1Q 2024","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":913904,"raw_reference":"DTB (ft) Sampler Initials Purge Date 79.90 2/26/2024 Purging Device Well Diameter (in) Actual Volume Purged Purge Rate (mL/min) Submersible Pump 381.0 Purge Purge Start Time End Time 10:46 11:07 96.60 5445 Horseshoe Lake Road, Collinsville, IL 62234","cited_authors":null,"cited_year":null,"cited_title":"DTB (ft) Sampler Initials Purge Date 79.90 2/26/2024 Purging Device Well Diameter (in) Actual Volume Purged Purge Rate (mL/min) Submersible Pump 381.0 Purge Purge Start Time End Time 10:46 11:07 96.60 5445 Horseshoe Lake Road, Collinsville, IL 62234","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}