Policy Replication

← Rulemakings

Pipeline Safety: Amendments to Parts 192 and 195 to require Valve installation and Minimum Rupture Detection Standards

RIN 2137-AF06 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 277 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

11 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 2019-06-25 · 1 document
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2021-12-15 · 1 document
Regulatory impact analysis5 files
Docket documents12 of 190 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (1)

Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards

Proposed rule (NPRM)2020-02-06 · FR 2020-01459 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 12 references, 3 linked to papers
Federal Register action: Notice of proposed rulemaking.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Final rule stage: Federal Register documents (1)

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards

Final rule2022-04-08 · FR 2022-07133 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 11 references, 2 linked to papers
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (2)

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections

Correction2023-08-01 · FR 2023-15904 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
Federal Register action: Correcting amendments.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections

Correction2024-06-28 · FR 2024-14116 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 2 references
Federal Register action: Correction amendments; response to petition for reconsideration.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Regulatory impact analyses (5)

For the proposed rule

Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment

RIA2020-02-06 · Regulatory impact analysis · PHMSA · 43 references, 3 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence
For the final rule

Final Regulatory Impact Analysis for the "Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule

RIA2022-04-08 · Regulatory impact analysis · PHMSA · 17 references, 1 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Placeholder RIA accident data

RIA2022-09-16 · Regulatory impact analysis · PHMSA · 1 reference
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Placeholder RIA incident data

RIA2022-09-16 · Regulatory impact analysis · PHMSA · 1 reference
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

ld cafe co2 nhtsa 2127 al76 epa pria 181016

RIA2022-09-16 · Regulatory impact analysis · PHMSA · 190 references, 104 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Docket documents

PHMSA-2013-0255: 190 documents, 12 held · Analyses 5 (5 held), Correspondence 6, Other 3, Reports 169, OIRA review record 2 (2 held), Rule documents 5 (5 held)

Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards

Rule documentsHeld2020-02-06 · PHMSA-2013-0255-0005 · Proposed Rule · Notice of Proposed Rulemaking (NPRM) · FR 2020-01459

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards

Rule documentsHeld2022-04-08 · PHMSA-2013-0255-0043 · Rule · Final Rule · FR 2022-07133

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards; Technical Corrections

Rule documentsHeld2023-08-01 · PHMSA-2013-0255-0216 · Rule · Correction · FR 2023-15904

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards; Technical Corrections

Rule documentsHeld2023-08-01 · PHMSA-2013-0255-0217 · Rule · Correction · FR 2023-15904

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Technical Corrections

Rule documentsHeld2024-06-28 · PHMSA-2013-0255-0218 · Rule · Correction · FR 2024-14116

OIRA reviews (2)

Proposed Rulereceived 2019-06-25, concluded 2020-01-06 · Consistent with Change
Final Rulereceived 2021-12-15, concluded 2022-03-18 · Consistent with Change