{"rin":{"rin":"2137-AF06","title":"Pipeline Safety: Amendments to Parts 192 and 195 to require Valve installation and Minimum Rupture Detection Standards","agency_code":"2137","year":2019,"sig":1,"es":0,"major":0,"n_reviews":2,"first_review":"2019-06-25","last_review":"2021-12-15","stages":"final,proposed","exp_pre":0,"exp_prop":1,"exp_ifr":0,"exp_fin":1,"rev_pre":null,"rev_prop":"2019-06-25","rev_ifr":null,"rev_fin":"2021-12-15","n_pre":0,"n_prop":1,"n_ifr":0,"n_fin":1,"n_fr_other":2,"got_pre":0,"got_prop":1,"got_ifr":0,"got_fin":1,"n_ria":5,"ria_in_text":0,"n_dockets":1,"n_docket_items":190,"n_docket_held":12,"n_other":2,"n_refs":277,"first_fr":"2020-02-06","last_fr":"2024-06-28","agency":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration"},"oira_reviews":[{"stage":"Proposed Rule","date_received":"2019-06-25","date_completed":"2020-01-06","date_published":null,"decision":"Consistent with Change","econ_significant":0,"major":0,"title":"Pipeline Safety: Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards"},{"stage":"Final Rule","date_received":"2021-12-15","date_completed":"2022-03-18","date_published":null,"decision":"Consistent with Change","econ_significant":0,"major":0,"title":"Pipeline Safety: Amendments to Parts 192 and 195 to require Valve installation and Minimum Rupture Detection Standards"}],"documents":[{"doc_id":1390,"source":"ria","doc_type":"regulatory_impact_analysis","date":"2020-02-06","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","role":"ria","stage":"proposed","section_chars":null,"analysis_id":58,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0006","action":null,"n_citations":43,"n_linked":3},{"doc_id":7232,"source":"fr_rule","doc_type":"Proposed Rule","date":"2020-02-06","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","role":"proposed_rule","stage":"proposed","section_chars":null,"analysis_id":null,"link_type":"explicit_id","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","native_id":"2020-01459","action":"Notice of proposed rulemaking.","n_citations":12,"n_linked":3},{"doc_id":128898,"source":"docket_item","doc_type":"review_record","date":"2020-12-23","title":"Rupture Detection Valve NPRM OMB Redline","role":"other","stage":null,"section_chars":null,"analysis_id":null,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0040","action":null,"n_citations":0,"n_linked":0},{"doc_id":1258,"source":"ria","doc_type":"regulatory_impact_analysis","date":"2022-04-08","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","role":"ria","stage":"final","section_chars":null,"analysis_id":57,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0046","action":null,"n_citations":17,"n_linked":1},{"doc_id":4963,"source":"fr_rule","doc_type":"Rule","date":"2022-04-08","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","role":"final_rule","stage":"final","section_chars":null,"analysis_id":null,"link_type":"explicit_id","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","native_id":"2022-07133","action":"Final rule.","n_citations":11,"n_linked":2},{"doc_id":128546,"source":"docket_item","doc_type":"review_record","date":"2022-04-08","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","role":"other","stage":null,"section_chars":null,"analysis_id":null,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0044","action":null,"n_citations":0,"n_linked":0},{"doc_id":1251,"source":"ria","doc_type":"regulatory_impact_analysis","date":"2022-09-16","title":"Placeholder  RIA accident data","role":"ria","stage":"final","section_chars":null,"analysis_id":57,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0128","action":null,"n_citations":1,"n_linked":0},{"doc_id":1253,"source":"ria","doc_type":"regulatory_impact_analysis","date":"2022-09-16","title":"Placeholder RIA incident data","role":"ria","stage":"final","section_chars":null,"analysis_id":57,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0124","action":null,"n_citations":1,"n_linked":0},{"doc_id":1255,"source":"ria","doc_type":"regulatory_impact_analysis","date":"2022-09-16","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","role":"ria","stage":"final","section_chars":null,"analysis_id":57,"link_type":"explicit_id","org":"PHMSA","native_id":"PHMSA-2013-0255-0202","action":null,"n_citations":190,"n_linked":104},{"doc_id":4448,"source":"fr_rule","doc_type":"Rule (administrative)","date":"2023-08-01","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections","role":"fr_administrative","stage":"final","section_chars":null,"analysis_id":null,"link_type":"explicit_id","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","native_id":"2023-15904","action":"Correcting amendments.","n_citations":0,"n_linked":0},{"doc_id":407,"source":"fr_rule","doc_type":"Rule (administrative)","date":"2024-06-28","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections","role":"fr_administrative","stage":"final","section_chars":null,"analysis_id":null,"link_type":"explicit_id","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","native_id":"2024-14116","action":"Correction amendments; response to petition for reconsideration.","n_citations":2,"n_linked":0}],"dockets":[{"docket_id":"PHMSA-2013-0255","n_items":190,"n_held":12,"by_category":"{\"analysis\":[5,5],\"correspondence\":[6,0],\"other\":[3,0],\"report\":[169,0],\"review_record\":[2,2],\"rule\":[5,5]}"}],"docket_items":[{"document_id":"PHMSA-2013-0255-0001","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"API Pipeline Conference San Antonio, TX 4.9.14","posted_date":"2014-04-11T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0002","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"GAO Study of Data and Incident Response","posted_date":"2014-04-11T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0003","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"Kiefner Leak Detection Study Final Report Dec. 2012","posted_date":"2014-04-11T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0004","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"ORNL Valves Study","posted_date":"2014-04-11T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0005","docket_id":"PHMSA-2013-0255","category":"rule","document_type":"Proposed Rule","subtype":"Notice of Proposed Rulemaking (NPRM)","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","posted_date":"2020-02-06T05:00:00Z","fr_doc_num":"2020-01459","doc_id":null},{"document_id":"PHMSA-2013-0255-0006","docket_id":"PHMSA-2013-0255","category":"analysis","document_type":"Supporting & Related Material","subtype":"Supplement","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","posted_date":"2020-02-06T05:00:00Z","fr_doc_num":null,"doc_id":1390},{"document_id":"PHMSA-2013-0255-0040","docket_id":"PHMSA-2013-0255","category":"review_record","document_type":"Other","subtype":"Supplement (SUP)","title":"Rupture Detection Valve NPRM OMB Redline","posted_date":"2020-12-23T05:00:00Z","fr_doc_num":null,"doc_id":128898},{"document_id":"PHMSA-2013-0255-0043","docket_id":"PHMSA-2013-0255","category":"rule","document_type":"Rule","subtype":"Final Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","posted_date":"2022-04-08T04:00:00Z","fr_doc_num":"2022-07133","doc_id":null},{"document_id":"PHMSA-2013-0255-0044","docket_id":"PHMSA-2013-0255","category":"review_record","document_type":"Other","subtype":"Assessment Document or Analysis","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","posted_date":"2022-04-08T04:00:00Z","fr_doc_num":null,"doc_id":128546},{"document_id":"PHMSA-2013-0255-0046","docket_id":"PHMSA-2013-0255","category":"analysis","document_type":"Other","subtype":"Assessment Document or Analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","posted_date":"2022-04-08T04:00:00Z","fr_doc_num":null,"doc_id":1258},{"document_id":"PHMSA-2013-0255-0047","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"Interstate Natural Gas Association of America (INGAA)1","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0048","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"API-AOPL Comments on Draft Valve Study 10-26-2012 FINAL","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0049","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Comments of Accufacts Inc.","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0050","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"1996 Study RCV Feasibility","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0051","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ADB-10-0- 1","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0052","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"AGA Final Comment Valve Study","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0053","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Alternative MAOP Final Rule","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0054","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"166 Congressional Record H8823 12-21-2020","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0055","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ANPRM on EFRDs 59 FR 2802","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0056","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ANPRM Hazardous Liquid Pipelines 75 FR 63774 Oct. 18 2010","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0057","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ANPRM Gas Transmission Pipelines 76 FR 53086 Aug. 25 2011","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0058","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Andy Drake PHMSA Valve Workshop","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0059","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"CFER Comments on ORNL Valve Study 25Oct2012","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0060","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"CPUC Approves Pipeline Safety Plan for PG E 12-20-2012","posted_date":"2022-09-15T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0061","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"DennisJarnecke  Main Line Valves","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0062","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Dave Chittick Valve Considerations for Natural Gas Transmission Pipelines","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0063","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"CPUC Consumer Protection and Safety Division Incident Investigation Report 1 12 2012","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0064","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC July 2022 Meeting Homepage","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0065","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC Committee Voting Slides","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0066","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC  Summary of Rupture Identification and Valve Closure on Pipeline Systems Presentation","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0067","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC Meeting Minutes","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0068","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC Meeting Agenda","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0069","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC Transcript 7 22 2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0070","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GAO 13 168 Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0071","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC Meeting Transcript  Valve Rule July 22 2022","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0072","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"July 2012 R D Forum Meeting Page","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0073","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Improving Leak Detection System Design Redundancy and Accuracy Natural Gas Pipeline Report 7 18 2017","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0074","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"HL IM NPRM 65 FR 21695","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0075","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Kori Patrick Valve Considerations","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0076","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Draft Environmental Assessment  PHMSA 2013 0255 0006 Feb. 2022","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0077","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Dennis Jarnecke R D Program Main Line Valves","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0078","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Don Ledversis28 Valve Considerations for Hazardous Liquid Pipelines","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0079","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"GPAC Meeting FR Notice  85 FR 37496 June 22 2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0080","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"INGAA Action Plan to Build Confidence in Pipeline Safety 07 2011","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0081","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"INGAA Guiding Principles for Pipeline Safety 03 2011","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0082","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Jim Hotinger Valve Considerations","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0083","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Joseph Summa Panel 3 Valve Capabilities Limitations and Research","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0084","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Jeff Gilliam28 Gas Transmission Understanding the Application of ACV","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0085","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Kiefner and Associates Final Report 12173 Leak Detection Study 12 10 2012","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0086","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Leak Valve Event Summary Report","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0087","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LindaDaugherty Panel 1 National Perspectives on Key Technical Challenges","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0088","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Meeting Minutes","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0089","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Transcript 7 23 2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0090","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Leak Event Transcripts","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0091","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Meeting Agenda","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0092","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC July 2022 Meeting Homepage","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0093","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Meeting Transcript Valve Rule July 23 2022","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0094","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Vote Slides","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0095","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Larry Hjalmarson Automatic Remote Control Valves","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0096","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Meeting FR Notice  85 FR 37496 June 22 2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0097","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LoriTraweek Government Industry Pipeline R D Forum","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0098","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"LPAC Valve Presentation Pipeline Maineline Valve Site Overview","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0099","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"March 2012 R D Workshop Public Meeting Meeting Page","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0100","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Methane Emissions Quantification Process Report 9 25 2019","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0101","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"March 1991 Emergency Flow Restricting Devices Study","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0102","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Special Study PSS 71 01 12 31 1970","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0103","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Report on Edison 3 12 2014","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0104","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Sissonville Report 12 11 2012","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0105","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Addendum to Report on Edison 5 18 2001","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0106","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Report on Edison 3 23 1994","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0107","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Report on San Bruno 9 9 2010","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0108","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NTSB Report on Enbridge 7 25 2010","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0109","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT  LPAC  Valve Installation and Minimum Rupture Detection Standards July 23 2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0110","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT  LPAC  Valve Installation and Minimum Rupture Detection Standards July 16 2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0111","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"October 2012 R D Webinar Leak Detection ASV RCV Valve Studies Briefing Meeting Page","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0112","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT  LPAC  Summary of Rupture Identification and Valve Closure on Pipeline Systems","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0113","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT Summary of Rupture Identification and Valve Closure on Pipeline Systems Presentation","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0114","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT  Pre LPAC Briefing  Summary of Rupture Identification and Valve Closure on Pipeline Systems","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0115","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT  Valve Installation and Minimum Rupture Detection Standards","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0116","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA Slides for Valve  10 05 12","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0117","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA PPT Pre PAC Briefing  Valve Installation and Minimum Rupture Detection Standards","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0118","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ORNL Valve Study PHMSA Webinar Oct 5 2012 Ver 2","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0119","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA Failure Investigation Report Plains Pipeline LP Line 901 Public","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0120","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder  post 2017 accident data","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0121","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Pipeline Safety Act 1996","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0122","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder  ruptures HL accident data","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0123","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PIPES Act 2006","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0124","docket_id":"PHMSA-2013-0255","category":"analysis","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder RIA incident data","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":1253},{"document_id":"PHMSA-2013-0255-0125","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder low stress HL accident data","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0126","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Pipeline Safety Regulatory Certainty and Job Creation Act of 2011","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0127","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder Annual report data","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0128","docket_id":"PHMSA-2013-0255","category":"analysis","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder  RIA accident data","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":1251},{"document_id":"PHMSA-2013-0255-0129","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Pipeline Safety Act 1992","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0130","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Remote Control Spill Reduction Technology Report","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0131","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Summary of Comments ORNL ASV RCV Draft Report 1","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0132","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Transcript","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0133","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Report to Congress on Shipping Crude Oil by Truck Rail and Pipeline 10-2018","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0134","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"San Bruno Victims and Their Families Deserve Long Overdue Action  NTSB Safety Compass Blog","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0135","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Study of Pipelines that Ruptured While Operating at a Hoop Stress Below 30 SMYS 02 2013","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0136","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Rover Pipeline Final EIS","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0137","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Valve Capabilities Research Panel 3 Objectives 2 12","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0138","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"US Methane Emissions Reduction Action Plan 1","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0139","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Viking Final Order 5 1 1998","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0140","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Valves HL Panel 1 Objectives 2","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0141","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Pipeline Research and Development Forum Event Summary Report 07 2012","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0142","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"SteveNanney PHMSA RESEARCH  TECHNICAL PERSPECTIVES","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0143","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Richard Kuprewicz28 Panel 3  Valve Capabilities","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0144","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Southeast Market Pipelines Project Final EIS Section 2","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0145","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Valve Event Transcripts","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0146","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WG1 ReportOut Threat Protection","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0147","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Valves NG Panel 2 Objectives 2","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0148","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WG5 ReportOut Design Materials Welding Joining","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0149","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WG2 ReportOut  Leak Detection Mitigation and Storage","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0150","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WG4 ReportOut  Anomaly Repair and Remediation","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0151","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WG3 ReportOut  Anomaly Detection Characterization","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0152","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Wiese Slides Summary28  Understanding the Application of A RCV","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0153","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"4 years later cleanup nears end for big North Dakota spill","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0154","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"1 20 16DakotaAccessApproval","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0155","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"49 CFR Part 195  current","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0156","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"3riskassessment033007","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0157","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"49 CFR Part 192  current","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0158","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"2006 Gas Gathering Final Rule","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0159","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"20151218 4001 6 Section 2 Description of the Proposed Action Final EIS","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0160","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"20140328 4001 06 Section 2 Description of the Proposed Action","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0161","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Wiese Slides Morning28 Understanding the Application of A RCV","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0162","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"1989PipelineSafetyReport","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0163","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"20120316 4001 Volume I Section 4 Environmental Analysis","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0164","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"20150123 4001 AIM Project Final EIS Vol I","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0165","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"20141024 4001Constitution FEIS Vol 1 Environmental Analysis","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0166","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISk","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0167","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"CrudeOilImpact March2016","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0168","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISf","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0169","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"HardwayPittsburgCh4News2016","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0170","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Incidents by age of pipes PST spring2015 newsletter excerpt","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0171","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"arb aliso canyon methane leak climate impacts mitigation program","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0172","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISe","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0173","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISc","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0174","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISd","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0175","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISa","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0176","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISg","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0177","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"addendum to sc ghg tsd august 2016","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0178","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISj","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0179","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISh","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0180","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISi","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0181","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Enbridge2012","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0182","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISl","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0183","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISb","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0184","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"KeystoneXLFEISm","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0185","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"DEIS0277","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0186","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"FERC2016EIS","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0187","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Final Supplemental Environmental Impact Statement for the Keystone XL Project December 2019","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0188","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PHMSA Hazardous Liquid Incidents Water Crossings","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0189","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PG E officials grilled about automatic shut off valves  The Mercury News","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0190","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder  Safety of Gas and Liquid Pipelines Dockets","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0191","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PSS7101","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0192","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"PAR0301","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0193","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"rbos newsletter nov 2015 final 508 v4","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0194","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"StateImpact Pennsylvania","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0195","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder  PHMSA Regional Consultation Operator Practice RMV Installation","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0196","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"New price tag for Kalamazoo River oil spill cleanup Enbridge","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0197","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"U.S. energy facts explained","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0198","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Placeholder ClimateChangeArticle","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0199","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Understanding Global Warming Potentials US EPA","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0200","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"TechnicalSupportDocument SocialCostofCarbonMethaneNitrousOxide","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0201","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Plains All American Pipeline Lp 2019 Annual Report 10 K","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0202","docket_id":"PHMSA-2013-0255","category":"analysis","document_type":"Other","subtype":"Supplemental Comment","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":1255},{"document_id":"PHMSA-2013-0255-0203","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"NCA4 2018 FullReport","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0204","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WageData2020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0205","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Incident20150148","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0206","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"MiesnerLefflerBook","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0207","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"WageData2016","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0208","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Salem residents wonder why gas lines don't have automatic shutoffs TribLIVE.com","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0209","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"env enforcement-2916722 v1 lodged fifth modification to consent decree","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0210","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ecec 03172017","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0211","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"ecec 12172020","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0212","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplemental Comment","title":"Pittsburgh Post Gazette","posted_date":"2022-09-16T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0214","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"2012 Hoidal Presentation\nHazardous Liquid Transmission – Understanding the Application of Automatic and Remote Control Shutoff Valves","posted_date":"2022-10-14T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0215","docket_id":"PHMSA-2013-0255","category":"report","document_type":"Other","subtype":"Supplement (SUP)","title":"2012-03-28 Gonzales Presentation\nEmergency Isolation Valves Hazardous Liquid Pipeline Perspective","posted_date":"2022-10-14T04:00:00Z","fr_doc_num":null,"doc_id":null},{"document_id":"PHMSA-2013-0255-0216","docket_id":"PHMSA-2013-0255","category":"rule","document_type":"Rule","subtype":"Correction","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards; Technical Corrections","posted_date":"2023-08-01T04:00:00Z","fr_doc_num":"2023-15904","doc_id":null},{"document_id":"PHMSA-2013-0255-0217","docket_id":"PHMSA-2013-0255","category":"rule","document_type":"Rule","subtype":"Correction","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards; Technical Corrections","posted_date":"2023-08-01T04:00:00Z","fr_doc_num":"2023-15904","doc_id":null},{"document_id":"PHMSA-2013-0255-0218","docket_id":"PHMSA-2013-0255","category":"rule","document_type":"Rule","subtype":"Correction","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Technical Corrections","posted_date":"2024-06-28T04:00:00Z","fr_doc_num":"2024-14116","doc_id":null}]}