Policy Replication

← Rulemakings

Pipeline Safety: Amendments to Parts 192 and 195 to require Valve installation and Minimum Rupture Detection Standards

RIN 2137-AF06 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 277 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

11 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 2019-06-25 · 1 document
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2021-12-15 · 1 document
Regulatory impact analysis5 files
Docket documents12 of 190 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (1)

Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards

Proposed rule (NPRM)2020-02-06 · FR 2020-01459 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 12 references, 3 linked to papers
Federal Register action: Notice of proposed rulemaking.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Final rule stage: Federal Register documents (1)

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards

Final rule2022-04-08 · FR 2022-07133 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 11 references, 2 linked to papers
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (2)

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections

Correction2023-08-01 · FR 2023-15904 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
Federal Register action: Correcting amendments.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections

Correction2024-06-28 · FR 2024-14116 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 2 references
Federal Register action: Correction amendments; response to petition for reconsideration.
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Regulatory impact analyses (5)

For the proposed rule

Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment

RIA2020-02-06 · Regulatory impact analysis · PHMSA · 43 references, 3 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence
For the final rule

Final Regulatory Impact Analysis for the "Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule

RIA2022-04-08 · Regulatory impact analysis · PHMSA · 17 references, 1 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Placeholder RIA accident data

RIA2022-09-16 · Regulatory impact analysis · PHMSA · 1 reference
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Placeholder RIA incident data

RIA2022-09-16 · Regulatory impact analysis · PHMSA · 1 reference
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

ld cafe co2 nhtsa 2127 al76 epa pria 181016

RIA2022-09-16 · Regulatory impact analysis · PHMSA · 190 references, 104 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF06) · high confidence

Docket documents

PHMSA-2013-0255: 190 documents, 12 held · Analyses 5 (5 held), Correspondence 6, Other 3, Reports 169, OIRA review record 2 (2 held), Rule documents 5 (5 held)

API Pipeline Conference San Antonio, TX 4.9.14

Reports2014-04-11 · PHMSA-2013-0255-0001 · Other · Supplement (SUP)

GAO Study of Data and Incident Response

Reports2014-04-11 · PHMSA-2013-0255-0002 · Other · Supplement (SUP)

Kiefner Leak Detection Study Final Report Dec. 2012

Reports2014-04-11 · PHMSA-2013-0255-0003 · Other · Supplement (SUP)

ORNL Valves Study

Reports2014-04-11 · PHMSA-2013-0255-0004 · Other · Supplement (SUP)

Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards

Rule documentsHeld2020-02-06 · PHMSA-2013-0255-0005 · Proposed Rule · Notice of Proposed Rulemaking (NPRM) · FR 2020-01459

Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment

AnalysesHeld2020-02-06 · PHMSA-2013-0255-0006 · Supporting & Related Material · Supplement

Comment of Pipeline Technology (PT)

Other2020-05-26 · PHMSA-2013-0255-0034 · Other · Petition(s)

Rupture Detection Valve NPRM OMB Redline

OIRA review recordHeld2020-12-23 · PHMSA-2013-0255-0040 · Other · Supplement (SUP)

Summary of Introductory Meeting with PST

Correspondence2021-02-26 · PHMSA-2013-0255-0041 · Other · Hearing/Meeting Summary

Meeting Summary

Correspondence2022-01-28 · PHMSA-2013-0255-0042 · Other · Hearing/Meeting Summary

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards

Rule documentsHeld2022-04-08 · PHMSA-2013-0255-0043 · Rule · Final Rule · FR 2022-07133

Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866

OIRA review recordHeld2022-04-08 · PHMSA-2013-0255-0044 · Other · Assessment Document or Analysis

Final Environmental Analysis for the ""Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule

Other2022-04-08 · PHMSA-2013-0255-0045 · Other · Environmental assessment

Final Regulatory Impact Analysis for the "Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule

AnalysesHeld2022-04-08 · PHMSA-2013-0255-0046 · Other · Assessment Document or Analysis

Interstate Natural Gas Association of America (INGAA)1

Reports2022-09-15 · PHMSA-2013-0255-0047 · Other · Supplement (SUP)

API-AOPL Comments on Draft Valve Study 10-26-2012 FINAL

Reports2022-09-15 · PHMSA-2013-0255-0048 · Other · Supplemental Comment

Comments of Accufacts Inc.

Reports2022-09-15 · PHMSA-2013-0255-0049 · Other · Supplemental Comment

1996 Study RCV Feasibility

Reports2022-09-15 · PHMSA-2013-0255-0050 · Other · Supplemental Comment

ADB-10-0- 1

Reports2022-09-15 · PHMSA-2013-0255-0051 · Other · Supplemental Comment

AGA Final Comment Valve Study

Reports2022-09-15 · PHMSA-2013-0255-0052 · Other · Supplemental Comment

Alternative MAOP Final Rule

Reports2022-09-15 · PHMSA-2013-0255-0053 · Other · Supplemental Comment

166 Congressional Record H8823 12-21-2020

Reports2022-09-15 · PHMSA-2013-0255-0054 · Other · Supplemental Comment

ANPRM on EFRDs 59 FR 2802

Reports2022-09-15 · PHMSA-2013-0255-0055 · Other · Supplemental Comment

ANPRM Hazardous Liquid Pipelines 75 FR 63774 Oct. 18 2010

Reports2022-09-15 · PHMSA-2013-0255-0056 · Other · Supplemental Comment

ANPRM Gas Transmission Pipelines 76 FR 53086 Aug. 25 2011

Reports2022-09-15 · PHMSA-2013-0255-0057 · Other · Supplemental Comment

Andy Drake PHMSA Valve Workshop

Reports2022-09-15 · PHMSA-2013-0255-0058 · Other · Supplemental Comment

CFER Comments on ORNL Valve Study 25Oct2012

Reports2022-09-15 · PHMSA-2013-0255-0059 · Other · Supplemental Comment

CPUC Approves Pipeline Safety Plan for PG E 12-20-2012

Reports2022-09-15 · PHMSA-2013-0255-0060 · Other · Supplemental Comment

DennisJarnecke Main Line Valves

Reports2022-09-16 · PHMSA-2013-0255-0061 · Other · Supplemental Comment

Dave Chittick Valve Considerations for Natural Gas Transmission Pipelines

Reports2022-09-16 · PHMSA-2013-0255-0062 · Other · Supplemental Comment

CPUC Consumer Protection and Safety Division Incident Investigation Report 1 12 2012

Reports2022-09-16 · PHMSA-2013-0255-0063 · Other · Supplemental Comment

GPAC July 2022 Meeting Homepage

Reports2022-09-16 · PHMSA-2013-0255-0064 · Other · Supplemental Comment

GPAC Committee Voting Slides

Reports2022-09-16 · PHMSA-2013-0255-0065 · Other · Supplemental Comment

GPAC Summary of Rupture Identification and Valve Closure on Pipeline Systems Presentation

Reports2022-09-16 · PHMSA-2013-0255-0066 · Other · Supplemental Comment

GPAC Meeting Minutes

Reports2022-09-16 · PHMSA-2013-0255-0067 · Other · Supplemental Comment

GPAC Meeting Agenda

Reports2022-09-16 · PHMSA-2013-0255-0068 · Other · Supplemental Comment

GPAC Transcript 7 22 2020

Reports2022-09-16 · PHMSA-2013-0255-0069 · Other · Supplemental Comment

GAO 13 168 Better Data and Guidance Needed to Improve Pipeline Operator Incident Response

Reports2022-09-16 · PHMSA-2013-0255-0070 · Other · Supplemental Comment

GPAC Meeting Transcript Valve Rule July 22 2022

Reports2022-09-16 · PHMSA-2013-0255-0071 · Other · Supplemental Comment

July 2012 R D Forum Meeting Page

Reports2022-09-16 · PHMSA-2013-0255-0072 · Other · Supplemental Comment

Improving Leak Detection System Design Redundancy and Accuracy Natural Gas Pipeline Report 7 18 2017

Reports2022-09-16 · PHMSA-2013-0255-0073 · Other · Supplemental Comment

HL IM NPRM 65 FR 21695

Reports2022-09-16 · PHMSA-2013-0255-0074 · Other · Supplemental Comment

Kori Patrick Valve Considerations

Reports2022-09-16 · PHMSA-2013-0255-0075 · Other · Supplemental Comment

Draft Environmental Assessment PHMSA 2013 0255 0006 Feb. 2022

Reports2022-09-16 · PHMSA-2013-0255-0076 · Other · Supplemental Comment

Dennis Jarnecke R D Program Main Line Valves

Reports2022-09-16 · PHMSA-2013-0255-0077 · Other · Supplemental Comment

Don Ledversis28 Valve Considerations for Hazardous Liquid Pipelines

Reports2022-09-16 · PHMSA-2013-0255-0078 · Other · Supplemental Comment

GPAC Meeting FR Notice 85 FR 37496 June 22 2020

Reports2022-09-16 · PHMSA-2013-0255-0079 · Other · Supplemental Comment

INGAA Action Plan to Build Confidence in Pipeline Safety 07 2011

Reports2022-09-16 · PHMSA-2013-0255-0080 · Other · Supplemental Comment

INGAA Guiding Principles for Pipeline Safety 03 2011

Reports2022-09-16 · PHMSA-2013-0255-0081 · Other · Supplemental Comment

Jim Hotinger Valve Considerations

Reports2022-09-16 · PHMSA-2013-0255-0082 · Other · Supplemental Comment

Joseph Summa Panel 3 Valve Capabilities Limitations and Research

Reports2022-09-16 · PHMSA-2013-0255-0083 · Other · Supplemental Comment

Jeff Gilliam28 Gas Transmission Understanding the Application of ACV

Reports2022-09-16 · PHMSA-2013-0255-0084 · Other · Supplemental Comment

Kiefner and Associates Final Report 12173 Leak Detection Study 12 10 2012

Reports2022-09-16 · PHMSA-2013-0255-0085 · Other · Supplemental Comment

Leak Valve Event Summary Report

Reports2022-09-16 · PHMSA-2013-0255-0086 · Other · Supplemental Comment

LindaDaugherty Panel 1 National Perspectives on Key Technical Challenges

Reports2022-09-16 · PHMSA-2013-0255-0087 · Other · Supplemental Comment

LPAC Meeting Minutes

Reports2022-09-16 · PHMSA-2013-0255-0088 · Other · Supplemental Comment

LPAC Transcript 7 23 2020

Reports2022-09-16 · PHMSA-2013-0255-0089 · Other · Supplemental Comment

Leak Event Transcripts

Reports2022-09-16 · PHMSA-2013-0255-0090 · Other · Supplemental Comment

LPAC Meeting Agenda

Reports2022-09-16 · PHMSA-2013-0255-0091 · Other · Supplemental Comment

LPAC July 2022 Meeting Homepage

Reports2022-09-16 · PHMSA-2013-0255-0092 · Other · Supplemental Comment

LPAC Meeting Transcript Valve Rule July 23 2022

Reports2022-09-16 · PHMSA-2013-0255-0093 · Other · Supplemental Comment

LPAC Vote Slides

Reports2022-09-16 · PHMSA-2013-0255-0094 · Other · Supplemental Comment

Larry Hjalmarson Automatic Remote Control Valves

Reports2022-09-16 · PHMSA-2013-0255-0095 · Other · Supplemental Comment

LPAC Meeting FR Notice 85 FR 37496 June 22 2020

Reports2022-09-16 · PHMSA-2013-0255-0096 · Other · Supplemental Comment

LoriTraweek Government Industry Pipeline R D Forum

Reports2022-09-16 · PHMSA-2013-0255-0097 · Other · Supplemental Comment

LPAC Valve Presentation Pipeline Maineline Valve Site Overview

Reports2022-09-16 · PHMSA-2013-0255-0098 · Other · Supplemental Comment

March 2012 R D Workshop Public Meeting Meeting Page

Reports2022-09-16 · PHMSA-2013-0255-0099 · Other · Supplemental Comment

Methane Emissions Quantification Process Report 9 25 2019

Reports2022-09-16 · PHMSA-2013-0255-0100 · Other · Supplemental Comment

March 1991 Emergency Flow Restricting Devices Study

Reports2022-09-16 · PHMSA-2013-0255-0101 · Other · Supplemental Comment

NTSB Special Study PSS 71 01 12 31 1970

Reports2022-09-16 · PHMSA-2013-0255-0102 · Other · Supplemental Comment

NTSB Report on Edison 3 12 2014

Reports2022-09-16 · PHMSA-2013-0255-0103 · Other · Supplemental Comment

NTSB Sissonville Report 12 11 2012

Reports2022-09-16 · PHMSA-2013-0255-0104 · Other · Supplemental Comment

NTSB Addendum to Report on Edison 5 18 2001

Reports2022-09-16 · PHMSA-2013-0255-0105 · Other · Supplemental Comment

NTSB Report on Edison 3 23 1994

Reports2022-09-16 · PHMSA-2013-0255-0106 · Other · Supplemental Comment

NTSB Report on San Bruno 9 9 2010

Reports2022-09-16 · PHMSA-2013-0255-0107 · Other · Supplemental Comment

NTSB Report on Enbridge 7 25 2010

Reports2022-09-16 · PHMSA-2013-0255-0108 · Other · Supplemental Comment

PHMSA PPT LPAC Valve Installation and Minimum Rupture Detection Standards July 23 2020

Reports2022-09-16 · PHMSA-2013-0255-0109 · Other · Supplemental Comment

PHMSA PPT LPAC Valve Installation and Minimum Rupture Detection Standards July 16 2020

Reports2022-09-16 · PHMSA-2013-0255-0110 · Other · Supplemental Comment

October 2012 R D Webinar Leak Detection ASV RCV Valve Studies Briefing Meeting Page

Reports2022-09-16 · PHMSA-2013-0255-0111 · Other · Supplemental Comment

PHMSA PPT LPAC Summary of Rupture Identification and Valve Closure on Pipeline Systems

Reports2022-09-16 · PHMSA-2013-0255-0112 · Other · Supplemental Comment

PHMSA PPT Summary of Rupture Identification and Valve Closure on Pipeline Systems Presentation

Reports2022-09-16 · PHMSA-2013-0255-0113 · Other · Supplemental Comment

PHMSA PPT Pre LPAC Briefing Summary of Rupture Identification and Valve Closure on Pipeline Systems

Reports2022-09-16 · PHMSA-2013-0255-0114 · Other · Supplemental Comment

PHMSA PPT Valve Installation and Minimum Rupture Detection Standards

Reports2022-09-16 · PHMSA-2013-0255-0115 · Other · Supplemental Comment

PHMSA Slides for Valve 10 05 12

Reports2022-09-16 · PHMSA-2013-0255-0116 · Other · Supplemental Comment

PHMSA PPT Pre PAC Briefing Valve Installation and Minimum Rupture Detection Standards

Reports2022-09-16 · PHMSA-2013-0255-0117 · Other · Supplemental Comment

ORNL Valve Study PHMSA Webinar Oct 5 2012 Ver 2

Reports2022-09-16 · PHMSA-2013-0255-0118 · Other · Supplemental Comment

PHMSA Failure Investigation Report Plains Pipeline LP Line 901 Public

Reports2022-09-16 · PHMSA-2013-0255-0119 · Other · Supplemental Comment

Placeholder post 2017 accident data

Reports2022-09-16 · PHMSA-2013-0255-0120 · Other · Supplemental Comment

Pipeline Safety Act 1996

Reports2022-09-16 · PHMSA-2013-0255-0121 · Other · Supplemental Comment

Placeholder ruptures HL accident data

Reports2022-09-16 · PHMSA-2013-0255-0122 · Other · Supplemental Comment

PIPES Act 2006

Reports2022-09-16 · PHMSA-2013-0255-0123 · Other · Supplemental Comment

Placeholder RIA incident data

AnalysesHeld2022-09-16 · PHMSA-2013-0255-0124 · Other · Supplemental Comment

Placeholder low stress HL accident data

Reports2022-09-16 · PHMSA-2013-0255-0125 · Other · Supplemental Comment

Pipeline Safety Regulatory Certainty and Job Creation Act of 2011

Reports2022-09-16 · PHMSA-2013-0255-0126 · Other · Supplemental Comment

Placeholder Annual report data

Reports2022-09-16 · PHMSA-2013-0255-0127 · Other · Supplemental Comment

Placeholder RIA accident data

AnalysesHeld2022-09-16 · PHMSA-2013-0255-0128 · Other · Supplemental Comment

Pipeline Safety Act 1992

Reports2022-09-16 · PHMSA-2013-0255-0129 · Other · Supplemental Comment

Remote Control Spill Reduction Technology Report

Reports2022-09-16 · PHMSA-2013-0255-0130 · Other · Supplemental Comment

Summary of Comments ORNL ASV RCV Draft Report 1

Reports2022-09-16 · PHMSA-2013-0255-0131 · Other · Supplemental Comment

Transcript

Reports2022-09-16 · PHMSA-2013-0255-0132 · Other · Supplemental Comment

Report to Congress on Shipping Crude Oil by Truck Rail and Pipeline 10-2018

Reports2022-09-16 · PHMSA-2013-0255-0133 · Other · Supplemental Comment

San Bruno Victims and Their Families Deserve Long Overdue Action NTSB Safety Compass Blog

Reports2022-09-16 · PHMSA-2013-0255-0134 · Other · Supplemental Comment

Study of Pipelines that Ruptured While Operating at a Hoop Stress Below 30 SMYS 02 2013

Reports2022-09-16 · PHMSA-2013-0255-0135 · Other · Supplemental Comment

Rover Pipeline Final EIS

Reports2022-09-16 · PHMSA-2013-0255-0136 · Other · Supplemental Comment

Valve Capabilities Research Panel 3 Objectives 2 12

Reports2022-09-16 · PHMSA-2013-0255-0137 · Other · Supplemental Comment

US Methane Emissions Reduction Action Plan 1

Reports2022-09-16 · PHMSA-2013-0255-0138 · Other · Supplemental Comment

Viking Final Order 5 1 1998

Reports2022-09-16 · PHMSA-2013-0255-0139 · Other · Supplemental Comment

Valves HL Panel 1 Objectives 2

Reports2022-09-16 · PHMSA-2013-0255-0140 · Other · Supplemental Comment

Pipeline Research and Development Forum Event Summary Report 07 2012

Reports2022-09-16 · PHMSA-2013-0255-0141 · Other · Supplemental Comment

SteveNanney PHMSA RESEARCH TECHNICAL PERSPECTIVES

Reports2022-09-16 · PHMSA-2013-0255-0142 · Other · Supplemental Comment

Richard Kuprewicz28 Panel 3 Valve Capabilities

Reports2022-09-16 · PHMSA-2013-0255-0143 · Other · Supplemental Comment

Southeast Market Pipelines Project Final EIS Section 2

Reports2022-09-16 · PHMSA-2013-0255-0144 · Other · Supplemental Comment

Valve Event Transcripts

Reports2022-09-16 · PHMSA-2013-0255-0145 · Other · Supplemental Comment

WG1 ReportOut Threat Protection

Reports2022-09-16 · PHMSA-2013-0255-0146 · Other · Supplemental Comment

Valves NG Panel 2 Objectives 2

Reports2022-09-16 · PHMSA-2013-0255-0147 · Other · Supplemental Comment

WG5 ReportOut Design Materials Welding Joining

Reports2022-09-16 · PHMSA-2013-0255-0148 · Other · Supplemental Comment

WG2 ReportOut Leak Detection Mitigation and Storage

Reports2022-09-16 · PHMSA-2013-0255-0149 · Other · Supplemental Comment

WG4 ReportOut Anomaly Repair and Remediation

Reports2022-09-16 · PHMSA-2013-0255-0150 · Other · Supplemental Comment

WG3 ReportOut Anomaly Detection Characterization

Reports2022-09-16 · PHMSA-2013-0255-0151 · Other · Supplemental Comment

Wiese Slides Summary28 Understanding the Application of A RCV

Reports2022-09-16 · PHMSA-2013-0255-0152 · Other · Supplemental Comment

4 years later cleanup nears end for big North Dakota spill

Reports2022-09-16 · PHMSA-2013-0255-0153 · Other · Supplemental Comment

1 20 16DakotaAccessApproval

Reports2022-09-16 · PHMSA-2013-0255-0154 · Other · Supplemental Comment

49 CFR Part 195 current

Reports2022-09-16 · PHMSA-2013-0255-0155 · Other · Supplemental Comment

3riskassessment033007

Reports2022-09-16 · PHMSA-2013-0255-0156 · Other · Supplemental Comment

49 CFR Part 192 current

Reports2022-09-16 · PHMSA-2013-0255-0157 · Other · Supplemental Comment

2006 Gas Gathering Final Rule

Reports2022-09-16 · PHMSA-2013-0255-0158 · Other · Supplemental Comment

20151218 4001 6 Section 2 Description of the Proposed Action Final EIS

Reports2022-09-16 · PHMSA-2013-0255-0159 · Other · Supplemental Comment

20140328 4001 06 Section 2 Description of the Proposed Action

Reports2022-09-16 · PHMSA-2013-0255-0160 · Other · Supplemental Comment

Wiese Slides Morning28 Understanding the Application of A RCV

Reports2022-09-16 · PHMSA-2013-0255-0161 · Other · Supplemental Comment

1989PipelineSafetyReport

Reports2022-09-16 · PHMSA-2013-0255-0162 · Other · Supplemental Comment

20120316 4001 Volume I Section 4 Environmental Analysis

Reports2022-09-16 · PHMSA-2013-0255-0163 · Other · Supplemental Comment

20150123 4001 AIM Project Final EIS Vol I

Reports2022-09-16 · PHMSA-2013-0255-0164 · Other · Supplemental Comment

20141024 4001Constitution FEIS Vol 1 Environmental Analysis

Reports2022-09-16 · PHMSA-2013-0255-0165 · Other · Supplemental Comment

KeystoneXLFEISk

Reports2022-09-16 · PHMSA-2013-0255-0166 · Other · Supplemental Comment

CrudeOilImpact March2016

Reports2022-09-16 · PHMSA-2013-0255-0167 · Other · Supplemental Comment

KeystoneXLFEISf

Reports2022-09-16 · PHMSA-2013-0255-0168 · Other · Supplemental Comment

HardwayPittsburgCh4News2016

Reports2022-09-16 · PHMSA-2013-0255-0169 · Other · Supplemental Comment

Incidents by age of pipes PST spring2015 newsletter excerpt

Reports2022-09-16 · PHMSA-2013-0255-0170 · Other · Supplemental Comment

arb aliso canyon methane leak climate impacts mitigation program

Reports2022-09-16 · PHMSA-2013-0255-0171 · Other · Supplemental Comment

KeystoneXLFEISe

Reports2022-09-16 · PHMSA-2013-0255-0172 · Other · Supplemental Comment

KeystoneXLFEISc

Reports2022-09-16 · PHMSA-2013-0255-0173 · Other · Supplemental Comment

KeystoneXLFEISd

Reports2022-09-16 · PHMSA-2013-0255-0174 · Other · Supplemental Comment

KeystoneXLFEISa

Reports2022-09-16 · PHMSA-2013-0255-0175 · Other · Supplemental Comment

KeystoneXLFEISg

Reports2022-09-16 · PHMSA-2013-0255-0176 · Other · Supplemental Comment

addendum to sc ghg tsd august 2016

Reports2022-09-16 · PHMSA-2013-0255-0177 · Other · Supplemental Comment

KeystoneXLFEISj

Reports2022-09-16 · PHMSA-2013-0255-0178 · Other · Supplemental Comment

KeystoneXLFEISh

Reports2022-09-16 · PHMSA-2013-0255-0179 · Other · Supplemental Comment

KeystoneXLFEISi

Reports2022-09-16 · PHMSA-2013-0255-0180 · Other · Supplemental Comment

Enbridge2012

Reports2022-09-16 · PHMSA-2013-0255-0181 · Other · Supplemental Comment

KeystoneXLFEISl

Reports2022-09-16 · PHMSA-2013-0255-0182 · Other · Supplemental Comment

KeystoneXLFEISb

Reports2022-09-16 · PHMSA-2013-0255-0183 · Other · Supplemental Comment

KeystoneXLFEISm

Reports2022-09-16 · PHMSA-2013-0255-0184 · Other · Supplemental Comment

DEIS0277

Reports2022-09-16 · PHMSA-2013-0255-0185 · Other · Supplemental Comment

FERC2016EIS

Reports2022-09-16 · PHMSA-2013-0255-0186 · Other · Supplemental Comment

Final Supplemental Environmental Impact Statement for the Keystone XL Project December 2019

Reports2022-09-16 · PHMSA-2013-0255-0187 · Other · Supplemental Comment

PHMSA Hazardous Liquid Incidents Water Crossings

Reports2022-09-16 · PHMSA-2013-0255-0188 · Other · Supplemental Comment

PG E officials grilled about automatic shut off valves The Mercury News

Reports2022-09-16 · PHMSA-2013-0255-0189 · Other · Supplemental Comment

Placeholder Safety of Gas and Liquid Pipelines Dockets

Reports2022-09-16 · PHMSA-2013-0255-0190 · Other · Supplemental Comment

PSS7101

Reports2022-09-16 · PHMSA-2013-0255-0191 · Other · Supplemental Comment

PAR0301

Reports2022-09-16 · PHMSA-2013-0255-0192 · Other · Supplemental Comment

rbos newsletter nov 2015 final 508 v4

Reports2022-09-16 · PHMSA-2013-0255-0193 · Other · Supplemental Comment

StateImpact Pennsylvania

Reports2022-09-16 · PHMSA-2013-0255-0194 · Other · Supplemental Comment

Placeholder PHMSA Regional Consultation Operator Practice RMV Installation

Reports2022-09-16 · PHMSA-2013-0255-0195 · Other · Supplemental Comment

New price tag for Kalamazoo River oil spill cleanup Enbridge

Reports2022-09-16 · PHMSA-2013-0255-0196 · Other · Supplemental Comment

U.S. energy facts explained

Reports2022-09-16 · PHMSA-2013-0255-0197 · Other · Supplemental Comment

Placeholder ClimateChangeArticle

Reports2022-09-16 · PHMSA-2013-0255-0198 · Other · Supplemental Comment

Understanding Global Warming Potentials US EPA

Reports2022-09-16 · PHMSA-2013-0255-0199 · Other · Supplemental Comment

TechnicalSupportDocument SocialCostofCarbonMethaneNitrousOxide

Reports2022-09-16 · PHMSA-2013-0255-0200 · Other · Supplemental Comment

Plains All American Pipeline Lp 2019 Annual Report 10 K

Reports2022-09-16 · PHMSA-2013-0255-0201 · Other · Supplemental Comment

ld cafe co2 nhtsa 2127 al76 epa pria 181016

AnalysesHeld2022-09-16 · PHMSA-2013-0255-0202 · Other · Supplemental Comment

NCA4 2018 FullReport

Reports2022-09-16 · PHMSA-2013-0255-0203 · Other · Supplemental Comment

WageData2020

Reports2022-09-16 · PHMSA-2013-0255-0204 · Other · Supplemental Comment

Incident20150148

Reports2022-09-16 · PHMSA-2013-0255-0205 · Other · Supplemental Comment

MiesnerLefflerBook

Reports2022-09-16 · PHMSA-2013-0255-0206 · Other · Supplemental Comment

WageData2016

Reports2022-09-16 · PHMSA-2013-0255-0207 · Other · Supplemental Comment

Salem residents wonder why gas lines don't have automatic shutoffs TribLIVE.com

Reports2022-09-16 · PHMSA-2013-0255-0208 · Other · Supplemental Comment

env enforcement-2916722 v1 lodged fifth modification to consent decree

Reports2022-09-16 · PHMSA-2013-0255-0209 · Other · Supplemental Comment

ecec 03172017

Reports2022-09-16 · PHMSA-2013-0255-0210 · Other · Supplemental Comment

ecec 12172020

Reports2022-09-16 · PHMSA-2013-0255-0211 · Other · Supplemental Comment

Pittsburgh Post Gazette

Reports2022-09-16 · PHMSA-2013-0255-0212 · Other · Supplemental Comment

INGAA 2015 Member Survey on Valves and Automation Results

Correspondence2022-09-21 · PHMSA-2013-0255-0213 · Other · Correspondence

2012 Hoidal Presentation Hazardous Liquid Transmission – Understanding the Application of Automatic and Remote Control Shutoff Valves

Reports2022-10-14 · PHMSA-2013-0255-0214 · Other · Supplement (SUP)

2012-03-28 Gonzales Presentation Emergency Isolation Valves Hazardous Liquid Pipeline Perspective

Reports2022-10-14 · PHMSA-2013-0255-0215 · Other · Supplement (SUP)

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards; Technical Corrections

Rule documentsHeld2023-08-01 · PHMSA-2013-0255-0216 · Rule · Correction · FR 2023-15904

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards; Technical Corrections

Rule documentsHeld2023-08-01 · PHMSA-2013-0255-0217 · Rule · Correction · FR 2023-15904

PHMSA Response to GPA & API Petition for Reconsideration

Correspondence2024-06-27 · PHMSA-2013-0255-0219 · Other · Letter(s)

Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Technical Corrections

Rule documentsHeld2024-06-28 · PHMSA-2013-0255-0218 · Rule · Correction · FR 2024-14116

Supplemental Letter Regarding Petition for Reconsideration PHMSA 2013 0255(.5320617.1

Correspondence2024-11-07 · PHMSA-2013-0255-0220 · Other · Letter(s)

GPA API Supplemental Letter Petition for Reconsideration PHMSA 2013 0255 5.30.24

Correspondence2024-11-15 · PHMSA-2013-0255-0221 · Other · Letter(s)

GPA Midstream Association and American Petroleum Institute Petition for Reconsideration of Technical Corrections Rule PHMSA 20

Other2024-11-15 · PHMSA-2013-0255-0222 · Other · Petition(s)

OIRA reviews (2)

Proposed Rulereceived 2019-06-25, concluded 2020-01-06 · Consistent with Change
Final Rulereceived 2021-12-15, concluded 2022-03-18 · Consistent with Change