Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards
Federal Register2022-04-08 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · Rule · 2022-07133
Final rule.
PHMSA is revising the Federal Pipeline Safety Regulations applicable to most newly constructed and entirely replaced onshore gas transmission, Type A gas gathering, and hazardous liquid pipelines with diameters of 6 inches or greater. In the revised regulations, PHMSA requires operators of these lines to install rupture-mitigation valves (i.e., remote-control or automatic shut-off valves) or alternative equivalent technologies, and establishes minimum performance standards for those valves' operation to prevent or mitigate the public safety and environmental consequences of pipeline ruptures. This final rule establishes requirements for rupture-mitigation valve spacing, maintenance and inspection, and risk analysis. The final rule also requires operators of gas and hazardous liquid pipelines to contact 9- 1-1 emergency call centers immediately upon notification of a potential rupture and conduct post-rupture investigations and reviews. Operators must also incorporate lessons learned from such investigations and reviews into operators' personnel training and qualifications programs, and in design, construction, testing, maintenance, operations, and emergency procedure manuals and specifications. PHMSA is promulgating these regulations in response to congressional directives following major pipeline incidents where there were significant environmental consequences or losses of human life. The revisions are intended to achieve better rupture identification, response, and mitigation of safety, greenhouse gas, and environmental justice impacts.
Original sourceXML (450 KB)PDF (459 KB)
Other documents for the same rulemaking
References: 11 extracted, 2 linked to papers
Page 1Download these results: CSV · JSON
NTSB, Accident Report PAR-12/01, "Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release; Marshall, MI: July 25, 2010" (July 10, 2012)
NTSB, Accident Report PAR-11/01, "Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010" (Aug. 30, 2011)
CPUC, "Sept. 9, 2010 PG&E Pipeline Rupture in San Bruno, CA" (Jan. 12, 2012)
GAO, "Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response" (Jan. 2013)
Oak Ridge National Laboratory (ORNL), ORNL/TM-2012/411, "Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves and Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety" (Oct. 31, 2012)
Kiefner and Associates, Inc., Report No. 12-173, "Leak Detection Study—DTPH56-11-D-000001" (Dec. 10, 2012)
Rosenfeld & Fassett "Study of Pipelines that Ruptured While Operating at a Hoop Stress Below 30% SMYS;" Pipeline Pigging and Integrity Management Conference (Feb. 13-14, 2013)
conference paperNot linked to a paper · Section III.E.3(ii) fn 42
NTSB, PSS-71-1, Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown (Dec. 31, 1970)
In the Matter of Viking Gas Transmission, Final Order, C.P.F. No. 32102 (May 1, 1998).
otherNot linked to a paper · Section H, PHMSA Response (fn 44)
NAS, “Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines” (last visited Nov. 23, 2021).
research reportNot linked to a paper · Section L, PHMSA Response (fn 48)
Ryan Emmanuel, et al., “Natural Gas Gathering and Transmission Pipelines and Social Vulnerability in the United States,” 5:6 GeoHealth (June 2021)