Policy Replication

Final Regulatory Impact Analysis for the "Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule

Regulatory impact analysis2022-04-08 · PHMSA · regulatory_impact_analysis · PHMSA-2013-0255-0046
RIN 2137-AF06 · Docket PHMSA-2013-0255

Other documents for the same rulemaking

2020-02-06 Regulatory impact analysisPreliminary Regulatory Impact Analysis and Preliminary Environmental Assessment
2020-02-06 Federal RegisterPipeline Safety: Valve Installation and Minimum Rupture Detection Standards
2020-12-23 Docket documentRupture Detection Valve NPRM OMB Redline
2022-04-08 Federal RegisterPipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards
2022-04-08 Docket documentRedline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866
2022-09-16 Regulatory impact analysisPlaceholder RIA accident data
2022-09-16 Regulatory impact analysisPlaceholder RIA incident data
2022-09-16 Regulatory impact analysisld cafe co2 nhtsa 2127 al76 epa pria 181016
2023-08-01 Federal RegisterPipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections
2024-06-28 Federal RegisterPipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections

References: 17 extracted, 1 linked to papers

Page 1Download these results: CSV · JSON
NTSB, Accident Report PAR-11/01, "Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010" (Aug. 30, 2011)
research reportNot linked to a paper · fn 1 · cited link
NTSB, Accident Report PAR-12/01, "Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release; Marshall, MI: July 25, 2010" (July 10, 2012)
research reportNot linked to a paper · fn 2 · cited link
Garret Ellison, "New price tag for Kalamazoo River oil spill cleanup: Enbridge says $1.21 billion". Grand Rapids Press, November 5, 2014
newsNot linked to a paper · fn 3 · cited link
NTSB, NTSB-PSS-71-1, "Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown" (1970)
research reportNot linked to a paper · 1.1. Background · cited link
NTSB, PAR-95-1, "Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey" (1995)
research reportNot linked to a paper · 1.1. Background · cited link
Better Data and Guidance Needed to Improve Pipeline Operator Incident Response (GAO 2013)
government reportNot linked to a paper · 1.1. Background · cited link
Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety (ORNL 2012)
Kiefner and Associates, Inc., Report No. 12-173, "Leak Detection Study – DTPH56-11-D-000001" (Dec. 10, 2012)
research reportNot linked to a paper · fn 18 · cited link
Carey & Rogers, "PG&E Officials Grilled About Automatic Shut Off Valves," Mercury News (March 1, 2011)
newsNot linked to a paper · fn 25 · cited link
IHS Economics, "The Economic Impact of Crude Oil Pipeline Construction and Operation" (2017)
research reportNot linked to a paper · 5.5. Summary of Costs · cited link
MacPherson, "4 Years Later, Cleanup Nears End for Big North Dakota Spill" StarTribune (Sept. 15, 2017)
newsNot linked to a paper · 4.3. Frequency and Consequences of Ruptures · cited link
ENSR Corporation, Pipeline Risk Assessment and Environmental Consequence Analysis, March 2007, Document No.: 10623-004
research reportNot linked to a paper · 6.2. Hazardous Liquid Pipeline Ruptures · cited link
Litvak, "Natural Gas Explosion Rocks Westmoreland County and U.S. Gas Markets," Pittsburgh Post-Gazette (May 1, 2016)
newsNot linked to a paper · 6.1.3. Summary · cited link
NTSB, Accident Report NTSB/PAR-14/01, "Columbia Gas Transmission Corporation Pipeline Rupture, Sissonville, West Virginia December 11, 2012" (2014)
research reportNot linked to a paper · 6.1.3. Summary · cited link
NTSB, Accident Report NTSB/PAR-03/01, "Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000" (2003)
research reportNot linked to a paper · 6.1.3. Summary · cited link
Federal Energy Regulatory Commission (FERC). 2018. Draft Environmental Impact Statement for Midship Pipeline Company, LLC – Midcontinent Supply Header Interstate Pipeline Project
research reportNot linked to a paper · 4.4. Valve Automation · cited link
U.S. Department of State. 2011. Final Environmental Impact Statement Keystone XL Project
research reportNot linked to a paper · 4.4. Valve Automation · cited link