Memorandum Development of Benchmark Times for Conducting the Closure of CCR Units
Other documents for the same rulemaking
References: 4 extracted, 0 linked to papers
Washington, DC. (accessed April 23, 2020) https://www.epa.gov/superfund/searchsuperfund-five-year-reviews Site/ Cleanup Name
AKZONOBEL SURFACE CHEMISTRY Regulatory Oversight Inorganic Date Contaminants Added Being Addressed to NPL (COCs) From 1970 to present day, a textile finishing and custom specialty chemical manufacturing NCD991278953 facility has operated on the Site. Soil, groundwater and surface water contamination at the Site resulted from disposal of 350,000 gallons of reaction vessel wash waters in the Trench Area between 1971 and 1978, the use of former unlined wastewater treatment lagoons, and the use of a leaking underground terra-cotta pipeline conveying process wastewater to the lagoons.
CERCLA Superfund EPA Region 4 Oct-89 Barium, beryllium, Performance Standard (1988 ROA= no The cleanup for noncarcinogens is the MCL and that if an MCL is not available, the cleanup cadmium, chromium, asterisk, 1993 ROA = *, all in ug/L): level is the reference dose or acceptable chronic intake equivalent concentration level. manganese, nickel, antimony (6*), arsenic (10), barium selenium, zinc, (1,000), beryllium (17.5), cadmium antimony, arsenic (10), chromium (50), manganese (7,700 and 50*), nickel (350), selenium (10), thallium (2*), zinc (7,350 and 2,100*) The 2012 FYR and subsequent evaluations by the PRP found that the OU1 extraction well Jul-89 network was insufficient to provide hydraulic capture of the plume, as the plume had migrated beyond the zone of influence of the extraction wells. In 2013, the OU1 mid-plume investigation began. The PRP installed six shallow bedrock monitoring wells in the mid-plume area to delineate groundwater impacts and to support selection of future extraction well locations. The remedy for OU1 was intended to contain and remediate groundwater downgradient of the Trench Area. The Trench Area extraction system was not functioning as designed and the system was turned off with EPA approval in 2014. In 2015, the PRP installed seven extraction wells in the same area. Hydraulic tests conducted in the new extraction wells found lower than expected yields. An aging system and metals fouling of system components has plagued the
Consequently, groundwater will be pumped into the facility’s wastewater treatment system for treatment prior to being discharged to the POTW. Since 1960, different companies have manufactured polyester polymer chips and filament NCD003446721 yam at the Site. Facility operations previously included on-site burning and burial of plant wastes, storage of drums containing waste chemicals and solvents, and on-site discharge of chemical wastes. These waste disposal activities contaminated soil, streambed sediment, surface water and groundwater with volatile organic compounds (VOCs), semi-volatile