Waukegan EAP and WAP History of Construction 2016
Other documents for the same rulemaking
References
Geosyntec, 2016a. Soil Properties Calculations, Waukegan Station, October.
Geosyntec, 2016b. Plans for the Construction of: East Ash Basin Slope Modification, Waukegan Generating Station, Lake County, Illinois, July, 2016.
Geosyntec, 2016c. Technical Specification Sections 02200 and 02770 for the Construction of: East Ash Basin Slope Modification, Waukegan Generating Station, Lake County, Illinois,
July, 2016. KPRG and Associates, Inc., 2005. Geotechnical Analysis of Soil Surrounding Settling Basins/Ponds, KPRG Project No. 15805, October.
Midwest Generation, 2002. East and West Ash Pond Liner Replacement Plans, Sections, and
Details, Sheet B739 NUS Corporation, 1977. Waste Water Treatment Facilities Waukegan: Ash Pond – Location and Plot Plan, Sheet No. 5082-C-5000. Ash Pond – Detail Plan, Sheet No. 5082-C-5006. Ash Pond – Sections & Details, Sheet No. 5082-C-5007.
NUS Corporation, 1978. Waste Water Treatment Facilities Waukegan: Ash Pond Sump – Plan, Sections and Details, Sheet No. 5082 C 5501 Ash Pond Sump Weir – Plan, Sections & Details, Sheet No. 5082 C 5502 Ash Pond Sump and Weir – Miscellaneous Sections and Details, Sheet No. 5082 C 5503 Ash Pond Inlet Flume & Distribution – Trough Details, Sheet No. 5082 C 5507
Patrick Engineering, 2011. Hydrogeological Assessment Report, Waukegan Generating Station,
RPG, 2002a. “Report of Engineering Study on Waukegan Generating Station #16 Ash Pond Repairs,” 25 January 2002.
RPG, 2002b. “Ash Pond Berm Inspection Report,” Letter to Chris Lux, 2 May 2002.
RPG, 2003b. “Ash Pond Berm Inspection Report,” Letter to Chris Lux, 12 June 2003.
USGS, 2015. “Watershed Boundary Dataset,” accessed via The National http://viewer.nationalmap.gov/viewer/nhd.html?p=nhd, accessed 1 February 2016. Map,
Valdes Engineering, 2009. “Ash Ponds Berm Inspection,” Letter to Chris Lux, 29 June 2009. SW0251.08.06. WAUKEGAN HOC.F East and West Ash Basins, Waukegan Station History of Construction Report October 2016
Valdes Engineering, 2014. “Ash Pond Berm Visual Assessment,” Letter to Chris Lux, 12 June 2014.
Valdes Engineering, 2015. “Ash Pond Berm Visual Assessment,” Letter to Chris Lux, 29 May 2015. Attachments Figure 1 – Site Location Figure 2 – Area-Capacity Curves Appendix A – Construction Drawings Appendix A-1 NUS Construction Drawings Appendix A-2 Liner Replacement Construction Drawing Appendix A-3 East Ash Basin Slope Modification Construction Drawings Appendix B – Technical Specifications Appendix B-1 East Ash Basin Liner Replacement Specifications Appendix B-2 West Ash Basin Liner Replacement Specifications Appendix B-3 East Ash Basin Slope Modification Technical Specifications SW0251.08.06. WAUKEGAN HOC.F West Ash Basin East Ash Basin
USGS TNM - National Structures Dataset; USGS TNM - National Transportation Dataset; TomTom CommercialOctober Roads; U.S. Census Diego 2016
Construction, January 2012. G. Latest version of the American Society for Testing and Materials (ASTM) standards:
EABSM - 02200.d.docx Rev 00 Earthwork 02200-1 June 2016 I. The Contractor shall submit to the Construction Manager a description of equipment and methods proposed for all earthwork components including excavation, ash relocation, select and engineered fill placement, moisture conditioning, and compaction, stockpiling, road subgrade preparation and road surfacing placement and compaction at least 5 days prior to the start of activities covered by this Section. J. The Contractor shall submit copies of all permits obtained for site work. The permits shall be provided prior to initiating the applicable site activities. K. The Contractor shall submit as-built Record Drawing electronic files and data, to the Construction Manager, within 7 days of project substantial completion, in accordance with this Section. The Record Drawings shall be submitted in AutoCAD version 2015 format or newer, or in a DXF format that can be converted to AutoCAD. 1.04