Policy Replication

Waukegan EAP and WAP History of Construction 2016

Docket document2023-05-18 · EPA · report · EPA-HQ-OLEM-2020-0107-0147
RIN 2050-AH39, RIN 2050-AH14, RIN 2050-AH36 · Docket EPA-HQ-OLEM-2020-0107

Other documents for the same rulemaking

2020-10-14 Docket documentExecutive Order 12866 Review Draft; ANPRM cleared by the Office of Management and Budget on September 18, 2020
2020-10-14 Docket documentExecutive Order 12866 Review Draft; ANPRM submitted to the Office of Management and Budget on July 23, 2020
2020-10-14 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments
2023-05-18 Regulatory impact analysisProposed Rule CCR Legacy Rule RIA
2023-05-18 Regulatory impact analysisExecutive Order 12866 Review Draft; Regulatory Impact Analysis submitted to the Office of Management and Budget on March 6, 2023
2023-05-18 Regulatory impact analysisExecutive Order 12866 Review Draft RIA cleared by OMB 050423
2023-05-18 Docket documentExecutive Order 12866 Review Draft; Proposed Rule submitted to the Office of Management and Budget on March 6, 2023
2023-05-18 Docket documentExecutive Order 12866 Review Draft Proposed Rule cleared by OMB 050423
2023-05-18 Docket documentWaukegan 2018 Annual GWMCA Report
2023-05-18 Docket documentR. M. Schahfer Generating Station 2018 Annual GWMCA Report- Landfill Phase V and VI
2023-05-18 Docket documentSeminole Generating Station Increment One Landfill 2018 Annual GWMCA Report
2023-05-18 Docket documentJB Sims - 2020 Alternate Source Demonstration Unit 3
2023-05-18 Docket documentNew Castle Annual GWMCA Report 2021 Ash Landfill
2023-05-18 Docket documentHuntington CCR Landfill Corrective Measures Assessment
2023-05-18 Docket documentJB Sims 2021 Annual Groundwater Monitoring & Corrective Action Report
2023-05-18 Docket documentEIP (2019) Coal’s Poisonous Legacy: Groundwater Contaminated by Coal Ash Across the U.S.
2023-05-18 Docket documentWaukegan 2019 Annual GWMCA Report
2023-05-18 Docket documentHuntington CCR Landfill Remedy Selection Report
2023-05-18 Docket documentU.S. EPA (2014) Human and Ecological Risk Assessment of Coal Combustion Residuals
2023-05-18 Docket documentJH Campbell Power Plant Pond A 2021 Annual Groundwater Monitoring and Corrective Action Report
2023-05-18 Docket documentJH Campbell Power Plant Ponds 1-2 North and 1-2 South, 2021 Annual GWMCA Report
2023-05-18 Docket documentJB Sims Fourth Quarter 2021 Monitoring Report- Response to comments
2023-05-18 Docket documentWaukegan 2020 Annual GWMCA Report
2023-05-18 Docket documentJH Campbell Semiannual Progress Report - Selection of Remedy, Ponds 1-2 North and 1-2 South, and Pond A
2023-05-18 Docket documentReid Gardner - Annual GMR 2018 Pond E-1
2023-05-18 Docket documentU.S. EIA (2017)
2023-05-18 Docket documentU.S. EPA (2019)
2023-05-18 Docket documentWaukegan - Boring Well Logs
2023-05-18 Docket documentProposed Compliance Deadlines for Legacy CCR Surface Impoundments and CCR Management Units
2023-05-18 Docket documentJB Sims -EGLE Enforcement Notice March 2022
2023-05-18 Docket documentMemo to docket - Copyright Documents for Legacy CCRMU Proposed Rule
2023-05-18 Docket documentJB Sims - 2021 Revised Closure Plan Units 1 and 2 and Unit 3
2023-05-18 Docket documentJB Sims - 2021 Letter-to-EGLE-ASD-Response
2023-05-18 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments
2023-06-09 Docket documentMemo to docket - Webinar Legacy CCRMU Proposed Rule - APPA-NRECA
2023-06-09 Docket documentMemo to docket - Webinar Legacy CCRMU Proposed Rule - USWAG-CCIG-Environmental
2023-06-09 Docket documentMemo to docket - Webinar Legacy CCRMU Proposed Rule - ASTSWMO-States
2023-07-07 Docket documentMemo to docket- Webinar Legacy CCRMU Proposed Rule-USWAG Affiliates
2023-07-07 Docket documentMemo to docket- Meeting with Environmental NGOs May 31 2023
2023-07-27 Docket document062823 Chicago Public Hearing Transcript
2023-07-27 Docket document062823 Chicago Public Hearing Transcript- Condensed Format
2023-07-27 Docket documentMemo to docket- Meeting with Environmental NGOs May 31 2023
2023-07-27 Docket documentMemo to docket- Webinar Legacy CCRMU Proposed Rule-USWAG Affiliates
2023-08-08 Docket documentTranscript for Virtual Hearing for Legacy CCR Proposed Rule 7-12-23
2023-11-14 Docket documentU.S. EPA. 2014d. Radiation Risk Assessment at CERCLA Sites: Q&A. OSWER 9285.6-20. Prepared by the Office of Land and Emergency Response. Washington, DC. June
2023-11-14 Docket documentU.S. EPA. 2014a. Final Human and Ecological Risk Assessment of Coal Combustion Residuals. RIN: 2050-AE81. Prepared by the EPA Office of Solid Waste and Emergency Response. Washington, DC. December
2023-11-14 Docket documentU.S. EIA. 2022a. Most U.S. Coal is Mined in the West, but Most Coal Mining Jobs are in the East. Last updated on 11/08/2022. Available online at: https://www.eia.gov/todayinenergy/detail.php?id=54579
2023-11-14 Docket documentDraft Risk Assessment of Coal Combustion Residuals Legacy Impoundments and CCR Management Units. 2023. Prepared By: United States Environmental Protection Agency Office of Land and Emergency Management Office of Resource Conservation and Recovery. October
2023-11-14 Docket documentLANL. 1981. Second Annual Report Radioactive Emissions from Coal Production and Utilization. LA-8825-PR. Prepared by P. Wagner and N.R. Griener. Los Alamos, New Mexico. July
2023-11-14 Docket documentLANL. 1982. Third Annual Report Radioactive Emissions from Coal Production and Utilization: October 1, 1980 – September 30, 1981. LA-9359-PR. Prepared by P. Wagner and N.R. Greiner for the U.S. DOE under Contract No. W-7405-ENG-36. Los Alamos, NM. June
2023-11-14 Docket documentU.S. EPA. 1984. Impacts of Coal Combustion on Trace Elements in the Environment: Wisconsin Power Plant Impact Study. EPA-600/S3-84-070. Office of Research and Development. Duluth, Minnesota. July
2023-11-14 Docket documentTVA. 2010. Kingston Ash Recovery Project Non-Time-Critical Removal Action Embayment/Dredge Cell Engineering Evaluation/Cost Analysis (EE/CA). Prepared by Jacobs
2023-11-14 Docket documentANL. 2015. Data Collection Handbook to Support Modeling Impacts of Radioactive Material in Soil and Building Structures. ANL/EVS/TM-14/4. Prepared for the U.S. Department of Energy (DOE) under contract DE-AC02-06CH11357. Chicago, IL
2023-11-14 Docket documentINDOT. 1998. Identification and Quantification of Radionuclides in Coal Ash. FHWA/IN/JTRP-98/01. Prepared by J. E. Alleman, F. M. Clikeman, and T. Skronski. Joint Transportation Research Program, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana
2023-11-14 Docket documentU.S. EPA. 2003c. Addendum to the EPACMTP Technical Background Document. Office of Solid Waste, Washington, DC. Available as document ID number EPA-HQ-RCRA-2003-0001-0166 at www.regulations.gov
2023-11-14 Docket documentUSGS. 2002. Characterization and Modes of Occurrence of Elements in Feed Coal and Fly Ash - An Integrated Approach. USGS Fact Sheet-038-02. May
2023-11-14 Docket documentLANL. 1980. Radioactive Emissions from Coal Production and Utilization. LA-8618-PR. Prepared by P. Wagner, D.R. Dreesen, E.M. Wewerka, N.R. Greiner. Los Alamos, New Mexico. December
2023-11-14 Docket documentU.S. EPA. 1989. Risk Assessment Guidance for Superfund Volume I Human Health Evaluation Manual (Part A). EPA/540/1-89/002. Prepared by the Office of Emergency and Remedial Response, Washington, DC. December
2023-11-14 Docket documentEPRI. 1995. Laboratory Characterization of Atmospheric Fluidized-Bed Combustion By-Products. TR-105527. Palo Alto, California
2023-11-14 Docket documentU.S. EPA. 1999. Peer Review of EPA’s Hazardous Waste Identification Rule Risk Assessment Model - The Vadose Zone and Saturated Zone Modules Extracted from EPACMTP for HWIR99. Office of Solid Waste. Washington, DC

References

Page 1Download these results: CSV · JSON
Geosyntec, 2016a. Soil Properties Calculations, Waukegan Station, October.
research reportNot linked to a paper · refsec
Geosyntec, 2016b. Plans for the Construction of: East Ash Basin Slope Modification, Waukegan Generating Station, Lake County, Illinois, July, 2016.
research reportNot linked to a paper · refsec
Geosyntec, 2016c. Technical Specification Sections 02200 and 02770 for the Construction of: East Ash Basin Slope Modification, Waukegan Generating Station, Lake County, Illinois,
research reportNot linked to a paper · refsec
July, 2016. KPRG and Associates, Inc., 2005. Geotechnical Analysis of Soil Surrounding Settling Basins/Ponds, KPRG Project No. 15805, October.
research reportNot linked to a paper · refsec
Midwest Generation, 2002. East and West Ash Pond Liner Replacement Plans, Sections, and
research reportNot linked to a paper · refsec
Details, Sheet B739 NUS Corporation, 1977. Waste Water Treatment Facilities Waukegan: Ash Pond – Location and Plot Plan, Sheet No. 5082-C-5000. Ash Pond – Detail Plan, Sheet No. 5082-C-5006. Ash Pond – Sections & Details, Sheet No. 5082-C-5007.
research reportNot linked to a paper · refsec
NUS Corporation, 1978. Waste Water Treatment Facilities Waukegan: Ash Pond Sump – Plan, Sections and Details, Sheet No. 5082 C 5501 Ash Pond Sump Weir – Plan, Sections & Details, Sheet No. 5082 C 5502 Ash Pond Sump and Weir – Miscellaneous Sections and Details, Sheet No. 5082 C 5503 Ash Pond Inlet Flume & Distribution – Trough Details, Sheet No. 5082 C 5507
research reportNot linked to a paper · refsec
Patrick Engineering, 2011. Hydrogeological Assessment Report, Waukegan Generating Station,
research reportNot linked to a paper · refsec
RPG, 2002a. “Report of Engineering Study on Waukegan Generating Station #16 Ash Pond Repairs,” 25 January 2002.
research reportNot linked to a paper · refsec
RPG, 2002b. “Ash Pond Berm Inspection Report,” Letter to Chris Lux, 2 May 2002.
research reportNot linked to a paper · refsec
RPG, 2003b. “Ash Pond Berm Inspection Report,” Letter to Chris Lux, 12 June 2003.
research reportNot linked to a paper · refsec
USGS, 2015. “Watershed Boundary Dataset,” accessed via The National http://viewer.nationalmap.gov/viewer/nhd.html?p=nhd, accessed 1 February 2016. Map,
research reportNot linked to a paper · refsec · cited link
Valdes Engineering, 2009. “Ash Ponds Berm Inspection,” Letter to Chris Lux, 29 June 2009. SW0251.08.06. WAUKEGAN HOC.F East and West Ash Basins, Waukegan Station History of Construction Report October 2016
research reportNot linked to a paper · refsec
Valdes Engineering, 2014. “Ash Pond Berm Visual Assessment,” Letter to Chris Lux, 12 June 2014.
research reportNot linked to a paper · refsec
Valdes Engineering, 2015. “Ash Pond Berm Visual Assessment,” Letter to Chris Lux, 29 May 2015. Attachments Figure 1 – Site Location Figure 2 – Area-Capacity Curves Appendix A – Construction Drawings Appendix A-1 NUS Construction Drawings Appendix A-2 Liner Replacement Construction Drawing Appendix A-3 East Ash Basin Slope Modification Construction Drawings Appendix B – Technical Specifications Appendix B-1 East Ash Basin Liner Replacement Specifications Appendix B-2 West Ash Basin Liner Replacement Specifications Appendix B-3 East Ash Basin Slope Modification Technical Specifications SW0251.08.06. WAUKEGAN HOC.F West Ash Basin East Ash Basin
research reportNot linked to a paper · refsec
USGS TNM - National Structures Dataset; USGS TNM - National Transportation Dataset; TomTom CommercialOctober Roads; U.S. Census Diego 2016
research reportNot linked to a paper · refsec
Construction, January 2012. G. Latest version of the American Society for Testing and Materials (ASTM) standards:
research reportNot linked to a paper · refsec
EABSM - 02200.d.docx Rev 00 Earthwork 02200-1 June 2016 I. The Contractor shall submit to the Construction Manager a description of equipment and methods proposed for all earthwork components including excavation, ash relocation, select and engineered fill placement, moisture conditioning, and compaction, stockpiling, road subgrade preparation and road surfacing placement and compaction at least 5 days prior to the start of activities covered by this Section. J. The Contractor shall submit copies of all permits obtained for site work. The permits shall be provided prior to initiating the applicable site activities. K. The Contractor shall submit as-built Record Drawing electronic files and data, to the Construction Manager, within 7 days of project substantial completion, in accordance with this Section. The Record Drawings shall be submitted in AutoCAD version 2015 format or newer, or in a DXF format that can be converted to AutoCAD. 1.04
research reportNot linked to a paper · refsec