Policy Replication

Executive Order 12866 Review Draft; Regulatory Impact Analysis submitted to the Office of Management and Budget on March 6, 2023

Regulatory impact analysis2023-05-18 · EPA · ria_oira_review_version · EPA-HQ-OLEM-2020-0107-0139
RIN 2050-AH39, RIN 2050-AH14, RIN 2050-AH36 · Docket EPA-HQ-OLEM-2020-0107

Other documents for the same rulemaking

2020-10-14 Docket documentExecutive Order 12866 Review Draft; ANPRM cleared by the Office of Management and Budget on September 18, 2020
2020-10-14 Docket documentExecutive Order 12866 Review Draft; ANPRM submitted to the Office of Management and Budget on July 23, 2020
2020-10-14 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments
2023-05-18 Regulatory impact analysisProposed Rule CCR Legacy Rule RIA
2023-05-18 Regulatory impact analysisExecutive Order 12866 Review Draft RIA cleared by OMB 050423
2023-05-18 Docket documentExecutive Order 12866 Review Draft; Proposed Rule submitted to the Office of Management and Budget on March 6, 2023
2023-05-18 Docket documentExecutive Order 12866 Review Draft Proposed Rule cleared by OMB 050423
2023-05-18 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments
2023-11-14 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments
2024-05-08 Regulatory impact analysisRegulatory Impact Analysis. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Legacy CCR Surface Impoundments. April 2024
2024-05-08 Regulatory impact analysisExecutive Order 12866 Review Draft RIA Redline cleared by OMB April 22, 2024
2024-05-08 Regulatory impact analysisExecutive Order 12866 Review Draft; Regulatory Impact Analysis submitted to the Office of Management and Budget on March 15, 2024
2024-05-08 Docket documentExecutive Order 12866 Draft Final Rule Redline cleared by OMB April 22, 2024
2024-05-08 Docket documentExecutive Order 12866 Review Draft; Risk Assessment Redline cleared by OMB April 22, 2024
2024-05-08 Docket documentExecutive Order 12866 Review Draft; Final Rule submitted to the Office of Management and Budget on March 15, 2024
2024-05-08 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy CCR Surface Impoundments
2025-07-22 Regulatory impact analysisRegulatory Economic Assessment; Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; CCR Management Unit Deadline Extension Rule
2025-07-22 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule
2025-07-22 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule
2025-09-04 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule; Reopening of Comment Period and Public Hearing
2025-09-04 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule; Withdrawal of Direct Final Rule
2026-02-10 Regulatory impact analysisRegulatory Impact Analysis: Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; CCR Management Unit Deadline Extension Rule
2026-02-10 Regulatory impact analysisExecutive Order 12866 Review Draft - Regulatory Impact Analysis (RIA); redline cleared by OMB on January 30, 2026
2026-02-10 Docket documentExecutive Order 12866 Review Draft - Final rule preamble and regulatory text; redline cleared by OMB on January 30, 2026
2026-02-10 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; CCR Management Unit Deadline Extension Rule
2026-04-13 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy/CCRMU Amendments
2026-04-16 Regulatory impact analysisRegulatory Impact Analysis. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Leagcy/CCRMU Amendments Proposed Rule
2026-06-12 Federal RegisterHazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Legacy/CCRMU Amendments; Extension of Comment Period

References: 63 extracted, 36 linked to papers

Page 1Download these results: CSV · JSON
Lemly (2015) estimates the initial impact of the surface impoundment failure
journal articleDamage cost of the Dan River coal ash spill (2014) · Chapter 4, Damage Case: Dan River Steam Station Spill in 2014
Hesterberg et al. (2015) found that use of the river water for irrigation would likely increase soil concentrations of trace elements
journal articleNot linked to a paper · Chapter 4, Damage Case: Dan River Steam Station Spill in 2014
Shin et al. (2017) noted ecosystem alterations along the banks of the Dan River and in its channel soils such as elevated heavy metals and altered pH
journal articleNot linked to a paper · Chapter 4, Damage Case: Dan River Steam Station Spill in 2014
Mainali et al., 2022
journal articleA follow up analysis of soil properties four years after the Dan River coal ash spill (2022) · Chapter 4, Damage Case: Dan River Steam Station Spill in 2014
Byrd, 2018
journal articleNot linked to a paper · Chapter 4, Damage Case: Dan River Steam Station Spill in 2014
Cowan, 2017
otherNot linked to a paper · Chapter 4, Damage Case: Dan River Steam Station Spill in 2014
Ruiz ES, Morgan FC, Zigler CM, Bewsaw RJ, Schmults CD. Analysis of national skin cancer expenditures in the United States medicare population, 2013. J Am Acad Dermatol. 2019 Jan; 80(1):275-278.
Yu HS, Liao WT, Chai CY. Arsenic carcinogenesis in the skin. J Biomed Sci. 2006 Sep;13(5):657-66. doi: 10.1007/s11373-006-9092-8.
Lanphear, B. P., Hornung, R., Khoury, J., Yolton, K., Baghurst, P., Bellinger, D. C., ... & Roberts, R. (2005). Low-level environmental lead exposure and children's intellectual function: an international pooled analysis. Environmental health perspectives, 113(7), 894-899.
Kirrane, E., & Patel, M. (2014). Identification and consideration of errors in Lanphear et al. (2005)
journal articleNot linked to a paper · fn 67
Crump, K. S., Van Landingham, C., Bowers, T. S., Cahoy, D., & Chandalia, J. K. (2013). A statistical reevaluation of the data used in the Lanphear et al. pooled-analysis. Critical reviews in toxicology, 43(9), 785-799.
Schutt, M. 2021. Systematic Variation in Waste Site Effects on Residential Property Values: A Meta-Regression Analysis and Benefit Transfer. Environmental and Resource Economics 78: 381-416.
Guignet, D. and C. Nolte. 2021. Hazardous Waste and Home Values: An Analysis of Treatment and Disposal Sites in the U.S. Appalachian State University Department of Economics Working Paper, 21-07.
Guignet et al. (2018) study how property values change in response to well-publicized releases from underground storage tanks
journal articleNot linked to a paper · Section 4.11.3
Boyle, M. A. and K. A. Kiel. 2001. A Survey of House Price Hedonic Studies of the Impact of Environmental Externalities. Journal of Real Estate Literature 9(2): 117-144.
Jackson, T. 2001. The Effects of Environmental Contamination on Real Estate: A Literature Review. Journal of Real Estate Literature 9(2): 93-116.
Ruhl, Laura, et al. The impact of coal combustion residue effluent on water resources: a North Carolina example. Environmental science & technology 46.21 (2012): 12226-12233.
Brandt, Jessica E., et al. Beyond selenium: coal combustion residuals lead to multielement enrichment in receiving lake food webs. Environmental science & technology 53.8 (2019): 4119-4127.
Seidler M, and Malloy K, Comprehensive Survey of Coal Ash Law and Commercialization: Its Environmental Risks, Disposal Regulation, and Beneficial Use Markets, National Association of Regulatory Utility Commissioners, Published January 2020
Junquera R, NIPSCO Receives Multi-Million Dollar Bailout for Aging Coal Plants, Published December 2017
newsNot linked to a paper · fn 84 · cited link
So Much for Coal's Rebound - Plant Closures Come Roaring Back
newsNot linked to a paper · fn 79 · cited link
Adler, M. D. (2004). Fear assessment: Cost-benefit analysis and the pricing of fear and anxiety. Chicago-Kent Law Review, 977-1053.
Berman, E., & Bui, L. T. M. (2001). Environmental regulation and labor demand: Evidence from the South Coast Air Basin. Journal of Public Economics, 79(2), 265–295.
Brandt, J. E., Simonin, M., Di Giulio, R. T., & Bernhardt, E. S. (2019). Beyond selenium: Coal combustion residuals lead to multielement enrichment in receiving Lake Food Webs. Environmental Science & Technology, 53(8), 4119–4127.
Crump, K. S., Van Landingham, C., Bowers, T. S., Cahoy, D., & Chandalia, J. K. (2013). A statistical reevaluation of the data used in the Lanphear et al. () pooled-analysis that related low levels of blood lead to intellectual deficits in children. Critical Reviews in Toxicology, 43(9), 785–799.
Lanphear, B. P., Hornung, R., Khoury, J., Yolton, K., Baghurst, P., Bellinger, D. C., ... & Roberts, R. (2005). Low-level environmental lead exposure and children’s intellectual function: an international pooled analysis. Environmental health perspectives, 113(7), 894-899.
Lemly, A.D., Skorupa, J.P. (2012). Wildlife and the coal waste policy debate: proposed rules for coal waste disposal ignore lessons from 45 years of wildlife poisoning. Environmental Science and Technology, 46(16), 8595–8600.
Lemly, A.D. (2015). Damage cost of the Dan River coal ash spill. Environmental Pollution. 197, 55-61.
Wobus, C., Zheng, P., Stein, J., Lay, C., Mahoney, H., Lorie, M., Mills, D., Spies, R., Szafranski, B., & Martinich, J. (2019). Projecting changes in expected annual damages from riverine flooding in the United States. Earth’s Future, 7(5): 516–527.
Federal Emergency Management Agency. National Flood Hazard Layer (NFHL), Final Flood Insurance Rate Map (FIRM). Updated 2019.
datasetNot linked to a paper · References · cited link
U.S. Environmental Protection Agency (2022). EJScreen Data Download.
datasetNot linked to a paper · References · cited link
U.S. Census Bureau. 2020 American Community Survey Population Data.
datasetNot linked to a paper · References · cited link
Industrial Economics. (2020). The Benefits and Costs of U.S. Air Pollution Regulations. Prepared for the Natural Resources Defense Counsel.
research reportNot linked to a paper · References
Solomon, M., Gimon, E., O’Boyle, M., Paliwal, U., & Phadke, A. (2023). Coal Cost Crossover 3.0: Local Renewables Plus Storage Create New Opportunities for Customer Savings and Community Reinvestment. Energy Innovation Policy & Technology LLC.
research reportNot linked to a paper · References
Seidler, M., and Malloy, K. (2020, January). A Comprehensive Survey of Coal Ash Law and Commercialization: Its Environmental Risks, Disposal Regulation, and Beneficial Use Markets. National Association of Regulatory Utility Commissioners.
Zierold, K.M., & Clara G. Sears. (2015). Community views about the health and exposure of children living near a coal ash storage site. Journal of Community Health, 40(2), 357-363.
Ruhl, L. et al. The impact of coal combustion residue effluent on water resources: a North Carolina example. Environmental science & technology 46.21 (2012): 12226-12233.
Vengosh, A. et al. (2019). Evidence for unmonitored coal ash spills in Sutton Lake, North Carolina: Implications for contamination of lake ecosystems. Science of the total environment, 686, 1090-1103.
Hesterberg, D., Polizzotto, M.L., Crozier, C. and Austin, R.E. (2016). Assessment of trace element impacts on agricultural use of water from the Dan River following the Eden coal ash release. Integr Environ Assess Manag, 12: 353-363.
Mainali, R., Iozzo, M., Shaffer, H., Elbakidze, C., Brown, S., Fasth, L., Piloso, J., Shakya, A., Keyser, N., Smith, R., Johnson, B., Robinson, C., Price, A., Kuppinger, D., & DeFord-Watts, L. (2022). A follow up analysis of soil properties four years after the Dan River coal ash spill. BIOS, 92(4), 127-138.
Shin, J., Natanson, A., Khun, J., et al. (2017). Assessing the impact of coal ash exposure on soil microbes in the Dan River. BIOS, 88(2), 72–85.
Cowan, E.A., Epperson, E.E., Seramur, K.C. et al. (2017). Magnetic susceptibility as a proxy for coal ash pollution within riverbed sediments in a watershed with complex geology (southeastern USA). Environ Earth Sci, 76, 657.
Trumbo, C.W., McComas, K.A. & Kannaovakun, P. (2007). Cancer anxiety and the perception of risk in alarmed communities. Risk Analysis: An International Journal 27(2), 337-350.
Kolstad, C. D. (2017, March). What is killing the US coal industry? Stanford Institute for Economic Policy Research (SIEPR).
working paperNot linked to a paper · References · cited link
Linn, J. & McCormack, K. (2017). The Roles of Energy Markets and Environmental Regulation in Reducing Coal-Fired Plant Profits and Electricity Sector Emissions. Resources for the Future.
U.S. Environmental Protection Agency (2001, February). Cost Analyses for Selected Groundwater Cleanup Projects: Pump and Treat Systems and Permeable Reactive Barriers. EPA 542-R-00-013.
government reportNot linked to a paper · References · cited link
U.S. Environmental Protection Agency (2014, December). Human and ecological risk assessment of coal combustion residuals. Regulation Identifier Number: 2050-AE81.
government reportNot linked to a paper · References · cited link
U.S. Energy Information Administration. (2020). Today in Energy: More than 100 coal-fired plants have been replaced or converted to natural gas since 2011.
web pageNot linked to a paper · References · cited link
U.S. Energy Information Administration. (2017). Today in Energy: Most coal plants in the United States were built before 1990.
web pageNot linked to a paper · References · cited link
Posner, D., Fong, C., Serrurier, B. (2022, October 17). Georgia Power and the Golden Securitization Opportunity. RMI.
web pageNot linked to a paper · References · cited link
Next →