Reid Gardner - Annual GMR 2018 Pond E-1
Other documents for the same rulemaking
References
Jacobs. 2019a. Closure Certification, Reid Gardner Generating Station Inactive Coal Combustion Residual Surface Impoundments Ponds 4B-1, 4B-2, 4B-3, and E-1. Final. April.
Jacobs. 2019b. Groundwater Monitoring System Certification, Reid Gardner Generating Station Inactive Coal Combustion Residual Surface Impoundment Ponds E-1. Final. April.
Jacobs. 2019c. Statistical Method Certification, Reid Gardner Generating Station Inactive Coal Combustion Residual Surface Impoundment Ponds E-1. Final. April. Stanley Consultants, Inc. (Stanley). 2014. Background Conditions Report, Administrative Order on Consent Activities, NV Energy, Reid Gardner Station, Draft. July. Stanley Consultants, Inc. (Stanley). 2017. 2016 Monitoring Report, Administrative Order on Consent
Activities, NV Energy, Reid Gardner Station n, Draft. March. Stanley Consultants, Inc. (Stanley). 2018. 2017 Monitoring Report, Administrative Order on Consent
Activities, NV Energy, Reid Gardner Station, Draft. April. Stanley Consultants, Inc. (Stanley). 2019. 2018 Monitoring Report, Administrative Order on Consent
Activities, NV Energy, Reid Gardner Station, Draft. May. U.S. Environmental Protection Agency (EPA). 2009a. Guidance for Labelling Externally Validated Laboratory Analytical Data for Superfund Use. EPA 540-R-08-005. January. U.S. Environmental Protection Agency (EPA). 2009b. Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities: Unified Guidance. EPA-530-R-09-007. Office of Resource Conservation and
Recovery, U.S. Environmental Protection Agency. March. U.S. Environmental Protection Agency (EPA). 2014. National Functional Guidelines for Inorganic Superfund Data Review. August. AX0731190959LAS Coal Combustion Residual 2019 Annual Groundwater Monitoring and Corrective Action Report Tables Table 1. Groundwater Monitoring Field Sampling Data, Reid Gardner Inactive CCR Surface Impoundment E-1 Location