JH Campbell Power Plant Ponds 1-2 North and 1-2 South, 2021 Annual GWMCA Report
Other documents for the same rulemaking
References
ARCADIS. May 13, 2016. Summary of Monitoring Well Design, Installation, and Development – Bottom Ash Pond Unit 1-2N/1-2S. JH Campbell Electric Generation Facility – West Olive, Michigan. Prepared for Consumers Energy Company. Consumers Power Company. September 1996. Hydrogeological Monitoring Plan for
JH Campbell Ash Storage Facility, Consumers Power Company, Solid Waste Disposal Area, Coal Ash, Type III. Golder Associates Inc. January 2018. JH Campbell Generating Facility Bottom Ash Ponds 1-2 Closure Plan, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. October 2017. Groundwater Statistical Evaluation Plan – JH Campbell Power Plant, Units 1-2 North and 1-2 South, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. January 2018. Annual Groundwater Monitoring Report, JH Campbell Power Plant, Unit 12 North and 1-2 South CCR Unit, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. October 15, 2018. Groundwater Protection Standards, Consumers Energy, JH Campbell
TRC. January 2019. 2018 Annual Groundwater Monitoring Report, JH Campbell Power Plant, Unit 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. September 2019. Assessment of Corrective Measures, JH Campbell Ponds 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. January 2020. 2019 Annual Groundwater Monitoring Report, JH Campbell Power Plant, Unit 1-2 North and 1-2 South CCR Unit, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. January 2021. 2020 Annual Groundwater Monitoring Report, JH Campbell Power Plant, Unit 1-2 North and 1-2 South CCR Unit, West Olive, Michigan. Prepared for Consumers Energy Company.
TRC. January 2021. Sample and Analysis Plan, JH Campbell Power Plant Ponds 1-2 and Pond 3, West Olive, Michigan. Prepared for Consumers Energy Company.
USEPA. 2009. Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities, Unified Guidance. Office of Conservation and Recovery. EPA 530/R‐09‐007.
USEPA. April 2015. 40 CFR Parts 257 and 261. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. 80 Federal Register 74 (April 17, 2015), pp. 21301-21501 (80 FR 21301).
TRC | Consumers Energy Company X:\WPAAM\PJT2\418422\0000\GMR\POND 1-2\R418422.0 PONDS 1-2.DOCX Final January 2022
USEPA. July 2018. 40 CFR Part 257. Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Amendments to the National Minimum Criteria (Phase One, Part One); Final Rule. 83 Federal Register 146 (July 30, 2018), pp. 36435-36456 (83 FR 36435).
USEPA. April 2018. Barnes Johnson (Office of Resource Conservation and Recovery) to James Roewer (c/o Edison Electric Institute) and Douglas Green, Margaret Fawal (Venable
LLP). Re: Coal Combustion Residuals Rule Groundwater Monitoring Requirements. April 30, 2018. United States Environmental Protection Agency, Washington, D.C. 20460. Office of Solid Waste and Emergency Response, now the Office of Land and Emergency Management.
TRC | Consumers Energy Company X:\WPAAM\PJT2\418422\0000\GMR\POND 1-2\R418422.0 PONDS 1-2.DOCX Final January 2022 Tables
TRC | Consumers Energy Company X:\WPAAM\PJT2\418422\0000\GMR\POND 1-2\R418422.0 PONDS 1-2.DOCX Final January 2022 Table 1 Summary of Groundwater Elevation Data – April 2021 - October 2021
Lee, Seungyeol, Zhizhang Shen, and Huifang Xu. 2016. "Study on nanophase iron oxyhydroxides in freshwater ferromanganese nodules from Green Bay, Lake Michigan, with implications for the adsorption of As and heavy metals." American Mineralogist 101.9 (2016): 1986-1995.
Korkisch, J., I. Steffan, and G. Arrhenius. 1977. "Chemical analysis of manganese nodules: Part
III. Determination of Thallium, Molybdenum and Vanadium after Anion-Exchange Separation." Analytica Chimica Acta 94.2 (1977): 237-244.
Mason, R. P., J-M. Laporte, and S. Andres. 2000. "Factors controlling the bioaccumulation of mercury, methylmercury, arsenic, selenium, and cadmium by freshwater invertebrates and fish." Archives of Environmental Contamination and Toxicology 38.3 (2000): 283-297.
TRC. January 2021. Sample Analysis Plan for JH Campbell Ponds 1-2 and Pond 3. Prepared for Consumers Energy Company.
TRC. July 30, 2021. Statistical Evaluation of April 2021 Assessment Monitoring Sampling Event Technical Memorandum. Prepared for Consumers Energy Company.
USEPA. November 1993; Revised April 13, 1998. Solid Waste Disposal Facility Criteria Technical Manual. EPA530-R-93-017. X:\WPAAM\PJT2\418422\0000\ASD\R418422.0 ASD.DOCX Appendix E Semiannual Progress Report
TRC | Consumers Energy Company X:\WPAAM\PJT2\418422\0000\GMR\POND 1-2\R418422.0 PONDS 1-2.DOCX Final January 2022 January 30, 2022 Subject: Semiannual Progress Report - Selection of Remedy
Environment, Great Lakes, and Energy (EGLE) Consent Agreement 115-01-2018, which was executed on December 28, 2018. Consumers Energy (CE) reported statistically significant exceedances above the groundwater protection standard (GWPS) for a single Appendix IV constituent, arsenic, in the “Notification of Appendix IV Constituent Exceeding Groundwater Protection Standard per §257.95(g)” (Consumers Energy Company, January 2019). Unit with GWPS Exceedance Constituent # of Downgradient Wells Observed Pond A Arsenic 1 of 6 Ponds 1-2 Arsenic 2 of 5
EGLE on September 30, 2021. Pond A Consumers Energy closed Pond A according to the “JH Campbell Generating Facility Pond A Closure Plan, West Olive, Michigan” (Golder, October 2016) and an updated closure plan detailing the final cover system submitted to EGLE in February 2019. The state closure certification as required by Paragraph 4.2 of Consent Agreement WMRPD No. 115-01-2018 was approved by EGLE on November 25, 2019. Since the installation of the final cover, six rounds of semiannual sampling have been conducted at Pond A. In accordance with Consent Agreement 115-01-2018, a revised Hydrogeological Monitoring Plan, Pond A Hydrogeological Monitoring Plan, JH Campbell Power Plant, West Olive, Michigan (HMP) (TRC, March 2019; Revised July 2019) was submitted to EGLE and approved in August 2019. The Pond A well network is being sampled quarterly under the EGLE-approved
HMP. The arsenic exceedance at JHC-MW-15011 which initially triggered corrective action continues to attenuate after reaching an apparent local maximum in late 2019, immediately following the completion of the final cover for Pond A. The arsenic concentration at JHC-MW-15011R decreased to below the GWPS in third and fourth quarter 2021 and the lower confidence limit for JHC-MW-15011/R was below the GWPS in third and fourth quarter 2021. Nature and extent near Pond A was further characterized in March 2021 by collecting soil borings and grab groundwater samples immediately downgradient of Pond A. Details of the data collected are included in Appendix E of the 2021 Annual Groundwater Monitoring and Corrective Action Report (TRC, January 2022) to which this progress report is also appended. Arsenic was below the GWPS (10 ug/L) at all five locations and was not detectable at a reporting limit of 1 ug/L at three of the five locations. Increases in Appendix III constituents (e.g. boron) and direct exceedances of the selenium
EGLE and a public meeting is conducted at least 30-days prior to the final selection as required under §257.96(e). References Consumers Energy Company. January 14, 2019. Notification of Appendix IV Constituent Exceeding Groundwater Protection Standard per §257.95(g), JH Campbell Pond A CCR Unit. Consumers Energy Company. January 14, 2019. Notification of Appendix IV Constituent Exceeding Groundwater Protection Standard per §257.95(g), JH Campbell Ponds 1-2 CCR Unit. Golder Associates. October 2016. JH Campbell Generating Facility Pond A Closure Plan, West
Olive, Michigan. Prepared for Consumers Energy Company. Golder Associates. January 2018. JH Campbell Generating Facility Bottom Ash Ponds 1-2 Closure
TRC Environmental Corporation. January 2022. 2021 Annual Groundwater Monitoring and Corrective Action Report, JH Campbell Power Plant, Pond A CCR Unit. Prepared for Consumers Energy Company.
TRC Environmental Corporation. January 2021. Sample Analysis Plan for JH Campbell Bottom Ash Ponds 1-2 and Pond 3. Prepared for Consumers Energy Company.
TRC Environmental Corporation. September 2019. Assessment of Corrective Measures, Consumers Energy Company JH Campbell Ponds 1-2 North and 1-2 South and Pond A Coal Combustion Residual Units. Prepared for Consumers Energy Company.
TRC Environmental Corporation. March 2019; Revised July 2019. Pond A Hydrogeological Monitoring Plan, JH Campbell Power Plant, West Olive, Michigan. Prepared for Consumers Energy Company