Information on CCR Dewatering Structures
Other documents for the same rulemaking
References: 14 extracted, 0 linked to papers
City Utilities, 2021. John Twitty Energy Center Utility Waste Landfill, Run-On & RunO Control System Plan In Accordance with 40 CFR Part 257.81. September. Link to document: https://www.cityutilities.net/DocumentCenter/View/2168/25781c3-Run-onand-Run-o -Control-System-Plan---2021-PDF
City Utilities, 2024. Wastewater Contribution Permit No. 048 – John Twitty Energy Center. November 7. Link to document: https://www.cityutilities.net/DocumentCenter/View/903/42319d-BottomAsh-Dewatering-Tank-Certification-Statement-PDF
Consumers, 2018. J.H. Campbell Generating Facility Pond 3, 2018 Annual Surface Impoundment Inspection Report. October 15. Link to document: https://www.consumersenergy.com//media/CE/Documents/sustainability/coal-combustion-residuals/jhc/ponda/2018-JHC-Inspection_Pond%203_Report_FINAL_10-15-18.pdf
Consumers, 2019. Assessment of Corrective Measures, Consumers Energy
DTE Electric, 2018. CCR Impoundment Inflow Design Flood Control System Plan: Inactive Bottom Ash Impoundment, Monroe Power Plant, DTE Energy, Monroe, Michigan. April 12. Link to document: https://www.dteenergy.com/content/dam/dteenergy/deg/website/common/d te-impact-and-news/environment/coal-combustion-residual/Bottom-AshImpoundment-IDFC.pdf
DTE Electric, 2024. CCR Impoundment Inflow Design Flood Control System Plan: Inactive Bottom Ash Impoundment, Monroe Power Plant, DTE Energy, Monroe, Michigan. April 30. Link to document: https://www.dteenergy.com/content/dam/dteenergy/deg/website/common/d te-impact-and-news/environment/coal-combustionresidual/2024/MonroeBAI_IDFCSP_2024.pdf
IKEC, 2022. Comments of the Indiana-Kentucky Electric Corporation on Environmental Protection Agency Docket ID: EPA-HQ-OLEM-2021-0587, Proposed Decision: Proposed Denial of Alternative Closure Deadline for Clifty Creek Power Station. March 24. Link to document (including referenced attachments: https://www.regulations.gov/comment/EPA-HQ-OLEM-2021-0587-0037
IKEC, 2023. Indiana-Kentucky Electric Cooperation- Clifty Creek Station, Revision to the West Boiler Slag Pond Phase 2-4 Closure Plan. June 29. Link to document: https://www.ovec.com/Env/CCR/Clifty%20Creek%20Station/West%20Boiler %20Slag%20Pond/Clifty%20Creek%20WBSP%20Closure%20and%20Post%20Closure%20Plan%20Rev.%201%20(Phases%202-4).pdf
IKEC, 2024. Indiana-Kentucky Electric Corporation Clifty Creek Station, Notification of CCR Rule Information Posting Annual Certified CCR Dam and Dike (Surface Impoundment) Inspection Report Posting. February 1. Link to document: https://www.ovec.com/Env/CCR/Clifty%20Creek%20Station/West%20Boiler %20Slag%20Pond/Annual%20Inspections/2024%20%20Clifty%20Creek%20Dam%20and%20Dike%20Inspection%20Report.pdf
OVEC, 2022. Kyger Creek Generating Station, Initial Certification Statement to Discharge Bottom Ash Transport Water. December. Link to document: https://www.ovec.com/Env/ELG/Kyger%20Creek%20Station/Kyger%20Creek %20Station%20%20Initial%20Certification%20Statement%20Bottom%20Ash%20Transport %20Water.pdf
OVEC, 2024. Ohio Valley Electric Corporation, Kyger Creek Station, Notification of
CCR Rule Information Posting, Annual Certified CCR Dam and Dike (Surface Impoundment) Inspection Report Posting. February 1. Link to document: https://www.ovec.com/Env/CCR/Kyger%20Creek%20Station/Boiler%20Slag %20Pond/Annual%20Inspections/2023%20%20Kyger%20Creek%20Station%20Dam%20and%20Dike%20Inspection%2 0Report.pdf
OVEC, 2025. Ohio Valley Electric Corporation, December 2025 Semi-Annual Selection of Remedy Report For Kyger Creek Station Boiler Slag Pond. December 6. Link to document: http://www.ovec.com/Env/CCR/Kyger%20Creek%20Station/Boiler%20Slag %20Pond/Kyger%20Creek%20BSP%20-%20SemiAnnual%20Selection%20of%20Remedy%20Progress%20Report%20%20December%202025.pdf
USEPA, 2013. Dam Safety Assessment of CCW Impoundments, Hunter Power Plant, Castle Dale, Utah. November 15. Link to document: https://archive.epa.gov/epawaste/nonhaz/industrial/special/fossil/web/pdf/ pacificorp_hunter_fnl_rpt.pdf