Damage Incidents Related to Piles
Other documents for the same rulemaking
References: 5 extracted, 0 linked to papers
Pekin, IL Reference: • 2024 Annual Inspection Report • 2023 Annual Inspection Report • 2024 Annual Fugitive Dust Control Report • 2025 Notification of Exceedances from Assessment Monitoring • WFEC 2021 Corrective Measures Action report • Landfill Closure Plan Location: On-site Description: This case was presented to EPA in comments on the 2019 CCR proposal (84 FR 40353) as relevant to requirements for CCR temporarily placed on land prior to beneficial use or disposal (i.e., in a “temporary CCR pile”). In June 2019, the Illinois Pollution Control Board found that 2011/2012 groundwater monitoring results from wells downgradient of a temporary
CCR pile (which had been stored for two to three months during the winter before 2012 and then was completely removed) showed exceedances of state groundwater standards for arsenic, boron, sulfate, and total dissolved solids and that, therefore, the temporary storage likely contributed to contamination at the Powerton station. In addition to the temporary pile, this facility also had four ash ponds constructed in 1978; and three historical
AES Guayama Power Plant – Agremax Stockpile Area Reference: • Stakeholder engagement & NODA comments o CCR Distribution (PDF 3A: 2.3 Mark Hutson Report / Earthjustice Comments) • 2018 Closure Plan • 2018 Corrective Action Report • 2017 Annual CCR Landfill Inspection • Public hearing set as Alliant Energy pivots Cedar Rapids plant to natural gas • Prairie Creek Generating Station • Toxic by Design: Understanding Coal Ash Pollution in Iowa (Iowa Environmental Council) Location: On-site Description: This case was presented to EPA in comments on the 2019 CCR proposal (84 FR 40353) and the 2020 CCR NODA (85 FR 83478), as relevant to
Additionally, in 2020, plant staff noted no change in CCR volume from 2019 (14.8 million cy) and indicated that in place of being taken to the landfill, bottom ash was being stored next to FGD Pond 2 for use in eventual closure. Subsequently to 2020, bottom ash was to be taken directly to the landfill for “storage” until such time when closure of FGD Pond 2 would begin. Contamination includes documented exceedances above groundwater protection standards for arsenic, berylium, cadmium, chromium, cobalt, fluoride, lead, lithium, molybdenum, radium, selenium and/or thalium at
Moapa, NV Reference: • 2020 Groundwater Corrective Measures report • CCR Rule Compliance - Nebraska City Power Station CCR Landfill 2015 Annual Inspection Report NC1 Ash Disposal Area • Climate and Average Weather Year Round in Nebraska City Location: On-site Description: This case was initially prepared by U.S. EPA in support of the 2015 Coal Combustion Residuals Disposal final rule (80 FR 21302), to discuss groundwater and fugitive dust impacts from disposal activities. Subsequently, this case was presented to EPA in comments on the 2019 CCR proposal (84