Geosyntec Consultants. 2018. 2017 Annual Groundwater Monitoring and Corrective Action Report, Brandywine Ash Management Facility Phase II, Brandywine, Maryland. Prepared for GenOn MD Ash Management
Other documents for the same rulemaking
References: 5 extracted, 0 linked to papers
Driscoll, F.G., 1986.Groundwater and Wells, Second Edition. St. Paul, Minnesota, H.M. Smyth Company. Geosyntec Consultants, Inc., 2015. Sampling and Analysis Plan, Brandywine Ash Management
Facility, Brandywine Maryland, September. Geosyntec Consultants, Inc., 2017a. Basis for Groundwater Monitoring Network, Brandywine Ash Management Facility, Brandywine, Maryland, October. Geosyntec Consultants, Inc. 2017b. Statistical Analysis Calculations Package for Background Groundwater - Cell B, Brandywine Ash Storage Facility, Brandywine, MD U.S. EPA, 2009. Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities Unified Guidance. March. U.S. EPA, 2015. Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals from Electric Utilities (Final Rule). Fed. Reg. 80 FR 21301, pp. 21301-21501, 40 CFR Parts 257 and 261, April.
FEDERAL CCR RULE - 2017 ANNUAL GROUNDWATER AND CORRECTIVE ACTION REPORT Brandywine Facility Phase II - MD Northing Easting feet feet Maryland State Maryland State Plane 1900 Plane 1900
NAD 1983 NAD 1983 Well ID Compliance / Background Permit Number Installation Date B15S Compliance
PG-11-0416 10/21/2015 377144.555 1367902.054 Ground Surface Elevation (ft msl) Top of Casing Elevation (ft msl) Inner Casing Diameter (inches) Top of Sand Pack (ft bgs) Screen Interval (ft bgs) Screen Length (feet) Screen Slot Size (inch) 212.71 214.95 7.75 - 17.75 0.01 233.73 236.11