JB Sims Fourth Quarter 2021 Monitoring Report- Response to comments
Other documents for the same rulemaking
References
ERM, 2016. Coal Ash Delineation Sampling Results for the Grand Haven Board of Light and Power. Environmental Resources Management Michigan, Inc. February 8, 2016.
ERM, 2017. Groundwater Monitoring System Certification for the Grand Haven Board of Light and Power, Environmental Resources Management Michigan, Inc. November 2017.
Golder, 2017. Statistical Analysis Plan for the Grand Haven Board of Light and Power. Golder Associates Inc. October 17, 2017.
Golder, 2019. Notice of Initiating Assessment of Corrective Measures. Golder Associates Inc. February 8, 2019.
Golder, 2020a. JB Sims Generating Station Unit 3 Impoundments – CCR Removal Documentation Report. Golder Associates Inc. December 11, 2020.
Golder, 2020b. Alternate Source Demonstration for the JB Sims Generating Station – Unit 3 Impoundments, Golder Associates Inc. December 28, 2020.
PA 451, 1995. State of Michigan enacted Natural Resources and Environmental Protection Act, Public Act No. 451 of 1994. State of Michigan. Effective March 30, 1995.
PA 640, 2018. State of Michigan enacted Public Act No. 640 of 2018 (PA 640) to amend the Natural Resources and Environmental Protection Act, also known as Part 115 of PA 451 of 1994, as amended (Part 115 amendment). State of Michigan. December 28, 2018.
Sanitas, 2014. Groundwater Statistical Software. Sanitas Technologies, Shawnee, KS. 2014.
State Waste Management Board, 2016. State Solid Waste Management Regulations – (9VAC20-81 et seq.). January 2016.
USEPA, 2009. Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities. Unified Guidance. USEPA 530/R-09-007.
USEPA, 2015. Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule/ [EPA-HQ-RCRA-20090640; FRL-9919-44-OSWER] (2015), Federal Register. Volume 80. No. 74. Friday April 17, 2015. Part II. Environmental Protection Agency. 40 CFR Parts 257 and 261. Hazardous and Solid Waste Management System.
USEPA, 2016. Disposal of Coal Combustion Residuals from Electric Utilities; Amendment, Federal Register. Volume 81. No. 151. Friday August 5, 2016.
USEPA, 2018. Disposal of Coal Combustion Residuals from Electric Utilities; Amendment, Federal Register. Volume 83. No. 146. Monday July 30, 2018. January 25, 2022 21461064 Signature Page Golder Associates Inc.
Dawn L. Prell, C.P.G. Senior Consultant CEP/DLP Golder and the G logo are trademarks of Golder Associates Corporation https://golderassociates.sharepoint.com/sites/27317g/deliverables/200 reports/2021 annual report/4q2021/units 3a-b/final rp-ghblp unit 3 4q2021 qmr.docx
JB Sims Generating Station Fourth Quarter 2021 Monitoring Report Location Identification Current Groundwater Monitoring Networks Inactive 1/2 Impoundment Former 3 A/B Impoundments Coordinates Date Installed Northing Easting Ground Surface Elevation (feet MSL) Top of Total Well Casing Depth Screen (Staff (Total Interval Gauge) Boring (ft) Elevation Depth) (ft) (feet MSL) Comments Monitoring Wells
AERIAL PHOTOGRAPH COURTESY OF GOOGLE EARTH PRO; IMAGE DATE: 2021-03-18.
INTERNATIONAL FEET. VERTICAL DATUM IS NAVD 1988.
INC. ON AUGUST 28, 2019. MW-1R AND SG-4R WERE SURVEYED BY DRIESENGA &
ASSOCIATES, INC. ON JUNE 17, 2020. PIEZOMTER AND STILLING WELLS WERE SURVEYED
BY GOLDER ASSOCIATES ON OCTOBER 1, 2021. 3. SG-05* HAS BEEN REMOVED
JB SIMS GENERATING STATION 2021 QUARTERLY GROUNDWATER MONITORING
CONSULTANT YYYY-MM-DD 2021-10-08 DESIGNED
BY GOLDER ASSOCIATES ON OCTOBER 1, 2021. 3. STAFF GAUGES WERE NOT INCLUDED IN EVALUATION OF GROUNDWATER CONTOURS.
GRAND HAVEN, MICHIGAN JB SIMS GENERATING STATION 2021 QUARTERLY GROUNDWATER MONITORING
CONSULTANT YYYY-MM-DD 2022-01-07 DESIGNED
CONSULTANT YYYY-MM-DD 2021-12-10 DESIGNED
GRAND RIVER Path: \\golder.gds\complexdata\office\Detroit\cad\Projects\21x-Projects\21464427-GHBLP\PRODUCTION\A-FIELD SUMMARY REPORT\ | File Name: 21464427A004.dwg | Last Edited By: dcoss Date: 2021-12-10 Time:6:37:43 PM | Printed By: DCoss Date: 2021-12-10 Time:6:37:59 PM
Golder, 2020a. JB Sims Generating Station Unit 3 Impoundments – CCR Removal Documentation Report. Golder Associates Inc. December 11, 2020. January 25, 2022 21461064
Dawn L. Prell, C.P.G. Senior Consultant CEP/DLP Golder and the G logo are trademarks of Golder Associates Corporation https://golderassociates.sharepoint.com/sites/27317g/deliverables/200 reports/2021 annual report/4q2021/unit 1-2/final rp-ghblp-units 1-2 4q2021 qmr.docx
ERM, 2017a. Sampling and Analysis Plan for the Grand Haven Board of Light and Power. Environmental Resources Management Michigan, Inc. March 10, 2017.
ERM, 2017b. Groundwater Monitoring System Certification for the Grand Haven Board of Light and Power, Environmental Resources Management Michigan, Inc. November 2017.
Golder, 2018a. 2017 Annual Groundwater Monitoring and Corrective Action Report. Golder Associates Inc. January 30, 2018.
Golder, 2018b. Notice of Establishing Assessment Groundwater Monitoring. Golder Associates Inc. April 10, 2018.
Golder, 2019a. CCR Impoundment Ash Delineation at the JB Sims Generating Station, October 14, 2019.
Golder, 2019b. Notice of Initiating Assessment of Corrective Measures. Golder Associates Inc. February 8, 2019.
Golder, 2020a. Alternate Source Demonstration for the JB Sims Generating Station – Unit 3 Impoundments, Golder Associates Inc. December 28, 2020.
Golder, 2021. Work Plan – Piezometer Installation and Additional Data Collection. June 22, 2021. PA451, 1995. State of Michigan enacted Natural Resources and Environmental Protection Act, Public Act No. 451 of 1994. State of Michigan. Effective March 30, 1995. PA640, 2018. State of Michigan enacted Public Act No. 640 of 2018 (PA 640) to amend the Natural Resources and Environmental Protection Act, also known as Part 115 of PA 451 of 1994, as amended (Part 115 amendment). State of Michigan. December 28, 2018.
USEPA, 2001. Environmental Investigations Standard Operating Procedures and Quality Assurance Manual, United States Environmental Protection Agency. November 2001.
USEPA, 2011. Data Validation Standard Operating Procedures. United States Environmental Protection Agency. September 2011.
USEPA, 2001. Environmental Investigations Standard Operating Procedures and Quality Assurance Manual. United States Environmental Protection Agency. November 2001.
USEPA, 2015. Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule/ [EPA-HQ-RCRA-20090640; FRL-9919-44-OSWER] (2015), Federal Register. Volume 80. No. 74. Friday April 17, 2015. Part II. 2021 Annual Groundwater Monitoring & Corrective Action Report
JB Sims Generating Station January 28, 2022 21461064 Environmental Protection Agency. 40 CFR Parts 257 and 261. Hazardous and Solid Waste Management System.
USEPA, 2018. Disposal of Coal Combustion Residuals from Electric Utilities; Amendment, Federal Register. Volume 83. No. 146. Monday July 30, 2018. 2021 Annual Groundwater Monitoring & Corrective Action Report
JB SIMS GENERATING STATION 2021 GROUNDWATER MONITORING
AERIAL PHOTOGRAPH COURTESY OF GOOGLE EARTH PRO; IMAGE DATE: 2018-09-22.
LEGEND MONITORING WELL STAFF GAUGE LIMIT OF UNITS 1/2 ASH PLACEMENT ~1974-2012
GRAND HAVEN, MICHIGAN JB SIMS GENERATING STATION 2021 GROUNDWATER MONITORING
CONSULTANT YYYY-MM-DD 2021-04-05 UNIT 3 FORMER LIMITS OF ASH PLACEMENT
DISPOSAL PRIOR TO 1974 PREPARED GROUNDWATER CONTOURS