Bull Run Environmental Assessment Report, 8-15-2023
Other documents for the same rulemaking
References: 41 extracted, 0 linked to papers
AECOM. (2019) Source Removal Construction Quality Assurance Plan (SRCQAP), Process Water Basin 1, Bull Run Fossil Plant, Anderson County, Tennessee. Prepared for Tennessee Valley Authority (TVA). June 13, 2019. Anderson County Chamber of Commerce. (2019). Retrieved October 2020, from https://andersoncountychamber.org/history/. Environmental Standards, Inc. (EnvStds). (2018a). Tennessee Valley Authority Multi-Site Order Environmental Investigations Data Management Plan. Prepared for the TVA, Revision 1. March 2018.
EnvStds. (2018b). Quality Assurance Project Plan for the Tennessee Valley Authority, Bull Run Fossil Plant Environmental Investigation, Revision 3. December 2018.
EnvStds. (2022). Data Quality Summary Report for the Tennessee Valley Authority Bull Run Fossil Plant Environmental Investigation. In progress. Haley & Aldrich, Inc. (2019). Risk-Based Closure Approach for the Fly Ash Stilling Pond 2C, TVA Bull Run Fossil Plant (BRF). April 11, 2019. Included as Attachment B within AECOM, 2019.
Hallsdale-Powell Utility District. (2020). Retrieved January 2020, from https://www.hpud.org. National Oceanic & Atmospheric Administration. (2020). Rogersville, TN USC00407884.Summary of Monthly Normals for the years 1981-2010. Retrieved May 2020, from https://www.ncdc.noaa.gov/cdo-web/datatools/normals. Stantec Consulting Services Inc. (Stantec). (2018a). Background Soil Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018.
Stantec. (2021). Background Soil Sampling and Analysis Plan, Bull Run Fossil Plant – Addendum I Rock Outcrop survey Sampling. Prepared for Tennessee Valley Authority. January 29, 2021.
Stantec. (2018b). Exploratory Drilling Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for
Stantec. (2018c). CCR Material Characteristics Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018.
Stantec. (2018d). Material Quantity Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for
Stantec. (2018e). Groundwater Investigation Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018.
Stantec. (2018f). Water Use Survey Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for
Stantec. (2018g). Seep Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018. References Environmental Assessment Report - Rev. 1 Bull Run Fossil Plant
Stantec. (2018h). Surface Stream Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018.
Stantec. (2018i). Benthic Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018.
Stantec. (2018j). Fish Tissue Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 4 Final. Prepared for TVA. December 17, 2018.
Stantec. (2019). Hydrogeological Investigation Sampling and Analysis Plan, Bull Run Fossil Plant. Revision 6 Final. Prepared for TVA. March 12, 2019.
Stantec. (2021a). Background Soil Sampling and Analysis Plan, Bull Run Fossil Plant – Addendum I Rock Outcrop survey Sampling. Prepared for TVA. January 29, 2021.
Stantec. (2021b). Addendum to Exploratory Drilling Sampling and Analysis Plan, Bull Run Fossil Plant. Prepared for TVA. March 15, 2021.
Swingle, G.D. (1964). Geologic Map of the Clinton Quadrangle, Tennessee. Tennessee Department of Environment and Conservation (TDEC). (2015). Commissioner’s Order No. OGC15- 177. August 6.
TDEC. (2018). State of Tennessee NPDES Permit No. TN0005410. Issued March 31, 2018. Expires April 30, 2023. Effective May 1, 2018 TriAD Environmental Consultants, Inc. (2017). Historical Ash Volume Calculation. Bull Run Fossil Plant. March and April.
TVA. (1996a). Bull Run Fossil Plant Groundwater Assessment. Report No. WR28-1-49-112. January.
TVA. (2009). Cobalt Investigation Report – Gypsum/Coal-Ash Landfill. October 2, 2009.
TVA. (2011). Biological Monitoring of the Clinch River Near Bull Run Fossil Plant Discharge, Autumn 2010. June.
TVA. (2012). Biological Monitoring of the Clinch River Near Bull Run Fossil Plant Discharge, Summer and Autumn 2011. October.
TVA. (2013). National Pollution Discharge Elimination System Permit Application for Renewal – NPDES Permit No. TN0005410. Submitted to Tennessee Department of Environment and Conservation Division of Water
TVA. (2015a). Biological Monitoring of the Clinch River Near Bull Run Fossil Plant Discharge, Autumn 2014. June.
TVA (2015b). Summary of TVA’s Biological Monitoring for Steam Generated Power Plants. August.
TVA. (2017a). Biological Monitoring of the Clinch River Near Bull Run Fossil Plant Discharge, Autumn 2016. May.
TVA. (2017a). Bull Run Plant Landfill Final Environmental Impact Statement. Anderson County Tennessee. Retrieved from https://www.nrc.gov/docs/ML1803/ML18036A961.pdf. Accessed September 2020. References Environmental Assessment Report - Rev. 1 Bull Run Fossil Plant
TVA. (2018a). Environmental Investigation Plan Bull Run Fossil Plant. Revision 4. December 17, 2018.
TVA. (2018b). Bull Run Fossil Plant Community Information Session Event Guide. Retrieved October 4, 2018, from https://www.tva.com/Energy/Our-Power-System/Coal/Bull-Run-Fossil-Plant.
TVA. (2018c). Seepage Action Plan, Bull, Run Fossil Plant, Clinton, Anderson County, Tennessee. July 27, 2018.
TVA. (2019a). Bull Run Fossil Plant Update. Retrieved June 17, 2019, from https://www.tva.com/Energy/Our-PowerSystem/Coal/Bull-Run-Fossil-Plant.
TVA. (2019b). Tennessee Valley Authority Cumberland Fossil Plant Public Open House Guide. December 2019. Retrieved from https://www.tva.gov/Energy/Our-Power-System/Coal/Cumberland-Fossil-Plant.
TVA. (2020a). TVA Coal Combustion Byproducts Fuel Economic Growth. Retrieved October 2020, from https://www.tva. com/environment/coal-ash/tva-coal-combustion-byproducts-fuel-economic-growth.
TVA. ENV-TI-05.80.50, Soil and Sediment Sampling. United States Department of Agriculture (USDA). 1978. Soil Survey of Anderson County, Tennessee. Retrieved September 2020, from https://www.nrcs.usda.gov/Internet/FSE_MANUSCRIPTS/tennessee/TN001/0/ anderson.pdf.
USDA. (2009). Soil Survey of Roane County, Tennessee. Retrieved September 2009, from https://www.nrcs.usda.gov/ Internet/FSE_MANUSCRIPTS/tennessee/TN145/0/Roane_TN.pdf.
United States Environmental Protection Agency. (2010). Tennessee Ambient Air Monitoring Plan. July 1, 2010. United States Geological Survey (USGS). (1946). Physical Divisions of the United States
USGS. (1995). Groundwater Atlas of the United States Illinois, Indiana, Kentucky, Ohio, Tennessee. Hydrologic Atlas 730K. 1995. References Environmental Assessment Report - Rev. 1 Bull Run Fossil Plant
USGS. (1997). Groundwater Atlas of the United States Delaware, Maryland, New Jersey, North Carolina, Pennsylvania,
Virginia, West Virginia. Hydrologic Atlas 730-L. 1997.
USGS. (2020). Retrieved April 2020, from https://www.nrc.gov/docs/ML0933/ML093340269.pdf.