Policy Replication

Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment

Federal Register2014-04-11 · DEPARTMENT OF LABOR; Occupational Safety and Health Administration · Rule · 2013-29579
Final rule.

OSHA last issued rules for the construction of transmission and distribution installations in 1972. Those provisions are now out of date and inconsistent with the more recently promulgated general industry standard covering the operation and maintenance of electric power generation, transmission, and distribution lines and equipment. OSHA is revising the construction standard to make it more consistent with the general industry standard and is making some revisions to both the construction and general industry requirements. The final rules for general industry and construction include new or revised provisions on host employers and contractors, training, job briefings, fall protection, insulation and working position of employees working on or near live parts, minimum approach distances, protection from electric arcs, deenergizing transmission and distribution lines and equipment, protective grounding, operating mechanical equipment near overhead power lines, and working in manholes and vaults. The revised standards will ensure that employers, when appropriate, must meet consistent requirements for work performed under the construction and general industry standards. The final rule also revises the general industry and construction standards for electrical protective equipment. The existing construction standard for the design of electrical protective equipment, which applies only to electric power transmission and distribution work, adopts several national consensus standards by reference. The new standard for electrical protective equipment, which matches the corresponding general industry standard, applies to all construction work and replaces the incorporation of out-of-date consensus standards with a set of performance-oriented requirements that is consistent with the latest revisions of the relevant consensus standards. The final construction rule also includes new requirements for the safe use and care of electrical protective equipment to complement the equipment design provisions. Both the general industry and construction standards for electrical protective equipment will include new requirements for equipment made of materials other than rubber. OSHA is also revising the general industry standard for foot protection. This standard applies to employers performing work on electric power generation, transmission, and distribution installations, as well as employers in other industries. The final rule removes the requirement for employees to wear protective footwear as protection against electric shock.

RIN 1218-AB67 · Docket OSHA-S215-2006-0063

Other documents for the same rulemaking (all, by stage)

1986-05-31 Regulatory impact analysisSupporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.
1987-10-23 Regulatory impact analysisSupporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA
1990-06-12 Regulatory impact analysisSupporting Exhibit 32; Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)
2003-02-14 Regulatory impact analysisSupporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.
2003-02-14 Regulatory impact analysisSupporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013
2003-04-07 Regulatory impact analysisSupporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.
2005-06-08 Regulatory impact analysisSupporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)
2005-06-15 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2005-10-12 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing
2008-10-22 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record
2009-09-14 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing
2014-04-01 Docket documentOffice of Management and Budget. 2003. Circular A-4
2014-09-24 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections
2015-10-05 Federal RegisterElectrical Safety-Related Work Practices; Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections

References: 94 extracted, 28 linked to papers

Page 2Download these results: CSV · JSON
IEEE Std 1048-2003, IEEE Guide for Protective Grounding of Power Lines
IEEE Std 80-2000, IEEE Guide for Safety in AC Substation Grounding
ASTM F855-09, Standard Specifications for Temporary Protective Grounds to Be Used on De-Energized Electric Power Lines and Equipment
bookNot linked to a paper · § 1910.269(n)(4) note
ANSI/IEEE C2-2012, National Electrical Safety Code
bookNot linked to a paper · § 1910.269(u)(1) note
Ex. 0430 (heat energy inverse proportion to square of distance)
otherNot linked to a paper · Head and face protection, fn 365 area
NIOSH recommended flash protection boundaries (Ex. 0130)
otherNot linked to a paper · Heat stress / Ex. 0505 discussion
Lukens Steel Co., 10 BNA OSHC 1115 (No. 76-1053, 1981)
otherNot linked to a paper · Are FR and arc-rated clothing PPE
Table 17 typical heat loss values through clothing (Ex. 0363)
datasetNot linked to a paper · Heat stress
NFPA 70E-2004
otherNot linked to a paper · Other issues relating to selection of protective clothing
ASTM F1796-09 Standard Specification for High Voltage Detectors—Part 1 Capacitive Type to be Used for Voltages Exceeding 600 Volts AC
otherNot linked to a paper · Grounding and testing for deenergized lines
ASTM F855-04 Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment
otherNot linked to a paper · Protective grounds discussion
IEEE Std 516, IEEE Guide for Maintenance Methods on Energized Power-Lines
otherNot linked to a paper · Section III.B, Relevant Consensus Standards
IEEE Std 1048, IEEE Guide for Protective Grounding of Power Lines.
otherNot linked to a paper · Section III.B, Relevant Consensus Standards
ANSI/IEEE C2-2012
otherNot linked to a paper · Section 1926.966(b) note
ANSI/IEEE Std 18-2012, IEEE Standard for Shunt Power Capacitors
otherNot linked to a paper · Section 1926.967(a)
IEEE Std 1048-2003
otherNot linked to a paper · Appendix C discussion
ASTM F1891-12, Standard Specification for Arc and Flame Resistant Rainwear
otherNot linked to a paper · Appendix E discussion
FCC OET Bulletin 65, Edition 97-01, Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields
research reportNot linked to a paper · Section 1926.967(k) discussion
CIGRÉ/SC 33, "Phase-to-Phase Insulation Coordination," ELECTRA, no. 64, 1979
journal articleNot linked to a paper · fn 217
Esmeraldo, P. C. V., and Fonseca, C. S., "Evaluation of the Phase-to-Phase Overvoltage Characteristics due to Switching Surges for Application on Risk of Failure Statistical Methods in Non- Conventional Power Design," Paper 34.01, 6th ISH, New Orleans, 1989
conference paperNot linked to a paper · fn 217
Gallet, G., Leroy, G., Lacey, R., and Kromer, I., "General expression for positive switching impulse strength valid up to extra line air gaps," IEEE Transaction on Power Apparatus and Systems, vol. PAS-94, pp. 1989-1993, Nov./Dec. 1975
Consequently, the Agency decided against adopting this method in the final rule. The second method, adopted by IEEE Std 516-2009, uses equations based on the paper by Vaisman,\228\ and two papers by Gallet,\229\ to determine minimum approach distances (Ex.
Gallet, G., Hutzler, B., and Riu, J-P., "Analysis of the switching impulse strength of phase-to-phase air gaps," IEEE Transactions on Power Delivery, vol. PAS-97, no. 2, Mar./Apr. 1978
Consequently, the Agency decided against adopting this method in the final rule. The second method, adopted by IEEE Std 516-2009, uses equations based on the paper by Vaisman,\228\ and two papers by Gallet,\229\ to determine minimum approach distances (Ex.
Elek, A., and Simpson, J. W., "Safe clearance and protection against shocks during live-line work," AIEE Transaction on Power Apparatus and Systems, vol. 80, pt. III, pp. 897-902, Feb. 1962
In addition, the IEEE committee chose not to use it for phase-to-ground exposures, presumably because the papers supporting the method for phase-to-ground exposures examined the safety of employees performing live-line maintenance.\235\ OSHA believes that these papers support the method used in the final rule to calculate minimum approach distances for phase-to-phase exposures, as well as phase-to-ground exposures.
IEEE Committee Report, "Live-line maintenance methods," IEEE Transactions on Power Apparatus and Systems, vol. PAS-92, pp. 1642-1648, Sept./Oct. 1973
journal articleLive-Line Maintenance Methods (1973) · fn 235
In addition, the IEEE committee chose not to use it for phase-to-ground exposures, presumably because the papers supporting the method for phase-to-ground exposures examined the safety of employees performing live-line maintenance.\235\ OSHA believes that these papers support the method used in the final rule to calculate minimum approach distances for phase-to-phase exposures, as well as phase-to-ground exposures.
IEEE Committee Report, "Recommendations for safety in live-line maintenance," IEEE Transactions on Power Apparatus and Systems, vol. PAS-87, no. 2, pp. 346-352, Feb. 1968
In addition, the IEEE committee chose not to use it for phase-to-ground exposures, presumably because the papers supporting the method for phase-to-ground exposures examined the safety of employees performing live-line maintenance.\235\ OSHA believes that these papers support the method used in the final rule to calculate minimum approach distances for phase-to-phase exposures, as well as phase-to-ground exposures.
EPRI Transmission Line Reference Book: 115-345-kV Compact Line Design, 2007 (Blue Book)
research reportNot linked to a paper · fn 233
Doughty, T.E., Neal, T.E., and Floyd II, H.L., "Predicting Incident Energy to Better Manage the Electric Arc Hazard on 600 V Power Distribution Systems," Record of Conference Papers IEEE IAS 45th Annual Petroleum and Chemical Industry Conference, September 28—30, 1998.
Stoll, A.M., and Chianta, M.A., 'Method and Rating System for Evaluations of Thermal Protection,' Aerospace Medicine, Vol 40, 1969, pp. 1232-1238
Stoll A.M., and Chianta, M.A., 'Heat Transfer through Fabrics as Related to Thermal Injury,' Transactions—New York Academy of Sciences, Vol 33(7), Nov. 1971, pp. 649-670.
IEEE Std 516-2009, IEEE Guide for Maintenance Methods on Energized Power Lines.
IEEE Std 1048-2003, IEEE Guide for Protective Grounding of Power Lines.
IEEE Std 1584b-2011 (Amendment 2 to IEEE Std 1584-2002), Guide for Performing Arc-Flash Hazard Calculations.
bookNot linked to a paper · Appendix E, Table 2
ARCPRO, a commercially available software program developed by Kinectrics, Toronto, ON, CA.
otherNot linked to a paper · Appendix E, Table 2
CONSAD report in support of the PRIA [5]
research reportNot linked to a paper · fn 538
the 2003 report of the Small Business Advocacy Review Panel [29]
government reportNot linked to a paper · fn 538
industry-specific wage rates published by BLS [37]... National Compensation Survey [36]
datasetNot linked to a paper · Profile of Affected Industries (fn 537)
Federal Energy Regulatory Commission's Form No. 1: Annual Report of Major Electric Utilities [10]
datasetNot linked to a paper · Costs Related to Minimum Approach Distances (section 14)
Energy Information Administration Form EIA-861 Final Data File for 2008 [50]
datasetNot linked to a paper · Costs Related to Minimum Approach Distances (section 14)
2008 EIA Form 860 database, which provides a nationwide census of generating plants by owner [49]
datasetNot linked to a paper · Costs for Providing Arc-Flash Protective Equipment / arc-hazard assessment (section 10)
U.S. Census Bureau's Statistics of U.S. Businesses [43]
datasetNot linked to a paper · Economic Feasibility and Impacts (section 16)
Internal Revenue Service's (IRS) Corporation Sourcebook
datasetNot linked to a paper · Economic Feasibility and Impacts (section 16)
Bureau of Economic Analysis' Implicit Price Deflator for Gross Domestic Product [32]
datasetNot linked to a paper · One-Time Costs for Additional Training for Employees Not Already Receiving Training (section 'One-Time Costs')
IEEE Std 80, Guide for Safety in AC Substation Grounding
bookNot linked to a paper · Section 1926.963 summary (testing and test facilities)
ASTM F855-09, Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment
bookNot linked to a paper · fn 414