Policy Replication

Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing

Federal Register2005-10-12 · DEPARTMENT OF LABOR; Occupational Safety and Health Administration · Proposed Rule (administrative) · 05-20421
Notice of hearing; extension of comment period; reopening of the period to file notices of intention to appear at an informal public hearing; additional issues for comment.

This notice reschedules an informal hearing on the proposed standards on electric power generation, transmission, and distribution and on electrical protective equipment, which were published on June 15, 2005. It also reopens the period to file notices of intention to appear at the informal public hearing, extends the period for written comments on the proposal, extends the period to provide the complete text of testimony and documentary evidence, and identifies additional issues on which OSHA is seeking comment. These periods are extended 90 days with this notice.

RIN 1218-AB67

Other documents for the same rulemaking

1986-05-31 Regulatory impact analysisSupporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.
1987-10-23 Regulatory impact analysisSupporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA
1990-06-12 Regulatory impact analysisSupporting Exhibit 32; Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)
2003-02-14 Regulatory impact analysisSupporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.
2003-02-14 Regulatory impact analysisSupporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013
2003-04-07 Regulatory impact analysisSupporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.
2005-06-08 Regulatory impact analysisSupporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)
2005-06-15 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2008-10-22 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record
2009-09-14 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing
2014-04-01 Docket documentOffice of Management and Budget. 2003. Circular A-4
2014-04-11 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2014-09-24 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections
2015-10-05 Federal RegisterElectrical Safety-Related Work Practices; Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections

References

No references to show.