Policy Replication

Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections

Federal Register2014-09-24 · DEPARTMENT OF LABOR; Occupational Safety and Health Administration · Rule (administrative) · 2014-22148
Correcting amendments.

On April 11, 2014 (79 FR 20316), the Occupational Safety and Health Administration published a final rule: Revising the general industry standards for electric power generation, transmission, and distribution work and for electrical protective equipment; revising the construction standard for electric power transmission and distribution work; and adopting a new construction standard for electrical protective equipment. The final rule updated those standards and made the general industry and construction standards consistent. This document corrects errors in the preamble and regulatory text of the final rule.

RIN 1218-AB67 · Docket OSHA-S215-2006-0063

Other documents for the same rulemaking

1986-05-31 Regulatory impact analysisSupporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.
1987-10-23 Regulatory impact analysisSupporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA
1990-06-12 Regulatory impact analysisSupporting Exhibit 32; Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)
2003-02-14 Regulatory impact analysisSupporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.
2003-02-14 Regulatory impact analysisSupporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013
2003-04-07 Regulatory impact analysisSupporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.
2005-06-08 Regulatory impact analysisSupporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)
2005-06-15 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2005-10-12 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing
2008-10-22 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record
2009-09-14 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing
2014-04-01 Docket documentOffice of Management and Budget. 2003. Circular A-4
2014-04-11 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2015-10-05 Federal RegisterElectrical Safety-Related Work Practices; Electric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections

References

No references to show.