Correcting amendments.

This document corrects the electrical safety-related work practices standard for general industry and the electric power generation, transmission, and distribution standards for general industry and construction to provide additional clarification regarding the applicability of the standards to certain operations, including some tree trimming work that is performed near (but that is not on or directly associated with) electric power generation, transmission, and distribution installations. This document also corrects minor errors in two minimum approach distance tables in the general industry and construction standards for electric power generation, transmission and distribution work.

RIN 1218-AA32, RIN 1218-AB67 · Docket OSHA-S016-2006-0646, Docket OSHA-S215-2006-0063

Other documents for the same rulemaking

1986-05-31 Regulatory impact analysisSupporting Exhibit 7-3; PREPARATION OF AN ECONOMIC IMPACT STUDY FOR THE PROPOSED OSHA REGULATION COVERING ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION. TASK ORDER NO. 1 CONTRACT NO. J-9-F-5-0057.
1987-10-23 Regulatory impact analysisSupporting Exhibit 2; OFFICE OF REGULATORY ANALYSIS, OSHA
1990-06-12 Regulatory impact analysisSupporting Exhibit 32; Regulatory Impact and Regulatory Flexibility Analysis of the Electrical Safety-Related Work Practices Standard for General Industry (29 CFR 1910, Subpart S)
2003-02-14 Regulatory impact analysisSupporting Exhibit 2-4; A BRIEF SUMMARY OF OSHAS PRELIMINARY ESTIMATES OF THE ECONOMIC IMPACTS, COSTS, AND BENEFITS OF THE PROPOSED RULE AS A WHOLE. CONTRACT NO. J-9-F-9-0013. TASK ORDER NUMBER 29. OPTION YEAR 3.
2003-02-14 Regulatory impact analysisSupporting Exhibit 3; FINAL REPORT. ANAYTICAL SUPPORT AND DATA GATHERING FOR A PRELIMINARY ECONOMIC ANALYSIS FOR A PROPOSED STANDARD FOR WORK ON ELEC POWER TRANSMISSION AND DISTRIBUTION LINES AND EQUIP (29 CFR 1910.269 AND 29 CFR 1926 - SUBPART V). CONTRACT NO. J-9-F-9-0013
2003-04-07 Regulatory impact analysisSupporting Exhibit 2-3; DRAFT COPY OF OSHAS PRELIMINARY INITIAL REGULATORY FLEXIBILITY ANALYSIS, WHICH INCLUDES THE AGENCYS ANALYSIS OF SOME ALTERNATIVES TO THE PROPOSED RULE.
2005-06-08 Regulatory impact analysisSupporting Exhibit 7-1; REVISED FINAL REPORT - ANALYTICAL SUPPORT AND DATA GATHERING FRO A PRELIMINARY ECONOMIC ANALYSIS FOR PROPOSED STANDARDS FOR WORK ON ELECTRIC POWER GENERATION, TRANSMISSION, AND DISTRIBUTION LINES AND EQUIPMENT (29 CFR 1910.269 AND 29 CFR 1926-SUBPART V)
2005-06-15 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2005-10-12 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Extension of Comment Period; Change in Date of Public Hearing
2008-10-22 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record
2009-09-14 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Limited Reopening of Record; Notice of Informal Public Hearing
2014-04-01 Docket documentOffice of Management and Budget. 2003. Circular A-4
2014-04-11 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment
2014-09-24 Federal RegisterElectric Power Generation, Transmission, and Distribution; Electrical Protective Equipment; Corrections

References: 1 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
"Preparation of an Economic Impact Study for the Proposed OSHA Regulation Covering Electric Power Generation, Transmission, and Distribution," a report prepared by Eastern Research Group, Inc.
research reportNot linked to a paper · fn 9 · cited link