NUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report
Other documents for the same rulemaking (all, by stage)
References: 521 extracted, 47 linked to papers
NRC (U.S. Nuclear Regulatory Commission). 2007. Combined License Applications for Nuclear Power Plants (LWR Edition). Regulatory Guide 1.206, Washington, D.C. ADAMS Accession No. ML070630003. TN12096.
NRC (U.S. Nuclear Regulatory Commission). 2007. Policy Issue, Information, Status of the Plan for the Implementation of the Commission’s Phase Approach to Probabilistic Risk Assessment Quality. SECY-07-0042, Washington, D.C. Accessed June 28, 2025, at https://www.nrc.gov/reading-rm/doc-collections/commission/secys/2007/secy2007-0042/20070042scy.pdf. TN12088. I-56
NRC (U.S. Nuclear Regulatory Commission). 2007. “Westinghouse AP1000 Design Control Document Rev. 16 (Public Version).” Washington, D.C. ADAMS Accession No. ML071580939. TN12151.
NRC (U.S. Nuclear Regulatory Commission). 2008. “Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design.” NUREG-1503, Washington, D.C. ADAMS Accession No. ML080670592. TN12106.
NRC (U.S. Nuclear Regulatory Commission). 2008. Policy Statement on the Regulation of Advanced Reactors. NRC-2008-0237, Washington, D.C. ADAMS Accession No. ML082750370. TN12103.
NRC (U.S. Nuclear Regulatory Commission). 2009. An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities. Regulatory Guide 1.200, Revision 2, Washington, D.C. ADAMS Accession No. ML090410014. TN6211.
NRC (U.S. Nuclear Regulatory Commission). 2009. Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors. DC/COLISG-020, Washington, D.C. ADAMS Accession No. ML092650342. TN12100.
NRC (U.S. Nuclear Regulatory Commission). 2009. Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decision Making, Main Report. NUREG-1855, Volume 1, Washington, D.C. ADAMS Accession No. ML090970525. TN12089.
NRC (U.S. Nuclear Regulatory Commission). 2010. “GE-Hitachi ESBWR Design Control
NRC (U.S. Nuclear Regulatory Commission). 2011. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the Amendment to the AP1000 Standard Plant Design Docket NO. 52-006. Washington, D.C. ADAMS Accession No. ML113480019. TN12154.
NRC (U.S. Nuclear Regulatory Commission). 2011. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the Amendment to the AP1000 Standard Plant Design Docket NO. 52-006. Washington, D.C. ADAMS Accession No. ML112380827. TN12120.
NRC (U.S. Nuclear Regulatory Commission). 2011. Letter from M.R. Johnson, Director, Office of New Reactors, to J.G. Head, Senior Vice President, Regulatory Affairs, dated March 9, 2011, regarding “Final Design Approval for the Economic Simplified Boiling Water Reactor.”
NRC (U.S. Nuclear Regulatory Commission). 2011. Final Safety Evaluation Report Related to Certification of the AP1000 Standard Plant Design. NUREG–1793, Supplement 2, Washington, D.C. ADAMS Accession No. ML112061231. TN2479. I-57
NRC (U.S. Nuclear Regulatory Commission). 2011. Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident. SECY–11–0093, NRC Task Force, Washington, D.C. ADAMS Accession No. ML111861807. TN684.
NRC (U.S. Nuclear Regulatory Commission). 2011. “Resolution of Generic Safety Issues (Formerly entitled “A Prioritization of Generic Safety Issues”) (NUREG-0933, Main Report with Supplements 1–35).” Washington, D.C. Accessed June 15, 2022, at https://www.nrc.gov/sr0933/index.html. TN7816.
NRC (U.S. Nuclear Regulatory Commission). 2012. Final Interim Staff Guidance Augmenting
ADAMS Accession No. ML12156A075. TN5528. NRC (U.S. Nuclear Regulatory Commission). 2012. Letter from D. Matthews, to Westinghouse Electric Company, dated August 23, 2012, regarding “Withdrawal of the AP1000 Final Design Approval.” Washington, D.C. ADAMS Accession No. ML12202A071. TN6238.
NRC (U.S. Nuclear Regulatory Commission). 2012. Policy Issue, Notation Votes, Consideration of Economic Consequences Within the U.S. Nuclear Regulatory Commission’s Regulatory Framework. SECY-12-0110, Washington, D.C. ADAMS Accession No. ML12173A479. TN12104.
NRC (U.S. Nuclear Regulatory Commission). 2013. “In the Matter of All Operating Boiling-Water Reactor Licensees With Mark 1 and Mark II Containments.” EA-13-109, Washington, D.C.
NRC (U.S. Nuclear Regulatory Commission). 2014. Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application Interim, Staff Guidance. DC/COL-ISG-028,
NRC (U.S. Nuclear Regulatory Commission). 2014. “Economic Simplified Boiling Water Reactor Final Supplemental Final Safety Evaluation Report.” Washington, D.C. ADAMS Accession No. ML14328A238. TN12129.
NRC (U.S. Nuclear Regulatory Commission). 2014. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the ESBWR Standard Plant Design Docket No. 52-010. Washington, D.C. ADAMS Accession No. ML111730382. TN12132.
NRC (U.S. Nuclear Regulatory Commission). 2014. “Final Safety Evaluation Report Related to the Certification of the Economic Simplified Boiling-Water Reactor Standard Design.” NUREG1966, Washington, D.C. ADAMS Accession No. ML14100A304. TN12125. I-58
NRC (U.S. Nuclear Regulatory Commission). 2014. “GE-Hitachi ESBWR Design Control Document Tier, Revision 10.” Washington, D.C. ADAMS Accession No. ML14104A929. TN12128.
NRC (U.S. Nuclear Regulatory Commission). 2014. “Final Safety Evaluation Report Related to the Certification of the Economic Simplified Boiling-Water Reactor Standard Design.” NUREG1966, Supplement 1, Washington, D.C. ADAMS Accession No. ML14265A084. TN12130.
NRC (U.S. Nuclear Regulatory Commission). 2014. Rulemaking Issue (Affirmation): Final Rule: Economic Simplified Boiling-Water Reactor Design Certification. SECY-14-0081, Washington, D.C. ADAMS Accession No. ML111730346. TN10131.
NRC (U.S. Nuclear Regulatory Commission). 2015. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the Amendment to the AP1000 Standard Plant Design Docket No. 52-006. Washington, D.C. ADAMS Accession No. ML15237A211. TN12121.
NRC (U.S. Nuclear Regulatory Commission). 2018. An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis. Regulatory Guide 1.174, Revision 3, Washington, D.C. ADAMS Accession No. ML17317A256. TN6335.
NRC (U.S. Nuclear Regulatory Commission). 2018. Letter from F.M. Akstulewicz, to Westinghouse Electric Company, dated February 14, 2018, regarding “AP1000 Reactor Design Certification—Granting In Part and Denial In Part of Request for Exemptions Related to the Duration of the AP1000 Design Certification.” Washington, D.C. ADAMS Package Accession No. ML17265A099. TN6296.
NRC (U.S. Nuclear Regulatory Commission). 2018. Technical Basis for the Containment Protection and Release Reduction Rulemaking for Boiling Water Reactors with Mark I and Mark
NRC (U.S. Nuclear Regulatory Commission). 2019. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the APR1400 Standard Plant Design Docket No. 52-046. Washington, D.C. ADAMS Accession No. ML18306A607. TN12134.
NRC (U.S. Nuclear Regulatory Commission). 2019. “NuScale DCA Safety Evaluation Reports with Open Items (Review Phase 2).” Washington, D.C. ADAMS Accession No. ML19191A196. TN12135.
NRC (U.S. Nuclear Regulatory Commission). 2019. NuScale NCP-2019-004 Draft Final R3.
NRC (U.S. Nuclear Regulatory Commission). 2020. “GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 (corrected).” Washington, D.C. ADAMS Accession No. ML20093K254. TN12114. I-59
NRC (U.S. Nuclear Regulatory Commission). 2020. “NRC Approved NuScale Topical Reports.”
NRC (U.S. Nuclear Regulatory Commission). 2020. “PHASE 6- NuScale DC Dinal Safety Evaluation Report (Complete with Appendices).” Washington, D.C. ADAMS Accession No. ML20023A318. TN12138.
NRC (U.S. Nuclear Regulatory Commission). 2020. Memorandum from A.L. Vietti-Cook,
Secretary, to M.M. Doane, Executive Director for Operations, dated May 26, 2020, regarding “Staff Requirements – SECY-19-0117 – Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for
NRC (U.S. Nuclear Regulatory Commission). 2021. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to Renewal of the U.S. ABWR Standard Design Certification. Washington, D.C. ADAMS Accession No. ML21147A381. TN12112.
NRC (U.S. Nuclear Regulatory Commission). 2019. “NuScale DCA Advanced Safety Evaluation Reports.” Washington, D.C. ADAMS Accession No. ML19192A011. TN12136.
NRC (U.S. Nuclear Regulatory Commission). 2021. Letter from M.W. Sunseri, Chairman, to D.H. Dorman, Executive Director for Operations, dated October 26, 2021, regarding “Regulatory Guide 1.247, Acceptability of Probabilistic Risk Assessment Results for Advanced Non-Light Water Reactor Risk-Informed Activities.” Washington, D.C. ADAMS Accession No. ML21288A018. TN12099.
NRC (U.S. Nuclear Regulatory Commission). 2021. Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing. Regulatory Guide RG 1.175, Revision 1, Washington, D.C.
NRC (U.S. Nuclear Regulatory Commission). 2021. Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications. Regulatory Guide 1.177, Revision 2, Washington, D.C. ADAMS Accession No. ML20164A034. TN12092.
NRC (U.S. Nuclear Regulatory Commission). 2021. Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping. Regulatory Guide 1.178, Revision 2,
NRC (U.S. Nuclear Regulatory Commission). 2022. Final Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the NuScale Standard Plant Design Docket No. 52-048. Washington, D.C. ADAMS Accession No. ML22004A006. TN12139. I-60
NRC (U.S. Nuclear Regulatory Commission). 2023. Kairos Power LLC Docket No. 50-7513 Hermes Test Reactor Construction Permit. Construction Permit No. CPTR-6, Washington, D.C.
NRC (Nuclear Regulatory Commission). 2023. Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. Regulatory Guide 1.183, Revision 1, Washington, D.C. ADAMS Accession No. ML22172A024. TN9587.
NRC (U.S. Nuclear Regulatory Commission). 2023. Draft Regulatory Guide DG-4034, Proposed Revision 4 to Regulatory Guide 4.7, General Site Suitability Criteria for Nuclear Power Stations.
NRC (U.S. Nuclear Regulatory Commission). 2023. Performance-Based Emergency Preparedness for Small Modular Reactors, Non-Light-Water Reactors, and Non-Power Production or Utilization Facilities. Regulatory Guide 1.242, Revision 0, Washington, D.C.
NRC (U.S. Nuclear Regulatory Commission). 2024. Kairos Power LLC Docket No. 50-611 Hermes 2 Test Reactor Facility Unit 1 Construction Permit. Construction Permit No. CPTR-7,