11/2002 - NUREG-0586, Supplement 1, Vol. 1, [1:2] Cover - Appendix D, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.

Docket document2024-10-04 · NRC · other · NRC-2020-0101-0138
RIN 3150-AK55 · Docket NRC-2020-0101

Other documents for the same rulemaking (all, by stage)

2021-03-08 Docket documentAdvanced Nuclear Reactor Generic Environmental Impact Statement
2021-03-09 Docket document09/2020 - Scoping Summary Report for the Advanced Nuclear Reactor Generic EIS
2021-03-15 Docket document05/28/20 - Scoping Meeting Slides - Advanced Reactor Generic Environmental Impact Statement
2021-03-15 Docket document05/28/20 - Scoping Meeting Transcript Advanced Reactor GEIS
2021-03-15 Docket document05/28/20 - Summary of Scoping Meeting Conducted for Advanced Reactor Generic EIS
2021-12-15 Regulatory impact analysisDraft Regulatory Analysis
2021-12-15 Docket documentRedline Prelimiary Draft Regulatory Guide DG-4032
2021-12-15 Docket documentDraft Advanced Nuclear Reactor Generic Environmental Impact Statement
2021-12-15 Docket documentSECY-21-0098: Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement
2021-12-15 Docket documentPreliminary Draft Interim Staff Guidance COL-ISG-30: Advanced Reactor Applications - Environmental Considerations for Advanced Nuclear Applications that Reference the GEIS (NUREG- 2249)
2021-12-15 Docket documentClean Preliminary Draft Regulatory Guide DG-4032
2024-10-03 Docket document09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations,” Redline/Strikeout Version to Support Public Comment
2024-10-03 Docket document09/2024 - Draft Interim Staff Guidance, COL-ISG-030, “Environmental Considerations for New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249)
2024-10-03 Docket document09/2024 - Energy and System Design Mitigation Alternatives White Paper Report
2024-10-03 Docket document09/2024 - Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates White Paper
2024-10-03 Docket document09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations”
2024-10-04 Federal RegisterGeneric Environmental Impact Statement for Licensing of New Nuclear Reactors
2024-10-04 Regulatory impact analysis09/2024 - Draft Regulatory Analysis for the 10 CFR Part 51, Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule
2024-10-04 Docket documentDraft Supporting Statement for Information Collections Contained in the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule
2024-10-04 Docket documentProposed Rule: Congressional Letters for the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2024-10-04 Docket document11/2002 - NUREG-0586, Supplement 1, Vol. 1, [2:2] Appendix E - End, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.
2024-10-04 Docket document04/17/24 - Staff Requirements Memorandum (SRM)-SECY-21-0098, “Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55; NRC-2020-0101)”
2024-10-04 Docket document04/17/24 - SRM-SECY-21-0098: Enclosure - Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55;NRC-2020-0101)
2024-10-08 Docket document09/2024 - Draft NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors”
2024-10-08 Docket document08/2024 - NUREG-1437, Volume 3, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
2024-10-08 Docket document09/2014 - NUREG-2157 Vol 1, "Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report."
2024-10-08 Docket document09/2014 -NUREG-2157 Vol 2, "Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report."
2024-10-08 Docket document05/28/20 - Advanced Reactor Generic Environmental Impact Statement Scoping Meeting List of Attendees
2024-10-08 Docket document02/28/20 - SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”
2024-10-08 Docket documentSummary of November 15 and 20, 2019, Public Meetings to Discuss Exploratory Process for Developing an Advanced Nuclear Reactor Generic Environmental Impact Statement, dated December 10, 2019
2024-10-08 Docket documentWorkshop to Discuss the Environmental Information Needed to Develop a Generic Environmental Impact Statement for Advanced Nuclear Reactors, dated December 13, 2019
2024-10-08 Docket document08/2024 - NUREG-1437, Volume 1, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
2024-10-08 Docket document09/21/20 - SRM-SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”
2024-10-08 Docket document05/28/20 - Meeting to Discuss the Scope of the Generic Environmental Impact Statement for Advanced Nuclear Reactors (Meeting Notice)
2024-10-08 Docket document08/2024 - NUREG-1437, Volume 2, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
2024-10-08 Docket documentSummary of October 1, 2020, Advanced Reactor Stakeholder Public Meeting, dated December 22, 2020
2024-10-08 Docket documentSummary of April 15, 2021, Advanced Reactor Stakeholder Public Meeting, dated August 24, 2021
2024-10-17 Federal RegisterGeneric Environmental Impact Statement for Licensing of New Nuclear Reactors
2024-10-22 Docket documentNR GEIS Email from E. Schlossberg 10-17-24
2026-04-24 Federal RegisterGeneric Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Regulatory impact analysisRegulatory Analysis-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)
2026-05-13 Docket documentFederal Register Notice-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)
2026-05-13 Docket document11-14-2024 - Public Meeting Transcript RE Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Page 1-31
2026-05-13 Docket documentSRM-M260413_Enclosure 2 - SECY-25-0085 - Final Rule_Generic Environmental Impact Statement For Licensing Of New Nuclear Reactors (RIN 3150-AK55_NRC-2020-0101)
2026-05-13 Docket document11-13-24 Public Meeting Transcript RE Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Docket documentCOL-ISG-030 Environmental Considerations Associated with New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249) (Final Rule - GEIS for Licensing New Nuclear Reactors)
2026-05-13 Docket documentSTC-24-058 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement for Advanced Nuclear Reactors (NUREG 2249)
2026-05-13 Docket document11-7-2024 - Public Meeting - Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule
2026-05-13 Docket documentM260413_ Transcript - Affirmation Session - b) SECY-25-0085 -Final Rule_ Generic Environmental Impact
2026-05-13 Docket document11-13-24 Public Meeting Summary RE_Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Docket documentSTC-24-062 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement
2026-05-13 Docket document11-14-2024 Public Meeting Summary RE_ Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Docket documentSRM-M260413_ SECY-24-0069 - Affirmation Session Final Rule - b) Generic Environmental Impact
2026-05-13 Docket documentNUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report
2026-05-13 Docket documentEnergy and System Design Mitigation Alternatives White Paper
2026-05-13 Docket documentPart 51 Information Collection Supporting Statement for the NRC GEIS Final Rule
2026-05-13 Docket document10-17-24_ Email from Elena Schlossberg to Stewart Schneider (NR GEIS Proposed Rule)
2026-05-13 Docket documentSTC-26-026 Letter NR GEIS Final Rule-Agreement States and State Liaison Officers
2026-05-13 Docket documentRegulatory Guide 4.2 Revision 4 Preparation of Environmental Reports for Nuclear Power Stations (Final Rule - GEIS for Licensing New Nuclear Reactors)

References

Page 1Download these results: CSV · JSON
NUREG-0586 Supplement 1 Introduction U.S. Nuclear Regulatory Commission (NRC). 1988. Final Generic EnvironmentalImpact Statement on Decommissioning of Nuclear Facilities. NUREG-0586, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1997. Final Generic EnvironmentalImpact Statement in Support of Rulemaking on RadiologicalCriteria for License Termination of NRC Licensed Nuclear Facilities. NUREG-1496, Vol. 1, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2000. "SECY-00-0041 Use of Rubblized Concrete Dismantlement to Address 10 CFR Part 20, Subpart E, Radiological Criteria for License Termination." NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2001. Letter from U.S. NRC to Distribution: "Subject: Issuance of a scoping summary report of comments received related to the intent to develop a Supplement to NUREG-0586." Dated April 17, 2001.
research reportNot linked to a paper · refsec
Stion, operation, maintenance, and refueling outages of a power reactor (e.g., decontamination, steam generator replacement, and pipe removal). However, the magnitude of some activities during decommissioning (e.g., removal of piping) is considerably greater than during operations. Activities associated with the decommissioning of facilities had resulted in impacts consistent with or less than those 'evaluated in the 1988 FinalGeneric En vironmental Impact: Statement on Decommissioning of Nuclear Facilities(GELS), NUREG-0586 (NRC 1988). Based on the above reasons, the Commission determined that review and approval by the U.S. Nuclear Regulatory Commission (NRC) staff of a detailed decommissioning plan was not -necessary. 2.2 Summary of Current Regulations 2.2.1 Regulations for Decommissioning Activities The current regulations (10 CFR 50.82) specify the regulatory actions that both the NRC and the licensee must take to decommission a nuclear power facility. Once the licensee decides to permanently cease operations, it must submit, within 30 days, a written certification to the NRC. November 2002
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 November 2002 Background Information Prior to submission of the PSDAR, the licensee can conduct a variety of activities at the site including activities to ensure the safe shutdown of the facility. Systems can be drained, components removed, and certain structures demolished. However, the licensee is prohibited from undertaking any major decommissioning activity as defined in 10 CFR 50.2. Once the PSDAR has been submitted and the 90-day period has been completed, the licensee may begin major decommissioning activities, which may include the following: "• permanent removal of major radioactive components; such as the reactor vessel, steam generators, or other components that are comparably radioactive "* permanent changes to the containment structure "• dismantling of components containing Greater-than-Class-C (GTCC) Waste.(a) In accordance with 10 CFR 50.82(a)(6)(ii), licensees shall not perform any decommissioning activities "that result in significant environmental impacts not previously reviewed." If any decommissioning activity does not meet this requirement, the licensee must submit a license
research reportNot linked to a paper · refsec
Ultimately, they will all permanently cease operations and be decommissioned. 3.1 Plants, Sites, and Reactor Systems(a) Between 1957 and 1996, the U.S. Nuclear Regulatory Commission (NRC) issued 126 operating licenses for commercial power reactor operation at 80 sites. The historyof and experience with the 22 reactors that are being decommissioned currently or have completed decommissioning are addressed in Section 3.3. Because each of the remaining 104 operating plants will eventually enter the decommissioning process, their attribut6s and characteristics are included in this section to ensure that this Su'pplement is appropriate for future decommissioning plants. The material presented iný this section is also provided as background information for the reader. (a) Much of the information in this section was taken from NUREG-1437, Generic EnvironmentalImpact Statement for License Renewal of Nuclear Plants(NRC 1996) and from NUREG-1628, Staff Responses to FrequentlyAsked Questions ConcerningDecommissioningof NuclearPower Reactors (NRC 2000a). This information has been supplemented and updated as appropriate to include all operating and currently decommissioning nuclear plants. •November 2002
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 November 2002 Description of Reactors dismantlement phase of SAFSTOR (see Section 3.2). Peach Bottom, Unit 1, is in long-term storage. Fort St. Vrain has had its license terminated following completion of decommissioning activities. Brief descriptions of these different types of reactors are given below as background. 3.1.1.1 Pressurized Water Reactors In PWRs, water is heated to a high temperature under pressure inside the reactor. The water is then pumped in the primary circulation loop to the steam generator. Within the steam generator, water in the secondary circulation loop is converted to steam that drives the turbines. The turbines turn the generator to produce 'electricity. The steam leaving the turbines is condensed by water in the tertiary loop and returned to the steam generator. The tertiary loop water flows either to cooling towers, where it is cooled by evaporation or discharged to a body of water such as a river, lake, or other heat sink. Th6 tertiary loop is open to the atmosphere, but the primary and secondary cooling loops are not (see Figure 3-1). Pressurizer S~Steam Gen~rator •Trbine
research reportNot linked to a paper · refsec
Fuller, C. H. 1988. "Fort St. Vrain Operational Experience." In Technical Committee Meeting on Design Requirements, Operation,and Maintenance of Gas-CooledReactors. San Diego, California. September 21-23, 1988, pp. 55-61. International Atomic Energy Agency, International Working Group on Gas-Cooled Reactors, IWGCCR-19, Vienna. Available: orAqinis/aws/htcqr/fulltextriwggcrl9 9.pdf.
research reportNot linked to a paper · refsec
Lobner, P, C. Donahoe, and C. Cavallin. 1990. Overview and Comparison of U.S. Commercial Nuclear PowerPlants.NUREG/CR-5640, NRC, Washington, D.C. Resource Conservation and Recovery Act (RCRA) of 1976, as amended by the Hazardous and Solid Waste Amendments Act of 1984, 42 USC 6901 et seq. U.S. Nuclear Regulatory Commission (NRC). 1988. Final Generic EnvironmentalImpact Statement on Decommissioning of Nuclear Facilities. NUREG-0586, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1996. Generic EnvironmentalImpact Statement for License Renewal of NuclearPlants. NUREG-1437, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2000a. Decommissioning of Nuclear Power Reactors. Regulatory Guide 1.184, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2000b. "Staff Requirements SECY-00-0129 Workshop Findings in the Entombment Options for Decommissioning Power Reactors and Staff Recommendations on Further Activities." Staff Requirements Memorandum, NRC,
research reportNot linked to a paper · refsec
Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2000c. Staff Responses to FrequentlyAsked Questions ConcerningDecommissioning of Nuclear PowerReactors. NUREG-1 628, NRC,
research reportNot linked to a paper · refsec
Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2000d. StandardFormatand Content for Post Shutdown DecommissioningActivities Report. Regulatory Guide 1.185, NRC, Washington, D.C. November 2002 3-37
research reportNot linked to a paper · refsec
MODERATE, and LARGE. SMALL - Environmental impacts are not detectable or are so minor that they will neither "destabilizenor noticeably alter any important attribute of the resource. For the purposes of assessing radiological impacts in this Supplement, the NRC has concluded that those impacts that do not exceed permissible levels in the Commission's regulations are. considered small. (a) The National Environmental Policy Act of 1969 (NEPA) requires consideration of both context and intensity when determining the significance of an environmental impact. Context means that the significance of ain action must be analyzed in several 6oh'texts, "sbch as society as a whole (hýuman, national), the affected region', the affected inte~ests,'and the locality. Significance varies with the setting of the proposed action.-Intensity refers to the severity of the impact and depends on many different factors, such as the unique characteristics of the site and the degree to which the proposed action affects public health or safety or may establish a precedent. November 2002 -4-1
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 November 2002 Environmental Impacts * Site-specific - For the issue, the analysis reported in this Supplement has shown that one or more of the generic criteria was not met. Therefore, additional plant-specific review is required. An example of a site-specific issue is threatened and endangered species. For many issues, similar activities may be performed either on the plant site or offsite. In several cases, the conclusions as to generic or site-specific are different for these locations. In this Supplement, the term "operational areas" are the areas within the protected area fences, the intake and-discharge structures, the cooling system, and other site structures, and the associated paved, graveled, and maintained landscaped areas. The operational area is defined
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 4 -74 November 2002 Environmental Impacts 4.3.16.3 Evaluation When noise levels are below those that result in hearing loss, impacts are judged primarily in terms of adverse public reactions to the noise. Generally, surveys around major sources of noise such as large highways and airports find that, when the DNL increases above 60 to 65 dBA, noise complaints increase significantly (FICN 1992). FHA/HUD uses a DNL of 65 dBA as the primary criterion for impact on residential properties and nearby populations. The staff believes that noise levels below 60 to 65 dBA are considered to be insignificant. Business and institutional properties may be less sensitive to changes in noise levels, but all populations of, concern should be considered when estimating the noise impact of decommissioning activities.
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Environmental Impacts Hazardous Air Pollutants, 42 USC 7412. Historic Sites Act of 1935, 16 USC 461 et seq. Idaho National Environmental and Engineering Laboratory (INEEL). 1999. "Environmental I Impact Statement for the Advanced Mixed Waste Treatment Project." Available URL: http://nepa.eh.doe.gov/eis/eis0290/Ch-5/5_10/5_1 ONoise.HTML International Commission on Radiological Protection (ICRP). 1991. Recommendations of the InternationalCommission on RadiologicalProtection. Publication 60, Oxford Press, Oxford.
research reportNot linked to a paper · refsec · cited link
Krupa, K. M., and R. J. Serne. 1988. Effects on Radionuclide Concentrationsby Cement/Ground-WaterInteractionsin Support of PerformanceAssessment of Low-Level Radioactive Waste DisposalActivities. NUREG/CR-6377, NRC, Washington, D.C. Migratory Bird Treaty Act, 16 USC 703 et seq. National Academy of Sciences (NAS). 1977. Guidelines for PreparingEnvironmentalImpact Statements on Noise. Report of Working Group 69 on Evaluation of Environmental Impact of
research reportNot linked to a paper · refsec
Noise, NAS, Washington, D.C. National Council on Radiation Protection and Measurements (NCRP). 1991. Effects of Ionizing Radiationon Aquatic Organisms. NCRP Report No. 109, NCRP, Bethesda, Maryland. National Environmental Policy Act (NEPA) of 1969, as amended, 42 USC 4321 et seq. National Historic Preservation Act of 1966, as amended, 16 USC 470 et seq. Native American Graves Protection and Repatriation Act of 1990, 25 USC 3001 et seq. I National Primary and Secondary Ambient Air Quality Standards, 42 USC 7409. I Neushauser, K. S., and F. L. Kanipe. 1996. RADTRAN 5-A Computer Code for Transportation Risk Analysis. SAND91-2600C, Sandia National Laboratories, Albuquerque, New Mexico. I Neuhauser, K. S., and F. L. Kanipe. 1992. RADTRAN 4- Volume 3:User's Guide. I SAND89-2370. Sandia National Laboratories, Albuquerque, New Mexico. Noise Control Act of 1972, as amended, 42 USC 4901 et seq. Occupational Safety and Health Act of 1970, as amended, 29 USC 651 et seq.
research reportNot linked to a paper · refsec
Plog, B., ed. 1988. Fundamentalsof IndustrialHygiene. 3' ed., National Safety Council,
research reportNot linked to a paper · refsec
Washington, D.C. NUREG-0586 Supplement 1 4-86 November 2002 Environmental Impacts
research reportNot linked to a paper · refsec
Ramsdell, J. V., Jr., C. E. Beyer, D. D. Lanning.2 U.P.Jenquin, R. A. Schwarz, D. L. Strenge,P. M. Daling, and R. T. Dahowski. 2001. EnvironmentalEffects of Extending Fuel Burnup Above 60 GWdIMTU. NUREG/CR-6703 (PNNL-13257), NRC, Washington, D.C. Resource Conservation and Recovery Act (RCRA) of 1976, as amended by the Hazardous and Solid Waste Amendments Act of 1984, 42 USC'6901 et seq.
research reportNot linked to a paper · refsec
Sackschewsky, M.'R.' 1997.' Threatenedand EndangeredSpecies Evaluation for 75 Licensed CommercialNuclear Power GeneratingPlants. PNNL-1 1524; Pacific Northwest National
research reportNot linked to a paper · refsec
Laboratory, Richland, Washington. Saricks, C. L., and M. M.Tompkins. 1999. State-Level Accident Rates of Surface Freight Transportation:A Reexamination. ANLJESD/TM-150, Argonne National Laboratory, Argonne, Illinois.
research reportNot linked to a paper · refsec
Sprung, J. L., D. J. Ammerman, N. L. Breivik, R. J. Dukhart, F. L. Kanipe, J. A. Koski, G. S. Mills, K. S. Neushauser, H. D. Radloff, R. F. Weiner, and H. R. Yoshimura. 2000. Reexamination of Spent Fuel Shipment Risk Estimates. NUREG/CR-6672 (SAND2000-0234), U.S. Nuclear Regulatory Commission, Washington, D.C. Tennessee Valley Authority (TVA). 1978a. (Yellow Creek Nuclear Plant Units ,1and 2), LBP 78-7,7 NRC 215. Tennessee Valley Authority (TVA). 1978b. (Yellow Creek Nuclear Plant Units 1 and 2), LAB 515,8 NRC 702. U.S. Environmental Protection Agency (EPA). -1971. "Noise from Construction Equipment and Operations." Building Equipment and Home Appliances. PB 206717, EPA, Washinrgton, D.C. U.S. Environmental Protection Agency (EPA). 1991. Manual of ProtectiveAction Guides and ProtectiveActions for Nuclear Incidents. 400-R-92-001, EPA, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1977. FinalEnvironmentalStatement on the Transportationof Radioactive Materialby Air and Other Modes. NUREG-0170, Vol. 1,
research reportNot linked to a paper · refsec
Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1988. Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities. NUREG-0586, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1996. Generic EnvironmentalImpact Statement for License Renewal of Nuclear Plants. NUREG-1437, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1997. Final Generic EnvironmentalImpact Statement in Support of Rulemaking on RadiologicalCriteriafor License Termination of NRC Licensed Nuclear Facilities. NUREG-1496, Vol. 1, NRC, Washington, D.C. November 2002 4-87
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Environmental Impacts U.S. Nuclear Regulatory Commission (NRC). 2000. Report on Waste Burial Charges.
research reportNot linked to a paper · refsec
NUREG-1307, Rev. 9, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2001 a. ProceduralGuidance for Preparing EnvironmentalAssessments and ConsideringEnvironmentalIssues. Office Instruction
research reportNot linked to a paper · refsec
LIC-203, Nuclear Reactor Regulation, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 2001 b. Technical Study of Spent Fuel Pool Accident Risk at DecommissioningNuclear PowerPlants. NUREG-1 738, NRC, I Washington, D.C. 4.5 Related Documents Big Rock Point (BRP). 1998. "Big Rock Point Performance Indicators." Big Rock Point (BRP). 1999. "Big Rock Point Performance Indicators." Big Rock Point (BRP). 2000. "Big Rock Point Performance Indicators." Haddam Neck Plant (HNP). 2000. "Haddam Neck Plant License Termination Plan," Rev. 0. Humboldt Bay Plant (HBP). 1997. "Humboldt Bay Unit 3 Caisson In-leakage Repair Project Summary." http://www.blm.gov/nstc/VRM/vrmsys.html. http://nepa.eh.doe.gov/eis/eis0290/Ch_5/5_10/5_1 ONoise.html.
research reportNot linked to a paper · refsec · cited link
NUREG-0586 Supplement 1 4-88 November 2002 5.0 No-Action Decommissioning Alternative The action discussed in this Supplement and in the Generic EnvironmentalImpact Statement on Decommissioningof Nuclear Facilities(1988 GELS; NRC 1988) is decommissioning. The only alternative to the action of decommissioning is not to decommission the facility. The option to restart the reactor is not considered to be an alternative to decommissioning because the regulations do not allow the licensee to reload fuel and restart the facility after submitting a certification that the fuel has been removed from the reactor vessel. The alternative to decommissioning at the end of the licensing period is a "no action" alternative, implying that a licensee would simply abandon or leave a facility after ceasing operations. Once the facility permanently ceases operation, if the licensee does not conduct decommissioning activities to an extent that meets the license termination criteria in 10 CFR 20
research reportNot linked to a paper · refsec
Subpart E, then the license will not be terminated (although the licensee will not be authorized to operate the reactor). The licensee will be required to comply with the necessary requirements for the operating license. As a result, the environmental impacts for maintaining the nuclear reactor facility will be considered to be in the bounds of the appropriate, previously issued Environmental Impact Statements. The objective of decommissioning is to restore a radiologically contaminated facility to a condition such that there is no unreasonable risk from the decommissioned facility to the public health and safety. The U.S. Nuclear Regulatory Commission (NRC) regulations do not allow the option of not decommissioning. Under NRC regulations, the original operating license for a nuclear power plant is issued for up to 40 years. The license may be renewed for additional 20-year periods if NRC requirements are met. However, at the end of the term of the license (whether it has been extended or not), the regulations require that the facility be decommissioned. 5.1 Reference U.S. Nuclear Regulatory Commission (NRC). 1988. FinalGeneric EnvironmentalImpact Statement on Decommissioning of Nuclear Facilities. NUREG-0586, NRC, Washington, D.C. November 2002
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix A Appendix A Appendixes A and B have been moved and redesignated as Appendixes N and 0. All comments and responses, whether written or oral, are now contained in Appendixes N, 0, and P, which comprise Volume 2 of this Supplement. November 2002
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix B Appendix B Appendixes A and B have been moved and redesignated as Appendixes N and 0. All comments and responses, whether written or oral, are now contained in Appendixes N, 0, and P, which comprise Volume 2 of this Supplement. November 2002
research reportNot linked to a paper · refsec
Kathenne A. Cort Research Scientist Socioeconomics November 2002 "_C-1
research reportNot linked to a paper · refsec
Rose M. Urbina Text Processor Administrative Support Tara 0. Eschbach Research Scientist Assistant Bev Miller Research Scientist Assistant Sue Gulley Program Administrator Assistant Amanda Stegen Research Scientist Assistant Terri Miley Research Scientist Assistant Retired in January 2002. Nuclear Matenals Safety and Safeguards. Pacific Northwest National Laboratory is operated for the U.S. Department of Energy by Battelle. Currently with the Office of Nuclear Regulatory Research, NRC.
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 November 2002
research reportNot linked to a paper · refsec