Policy Replication

11/2002 - NUREG-0586, Supplement 1, Vol. 1, [2:2] Appendix E - End, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.

Docket document2024-10-04 · NRC · other · NRC-2020-0101-0139
RIN 3150-AK55 · Docket NRC-2020-0101

Other documents for the same rulemaking (all, by stage)

2021-03-08 Docket documentAdvanced Nuclear Reactor Generic Environmental Impact Statement
2021-03-09 Docket document09/2020 - Scoping Summary Report for the Advanced Nuclear Reactor Generic EIS
2021-03-15 Docket document05/28/20 - Scoping Meeting Slides - Advanced Reactor Generic Environmental Impact Statement
2021-03-15 Docket document05/28/20 - Scoping Meeting Transcript Advanced Reactor GEIS
2021-03-15 Docket document05/28/20 - Summary of Scoping Meeting Conducted for Advanced Reactor Generic EIS
2021-12-15 Regulatory impact analysisDraft Regulatory Analysis
2021-12-15 Docket documentRedline Prelimiary Draft Regulatory Guide DG-4032
2021-12-15 Docket documentDraft Advanced Nuclear Reactor Generic Environmental Impact Statement
2021-12-15 Docket documentSECY-21-0098: Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement
2021-12-15 Docket documentPreliminary Draft Interim Staff Guidance COL-ISG-30: Advanced Reactor Applications - Environmental Considerations for Advanced Nuclear Applications that Reference the GEIS (NUREG- 2249)
2021-12-15 Docket documentClean Preliminary Draft Regulatory Guide DG-4032
2024-10-03 Docket document09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations,” Redline/Strikeout Version to Support Public Comment
2024-10-03 Docket document09/2024 - Draft Interim Staff Guidance, COL-ISG-030, “Environmental Considerations for New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249)
2024-10-03 Docket document09/2024 - Energy and System Design Mitigation Alternatives White Paper Report
2024-10-03 Docket document09/2024 - Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates White Paper
2024-10-03 Docket document09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations”
2024-10-04 Federal RegisterGeneric Environmental Impact Statement for Licensing of New Nuclear Reactors
2024-10-04 Regulatory impact analysis09/2024 - Draft Regulatory Analysis for the 10 CFR Part 51, Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule
2024-10-04 Docket documentDraft Supporting Statement for Information Collections Contained in the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule
2024-10-04 Docket documentProposed Rule: Congressional Letters for the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2024-10-04 Docket document11/2002 - NUREG-0586, Supplement 1, Vol. 1, [1:2] Cover - Appendix D, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.
2024-10-04 Docket document04/17/24 - Staff Requirements Memorandum (SRM)-SECY-21-0098, “Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55; NRC-2020-0101)”
2024-10-04 Docket document04/17/24 - SRM-SECY-21-0098: Enclosure - Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55;NRC-2020-0101)
2024-10-08 Docket document09/2024 - Draft NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors”
2024-10-08 Docket document08/2024 - NUREG-1437, Volume 3, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
2024-10-08 Docket document09/2014 - NUREG-2157 Vol 1, "Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report."
2024-10-08 Docket document09/2014 -NUREG-2157 Vol 2, "Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report."
2024-10-08 Docket document05/28/20 - Advanced Reactor Generic Environmental Impact Statement Scoping Meeting List of Attendees
2024-10-08 Docket document02/28/20 - SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”
2024-10-08 Docket documentSummary of November 15 and 20, 2019, Public Meetings to Discuss Exploratory Process for Developing an Advanced Nuclear Reactor Generic Environmental Impact Statement, dated December 10, 2019
2024-10-08 Docket documentWorkshop to Discuss the Environmental Information Needed to Develop a Generic Environmental Impact Statement for Advanced Nuclear Reactors, dated December 13, 2019
2024-10-08 Docket document08/2024 - NUREG-1437, Volume 1, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
2024-10-08 Docket document09/21/20 - SRM-SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”
2024-10-08 Docket document05/28/20 - Meeting to Discuss the Scope of the Generic Environmental Impact Statement for Advanced Nuclear Reactors (Meeting Notice)
2024-10-08 Docket document08/2024 - NUREG-1437, Volume 2, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
2024-10-08 Docket documentSummary of October 1, 2020, Advanced Reactor Stakeholder Public Meeting, dated December 22, 2020
2024-10-08 Docket documentSummary of April 15, 2021, Advanced Reactor Stakeholder Public Meeting, dated August 24, 2021
2024-10-17 Federal RegisterGeneric Environmental Impact Statement for Licensing of New Nuclear Reactors
2024-10-22 Docket documentNR GEIS Email from E. Schlossberg 10-17-24
2026-04-24 Federal RegisterGeneric Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Regulatory impact analysisRegulatory Analysis-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)
2026-05-13 Docket documentFederal Register Notice-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)
2026-05-13 Docket document11-14-2024 - Public Meeting Transcript RE Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Page 1-31
2026-05-13 Docket documentSRM-M260413_Enclosure 2 - SECY-25-0085 - Final Rule_Generic Environmental Impact Statement For Licensing Of New Nuclear Reactors (RIN 3150-AK55_NRC-2020-0101)
2026-05-13 Docket document11-13-24 Public Meeting Transcript RE Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Docket documentCOL-ISG-030 Environmental Considerations Associated with New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249) (Final Rule - GEIS for Licensing New Nuclear Reactors)
2026-05-13 Docket documentSTC-24-058 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement for Advanced Nuclear Reactors (NUREG 2249)
2026-05-13 Docket document11-7-2024 - Public Meeting - Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule
2026-05-13 Docket documentM260413_ Transcript - Affirmation Session - b) SECY-25-0085 -Final Rule_ Generic Environmental Impact
2026-05-13 Docket document11-13-24 Public Meeting Summary RE_Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Docket documentSTC-24-062 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement
2026-05-13 Docket document11-14-2024 Public Meeting Summary RE_ Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors
2026-05-13 Docket documentSRM-M260413_ SECY-24-0069 - Affirmation Session Final Rule - b) Generic Environmental Impact
2026-05-13 Docket documentNUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report
2026-05-13 Docket documentEnergy and System Design Mitigation Alternatives White Paper
2026-05-13 Docket documentPart 51 Information Collection Supporting Statement for the NRC GEIS Final Rule
2026-05-13 Docket document10-17-24_ Email from Elena Schlossberg to Stewart Schneider (NR GEIS Proposed Rule)
2026-05-13 Docket documentSTC-26-026 Letter NR GEIS Final Rule-Agreement States and State Liaison Officers
2026-05-13 Docket documentRegulatory Guide 4.2 Revision 4 Preparation of Environmental Reports for Nuclear Power Stations (Final Rule - GEIS for Licensing New Nuclear Reactors)

References

Page 1Download these results: CSV · JSON
Noah W. Fetherston, Connecticut Yankee Atomic Power Company, to U.S. Nuclear Regulatory Commission. "Response to NRC Request for Additional Information to Support GElS Supplement." April 25, 2001. November 2002 G-25 N 2NUREG-0586 Supplement 1 Appendix G
research reportNot linked to a paper · refsec
Entergy. 2000. Entergy, Arkansas Nuclear One - Units 1 and 2 - Annual Radioactive Effluent Release Report for 1999. Maine Yankee, MN-01-009, RA-01-033. Letter from Thomas L. Williamson to Dino Scaletti, U.S. Nuclear Regulatory Commission. "Request for Information to Support GElS Supplement." March 21, 2001. Sacramento Municipal Utility District, Docket 50-312. Letter from Sacramento Municipal Utility District to Dino Scaletti, U.S. Nuclear Regulatory Commission. "Request for Information to Support GElS Supplement." January 31, 2001. Southern California Edison. Letter from A. Edward Scher to Dino Scaletti, U.S. Nuclear Regulatory Commission. "Request for Information to Support GElS Supplement." February 5, 2001.
research reportNot linked to a paper · refsec
Southern Company. 2000. Southern Company, E.I. Hatch Nuclear Plant Units 1 & 2, Annual Report - Plant Radioactive Effluent Releases, January 1, 1999 - December 31, 1999.
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 G-26 November 2002 Appendix H Summary of Environmental Impacts from Decommissioning Activities Appendix H Appendix H Summary of Environmental Impacts from Decommissioning Activities This appendix provides two tables that summarize findings from the analysis of the environmen tal impacts from decommissioning of permanently shutdown nuclear reactors. Table H-1 shows those issues and decommissioning activities that have no environmental impacts. Licensees may conduct these activities without further consideration of the potential environmental impacts. Table H-2 presents each environmental issue that was evaluated, provides the activities that were determined potentially to have environmental impacts, and then states whether the impacts related to the issue's associated activities were determined to be generic or site-specific for all variables. The significance level is identified and a short discussion of the finding is provided on the right-hand side of the table. !Section 4.1 defines the significance levels and explains the distinction between generic-or site-specific issues. November 2002
datasetNot linked to a paper · refsec
Oak, H. D., G. M. Holter, W. E. Kennedy, Jr., and G. J. Konzek. 1980. Technology, Safety and Cost of Decommissioning a Reference Boiling Water Reactor Power Station.
research reportNot linked to a paper · refsec
NUREG/CR-0672, NRC, Washington, D.C. Sailor; V. L, et al. 1987. Severe Accidents in Spent Fuel Pools in Support of Genefic Safety Issue 82,,NUREG/CR-4982, NRC, Washington, D.C.
research reportNot linked to a paper · refsec
Smith, R. I., G. J. Konzek, and W. E. Kennedy, Jr. 1978. Technology, Safety and Costs of Decommissioninga Reference PressurizedWater Reactor Power Station. NUREG/CR-0130,
research reportNot linked to a paper · refsec
NRC, Washington,,D.C. November 2002 S1-27
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix I Travis, R. J., R. E. Davis, E. J. Grove, and M.A. Azarm. 1997. A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown NuclearPower Plants.
research reportNot linked to a paper · refsec
NUREG/CR-6451, NRC, Washington, D.C. I U.S. Environmental Protection Agency (EPA). 1991. Manual of Protective Action Guides and ProtectiveActions for Nuclear Incidents, 400-R-92-001, EPA, Washington, D.C. I U.S. Nuclear Regulatory Commission (NRC). 1988. FinalGeneric EnvironmentalImpact Statement on Decommissioning of Nuclear Facilities. NUREG-0583, NRC, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). 1989. Regulatory Analysis for the Resolution of Generic Issue 82, "Beyond Design Basis Accidents in Spent Nuclear Fuel Pools."
research reportNot linked to a paper · refsec
NUREG-1353, NRC, Washington, D.C. I U.S. Nuclear Regulatory Commission (NRC). 2001. TechnicalStudy of Spent Fuel Pool Accident Risk at DecommissioningNuclear PowerPlants. NUREG-1738, NRC, I Washington, D.C. I 1.5 Licensing Basis Documents One of the sources of information used in this report was licensing basis documents. The sources of information listed below by nuclear facility were consulted. The documents that are listed have been docketed by the NRC and are publicly available. The docket numbers for the facilities are noted below next to the facility name. The documents can be obtained one of three ways. First, by accessing the NRC's website the reader can obtain most of the Post-Shutdown Defueling Activities Reports (PSDARs) and License Termination Plans (LTPs) that are cited in this chapter. The address for the decommis sioning page on the NRC's website is http://www.nrc.gov/OPNreports/dcmmssng.htm.
research reportNot linked to a paper · refsec · cited link
Second, the documents can be obtained from the Public Electronic Reading Room, which provides access to the NRC's new records-management system of publicly available information the Agency wide Documents Access and Management System (ADAMS). Within this system you can access two libraries: the Publicly Available Records System, and that Public Legacy Library. This system, which was implemented on October 12, 1999, marks a change in the previous practice where records were available only in paper or microfiche copies at either the main NRC Public Document Room in Washington, DC or at 86 local public document rooms at libraries near nuclear power plants and other regulated facilities throughout the United States. Access
research reportNot linked to a paper · refsec
NUREG-0586 Supplement I 1-28 November 2002 Appendix I to the NRC Public Electronic Reading Room will now be possible from personal computers, including those located in most public libraries.
research reportNot linked to a paper · refsec
ADAMS can be accessed via the Internet at the NRC's website using the following URL: http://www.nrc.gov/NRC/ADAMS/index.html. This site contains instructions for installing and running ADAMS as well as information on obtaining assistance during installation or use. The'Public Electronic Reading Room on the NRC Web site at: www.nrc.gov, allows the public to use the Internet to search for any of the records that NRC has already released to the public. This site uses NRC's Agency wide Documents Access and Management System (ADAMS) to search two electronic libraries: the Public Legacy Library and the Publicly Available Records System (PARS) Library.- The Public Legacy Library currently has a selection of bibliographic descriptions and some full text files of NRC records released to the public, prior to Fall 1999. Records in this library were copied from the NRC Bibliographic Retrieval System (BRS) and the Nuclear Document System (NUDOCS), the two systems previously used bythe public to search for NRC records. Both BRS and NUDOCS will remain available for searching until all the records are in the Legacy Library. The other library, the Publicly Available Records System (PARS) Library, contains all NRC publicly available records released since Fall 1999. The records in the PARS Library are in, both, full text and image and the public can perform full text searches of the database, as well as view, download, and print the files from there.
datasetNot linked to a paper · refsec · cited link
Third, the NRC Public Document Room (PDR) at NRC Headquarters in Rockville, Maryland (One White Flint North, 20555 Rockville Pike, Washington DC 20555-0001 (1-'800-397-4209),' has a complete collection of over two million NRC documents released prior to the Fall of 1999 that are still retained as agency documents. The public may view documents at the PDR and there are reference librarians available to help in identifying, retrieving, organizing, and evaluating NRC documents from various resources and formats, including the Public Electronic Reading Room. Members of the public may also access the Electronic Reading Room libraries from computer terminals in the PDR. The PDR also provides reproduction services and, for a fee, the public can order copies of any of the records in the PDR, the Legacy, and the PARS libraries. November 2002 1-29
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix I Big Rock Point (NRC Docket Number 50-155) U.S. Nuclear Regulatory Commission (NRC). Undated. Transmittal of Safety Evaluation, Environmental Assessment and Notice of Issuance. Consumers Energy. February 27, 1995. Big Rock Point Plant Decommissioning Plan. U.S. Nuclear Regulatory Commission (NRC). 1995. Environmental Assessment by the U.S. Nuclear Regulatory Commission Related to the Request to Authorize Facility Decommissioning of Big Rock Point Nuclear Power Company, Consumers Energy. U.S. Nuclear Regulatory Commission (NRC). 1995. Safety Evaluation Report by the U.S. Nuclear Regulatory Commission Related to the Request to Authorize Facility Decommissioning of Big Rock Point Nuclear Plant, Consumers Energy. Consumers Energy. September 19, 1997. Big Rock Point Post-Shutdown Decommissioning Activities Report, Rev. 1. Consumers Energy. September 19, 1997. Letter from Kenneth P. Powers, Consumers
research reportNot linked to a paper · refsec
Dresden, Unit 1 (NRC Docket Number 50-010) Commonwealth Edison Company. April 10, 1989. "Dresden Nuclear Power Station, Unit 1, Emergency Plan Response to Request for Additional Information."
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 1-30 November 2002 Appendix I U.S. Nuclear Regulatory Commission (NRC). September 3,1993. Letter from Office of Nuclear Reactor Regulation, NRC, to D.L. Farrar, Commonwealth Edison Company. "Order to Authorize"Decommissioning of Dresden Nuclear Power Station, Unit 1, and Amendment No. 37 to License No. DPR-2." U.S. Nuclear Regulatory Commission (NRC). April 15, 1994. Letter from NRC to M.J. Wallace, Commonwealth Edison Company, "Special Inspection of a Potential Loss of Water,from the Dresden Unit 1 Spent Fuel Storage Pool and the Plant's Compliance to the SAFSTOR Decom missioning Plan (Inspection Report No. 50-010/94001)." U.S: Nuclear Regulatory Commission (NRC). October 20, 1995. Letter from Office of Nuclear Reactor Regulation, NRC, to D.L. Farrar, Commonwealth Edison Company. "Issuance of Amendments." Commonwealth Edison Company. December,1996.. Decommissioning Program Plan for the Dresden Nuclear Power Station Unit 1: Commonwealth Edison Company. Rev. 5. Commonwealth Edison Company. December 19, 1996. Letter from J. Stephen Perry, Dresden
research reportNot linked to a paper · refsec
Station, Commonwealth Edison Company, to U.S. Nuclear RegulatoryCommission. "Dresden Nuclear Power Station Unit 1 Decommissioning Program Plan, vision 5, NRC Docket Number 50-010." JSPLTR #960245. U.S. Nuclear Regulatory Commission (NRC). July 8, 1997. "Issuance of Amendment 39." [Includes Technical Specifications and Safety Evaluation.]
research reportNot linked to a paper · refsec
Fermi, Unit 1 (NRC Docket Number 50-016) Detroit Edison Company. September 15, 1986.- Letter from Detroit Edison to U.S. NuclearRegulatory Commission. "Request for Additional Information as Outlined in 1OCFR51.45(b) for Fermi 1." VP-86-0118. U.S. Nuclear Regulatory Commission (NRC). April 1989. The Office of Nuclear Reactor Regulation Safety Evaluation Supporting Amendment No. 9 to Possession-Only License No. DRP-9: Fermi Unit No. 1. U.S. Nuclear Regulatory Commission (NRC). April 28, 1989. Letter from Office of Nuclear. Reactor Regulation, NRC, to W.S. Orser, Detroit Edison Company. Issuance of Amendment No. 9 to Renew Possession-Only License No. DPR-9 for Fermi Unit 1. November 2002 1-31
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix I U.S. Nuclear Regulatory Commission (NRC). April 2, 1996. "Inspection Results - Fermi 1." Detroit Edison Company. August 23, 1996. Letter from Douglas R. Gipson, Detroit Edison
research reportNot linked to a paper · refsec
Company, to U.S. Nuclear Regulatory Commission. "Enrico Fermi Atomic Power Plant, Unit 1: Annual Report Year Ending June 30, 1996." #NRC-96-01 10. U.S. Nuclear Regulatory Commission (NRC). November 21, 1996. Meeting Summary by U.S. Nuclear Regulatory Commission. "Summary of September 27, 1996, Meeting Regarding Status of Detroit Edison Company's Plans to Decommission its Fermi 1 Facility." Detroit Edison Company. October 2, 1997. Letter from Douglas R. Gipson, Detroit Edison
research reportNot linked to a paper · refsec
Company, to U.S. Nuclear Regulatory Commission. "Notification of Changes in Fermi 1 Schedule and Activities." #NRC-97-01 10. Detroit Edison Company. December 15, 1997. Letter from Douglas R. Gipson, Detroit Edison
research reportNot linked to a paper · refsec
Company, to U.S. Nuclear Regulatory Commission. "Application for a License Amendment Fermi Safety Analysis Report." #NRC-97-0115. Fort St. Vrain (NRC Docket Number 50-267) U.S. Nuclear Regulatory Commission (NRC). October 3, 1991. "Natural Gas Hazards at Fort St. Vrain." NRC Information Notice 91-63. U.S. Nuclear Regulatory Commission (NRC). November 20, 1992. Letter from NRC to Public Service Company of Colorado. "Environmental Assessment and Finding of No Significant Impact regarding exemption from emergency preparedness requirements of 10 CFR 50.54(q)." U.S. Nuclear Regulatory Commission (NRC). November 23, 1992. Letter from Office of Nuclear Reactor Regulation, NRC, to A. Clegg Crawford, Public Service Company of Colorado. "Order to Authorize Decommissioning of Fort St. Vrain and Amendment No. 85 to Possession Only License No. DPR-34." Haddam Neck (NRC Docket Number 50-213) Haddam Neck Plant Updated Final Safety Analysis Report. October 1995. Section 15.1, pp. 15.1-1 - 15.5-4; Table 15.5-1 (May 1987), 15.5-2 (May 1996), and 15.5-3 May 1987). Connecticut Yankee Atomic Power Company. August 31, 1996. "Licensee Event Report: Pinhole Leak on Inlet Valve to "A" Residual Heat Removal Heat Exchanger."
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 1-32 November 2002 Appendix I Connecticut Yankee Atomic Power Company. August 22, 1997. Cover letter from Connecticut Yankee Atomic Power Company to U.S. Nuclear Regulatory Commission re "Haddam Neck Plant Post Shutdown Decommissioning Activities Report." CY-97-075. Connecticut Yankee Atomic Power Company. December 18, 1997. Letter from R.A. Mellor, Connecticut Yankee Atomic Power Company, to U.S. Nuclear Regulatory Commission. "Haddam Neck Plant: Additional Information for the Proposed Defueled Emergency Plan."
research reportNot linked to a paper · refsec
Crawford, Consolidated Edison Company of New York, Inc., to Office of Nuclear Reactor Regulation;NRC. "Response to NRC Request for Additional Information on Indian Point Unit 1 'Decommissioning." U.S. Nuclear Regulatory Commission (NRC). June 18, 1993. Letter from Office of Nuclear Reactor Regulation, NRC, to Stephen B. Bram, Consolidated Edison Company of New York, Inc.. "Indian Point Unit 1 Decommissioning Plan Request for Additional Information." November 2002 1-33
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix I Consolidated Edison Company of New York, Inc. September 20, 1993. Indian Point Unit 1 Decommissioning Plan. Request for Additional Information. U.S. Nuclear Regulatory Commission (NRC). January 2, 1996. "Approval of Decommissioning Plan and Amendment of License for Indian Point Unit 1, Consolidated Edison Company of New
research reportNot linked to a paper · refsec
York, Inc." Consolidated Edison Company of New York, Inc. January 31, 1996. Appendix A to Provisional Operating License DPR-5 for the Consolidated Edison Company of New York, Inc. Amendment No. 45, Indian Point Station Unit No. 1. U.S. Nuclear Regulatory Commission (NRC). January 31, 1996. Order to Authorize Decom missioning and Amendment No. 45 to License No. DPR-5 for Indian Point Unit No. 1. U.S. Nuclear Regulatory Commission (NRC). January 31, 1996. Cover letter from Office of Nuclear Reactor Regulation, NRC, to the Consolidated Edison Company of New York, Inc. Indian Point Unit No. 1. "Amendment to Provisional Operating License." La Crosse (NRC Docket Number 50-409) U.S. Nuclear Regulatory Commission (NRC). December 23, 1987. Letter from NRC to Dairyland Power Cooperative. "Exempted from Requirement to Conduct 1987 Exercise and Exempted from Requirement to Produce and Distribute Annual Information Brochure to Public." U.S. Nuclear Regulatory Commission (NRC). April 1, 1988. "Notice of Consolidation of Issuance of Amendment to Facility License." La Crosse Boiling Water Reactor (LACBWR). May 1991. Decommissioning Plan. Prepared by the LACBWR staff, La Crosse, Wisconsin. U.S. Nuclear Regulatory Commission (NRC). September 15, 1994. Letter from Office of Nuclear Materials Safety and Safeguards, NRC, to William L. Berg, La Crosse Boiling Water
research reportNot linked to a paper · refsec
Reactor, Dairyland Power Cooperative. "Confirmatory Order Modifying the August 7, 1991, Decommissioning Order for the La Crosse Boiling Water Reactor." Dairyland Power Cooperative. December 10, 1996. Letter from William L. Berg, Dairyland Power Cooperative, La Crosse Boiling Water Reactor, to U.S. Nuclear Regulatory Commission. Dairyland Power Cooperative, La Crosse Boiling Water Reactor (LACBWR), Possession-Only License DPR-45, "Annual Decommissioning Plan Revision." LAC-13570.
research reportNot linked to a paper · refsec
TLG Engineering, Inc. for the Sacramento Mtinicipal Utility District (SMUD), Sacramento, California. November 2002 1-35
research reportNot linked to a paper · refsec
MPC&D 96-034. Sacramento Municipal Utility District. October 14, 1996. "Amendment 2 to the Rancho Seco Defueled Safety Analysis Report." Sacramento Municipal Utility District. January 29, 1997. Letter from Steve J. Redeker, SMUD, to U.S. Nuclear Regulatory Commission. "Rancho Seco Decommissioning Schedule Change."
research reportNot linked to a paper · refsec
MPC&D 97-006. Sacramento Municipal Utility District. March 20, 1997. Rancho Seco Post-Shutdown Decom missioning Activities Report, Docket No. 50-312. Rancho Seco Nuclear Generating Station, License No. DPR-54. San Onofre, Unit 1 (NRC Docket Number 50-206) San Onofre Nuclear Generating Station, Unit 1. Decommissioning Plan. Vision 0. Southern California Edison Company, Irvine, California, and San Diego Gas and Electric Company, San
research reportNot linked to a paper · refsec
Diego, California. NUREG-0586 Supplement 1 1-36 November 2002 Appendix I San Onofre Nuclear Generating Station, Unit 1. December 1988. San Onofre 1 Final Safety Analysis Report, Updated. Section 15.17, pp. 15.17-1- 15.18-4, Tables 15.18-1 - 15.18-3, and Figures 15.18-1 - 15.18-4. Southern California Edison Company. November 23, 1993. Letter from Walter Marsh, Southern California' Edison Company, to U.S. Nuclear Regulatory Commission. "Docket,, No. 50-206, Amendment Application No. 211, Supplement 2, Permanently Defueled Technical specifications, San Onofre Nuclear Generating Station, Unit 1." Southern California Edison Company. May 12, 1993. Letter from Harold B. Ray, Southern California Edison Company, to U.S. Nuclear Regulatory Commission. -"Docket No. 50-206. Amendment Application No. 211, Permanently Defueled Technical Specifications, San Onofre Nuclear Generating Station, Unit 1." U.S. Nuclear Regulatory Commission (NRC). December 28, 1993. Letter from Office of Nuclear Reactor Regulation, NRC, to Harold B. Ray, Southern California Edison Company. "Issuance of Amendment No. 155 to FacilityOperating License No. DPR-13, San Onofre Nuclear Generating Station, Unit No. 1, Permanently Defueled Technical Specifications." U.S. Nuclear Regulatory Commission (NRC). December 28, 1993. Safety Evaluation by the, Office of Nuclear Reactor Regulation Related to Amendment No. 155 to Facility Operating License No. DPR-13. Southern California Edison Company, San Diego Gas and Electric
research reportNot linked to a paper · refsec
Company, San Onofre Nuclear Generating Station, Unit No. 1, Docket No. 50-206. Southern California Edison Company. March 7, 1994., "Revision 6.0 to the Site Emergency Plan." Southern California Edison Company. November 3, 1994. "Proposed Decommissioning Plan, San Onofre Nuclear Generating Station, Unit 1."' Southern California Edison Company. November 29, 1994. "Application for Termination of License." Southern California Edison Company. August 16, 1996. Letter from Gregory T. Gibson, Southern California Edison Company, to U.S. Nuclear Regulatory Commission. "Unit 1 Spent Fuel Pool Information: San Onofre Nuclear Generating Station, Unit 1." Saxton (NRC Docket Number 50-146)
research reportNot linked to a paper · refsec
GPU Nuclear, Inc. February 16, 1996. "Decommissioning Plan for Saxton Nuclear Experimental Facility." 0301-96-2006. November 2002 "-1-37
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix I GPU Nuclear, Inc. February 1998. Updated Safety Analysis Report for Decommissioning the
research reportNot linked to a paper · refsec
Middletown, Pennsylvania. GPU Nuclear, Inc. March 3, 1998. Letter from G.A. Kuehn, GPU Nuclear, Inc. to U.S. Nuclear Regulatory Commission. "SNEC Facility Response to Question 7 of the Fourth Request for Additional Information." 6L20-98-20105. U.S. Nuclear Regulatory Commission (NRC). March 1998. Letter from Office of Nuclear Reactor Regulation, NRC, to G.A. Kuehn, Jr., GPU Nuclear, Inc.. "Environmental Assessment and Finding of No Significant Impact Related to Request to Authorize Facility Decommissioning, Saxton Nuclear Experimental Facility." U.S. Nuclear Regulatory Commission (NRC). March 1998. Letter from Office of Nuclear Reactor Regulation, NRC, to G.A. Kuehn, Jr., GPU Nuclear, Inc.. "Issuance of Amendment No. 15 to Amended Facility License No. DPR-4 - GPU Nuclear, Inc. and Saxton Nuclear Experimental Corporation." Shoreham (NRC Docket Number 50-322) Shoreham Nuclear Power Station. January 15, 1994. Letter from A.J. Bortz, Shoreham Nuclear Power Station, to U.S. Nuclear Regulatory Commission. "Request for Approval of Decommissioning Plan Change: Spent Fuel Storage Pool (SFSP) Decommissioning Shoreham Nuclear Power Station - Unit 1, Docket No. 50-322." Shoreham Nuclear Power Station. January 1994. Licensee Event Report 93-002, Shoreham Nuclear Power Station - Unit 1, Docket No. 50-322. LSNRC-2143, Shoreham Nuclear Power
research reportNot linked to a paper · refsec
Station, Wading River, New York. U.S. Nuclear Regulatory Commission (NRC). February 1993. Updated Decommissioning Plan, Long Island Power Authority, Shoreham Nuclear Power Station. U.S. Nuclear Regulatory
research reportNot linked to a paper · refsec
Commission, Washington, D.C. U.S. Nuclear Regulatory Commission (NRC). September 30, 1993. Letter from NRC to Long Island Power Authority, "Issuance of Exemption from the Emergency Preparedness Require ments of 10 CFR 50.54(q) for the Shoreham Nuclear Power Station, Unit 1. Emergency Assessment and Finding of No Significant Impact."
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 1-38 November 2002 Appendix I Shoreham Nuclear Power Station. October 1993.r Decommissioning Plan Change Notification: Removal of Reactor Pressure Vessel Bioshield Wall: Shoreham Nuclear Power Station Unit 1._ Docket No. 50-332, Shoreham Nuclear Power Station, Wading River, New York. Trojan Nuclear Plant (NRC Docket Number 50-344) Portland General Electric Company. June 18, 1997. Letter from Stephen M. Quennoz, Portland General Electric Company, Trojan Nuclear Plant, to U.S. Nuclear Regulatory Commission. "Response to NRC Request for Additional Information - Reactor Vessel Package." Portland General Electric Company. June 18, 1997. Trojan Reactor Vessel Dose Analysis.
research reportNot linked to a paper · refsec
VPN-048-97, Portland General Electric Company, Portland, Oregon. Portland General Electric Company. March 31, 1997. Trojan Reactor Vessel Package: Safety Analysis Report. PGE-1076, Portland General Electric Company, Portland, Oregon. Vallecitos Nuclear Center, GE-VBWR (NRC Docket Number 50-018)
research reportNot linked to a paper · refsec
Kornblith, L., Jr., E. Strain, and L. Welsh. February 1, 1957. The General Electric Develop mental Boiling Water Reactor: Description. SG-VAL 1, General Electric Company, Portland, Oregon. U.S. Atomic Energy Commission. July 25, 1966., Order Authorizing Dismantling of Facility General Electric CompanyNallecitos Boiling Water Reactor. U.S. Atomic Energy Commission,
research reportNot linked to a paper · refsec
Washington, D.C. U.S.' Nuclear Regulatory Commission (NRC).: September 30, 1992. Letter from Office of-, Nuclear Reactor Regulation, NRC, to Gary L. Stimmell, General Electric Company. "Issuance of Amendment No. 16 to Facility License No. TR-1 for the General Electric Test Reactor License." General Electric Company. August 21, 1995. Letter from G.E. Cunningham, General Electric
research reportNot linked to a paper · refsec
Company, to U.S. Nuclear Regulatory Commission. "License R-33, Docket No. 50-73, VNC Reactor Facilities Radiological Emergency Plan; October, 1981 (as Revised)." U.S. Nuclear Regulatory Commission (NRC). April 22, 1996. Letter from Thomas P. Bwynn, Division of Reactor Safety, NRC, to Gary L. Stimmell, General Electric Company, Vallecitos Nuclear Center. "NRC Inspection Report 50-073/96/01; 50-070/96-01; 50-018/96/01; 50-183/96-01. November 2002 ,1-39
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 Appendix I Yankee Rowe (NRC Docket Number 50-029) U.S. Nuclear Regulatory Commission (NRC). October 30, 1992. Letter from NRC to Yankee Atomic Electric Company, "Exemption from the Emergency Preparedness Rule 10 CFR 50.54(q) and Approval of the Defueled Emergency Plan at the Yankee Nuclear Power Station." U.S. Nuclear Regulatory Commission (NRC). August 19, 1993. Letter from Division of Reactor
research reportNot linked to a paper · refsec
Projects, NRC, to Mr. Jay K. Thayer, Yankee Atomic Electric Company. "Yankee Rowe Inspection 93-05." Yankee Atomic Electric Company. December 20, 1993. "Decommissioning Plan for Yankee Nuclear Power Station." BYR 93-087. U.S. Nuclear Regulatory Commission (NRC). December 14, 1994. Environmental Assessment Related to the Request to Authorize Facility Decommissioning: Yankee Nuclear Power Station, Yankee Atomic Electric Company. U.S. Nuclear Regulatory Commission (NRC). February 2, 1995. "Issuance of Decommission ing Order to Yankee Atomic Electric Company Approving Yankee Nuclear Power Station Decommissioning Plan." U.S. Nuclear Regulatory Commission (NRC). February 14, 1995. Letter from Office of Nuclear Reactor Regulation, NRC, to James A. Kay, Yankee Atomic Electric Company. "Order Approving the Decommissioning Plan and Authorizing Decommissioning of the Yankee Nuclear Power Station." U.S. Nuclear Regulatory Commission (NRC). November 5, 1995. Letter from Division of Reactor Safety, NRC, to Russell Mellor, Yankee Atomic Electric Company. "Yankee Rowe Inspection 95-04." NRC Inspection Report 50-029/95-04.
research reportNot linked to a paper · refsec
NUREG-0586 Supplement 1 1-40 November 2002 Appendix J Socioeconomics and Environmental Justice Impacts Related to the Decision to Permanently Cease Operations Appendix J Appendix J Socioeconomics and Environmental Justice Impacts Related to the . Decision to Permanently Cease operations This appendix presents information on the socioeconomic and environmental justice aspects of selected nuclear power facilities currently in the decommissioning process or that have recently completed the process. This Appendix provides a discussion of the impacts related to the decision to permanently cease operations that are outside the scope of this Supplement (See Section 1.3). The NRC staff reviewed this information to provide additional information related to concerns raised during scoping and Supplement development about Socioeconomic Impacts (Section 4.3.12) and Environmental Justice (Section 4.3.13). Impact significance is assigned to specific issues as described in 10 CFR Part 51 Subpart A,
research reportNot linked to a paper · refsec
LARGE -- For the issue, environmental effects are clearly noticeable and are sufficient to destabilize important attributes of the resource. J.1 Socioeconomic Impacts There are two primary pathways through which the decision to permanently cease operations at a nuclear power plant creates socioeconomic impacts on the area surrounding the plant. The first is through direct expenditures in a local community by the plant work force, plus any purchases of goods and services required for plant activities. The second pathway for socioeconomic impact is through the effects on local government tax revenues and services.' The impact pathways (direct expenditures and tax revenues) relate specifically to changes in the workforce and population, local tax revenues, housing availability, and public services. November 2002
research reportNot linked to a paper · refsec