NUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report
Other documents for the same rulemaking (all, by stage)
References: 521 extracted, 47 linked to papers
NRC (U.S. Nuclear Regulatory Commission). 2024. Kairos Power LLC Docket No. 50-612 Hermes 2 Test Reactor Facility Unit 2 Construction Permit. Construction Permit No. CPTR-8,
NRC (U.S. Nuclear Regulatory Commission). 2024. Abilene Christian University Docket No. 50610 Abilene Christian University Molten Salt Research Reactor Construction Permit. Construction Permit No. CPTR-124, Washington, D.C. ADAMS Accession No. ML24243A040. TN12141.
NRC (U.S. Nuclear Regulatory Commission). 2024. General Site Suitability Criteria for Nuclear Power Stations. Regulatory Guide 4.7, Revision 4. Washington, D.C. ADAMS Accession No. ML23324A005. TN12081.
NRC (U.S. Nuclear Regulatory Commission). 2024. Method for Graded Risk-Informed Performance-Based Control Room Design Criteria Framework. Washington, D.C. ADAMS Accession No. ML24150A080. TN12156.
NRC (U.S. Nuclear Regulatory Commission). 2025. “Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design (NUREG-1793, Supplement 2).” Washington, D.C. Accessed June 29, 2022, at https://www.nrc.gov/reading-rm/doccollections/nuregs/staff/sr1793/s2/index.html. TN12115.
NRC (U.S. Nuclear Regulatory Commission). 2025. “Final Safety Evaluation Report Related to Certification of the AP600 Standard Design.” NUREG-1512, Volume 1, Volume 2, Volume 3, and Supplement 1, Washington, D.C. Accessed June 26, 2025, at https://www.nrc.gov/readingrm/doc-collections/nuregs/staff/sr1512/index.html. TN12073. I-61 TerraPower (TerraPower, LLC). 2024. Letter from G. Wilson, Vice President, Regulatory Affairs, to NRC Document Control Desk, dated March 28, 2024, regarding “Submittal of the Construction Permit Application for the Natrium Reactor Plant, Kemmerer Power Station Unit 1.”
WEC (Westinghouse Electric Company). 2000. AP600 Design Control Document, Chapter 1, Appendix 1B, Severe Accident Mitigation Design Alternatives. Pittsburgh, Pennsylvania.
WEC (Westinghouse Electric Company, LLC). 2007. Letter from A. Sterdis, Manager, Licensing and Customer Interface Regulatory Affairs and Standardization, to NRC Document Control
Desk, dated September 21, 2007, regarding “AP1000 COL Standard Technical Report Submittal of APP-PRA-GER-001 (TR 135).” Pittsburgh, Pennsylvania. ADAMS Accession No. ML072670541. TN12118.
Desk, dated May 26, 2007, regarding “Westinghouse Application to Amend the AP1000 Design Certification Rule.” Pittsburgh, Pennsylvania. ADAMS Accession No. ML071580757. TN12119. Westinghouse (Westinghouse Electric Company LLC). 2008. AP1000 Design Control Document. APP-GW-GL-700, Revision 17, Pittsburgh, Pennsylvania. ADAMS Accession No. ML083230868. TN496. Westinghouse (Westinghouse Electric Company LLC). 2010. AP1000 Design Control Document. APP-GW-GL-700, Revision 18, Pittsburgh, Pennsylvania. ADAMS Accession No. ML103480572. TN3251. Westinghouse (Westinghouse Electric Company, LLC). 2010. Letter R.F. Ziesing, Director, U.S.
Licensing, to NRC Document Control Desk, dated December 10, 2010, regarding “Westinghouse request for NRC to retire the AP1000 Final Design Approval (FDA) issued March 10, 2006 upon completion of rulemaking for the amendment to the AP1000 NRC certified design.” Cranberry Township, Pennsylvania. ADAMS Accession No. ML103480065. TN12152. Westinghouse (Westinghouse Electric Company). 2016. Letter from R. Easterling, to NRC, dated December 2, 2016, regarding “Request for Exemptions Related to the Duration of the AP1000® Design Certification.” DCP NRC 003303, Cranberry Township, Pennsylvania. ADAMS Accession No. ML16342A975. TN6297. I-62
NRC FORM 335 U.S. NUCLEAR REGULATORY COMMISSION (12-2010)
MONTH YEAR April 2026 4. FIN OR GRANT NUMBER
The U.S. Nuclear Regulatory Commission (NRC) staff prepared this generic environmental impact statement (GEIS) in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended, to address the NRC licensing of the building and operation of new nuclear reactors in the United States. In this GEIS, the NRC staff uses the values and assumptions in a technology-neutral plant parameter envelope (PPE) for a new nuclear reactor to evaluate the environmental impacts of constructing and operating a nuclear reactor. In addition, this GEIS assumes that a new reactor might be built anywhere in the United States that meets the requirements of the NRC’s siting regulations. To accommodate this broad range of siting possibilities, the staff developed a site parameter envelope (SPE) that provides limiting values and assumptions related to the site. The results from this GEIS will be codified in Title 10 of the Code of Federal Regulations Part 51.
NUREG-2249, Final Generic Environmental Impact Statement for Licensing of New Nuclear Reactors April 2026
https://doi.org/10.1073/pnas.2111833119
in the United States, Science Advances 7(18), 10.1126/sciadv.abf4491;
10.1080/23251042.2018.1424497;
USA, 1515 pp. doi: 10.7930/NCA4.2018,
in Example Fuel Cycles (ANL/NSE-22/21) (June 2023), https://doi.org/10.2172/1985692.
Institute, 92(12), 973-974. https://doi.org/10.1093/jnci/92.12.973.