NUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report
Other documents for the same rulemaking (all, by stage)
References
WSDOT (Washington State Department of Transportation). 2017. “Construction Noise Impact Assessment.” Chapter 7 in Biological Assessment Preparation for Transportation Projects – Advanced Training Manual. Olympia, Washington. Available at https://wsdot.wa.gov/sites/default/files/2021-10/Env-FW-BA_ManualCH07.pdf. TN5313. G-22
AEC (U.S. Atomic Energy Commission). 1974. Environmental Survey of the Uranium Fuel Cycle. WASH–1248, Washington, D.C. ADAMS Accession No. ML14092A628. TN23. Cefic and ECTA (European Chemical Industry Council and European Chemical Transport Association). 2011. Guidelines for Measuring and Managing CO2 Emission from Freight Transport Operations. Brussels, Belgium. Accessed September 10, 2025, at https://www.ecta.com/wp-content/uploads/2021/03/ECTA-CEFIC-GUIDELINE-FORMEASURING-AND-MANAGING-CO2-ISSUE-1.pdf. TN6966.
EPA (U.S. Environmental Protection Agency). 2012. “Clean Energy: Calculations and References.” Washington, D.C. ADAMS Accession No. ML12292A648. TN2643.
EPA (U.S. Environmental Protection Agency). 2012. “Stationary Internal Combustion Sources.” Chapter 3 in Technology Transfer Network Clearinghouse for Inventories & Emissions Factors:
FHWA (Federal Highway Administration). 2012. “Highway Statistics 2010 (Table VM-1).” Office of Highway Policy Information, Washington, D.C. ADAMS Accession No. ML12292A645. TN2645.
NRC (U.S. Nuclear Regulatory Commission). 2014. Attachment 1: Staff Guidance for Greenhouse Gas and Climate Change Impacts for New Reactor Environmental Impact
Statements, COL/ESP-ISG-026. Washington, D.C. ADAMS Accession No. ML14100A157. TN3768. UniStar (UniStar Nuclear Energy, LLC). 2007. Technical Report in Support of Application of UniStar Nuclear Energy, LLC and UniStar Nuclear Operating Services, LLC for Certificate of Public Convenience and Necessity Before the Maryland Public Service Commission for Authorization to Construct Unit 3 at Calvert Cliffs Nuclear Power Plant and Associated Transmission Lines. Public Service Commission of Maryland, Baltimore, Maryland. ADAMS Accession No. ML090680053. TN1564.
PRA. At the time it issued the Severe Accident Policy Statement, the Commission determined that an adequate basis existed to establish appropriate guidance. This determination was supported by the current operating reactor experience, ongoing severe accident research, and insights from a variety of risk analyses. The Commission recognized the need to strike a balance between accident prevention and consequence mitigation, and in doing so, expected designers engaged in designing new standard plants to achieve a higher standard of severe accident safety performance than was achieved in previous designs. I.2.3 Commission Safety Goals Policy Statement The Commission issued its policy statement entitled, “Safety Goals for the Operation of Nuclear Power Plants,” on August 4, 1986 (51 FR 28044-TN12078). This policy statement focused on the risks to the public from NPP operations with the objective of establishing goals that broadly define an acceptable level of radiological risk that might be imposed on the public as a result of
ASME/ANS (American Society of Mechanical Engineers/American Nuclear Society). 2021. Probabilistic Risk Assessment Standard for Advanced Non-Light Water Reactor Nuclear Power Plants. ASME/ANS RA-S-1.4, Washington, D.C. TN12100.
ASME/ANS (American Society of Mechanical Engineers/American Nuclear Society). 2024. Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications. ASME/ANS RA-S-1.1, Washington, D.C. TN12093.
GE (GE Nuclear Energy). 1997. Letter from J.F. Quirk, Project Manager, to NRC Document Control Desk, dated December 21, 1994, regarding “NEPA/SAMDA Submittal for the ABWR.”
GE (GE Hitachi Nuclear Energy). 2010. Letter from R.E. Kingston, Vice President, to NRC Document Control Desk, dated October 25, 2010, regarding “Clarification of SAMDA Screening Process in NEDO-3306.” Wilmington, North Carolina. ADAMS Accession No. ML102990433. TN12133.
GE Hitachi (GE Hitachi Nuclear Energy). 2014. Letter from J.G. Head to NRC, dated June 3, 2014, regarding “GEH Request for NRC to Retire the ESBWR Final Design Approval Upon Issuance of the ESBWR Final Design Certification Rule.” Wilmington, North Carolina. ADAMS Accession No. ML14154A094. TN6239.
GE Hitachi (GE Hitachi Nuclear Energy). 2017. Letter from J.G. Head, Senior Vice President, Regulatory Affairs, to NRC Document Control Desk, dated March 21, 2017, regarding “NRC Request for Additional Information Letter Number 1 Related to Environmental Assessment for
GE-Hitachi Nuclear Energy Advanced Boiling Water Reactor Design Certification Rule Renewal Application – GEH Response to RAIs 01.05-2, 01.05-3, and 01.05-4.” Wilmington, North Carolina. ADAMS Accession No. ML17080A064. TN12113. National Environmental Policy Act of 1969 (NEPA), as amended. 42 U.S.C. § 4321 et seq. TN661.
NEI (Nuclear Energy Institute). 2005. Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document. NEI-05-01, Revision A, Washington, D.C. ADAMS Accession No. ML060530203. TN1978.
NEI (Nuclear Energy Institute). 2019. Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors, Risk-Informed Performance-Based Technology Inclusive I-53 Guidance for Non-Light Water Reactor Licensing Basis Development. NEI 18-04, Washington, D.C. ADAMS Accession No. ML19241A472. TN12097.
NFPA (National Fire Protection Association). 2025. “NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants.” Quincy, Massachusetts. Accessed June 28, 2025, at https://www.nfpa.org/codes-and-standards/nfpa-805-standarddevelopment/805. TN12095.
NRC (U.S. Nuclear Regulatory Commission). 1988. Policy Issue: Integration Plan for Closure of Severe Accident Issues. SECY88-147, Washington, D.C. ADAMS Accession No. ML20154P449. TN12036.
NRC (U.S. Nuclear Regulatory Commission). 1990. Memorandum from S.J. Chilk to J.M.
Taylor, dated June 26, 1990, regarding “SECY-90-16 – Evolutionary Light Water Reactor (LWR) Certification Issues and Their Relationships to Current Regulatory Requirements.” Staff Requirements Memorandum, Washington, D.C. ADAMS Accession No. ML003707885. TN6366.
NRC (U.S. Nuclear Regulatory Commission). 1990. Policy Issue: Evolutionary LWR Certification Issues and Their Relationships to Current Regulatory Requirements. SECY-90-016,
NRC (U.S. Nuclear Regulatory Commission). 1990. Severe Accident Risks: An Assessment for
NRC (U.S. Nuclear Regulatory Commission). 1993. Policy Issue: Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor (ALWR) Designs. SECY-93-087, Washington, D.C. ADAMS Accession No. ML003708021. TN6212.
NRC (U.S. Nuclear Regulatory Commission). 1993. Memorandum from S.J. Chilk, Secretary, to J.M. Taylor, Executive Director for Operations, dated July 21, 1993, regarding “SECY-93-087 Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor (ALWR) Designs.” Washington, D.C. ADAMS Accession No. ML003708056. TN12041.
NRC (U.S. Nuclear Regulatory Commission). 1994. Final Safety Evaluation Report Related to the Certification of the System 80+ Design, Chapters 15-22 and Appendices. NUREG-1462, Vol. 2, Washington, D.C. ADAMS Accession No. ML100430017. TN12072.
NRC (U.S. Nuclear Regulatory Commission). 1995. Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission, Final Report. NUREG/BR-0058, Revision 2. Washington, D.C.
NRC (U.S. Nuclear Regulatory Commission). 1996. Certification of Two Evolutionary Designs.
NRC (U.S. Nuclear Regulatory Commission). 1996. Guidelines for Preparing & Reviewing Applications for Licensing of Non-Power Reactors, Parts 1 & 2. NUREG-1537, Washington, D.C. ADAMS Accession No. ML12251A353. TN8775.
NRC (U.S. Nuclear Regulatory Commission). 1996. Policy Issue: Policy and Key Technical Issues Pertaining to the Westinghouse AP600 Standardized Passive Reactor Design. SECY-96128, Washington, D.C. ADAMS Accession No. ML003708224. TN12042.
NRC (U.S. Nuclear Regulatory Commission). 1996. Memorandum from J.M. Taylor, Executive Director for Operations, to The Commissioners, dated April 15, 1996, regarding “Certification of Two Evolutionary Designs.” SECY-97-077, Washington, D.C. TN12108.
NRC (U.S. Nuclear Regulatory Commission). 1997. Memorandum from H.L. Thompson, Jr., Acting Executive Director for Operations, to The Commissioners, dated February 19, 1997, regarding “Policy and Key Technical Issues Pertaining to the Westinghouse AP600 Standardized Passive Reactor Design.” SECY-97-044, Washington, D.C. TN12084.
NRC (U.S. Nuclear Regulatory Commission). 1997. Regulatory Analysis Technical Evaluation Handbook. NUREG/BR–0184, Washington, D.C. ADAMS Accession No. ML050190193. TN676.
NRC (U.S. Nuclear Regulatory Commission). 1997. Memorandum from J.C. Hoyle, Secretary, to H.L. Thompson, Jr., Acting Executive Director for Operations, K.D. Cyr, General Counsel, dated January 15, 1997, regarding “Staff Requirements - SECY-96-128 - Policy and Key Technical Issues Pertaining to the Westinghouse AP600 Standardized Passive Reactor Design.” Washington, D.C. ADAMS Accession No. ML003755486. TN12043.
NRC (U.S. Nuclear Regulatory Commission). 1997. Memorandum from J.C. Hoyle, Secretary, to L.J. Callan, Executive Director for Operations, dated June 30, 1997, regarding “Staff Requirements - SECY-97-044 - Policy and Key Technical Issues Pertaining to the Westinghouse AP600 Standardized Passive Reactor Design.” Washington, D.C. ADAMS Accession No. ML003708232. TN12085.
NRC (U.S. Nuclear Regulatory Commission). 1999. Memorandum from A.L. Vietti-Cook,
Secretary, to W.D. Travers, dated March 1, 1999, regarding “Staff Requirements - SECY-98144 - White Paper on Risk-Informed and Performance-Based Regulation.” SECY-98-144,
NRC (U.S. Nuclear Regulatory Commission). 2000. Policy Issue, Negative Consent, Addressing
NRC (U.S. Nuclear Regulatory Commission). 2004. “Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design (NUREG-1793, Initial Report).” Washington, D.C. Accessed June 14, 2022, at https://www.nrc.gov/reading-rm/doccollections/nuregs/staff/sr1793/initial/index.html. TN7796. I-55
NRC (U.S. Nuclear Regulatory Commission). 2004. Policy Issue, Notation Votes, Plan for the Implementation of the Commission’s Phased Approach to Probabilistic Risk Assessment Quality. SECY-04-0118, Washington, D.C. ADAMS Accession No. ML041470505. TN12087.
NRC (U.S. Nuclear Regulatory Commission). 2004. Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission. NUREG/BR-0058, Revision 4, Washington, D.C. ADAMS Accession No. ML042820192. TN8977.
NRC (U.S. Nuclear Regulatory Commission). 2005. Letter from D.B. Matthews, Director Division of New Reactor Licensing Office of Nuclear Reactor Regulation, to S.A. Hucik, General
Manager, Nuclear Plant Projects, dated December 1, 2005, regarding “Acceptance of the General Electric Company Application for Final Design Approval and Standard Design Certification for the Economic Simplified Boiling Water Reactor (ESBWR) Design.” Washington, D.C. ADAMS Accession No. ML053200311. TN12123.
NRC (U.S. Nuclear Regulatory Commission). 2005. Commission Voting Record, Decision Item:
NRC (U.S. Nuclear Regulatory Commission). 2005. “General Electric Company Application for Final Design Approval and Design Certification of ESBWR Standard Plant Design.” Washington, D.C. ADAMS Accession No. ML052450245. TN12122.
NRC (U.S. Nuclear Regulatory Commission). 2005. “Westinghouse AP1000 Design Control Document Revision 15 Errata.” Washington, D.C. ADAMS Accession No. ML053460400. TN12117.
NRC (U.S. Nuclear Regulatory Commission). 2006. Environmental Assessment by the U.S. Nuclear Regulatory Commission Relating to the Certification of the AP1000 Standard Plant
NRC (U.S. Nuclear Regulatory Commission). 2006. Guidelines for Categorizing Structures,
NRC (U.S. Nuclear Regulatory Commission). 2006. Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants. Regulatory Guide 1.205, Washington, D.C. ADAMS Accession No. ML061100174. TN12094.
NRC (U.S. Nuclear Regulatory Commission). 2007. Environmental Standard Review Plan— Standard Review Plans for Environmental Reviews for Nuclear Power Plants. NUREG–1555, Draft Revision 1, Washington, D.C. ADAMS Accession No. ML18023A205. TN5141.