Policy Replication

ORNL Valves Study

Docket document2014-04-11 · PHMSA · report · PHMSA-2013-0255-0004
RIN 2137-AF06 · Docket PHMSA-2013-0255

Other documents for the same rulemaking (all, by stage)

2014-04-11 Docket documentKiefner Leak Detection Study Final Report Dec. 2012
2014-04-11 Docket documentAPI Pipeline Conference San Antonio, TX 4.9.14
2014-04-11 Docket documentGAO Study of Data and Incident Response
2020-02-06 Regulatory impact analysisPreliminary Regulatory Impact Analysis and Preliminary Environmental Assessment
2020-02-06 Federal RegisterPipeline Safety: Valve Installation and Minimum Rupture Detection Standards
2020-05-26 Docket documentComment of Pipeline Technology (PT)
2020-12-23 Docket documentRupture Detection Valve NPRM OMB Redline
2021-02-26 Docket documentSummary of Introductory Meeting with PST
2022-01-28 Docket documentMeeting Summary
2022-04-08 Regulatory impact analysisFinal Regulatory Impact Analysis for the "Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule
2022-04-08 Federal RegisterPipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards
2022-04-08 Docket documentRedline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866
2022-04-08 Docket documentFinal Environmental Analysis for the ""Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule
2022-09-15 Docket documentANPRM on EFRDs 59 FR 2802
2022-09-15 Docket documentANPRM Hazardous Liquid Pipelines 75 FR 63774 Oct. 18 2010
2022-09-15 Docket documentInterstate Natural Gas Association of America (INGAA)1
2022-09-15 Docket documentANPRM Gas Transmission Pipelines 76 FR 53086 Aug. 25 2011
2022-09-15 Docket documentAPI-AOPL Comments on Draft Valve Study 10-26-2012 FINAL
2022-09-15 Docket documentAndy Drake PHMSA Valve Workshop
2022-09-15 Docket documentComments of Accufacts Inc.
2022-09-15 Docket documentCFER Comments on ORNL Valve Study 25Oct2012
2022-09-15 Docket document1996 Study RCV Feasibility
2022-09-15 Docket documentCPUC Approves Pipeline Safety Plan for PG E 12-20-2012
2022-09-15 Docket documentAGA Final Comment Valve Study
2022-09-15 Docket documentADB-10-0- 1
2022-09-15 Docket document166 Congressional Record H8823 12-21-2020
2022-09-15 Docket documentAlternative MAOP Final Rule
2022-09-16 Regulatory impact analysisPlaceholder RIA accident data
2022-09-16 Regulatory impact analysisPlaceholder RIA incident data
2022-09-16 Regulatory impact analysisld cafe co2 nhtsa 2127 al76 epa pria 181016
2022-09-16 Docket documentDennisJarnecke Main Line Valves
2022-09-16 Docket documentGPAC Transcript 7 22 2020
2022-09-16 Docket documentDennis Jarnecke R D Program Main Line Valves
2022-09-16 Docket documentKiefner and Associates Final Report 12173 Leak Detection Study 12 10 2012
2022-09-16 Docket documentLPAC Meeting Transcript Valve Rule July 23 2022
2022-09-16 Docket documentMarch 1991 Emergency Flow Restricting Devices Study
2022-09-16 Docket documentPHMSA PPT LPAC Valve Installation and Minimum Rupture Detection Standards July 23 2020
2022-09-16 Docket documentPHMSA PPT Pre PAC Briefing Valve Installation and Minimum Rupture Detection Standards
2022-09-16 Docket documentPlaceholder low stress HL accident data
2022-09-16 Docket documentReport to Congress on Shipping Crude Oil by Truck Rail and Pipeline 10-2018
2022-09-16 Docket documentPipeline Research and Development Forum Event Summary Report 07 2012
2022-09-16 Docket documentWG2 ReportOut Leak Detection Mitigation and Storage
2022-09-16 Docket document49 CFR Part 192 current
2022-09-16 Docket document20141024 4001Constitution FEIS Vol 1 Environmental Analysis
2022-09-16 Docket documentKeystoneXLFEISc
2022-09-16 Docket documentEnbridge2012
2022-09-16 Docket documentPG E officials grilled about automatic shut off valves The Mercury News
2022-09-16 Docket documentU.S. energy facts explained
2022-09-16 Docket documentIncident20150148
2022-09-16 Docket documentDave Chittick Valve Considerations for Natural Gas Transmission Pipelines
2022-09-16 Docket documentGAO 13 168 Better Data and Guidance Needed to Improve Pipeline Operator Incident Response
2022-09-16 Docket documentDon Ledversis28 Valve Considerations for Hazardous Liquid Pipelines
2022-09-16 Docket documentLeak Valve Event Summary Report
2022-09-16 Docket documentLPAC Vote Slides
2022-09-16 Docket documentNTSB Special Study PSS 71 01 12 31 1970
2022-09-16 Docket documentPHMSA PPT LPAC Valve Installation and Minimum Rupture Detection Standards July 16 2020
2022-09-16 Docket documentORNL Valve Study PHMSA Webinar Oct 5 2012 Ver 2
2022-09-16 Docket documentPipeline Safety Regulatory Certainty and Job Creation Act of 2011
2022-09-16 Docket documentSan Bruno Victims and Their Families Deserve Long Overdue Action NTSB Safety Compass Blog
2022-09-16 Docket documentSteveNanney PHMSA RESEARCH TECHNICAL PERSPECTIVES

References

Page 2Download these results: CSV · JSON
NFPA 1851, 2008 Edition, National Fire Protection Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2010. “Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations, and Special Operations to the Public by Career Fire Departments.” NFPA 1710, 2010 Edition, National Fire Protection
research reportNot linked to a paper · refsec
Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011. “Guide for Fire and Explosion Investigations.” NFPA 921, 2011 Edition, National Fire Protection Association, 1 Batterymarch Park,
research reportNot linked to a paper · refsec
Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011. “Recommended Practice for Protection of Buildings from Exterior Fire Exposure.” NFPA 80A, 2012 Edition, National Fire Protection
research reportNot linked to a paper · refsec
Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2011. “Standard on Protective Clothing and Equipment for Wildlife Fire Fighting.” NFPA 1977, 2011 Edition, National Fire Protection
research reportNot linked to a paper · refsec
Association, 1 Batterymarch Park, Quincy, Massachusetts. National Fire Protection Association (NFPA). 2012. “Standard Test Method for Determining Ignitibility of Exterior Wall Assemblies Using a Radiant Heat Energy Source.” NFPA 268, 2012
research reportNot linked to a paper · refsec
Edition, National Fire Protection Association, 1 Batterymarch Park, Quincy, Massachusetts. National Institute of Standards and Technology. 2010. “Report on Residential Fireground Field Experiments.” Technical Note 1661. National Transportation Safety Board (NTSB). 1970. “Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown.” PSS-71-1. National Transportation Safety Board (NTSB). 1995. “Safety Recommendations.” P-95-1 through 4. National Transportation Safety Board (NTSB). 1995. “Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire Edison, New Jersey, March 23, 1994.”
research reportNot linked to a paper · refsec
NTSB/PAR-95/01, PB95-916501. National Transportation Safety Board (NTSB). 1996. “Pipeline Special Investigation Report.”
research reportNot linked to a paper · refsec
NTSB/SIR-96/02, PB96-917002. National Transportation Safety Board (NTSB). 2002. “Pipeline Rupture and Subsequent Fire in Bellingham, Washington June 10, 1999.” NTSB/PAR-02/02, PB2002-916501. National Transportation Safety Board (NTSB). 2002. “Rupture of Piney Point Oil Pipeline and Release of Fuel Oil Near Chalk Point, Maryland April 7, 2000.” NTSB/PAR-02/01, PB2002916501. National Transportation Safety Board (NTSB). 2003. “Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000.” NTSB/PAR-03/01, PB2003-916501. National Transportation Safety Board (NTSB). 2009. “Rupture of Hazardous Liquid Pipeline with Release and Ignition of Propane Carmichael, Mississippi November 1, 2007.” NTSB/PAR09/01, PB2009-916501. National Transportation Safety Board (NTSB). 2011. “Operations Chairman Factual Report Addendum.” Accident Number: DCA10MP008, August 12. National Transportation Safety Board (NTSB). 2011. “Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9, 2010.”
research reportNot linked to a paper · refsec
NTSB/PAR-11/01, PB2011-916501. Nicholson, M. 2012. “Enbridge Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan July 25, 2010.” National Transportation Safety Board. Oil and Gas Producers (OGP). 2010. “Consequence Modelling.” Report No. 434-7, The International Association of Oil and Gas Producers, London. Pipeline Association for Public Awareness (PAPA). 2011. Pipeline Emergency Response Guidelines. Golden, Colorado.
research reportNot linked to a paper · refsec
Woodward, J. L. 1998. Estimating the Flammable Mass of a Vapor Cloud. Center for Chemical Process Safety, American Institute of Chemical Engineers, New York.
research reportNot linked to a paper · refsec
Yan, S., et. al. 2004. Experimental Study of Burning Rate in Jet-Fuel Pool Fire. Department of Chemical and Fuels Engineering, University of Utah, Salt Lake City, Utah.
research reportNot linked to a paper · refsec
← Previous