Policy Replication

March 1991 Emergency Flow Restricting Devices Study

Docket document2022-09-16 · PHMSA · report · PHMSA-2013-0255-0101
RIN 2137-AF06 · Docket PHMSA-2013-0255

Other documents for the same rulemaking (all, by stage)

2014-04-11 Docket documentORNL Valves Study
2014-04-11 Docket documentKiefner Leak Detection Study Final Report Dec. 2012
2014-04-11 Docket documentAPI Pipeline Conference San Antonio, TX 4.9.14
2014-04-11 Docket documentGAO Study of Data and Incident Response
2020-02-06 Regulatory impact analysisPreliminary Regulatory Impact Analysis and Preliminary Environmental Assessment
2020-02-06 Federal RegisterPipeline Safety: Valve Installation and Minimum Rupture Detection Standards
2020-05-26 Docket documentComment of Pipeline Technology (PT)
2020-12-23 Docket documentRupture Detection Valve NPRM OMB Redline
2021-02-26 Docket documentSummary of Introductory Meeting with PST
2022-01-28 Docket documentMeeting Summary
2022-04-08 Regulatory impact analysisFinal Regulatory Impact Analysis for the "Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule
2022-04-08 Federal RegisterPipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards
2022-04-08 Docket documentRedline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866
2022-04-08 Docket documentFinal Environmental Analysis for the ""Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards" final rule
2022-09-15 Docket documentANPRM on EFRDs 59 FR 2802
2022-09-15 Docket documentANPRM Hazardous Liquid Pipelines 75 FR 63774 Oct. 18 2010
2022-09-15 Docket documentInterstate Natural Gas Association of America (INGAA)1
2022-09-15 Docket documentANPRM Gas Transmission Pipelines 76 FR 53086 Aug. 25 2011
2022-09-15 Docket documentAPI-AOPL Comments on Draft Valve Study 10-26-2012 FINAL
2022-09-15 Docket documentAndy Drake PHMSA Valve Workshop
2022-09-15 Docket documentComments of Accufacts Inc.
2022-09-15 Docket documentCFER Comments on ORNL Valve Study 25Oct2012
2022-09-15 Docket document1996 Study RCV Feasibility
2022-09-15 Docket documentCPUC Approves Pipeline Safety Plan for PG E 12-20-2012
2022-09-15 Docket documentAGA Final Comment Valve Study
2022-09-15 Docket documentADB-10-0- 1
2022-09-15 Docket document166 Congressional Record H8823 12-21-2020
2022-09-15 Docket documentAlternative MAOP Final Rule
2022-09-16 Regulatory impact analysisPlaceholder RIA accident data
2022-09-16 Regulatory impact analysisPlaceholder RIA incident data
2022-09-16 Regulatory impact analysisld cafe co2 nhtsa 2127 al76 epa pria 181016
2022-09-16 Docket documentDennisJarnecke Main Line Valves
2022-09-16 Docket documentGPAC Transcript 7 22 2020
2022-09-16 Docket documentDennis Jarnecke R D Program Main Line Valves
2022-09-16 Docket documentKiefner and Associates Final Report 12173 Leak Detection Study 12 10 2012
2022-09-16 Docket documentLPAC Meeting Transcript Valve Rule July 23 2022
2022-09-16 Docket documentPHMSA PPT LPAC Valve Installation and Minimum Rupture Detection Standards July 23 2020
2022-09-16 Docket documentPHMSA PPT Pre PAC Briefing Valve Installation and Minimum Rupture Detection Standards
2022-09-16 Docket documentPlaceholder low stress HL accident data
2022-09-16 Docket documentReport to Congress on Shipping Crude Oil by Truck Rail and Pipeline 10-2018
2022-09-16 Docket documentPipeline Research and Development Forum Event Summary Report 07 2012
2022-09-16 Docket documentWG2 ReportOut Leak Detection Mitigation and Storage
2022-09-16 Docket document49 CFR Part 192 current
2022-09-16 Docket document20141024 4001Constitution FEIS Vol 1 Environmental Analysis
2022-09-16 Docket documentKeystoneXLFEISc
2022-09-16 Docket documentEnbridge2012
2022-09-16 Docket documentPG E officials grilled about automatic shut off valves The Mercury News
2022-09-16 Docket documentU.S. energy facts explained
2022-09-16 Docket documentIncident20150148
2022-09-16 Docket documentDave Chittick Valve Considerations for Natural Gas Transmission Pipelines
2022-09-16 Docket documentGAO 13 168 Better Data and Guidance Needed to Improve Pipeline Operator Incident Response
2022-09-16 Docket documentDon Ledversis28 Valve Considerations for Hazardous Liquid Pipelines
2022-09-16 Docket documentLeak Valve Event Summary Report
2022-09-16 Docket documentLPAC Vote Slides
2022-09-16 Docket documentNTSB Special Study PSS 71 01 12 31 1970
2022-09-16 Docket documentPHMSA PPT LPAC Valve Installation and Minimum Rupture Detection Standards July 16 2020
2022-09-16 Docket documentORNL Valve Study PHMSA Webinar Oct 5 2012 Ver 2
2022-09-16 Docket documentPipeline Safety Regulatory Certainty and Job Creation Act of 2011
2022-09-16 Docket documentSan Bruno Victims and Their Families Deserve Long Overdue Action NTSB Safety Compass Blog
2022-09-16 Docket documentSteveNanney PHMSA RESEARCH TECHNICAL PERSPECTIVES

References: 6 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
FINDINGS, CONCLUSIONS, AND PROPOSALS APPENDICES Appendix A - Section 305 of the Pipeline Safety Reauthorization Act of 1988 . . • . Appendix B - Summary of Responses to Each Question contained in Docket No. PS-I04; Notice 1 . . • . • . • •.•.. Appendix C - Summary of Calculations for Benefits Versus Cost Analysis - Hazardous Liquid Pipelines in Urban Areas
research reportNot linked to a paper · refsec
PURPOSE The purpose of this report is to fulfill the requirements section 305 of the pipeline Safety Reauthorization Act of 1988 (Public Law 100-561) determine whether (the Act) operators that should study be install conducted emergency flow restricting devices in existing and future pipeline systems in varying circumstances and locations. This report also includes proposals for other future action. In addition, this report presents the summary of responses to the Request for Information public notice published May 15, 1989 (52
research reportNot linked to a paper · refsec
Gross, Court Report and Transcriber, 1323 Rhode Island Avenue, N.W., Washington, D.C. 20005. U.S. Department of Transportation, Office of the Secretary of Transportation, "Safety Review Task Force Report Research and Special Programs Administration's Pipeline Safety Program," January 1989. M. Rusin and E. Savvides-Gellerson, "The Safety of Interstate Liquid Pipelines: Evaluation Present Levels Proposals for Change," American Petroleum Institute Research Study #040, July 1987. House of Representatives, committee Energy Rep.
journal articleNot linked to a paper · refsec
John D. Commerce, Dingell, Chairman, "Pipeline Safety Reauthorization Act of 1987 Report," Report 100-445, Part 1, November 17, 1987, p. 17. National Transportation Safety Board, "Williams Pipe Line Company Fire, Liquid Minnesota, July Pipeline Rupture 1986,"
research reportNot linked to a paper · refsec
NTSB/PAR-87/102, Mounds View, PB87-916502, July 20, 1987. Telephone communication with the Central Region, Office of Pipeline Safety. National Transportation Factual Report, Safety Pipeline Board, Group," "Group Chairman's Southern Pacific Transportation Company and Calnev Pipe Line Company accidents, May 12, 1989, and May 25, 1989, Docket No.
research reportNot linked to a paper · refsec
DCA-89-MR-004 I August 4, 1989. Telephone communication with James J. Opaluch, university of Rhode Island, Kingston, Rhode Island. Telephone communication with Roger Price, Center for Hazardous Material Research, University pittsburgh, Pittsburgh, Pennsylvania. (10) The oil Daily, November 9, 1989. (11) Telephone communication with John Holden, corporation.
research reportNot linked to a paper · refsec