Reanalysis of MACT for Delayed Coking Unit Decoking Operations
Other documents for the same rulemaking (all, by stage)
References: 14 extracted, 0 linked to papers
BAAQMD, 2004 Technical Memorandum – Reanalysis of MACT for Delayed Coking Unit Decoking Operations July 22, 2015 Evaluation of MACT Emission Limitations for DCU Decoking Operations Existing Source MACT Floor We previously conducted the MACT analysis considering each DCU as the affected source, so the fifth unit represented MACT for existing sources. However, 40 CFR 63.640(c), as proposed, states that “the affected source shall comprise all emission points in combination, listed in paragraphs (c)(1) through (c)(9) of this section that are located at a single refinery plant site.” This affected source was defined in this manner to allow for emissions averaging. The newly proposed 40 CFR 63.640(c)(9) reads “All releases associated with decoking operations and defined in this subpart.” Therefore, we conclude that the MACT floor analysis for existing sources should be conducted considering, on aggregate, the emissions limitations achieved by all
DCU at the facility. This is important because the data in Table 2 refers to specific DCU. Units ranked 1 and 3 only apply to the new units at the facility and other units are present that, according to the ICR responses, do not typically vent at pressures of 2 psig or less. The sixth percentile of 60 facilities that operate DCU is the fourth ranked facility. Considering that there are other DCU at the facilities with DCU ranked 1 and 3, we cannot say for certain that the facility with DCU ranked 1 would have better overall emissions performance (on average, considering all DCU as the facility) than the facilities complying with the Bay Area permit requirements (currently listed as DCU “5-7”). That is, considering only permitted emissions, we expect the Bay Area permit requirements would represent the 4th ranked facility (regardless of the inclusion or exclusion of the Hovensa refinery). The Bay Area requirement is based on Regulation 8, Rule 10, Section 8-10-301 which controls vessel depressuring “…until the pressure within the process vessel is as close to atmospheric pressure as practicably possible, in no case shall a process vessel be vented to the atmosphere until the partial pressure of organic compounds in that vessel is less than 1000 mm Hg (4.6 psig).” The Bay Area permits in 2004 only included a requirement to reduce the vessel pressure to 1000 mm Hg (4.6 psig), whereas 2008 and later Bay Area permits included more specific
ASME (founded as the American Society of Mechanical Engineers). 2006. ASME Steam Tables – Compact Edition. ISBN: 0-7918-0254-X. ASME, New York, New York.
BAAQMD (Bay Area Air Quality Management District). 2004. Process Vessel Depressurizing, Regulation 8, Rule 10-301. Last Amended 1/21/04. http://hank.baaqmd.gov/dst/regulations/rg0810.pdf. [Accessed 9/16/2013].
Coburn, J. 2013. Impact Estimates for Delayed Coking Units. Memorandum to Brenda Shine, U.S. EPA, from Jeff Coburn, RTI International. Revised September 12, 2013. (Docket Item No. EPA-HQ-OAR-2010-0682-0202)
Coburn, J. and S. Johnson. 2013. MACT Analysis for Delayed Coking Unit Decoking Operations. Memorandum from Jeff Coburn and Shelly Johnson, RTI International, to Brenda Shine,
EPA/OAQPS/SPPD. September 20, 2013. (Docket Item No. EPA-HQ-OAR-2010-06820203)
Consent Decree. 2011. United States of America and The United States Virgin Islands, Plaintiffs, v. HOVENSA LLC, Defendant. 1:11-cv-00006. Filed 1/26/2011. http://www2.epa.gov/enforcement/hovensa-llc-clean-air-act-settlement. [Accessed 9/11/2013].
Consent Decree. 2012b. United States of America and The State of Indiana, Plaintiffs, and The Sierra Club, Save the Dunes, The Natural Resources Defense Council, The Hoosier Environmental Council, Susan Eleuterio and Tom Tsourlis, Plaintiff-Intervenors, v. BP Products North America Inc. Defendant. 2:12-cv-00207. Filed 5/23/2012. http://www2.epa.gov/enforcement/bp-whiting-settlement-flaring. [Accessed 9/11/2013].
EPA (U.S. Environmental Protection Agency). 2011. Petroleum Refinery Database, based on Refinery Information Collection Request (ICR) for Calendar Year 2010. September 2011. (Docket Item Nos. EPA-HQ-OAR-2010-0682-0061 through 0069)
LDEQ (State of Louisiana Department of Environmental Quality: Environmental Services). 2013. Marathon Petroleum Co LP-LA Refining Division- Garyville Refinery, Title V Regular Permit Minor Mod: 2580-00013-V11. 8/29/2013. (Docket Item No. EPA-HQ-OAR2010-0682-0183)
MDEQ (Michigan Department of Environmental Quality: Air Quality Division). 2012. Marathon Petroleum Company LP, Permit to Install: 63-08C. 1/11/2012. (Docket Item No. EPA-HQOAR-2010-0682-0176)
SCAQMD (South Coast Air Quality Management District). 2013. Petroleum Refinery Coking
Operations, Rule 1114. Adopted May 3, 2013. http://www.arb.ca.gov/DRDB/SC/CURHTML/R1114.PDF. [Accessed 9/11/2013].