MACT Analysis for Delayed Coking Unit Decoking Operations
Other documents for the same rulemaking (all, by stage)
References: 15 extracted, 0 linked to papers
MDEQ, 2012 Marathon Garyville Unit 5 Coker, Unit 205 Coker Shall relieve the Coker 8/29/13 Drum Vents at a pressure equal to or less than 2 psig during atmospheric venting
LDEQ, 2013 ConocoPhillips Co., WRB Refining, LP Wood River Coker 2 Coke Drum OH Pressure Limit of 2 psig for the Coker 2 Coke Drums 2/28/12 Consent Decree,
BAAQMD, 2004 Technical Memorandum – MACT Analysis for Delayed Coking Unit Decoking Operations September 20, 2013 While we identified eight DCU with permit requirements or consent decrees specifying a coke drum venting pressure limit of 2 psig, we did not identify any permit or consent decree requirements more stringent than 2 psig. Refinery owners and operators were asked to provide the “typical coke drum pressure just prior to venting” for each DCU in their responses to the
BAAQMD (Bay Area Air Quality Management District). 2004. Process Vessel Depressurizing, Regulation 8, Rule 10-301. Last Amended 1/21/04. http://hank.baaqmd.gov/dst/regulations/rg0810.pdf. [Accessed 9/16/2013].
Coburn, J. 2013. Impact Estimates for Delayed Coking Units. Memorandum to Brenda Shine, U.S. EPA, from Jeff Coburn, RTI International. Revised September 12, 2013.
Coburn, J. and C. Richardson. 2008. Final Impacts Analysis for Delayed Coker Depressurization Emissions. Memorandum from Jeff Coburn and Carrie Richardson, RTI International, to Bob
Lucas, EPA/SPPD. April 28, 2008. Docket Item No. EPA-HQ-OAR-2007-0011-0226.
Consent Decree. 2011. United States of America and The United States Virgin Islands, Plaintiffs, v. HOVENSA LLC, Defendant. 1:11-cv-00006. Filed 1/26/2011. http://www2.epa.gov/enforcement/hovensa-llc-clean-air-act-settlement. [Accessed 9/11/2013]. Technical Memorandum – MACT Analysis for Delayed Coking Unit Decoking Operations September 20, 2013
Consent Decree. 2012b. United States of America and The State of Indiana, Plaintiffs, and The Sierra Club, Save the Dunes, The Natural Resources Defense Council, The Hoosier Environmental Council, Susan Eleuterio and Tom Tsourlis, Plaintiff-Intervenors, v. BP Products North America Inc. Defendant. 2:12-cv-00207. Filed 5/23/2012. http://www2.epa.gov/enforcement/bp-whiting-settlement-flaring. [Accessed 9/11/2013].
EPA (U.S. Environmental Protection Agency). 1995. National Emission Standards for Hazardous Air Pollutants Petroleum Refineries - Background Information for Final Standards; EPA-453/R-95-015b. Office of Air Quality Planning and Standards, Research Triangle Park, NC. July.
EPA (U.S. Environmental Protection Agency). 2011. Petroleum Refinery Database, based on Refinery Information Collection Request (ICR) for Calendar Year 2010. September 2011. Docket Item Nos. EPA-HQ-OAR-2010-0682-0061 through 0069.
LDEQ (State of Louisiana Department of Environmental Quality: Environmental Services). 2013. Marathon Petroleum Co LP-LA Refining Division- Garyville Refinery, Title V Regular Permit Minor Mod: 2580-00013-V11. 8/29/2013.
MDEQ (Michigan Department of Environmental Quality: Air Quality Division). 2012. Marathon Petroleum Company LP, Permit to Install: 63-08C. 1/11/2012.
SCAQMD (South Coast Air Quality Management District). 2013. Petroleum Refinery Coking
Operations, Rule 1114. Adopted May 3, 2013. http://www.arb.ca.gov/DRDB/SC/CURHTML/R1114.PDF. [Accessed 9/11/2013].