Final Supplemental Environmental Impact Statement for the Keystone XL Project December 2019
Other documents for the same rulemaking (all, by stage)
References: 456 extracted, 4 linked to papers
Wisconsin Public Radio. 2018. State Appeals Court Sends Enbridge Pipeline Expansion Back to Dane County. Dated May 25, 2018. Accessed December 19, 2018 at https://www.wpr.org/stateappeals-court-sends-enbridge-pipeline-expansion-back-dane-county.
World Resources Institute. 2018. CAIT – Historical Emissions Data (Countries, U.S. States, UNFCCC).
Washington, D.C. Accessed May 8, 2018 at http://www.wri.org/resources/data-sets/caithistorical-emissions-data-countries-us-states-unfccc.
Wright, G.D., T.J. Smith, R.K. Murphy, J.T. Runge, and R.R. Harms. 2009. “Mortality of Cranes (Gruidae) Associated with Power Lines over a Major Roost on the Platte River, Nebraska.” The Prairie Naturalist 41, no. 3/4: 116-120. Wuczyński, A. 2005. “Habitat use and hunting behavior of Common Buzzards Buteo buteo wintering in south-western Poland.” Acta Ornitholgica 40(2): 147-154.
Wyoming Industrial Siting Council. 2010. Workforce Requirements for Energy Projects in Wyoming. Presentation by Tom Schroeder at Montana Energy Symposium on May 18. Accessed at http://www.energyfuture.mt.gov/presentations/Tom%20Schroeder%20%20MT%20Symposium%2010-18-05.pdf.
Yee, ML. 2008. Testing the Effectiveness of an Avian Flight Diverter for Reducing Avian Collisions with Distribution Power Lines in the Sacramento Valley, California. California Energy Commission,