{"document":{"doc_id":174185,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"March 1991 Emergency Flow Restricting Devices Study","date":"2022-09-16","url":"https://www.regulations.gov/document/PHMSA-2013-0255-0101","source_native_id":"PHMSA-2013-0255-0101","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2013-0255"],"rins":["RIN 2137-AF06"],"related":[{"doc_id":248546,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ORNL Valves Study","date":"2014-04-11"},{"doc_id":248547,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Kiefner Leak Detection Study Final Report Dec. 2012","date":"2014-04-11"},{"doc_id":248551,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Pipeline Conference San Antonio, TX 4.9.14","date":"2014-04-11"},{"doc_id":248552,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GAO Study of Data and Incident Response","date":"2014-04-11"},{"doc_id":1390,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","date":"2020-02-06"},{"doc_id":7232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","date":"2020-02-06"},{"doc_id":224366,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Comment of Pipeline Technology (PT)","date":"2020-05-26"},{"doc_id":128898,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Rupture Detection Valve NPRM OMB Redline","date":"2020-12-23"},{"doc_id":220099,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Introductory Meeting with PST","date":"2021-02-26"},{"doc_id":217090,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting Summary","date":"2022-01-28"},{"doc_id":1258,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":4963,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","date":"2022-04-08"},{"doc_id":128546,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","date":"2022-04-08"},{"doc_id":176460,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Environmental Analysis for the \"\"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":174334,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ANPRM on EFRDs 59 FR 2802","date":"2022-09-15"},{"doc_id":174338,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ANPRM Hazardous Liquid Pipelines 75 FR 63774 Oct. 18 2010","date":"2022-09-15"},{"doc_id":174342,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America (INGAA)1","date":"2022-09-15"},{"doc_id":174343,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ANPRM Gas Transmission Pipelines 76 FR 53086 Aug. 25 2011","date":"2022-09-15"},{"doc_id":174346,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API-AOPL Comments on Draft Valve Study 10-26-2012 FINAL","date":"2022-09-15"},{"doc_id":174347,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Andy Drake PHMSA Valve Workshop","date":"2022-09-15"},{"doc_id":174350,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Comments of Accufacts Inc.","date":"2022-09-15"},{"doc_id":174351,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"CFER Comments on ORNL Valve Study 25Oct2012","date":"2022-09-15"},{"doc_id":174354,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"1996 Study RCV Feasibility","date":"2022-09-15"},{"doc_id":174355,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"CPUC Approves Pipeline Safety Plan for PG E 12-20-2012","date":"2022-09-15"},{"doc_id":174357,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"AGA Final Comment Valve Study","date":"2022-09-15"},{"doc_id":174358,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ADB-10-0- 1","date":"2022-09-15"},{"doc_id":174361,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"166 Congressional Record H8823 12-21-2020","date":"2022-09-15"},{"doc_id":174362,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Alternative MAOP Final Rule","date":"2022-09-15"},{"doc_id":1251,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder  RIA accident data","date":"2022-09-16"},{"doc_id":1253,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder RIA incident data","date":"2022-09-16"},{"doc_id":1255,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","date":"2022-09-16"},{"doc_id":174180,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"DennisJarnecke  Main Line Valves","date":"2022-09-16"},{"doc_id":174181,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Transcript 7 22 2020","date":"2022-09-16"},{"doc_id":174182,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Dennis Jarnecke R D Program Main Line Valves","date":"2022-09-16"},{"doc_id":174183,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Kiefner and Associates Final Report 12173 Leak Detection Study 12 10 2012","date":"2022-09-16"},{"doc_id":174184,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"LPAC Meeting Transcript Valve Rule July 23 2022","date":"2022-09-16"},{"doc_id":174186,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA PPT  LPAC  Valve Installation and Minimum Rupture Detection Standards July 23 2020","date":"2022-09-16"},{"doc_id":174187,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA PPT Pre PAC Briefing  Valve Installation and Minimum Rupture Detection Standards","date":"2022-09-16"},{"doc_id":174188,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Placeholder low stress HL accident data","date":"2022-09-16"},{"doc_id":174189,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Report to Congress on Shipping Crude Oil by Truck Rail and Pipeline 10-2018","date":"2022-09-16"},{"doc_id":174190,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Pipeline Research and Development Forum Event Summary Report 07 2012","date":"2022-09-16"},{"doc_id":174191,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"WG2 ReportOut  Leak Detection Mitigation and Storage","date":"2022-09-16"},{"doc_id":174192,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"49 CFR Part 192  current","date":"2022-09-16"},{"doc_id":174193,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"20141024 4001Constitution FEIS Vol 1 Environmental Analysis","date":"2022-09-16"},{"doc_id":174194,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"KeystoneXLFEISc","date":"2022-09-16"},{"doc_id":174195,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Enbridge2012","date":"2022-09-16"},{"doc_id":174196,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PG E officials grilled about automatic shut off valves  The Mercury News","date":"2022-09-16"},{"doc_id":174197,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. energy facts explained","date":"2022-09-16"},{"doc_id":174198,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Incident20150148","date":"2022-09-16"},{"doc_id":174199,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Dave Chittick Valve Considerations for Natural Gas Transmission Pipelines","date":"2022-09-16"},{"doc_id":174200,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GAO 13 168 Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","date":"2022-09-16"},{"doc_id":174201,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Don Ledversis28 Valve Considerations for Hazardous Liquid Pipelines","date":"2022-09-16"},{"doc_id":174202,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Leak Valve Event Summary Report","date":"2022-09-16"},{"doc_id":174203,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"LPAC Vote Slides","date":"2022-09-16"},{"doc_id":174204,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"NTSB Special Study PSS 71 01 12 31 1970","date":"2022-09-16"},{"doc_id":174205,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA PPT  LPAC  Valve Installation and Minimum Rupture Detection Standards July 16 2020","date":"2022-09-16"},{"doc_id":174206,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"ORNL Valve Study PHMSA Webinar Oct 5 2012 Ver 2","date":"2022-09-16"},{"doc_id":174207,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Pipeline Safety Regulatory Certainty and Job Creation Act of 2011","date":"2022-09-16"},{"doc_id":174208,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"San Bruno Victims and Their Families Deserve Long Overdue Action  NTSB Safety Compass Blog","date":"2022-09-16"},{"doc_id":174209,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"SteveNanney PHMSA RESEARCH  TECHNICAL PERSPECTIVES","date":"2022-09-16"}],"references":[{"citation_id":1897056,"raw_reference":"FINDINGS, CONCLUSIONS, AND PROPOSALS APPENDICES Appendix A - Section 305 of the Pipeline Safety Reauthorization Act of 1988 . . • . Appendix B - Summary of Responses to Each Question contained in Docket No. PS-I04; Notice 1 . . • . • . • •.•.. Appendix C - Summary of Calculations for Benefits Versus Cost Analysis - Hazardous Liquid Pipelines in Urban Areas","cited_authors":null,"cited_year":null,"cited_title":"FINDINGS, CONCLUSIONS, AND PROPOSALS APPENDICES Appendix A - Section 305 of the Pipeline Safety Reauthorization Act of 1988 . . • . Appendix B - Summary of Responses to Each Question contained in Docket No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1897057,"raw_reference":"PURPOSE The purpose of this report is to fulfill the requirements section 305 of the pipeline Safety Reauthorization Act of 1988 (Public Law 100-561) determine whether (the Act) operators that should study be install conducted emergency flow restricting devices in existing and future pipeline systems in varying circumstances and locations. This report also includes proposals for other future action. In addition, this report presents the summary of responses to the Request for Information public notice published May 15, 1989 (52","cited_authors":null,"cited_year":null,"cited_title":"PURPOSE The purpose of this report is to fulfill the requirements section 305 of the pipeline Safety Reauthorization Act of 1988 (Public Law 100-561) determine whether (the Act) operators that should study be install conducted emergency flow restricting devices in existing and future pipeline systems in varying circumstances and locations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1897058,"raw_reference":"Gross, Court Report and Transcriber, 1323 Rhode Island Avenue, N.W., Washington, D.C. 20005. U.S. Department of Transportation, Office of the Secretary of Transportation, \"Safety Review Task Force Report Research and Special Programs Administration's Pipeline Safety Program,\" January 1989. M. Rusin and E. Savvides-Gellerson, \"The Safety of Interstate Liquid Pipelines: Evaluation Present Levels Proposals for Change,\" American Petroleum Institute Research Study #040, July 1987. House of Representatives, committee Energy Rep.","cited_authors":"Gross, Court Report and Transcriber, 1323 Rhode Island Avenue, N.W., Washington, D.C. 20005. U.S. Department of Transportation, Office of the Secretary of Transportation, \"Safety Review Task Force Report Research and Special Programs Administration's Pipeline Safety Program,\" January","cited_year":"1989","cited_title":"The Safety of Interstate Liquid Pipelines: Evaluation Present Levels Proposals for Change","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1897059,"raw_reference":"John D. Commerce, Dingell, Chairman, \"Pipeline Safety Reauthorization Act of 1987 Report,\" Report 100-445, Part 1, November 17, 1987, p. 17. National Transportation Safety Board, \"Williams Pipe Line Company Fire, Liquid Minnesota, July Pipeline Rupture 1986,\"","cited_authors":"John D. Commerce, Dingell, Chairman, \"Pipeline Safety Reauthorization Act of 1987 Report,\" Report 100-445, Part 1, November 17","cited_year":"1987","cited_title":"Williams Pipe Line Company Fire, Liquid Minnesota, July Pipeline Rupture 1986","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1897060,"raw_reference":"NTSB/PAR-87/102, Mounds View, PB87-916502, July 20, 1987. Telephone communication with the Central Region, Office of Pipeline Safety. National Transportation Factual Report, Safety Pipeline Board, Group,\" \"Group Chairman's Southern Pacific Transportation Company and Calnev Pipe Line Company accidents, May 12, 1989, and May 25, 1989, Docket No.","cited_authors":"NTSB/PAR-87/102, Mounds View, PB87-916502, July 20","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1897061,"raw_reference":"DCA-89-MR-004 I August 4, 1989. Telephone communication with James J. Opaluch, university of Rhode Island, Kingston, Rhode Island. Telephone communication with Roger Price, Center for Hazardous Material Research, University pittsburgh, Pittsburgh, Pennsylvania. (10) The oil Daily, November 9, 1989. (11) Telephone communication with John Holden, corporation.","cited_authors":"DCA-89-MR-004 I August 4","cited_year":"1989","cited_title":"Telephone communication with James J. Opaluch, university of Rhode Island, Kingston, Rhode Island","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}