Comprehensive Study to Understand Longitudinal ERW Seam Failures
Original sourcePDF at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at source
Other documents for the same rulemaking
References: 432 extracted, 0 linked to papers
Young, B. A., et al. 2014. IPC2014-33226: Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures. s.l. : International Pipeline Conference, 2014.
Young, Bruce, O'Brian, Jennifer and Olson, Richard. 2016. Final Interim Report for Phase II - Task 2 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures: "Defect Characterization:
Types, Sizes, Shapes, and Idealizations". Columbus : Battelle Memorial Institute, 2016. DOT PHMSA Contract No. DTPH56-11T-000003. Copyright © 2017 by Battelle Memorial Institute. All Rights Reserved. 24 / 24
Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Appendix B Demonstration Presentation Bruce Young and Jennifer O’Brian Battelle Energy Resources November 16, 2016
Mayflower, AR - 2013 Carmichael, MS - 2007 Electric resistance welded (ERW) pipe is longitudinally welded pipe. A failure in the weld seam of this type of pipe can propagate for a distance along the pipe and can quickly release large quantities of product to the environment. Lowfrequency (LF) ERW pipe installed prior to 1970, in particular, can be susceptible to such failures. Drivers for the Project • Stemmed from the Carmichael, MS rupture in 2007 • NTSB P-09-01 Recommended Comprehensive Study • ERW pipe properties • Assess the means to assure the integrity - so they do not fail in service. • Battelle, KAI, and DNV–Columbus teamed to conduct a comprehensive study to understand longitudinal seam failures in electric resistance welded (ERW) and flash-welded pipes. • Project started in August 2011 • Phase I completed in January 2014 Project Review Papers • B. A. Young, S. Nanney, B. L. Leis, and J. M. Smith, “Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures” IPC2014-33226,
ASME-IPC 2014, Calgary, Alberta, Canada, September 2014 • B. A. Young, S. Nanney, and J. M. O’Brian, “Review of Phase II for the Comprehensive Study to Understand
3. NACE SP0169-2007, NACE International, Houston (2007). 4. C. S. Brossia, Selective Seam Weld Corrosion Test Method Development, Final Report, Task 3.2, PHMSA (2013). 5. J. A. Beavers and C. L. Durr, “Corrosion of Steel Piping in Non-marine Applications,” National Cooperative Highway Research Program, NCHRP Report 408, National Academy
Press, Washington DC, 1998. TAOUS811CSEAN PP017533 June 28, 2013 Det Norske Veritas
DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since 1864, DNV has balanced the needs of business and society based on our independence and integrity. Today, we have a global presence with a network of 300 offices in 100 countries, with headquarters in Oslo, Norway. Global Impact for a Safe and Sustainable Future Learn more on www.dnv.com Interim Report for Phase II – Task 4 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Models and Mechanisms with Validation Results” Authors Richard Olson, Bruce A. Young, and Jennifer M. O’Brian Battelle Memorial Institute 505 King Avenue
Phase II, Task 4 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.
Phase II, Task 4 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Executive Summary On November 1, 2007 a liquid propane pipeline operated by Dixie Pipeline Company ruptured near Carmichael, Mississippi, which several pipeline industry experts collaboratively indicated the origin was likely a defect in the longitudinal ERW seam, with the ensuing fracture running along that joint into portions of the adjacent pipes. These experts also noted that a seam-integrity assessment did not prevent the failure, as this failure came 2 years after an in-line inspection (ILI) with a sophisticated crackdetection tool; and 23 years after a hydrostatic test to a hoop stress level greater than 1.25 times the maximum operating hoop stress level. Following the NTSB’s public report, the
NTSB issued Recommendation P-09-1, which called upon the PHMSA to conduct a comprehensive study to identify actions that can be used by operators to eliminate catastrophic longitudinal seam failures in pipe, and indicated the required scope. This led to the PHMSA issued a research announcement (RA) that targeted Recommendation P09-1 in the form of BAA Solicitation DTPH56-11-RA-000001. That Solicitation sought a Comprehensive Understanding of Longitudinal ERW Seam Failures. In response to that Solicitation, Battelle, as the prime contractor, proposed a twophase project to work to develop the understanding sought by the research announcement in resolving Recommendation P-09-1. The Phase I final report was issued in January 2014 and can be found at the following website: https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390. Phase II has five tasks including: Task 1: Hydrotest protocols Task 2: ILI and ITDM Inspection Assessment Task 3: Defect Characterization: Types, Sizes, Shapes, and Idealizations Task 4: Model Validation Task 5L: Software Development for Integrity Management of Long Seam Welds. This report focuses on the results obtained during the work completed under
[4] B. Leis and D. Stephens, "An Alternative Approach to Assess the Integrity of Corroded Line Pipe - Part One: Current Status and Part Two: Alternative Criterion," in 7th International Conference on Offshore Pipelines and Polar Engineering, Lisbon, Portugal, 2007.
[6] W. Ramberg and W. Osgood, "Description of Stress-Strain Curves by Threee Parameters," Technical Note No. 902, National Advisory Committee for Aeronautics, Waschington, DC, 1943.
[7] B. Leis, F. Brust and P. Scott, "Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe," PRCI Catalog L51643, 1991.
[8] V. Kuhnle and H. Reidel, "Time-Dependent Deformation and Fracture of Stell between 20C and 400C," International Journal of Fracture, vol. 34, pp. 179-194, 1987.
[9] K. Walker, "The Effect of Stress Ratio During Crack Propagation and Fatigue for 2024-T3 and 7075-T6 Aluminum," in Effect of Environment and Complex Load History on Fatigue Life: ASTM STP 462, West Conshohocken, PA, 1970.
Wright Patterson Air Force Base, 1971.
[11] ASTM International, "Standard Practice for Cycle Counting in Fatigue Analyses: ASTM E1049-85(2011)," West Conshohocken, PA, 2011.
[12] Rolfe S. and J. Barson, Fracture and Fatigue Control in Structures, Englewood: PrenticeHall, 1977.
Engineering, Transactions of the American Society of Mechanical Engineers, pp. 528-534, 1963.
[14] G. Irwin, "Linear Fracture Mechanics, Fracture Transition, and Fracture Control," Engineering Fracture Mechanics, vol. 1, no. 2, pp. 241-257, 1968.
[15] G. Irwin, "Plastic Zone Near a Crack Tip and Fracture Toughness," in Sagamore Ordinance Materials Conference, Syracuse, 1961.
[16] B. A. Young, R. Olson and J. O'Brian, "Validation of Fatigue Models for ERW Seam Weld Cracking (Phase II, Task 3)," in ASME PVP 2017, Waikoloa, 2017.
[17] B. N. Leis and R. J. Eiber, "Fracture Control Technology for Transmission Pipelines (NG18 208 Update)," Battelle Memorial Institute, Columbus, 2009.
[18] J. F. Kiefner, W. A. Maxey, R. J. Eiber and A. R. Duffy, "Failure Stress Levels of Flaws in Pressurized Cylinders," ASTM STP 536, pp. 461-481, 1973.
[19] J. F. Keifner and K. M. Kolovich, "Models for Predicting Failure Stress Levels for Defects Affecting ERW and Flash-Welded Seams," KAI, Worthington, 2013.
Shapes, and Idealizations," Battelle Memorial Institute, Columbus, 2017.
Washington, DC Report No./DNV Reg No.: TAOUS811CSEAN (PP017533) July 15, 2013
Dublin, OH 43017-1886, United States Tel: (614) 761-1214 Fax: (614) 761-1633 http://www.dnv.com http://www.dnvusa.com For: U.S. Department of Transportation Pipeline and Hazardous Materials Safety Admin. East Building, 2nd Floor 1200 New Jersey Avenue, SE
Washington, DC 20590 Account Ref.: Date of First Issue: Report No.: Revision No.: Summary: June 28, 2013 Project No. Organization Unit: Subject Group: PP017533-3 Materials & Corrosion Technology Ctr. Please see Executive Summary. Signature Prepared by: Sean Brossia, Ph.D. Director – Technology Development Signature Verified by: John Beavers, Ph.D. Director – Failure Analysis Signature Approved by:
DNV after 3 years) No distribution without permission from the client or responsible organizational unit Words Strictly confidential Unrestricted distribution Rev. No. / Date: Reason for Issue: Prepared by: Approved by: Verified by © 2013 Det Norske Veritas (U.S.A.), Inc. All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by any means, including photocopying or recording, without the prior written consent of Det Norske Veritas (U.S.A.), Inc. TAOUS811CSEAN Q:\TAOUS813\ANDERSON\2011\JOHN BEAVERS\BATTELLE - PHMSA (1-3G9PY8) June 17 (PP01 7533) and (PP01 7534)\TASKS 2point3 AND 3 (1-3G9PY8) June 28 (PP01 7533)\SEAN BROSSIA\PHMSA Task 3.4 P-09-1 Input Final Report (PP01 7533) July 15.doc July 15, 2013
DET NORSKE VERITAS™ Pipeline and Hazardous Materials Safety Administration (PHMSA) Task 3.4 – Input to Report: Implications for Recommendation P-09-1 Executive Summary Over the past few years, a number of high profile pipeline failures have occurred wherein fracture initiated at the longitudinal seam welds in early generation electric resistance welded (ERW) pipe. These include failure of a liquid propane pipeline operated by Dixie Pipeline Company in Carmichael, Mississippi in 2007. In some cases, it appears that seam-integrity assessments, in-line inspection (ILI), and/or mill hydrotesting did not detect the presence of significant seam weld defects.
Research Group, (1991). 16. W. E. Heitmann, P. D. Sothwick, and F. Pausic, “ERW Linepipe: The Effect of Welding and Annealing Upon the Properties, Microstructure, and Corrosion Resistance,” p. 957 in International Conferene on Technology and Application of
HSLA Steels, ASM International (1984). 17. G. Wranglen, in Sulfide Inclusions in Steel, p. 361, ASM International (1975). 18. Z. Szklarska-Smialowska, Pitting and Crevice Corrosion, NACE International (2005). 19. C. S. Brossia and R. G. Kelly, Corrosion Science, vol. 40, p. 1851 (1998). 20. G. Wranglen, Corrosion Science, vol. 14, p. 331 (1974). 21. P. Sury, Corrosion Science, vol. 16, p. 879 (1976). 22. P. Marcus, J. Chim. Phys., vol. 88, p. 1697 (1991). 23. C. S. Brossia and R. G. Kelly, Corrosion, vol. 54, p. 145 (1998). 24. G.S. Eklund, J. Electrochem. Soc., vol. 121, p. 467 (1974). 25. S.E. Lott and R.C. Alkire, J. Electrochem. Soc., vol. 136, p. 973 (1989). 26. C. Duran, E. Treiss, G. Herbsleb, Materials Performance, p. 41, September (1986). 27. C. S. Brossia, Selective Seam Weld Corrosion Test Method Development, Final Report,
PHMSA (2013). 28. C.S. Brossia, Selective Seam Weld Corrosion Effectiveness of Cathodic Protection, Final Report, PHMSA (2013). 29. C. S. Brossia, M. Yunovich, D. Hill, K. M. Lawson, R. Denzine, J. T. Schmidt, E.
Klechka, E. Schindelholz, E. Nordgren, D. Krop, R. Baboian, H. Hack, J. D. Flessas, D. C. Cook, “Corrosion condition assessment, mitigation, and preservation of USS Monitor artifacts,” NACE Corrosion2007, Paper No. 07239 (2007). TAOUS811CSEAN PP017533 July 15, 2013 Det Norske Veritas
DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since 1864, DNV has balanced the needs of business and society based on our independence and integrity. Today, we have a global presence with a network of 300 offices in 100 countries, with headquarters in Oslo, Norway. Global Impact for a Safe and Sustainable Future Learn more on www.dnv.com Battelle Final Report No. 13-021 Final Report Predicting Times to Failure for ERW Seam Defects that Grow by Pressure-CycleInduced Fatigue J. F. Kiefner and K. M. Kolovich January 28, 2013 Kiefner & Associates, Inc. 585 Scherers Court
OTHER TRANSACTION AGREEMENT NO. DTPH56-11-T-000003 January 28, 2013 J. F. Kiefner and K. M. Kolovich Kiefner and Associates, Inc. 585 Scherers Court
ASME, Journal of Basis Engineering, Series D, Volume 85, No. 5, (1963) pp 405-09 J.C. Newman, Jr. and I.S. Raju, “An Empirical Stress-Intensity Factor Equation for the Surface Crack”. Engineering Fracture Mechanics, Vol. 15, No. 1-2, pp 185-192, 1981, printed in Great Britain. iv Kiefner, J.F., “Modified equation helps integrity management”, Oil and Gas Journal, Oct 6, 2008, pp 76-82 and “Modified Ln-Secant equation improves failure prediction”Oct 13, 2008, pp 64-66.
Jaske, C. E., and Beavers, J. A., “Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines”, Proceedings of IPC 2002, 4th International Pipeline Conference, September 29-October 3, 2002, Calgary, Alberta, Canada
Anderson, T. L., Merrick, R. D., Yukawa, S., Bray, D. E., Kaley, L., and Van Scyoc, K., “FitnessFor-Service Evaluation Procedures For Operating Pressure Vessels, Tanks, And Piping in Refinery And Chemical Service”, FS-26, Consultants’ Report, MPC Program On Fitness-For-Service, Draft 5, The Materials Properties Council, New York, N.Y., October, 1995. viii
API 579-2/ASME FFS-1 – Fitness-for-Service, 2009
Mayfield, M.E., and Maxey, W.A., “ERW Weld Zone Characteristics”. Final Report to A.G.A./PRC, A.G.A. Catalog No. L51427, June, 1982.
Conference, Calgary, Alberta, Canada (October 4-8, 2004). Kiefner and Associates, Inc. January 2013
Kiefner, J.F., and Kolovich, K.M., “Models for Predicting Failure Stress Levels for ERW and Flash Weld Seams” Subtask 2.4 of U.S. Department of Transportation Other Transaction Agreement No. DTPH56-11-T-000003, December 18, 2012. Kiefner and Associates, Inc. January 2013 Interim Report for Phase II – Task 1 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Hydrostatic Testing Protocols” Authors
Phase II, Task 1 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.
American Gas Association, 1991.
[3] R. J. Olson, B. A. Young and B. Leis, "Findings from an Investigation of Hydrotest Protocols," in ASME IPC 2016, Calgary, 2016.
[4] T. Anderson and G. Throwald, "A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth," in ASME IPC 2016,