Policy Replication

Gas Transmission Regulatory Impact Analysis

Regulatory impact analysis2019-10-02 · PHMSA · regulatory_impact_analysis · PHMSA-2011-0023-0466
RIN 2137-AE72, RIN 2137-AF39, RIN 2137-AF38 · Docket PHMSA-2011-0023

Other documents for the same rulemaking

2011-08-25 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines
2011-11-16 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines
2016-04-08 Federal RegisterPipeline Safety: Safety of Gas Transmission and Gathering Pipelines
2016-05-13 Federal RegisterPipeline Safety: Safety of Gas Transmission and Gathering Pipelines
2019-10-01 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments
2019-10-02 Docket documentSubstantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)
2020-07-06 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration
2021-11-14 Regulatory impact analysisFinal RIA/RFA: Safety of Gas Gathering Pipelines
2021-11-15 Federal RegisterPipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments
2022-05-04 Federal RegisterPipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments: Response to a Petition for Reconsideration; Technical Corrections; Issuance of Limited Enforcement Discretion
2022-06-13 Federal RegisterPipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments: Technical Corrections
2022-08-24 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments
2022-08-26 Regulatory impact analysisFinal Regulatory Impact Analysis (RIA)
2022-08-26 Docket documentFinal Rule Draft -Redline Comparison Document
2022-10-25 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments
2023-04-24 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Technical Corrections; Response to Petitions for Reconsideration
2023-09-15 Regulatory impact analysis2137 AF39 Final Regulatory Flexibility Analysis RIN 2
2023-09-15 Regulatory impact analysisEPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses
2023-09-15 Regulatory impact analysisJack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010
2023-09-15 Regulatory impact analysisU.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis
2025-01-15 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Corrections To Conform to Judicial Review
2026-04-24 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction

References: 27 extracted, 2 linked to papers

Page 1Download these results: CSV · JSON
Kishawy and Gabbar 2010
otherNot linked to a paper · Section 3.1 Introduction to the Natural Gas Transmission Pipeline Industry
Greene Energy Group (2013)
otherNot linked to a paper · Section 4.2 Method 1: Pressure Test
Gulf Interstate Engineering 2017
otherNot linked to a paper · Section 4.2 Method 1: Pressure Test
Corrpro Companies 2017
otherNot linked to a paper · Section 4.2 Method 2/5 CIS costs
Mears Corrosion 2018
otherNot linked to a paper · Section 4.2 Method 5 Close Interval Survey costs
Alpha 2012
otherNot linked to a paper · Section 4.2 ECDA
T.D. Williamson 2018
otherNot linked to a paper · Section 4.2 Launcher and Receiver Pressure Relief System Installation Costs
Rocky Mountain Education Center 2012
otherNot linked to a paper · Section 5.3 Background
U.S. DOT 2016
otherNot linked to a paper · Section 5.3 Exhibit 30
Consolidated Edison Company of New York 2016
otherNot linked to a paper · Section 5.6.1.4 Method 4: Pipe Replacement Costs
NTSB 2011
government reportNot linked to a paper · Section 5.6 Benefits (San Bruno report)
PHMSA 2017c
datasetNot linked to a paper · Section 3.1 Introduction
NTSB 2003. Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico, August 19, 2000. Pipeline Accident Report NTSB/PAR-03/01. Washington, D.C
government reportNot linked to a paper · fn 24
NTSB 1995. Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire. Pipeline Accident Report NTSB/PAR-95-01. Washington D.C.
government reportNot linked to a paper · fn 24
NTSB 2011. Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9, 2010. NTSB/PAR-11/01.
government reportNot linked to a paper · Section 5.10 · cited link
Kishawy, Hossam A., and Hossam A. Gabbar. 2010. “Review of Pipeline Integrity Management Practices.” International Journal of Pressure Vessels and Piping 87 (7): 373–80.
Parfomak, Paul W. 2013. “Keeping America’s Pipeline’s Safe and Secure: Key Issues for Congress.” CRS Report for Congress. Washington D.C.: Congressional Research Service.
Gulf Interstate Engineering. 2017. “Pipeline Testing and Inspection Cost Estimates.” 1765-000EBM-0001-00. Oak Ridge National Laboratory.
research reportNot linked to a paper · References
Corrpro Companies. 2017. “Cost Estimates Information for Pipeline Testing and Inspection Methods,” October 23, 2017.
research reportNot linked to a paper · References
Greene’s Energy Group. 2013. “Budgetary Proposal: Various 12", 24", 36" Pipelines Located In Nashville, Tennessee For PHMSA.” #8251. Houston, Texas: PHMSA.
research reportNot linked to a paper · Appendix A.3
U.S. Census Bureau, Geography Division. 2010. “TIGER/Line Shapefile, 2010 Census Block State-Based (Edition 2010). Vector Digital Data.” U.S. Department of Commerce.
datasetNot linked to a paper · Section 5.7.2.1 · cited link
U.S. Geological Survey. 2011. “NLCD 2011 Land Cover (2011 Edition).” http://www.mrlc.gov.
datasetNot linked to a paper · Section 5.7.2.1 · cited link
Environmental Systems Research Institute (Esri), and Tele Atlas North America, Inc. 2010. “U.S. and Canada Major Roads.” Esri Streetmap10 version 5/30/2010.
datasetNot linked to a paper · Section 5.7.2.1
Mears Corrosion. 2018. “RE: Information Request for Corrosion Control Costs,” February 9, 2018.
otherNot linked to a paper · References
T.D. Williamson. 2018. “Launcher and Receiver Installation Costs - Abt Support Request - Meet Mon Jan 8th,” February 2, 2018.
otherNot linked to a paper · References · cited link
U.S. DOT. 2016. “Revised Departmental Guidance on Valuation of a Statistical Life in Economic Analysis.” U.S. Department of Transportation.
government reportNot linked to a paper · References · cited link
Intergovernmental Panel on Climate Change. 2007. “2.10.2 Direct Global Warming Potentials.” IPCC Fourth Assessment Report: Climate Change 2007.
government reportNot linked to a paper · References · cited link