{"document":{"doc_id":142879,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Comprehensive Study to Understand Longitudinal ERW Seam Failures","date":"2023-09-15","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0680","source_native_id":"PHMSA-2011-0023-0680","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":1561551,"raw_reference":"[3] ApplusRTD, \"Long Seam Assessment On RFQ-15092 with IWEX: NDT ILI Verifications for Battelle,\" 2015.","cited_authors":"[3] ApplusRTD, \"Long Seam Assessment On RFQ-15092 with IWEX: NDT ILI Verifications for Battelle,\"","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561552,"raw_reference":"[4] C. Holmes, B. W. Drinkwater and P. D. Wilcox, \"The post-processing of ultrasonic aray data using the Total Focusing Method,\" Insight 46(11), pp. 677-680, 2005.","cited_authors":"[4] C. Holmes, B. W. Drinkwater and P. D. Wilcox, \"The post-processing of ultrasonic aray data using the Total Focusing Method,\" Insight 46(11), pp. 677-680","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561553,"raw_reference":"[6] H. H. Haines, L. Hörchens and P. Tomar, \"IPC2016-64069: Identifying and Sizing Axial Seam Weld Flaws in ERW Pipe Seams and SCC in the Pipe Body Using Ultrasonic Imaging,\" Proceedings of the 2016 11th International Pipeline","cited_authors":null,"cited_year":null,"cited_title":"IPC2016-64069: Identifying and Sizing Axial Seam Weld Flaws in ERW Pipe Seams and SCC in the Pipe Body Using Ultrasonic Imaging","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561554,"raw_reference":"Conference, (to be published October 2016).","cited_authors":"Conference, (to be published October","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561555,"raw_reference":"[7] RTD Quality Services USA, L.P., \"In-Ditch Validation Methodology for Determination of Defect Sizing,\" < https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=503 >, DTPH56-13-T000008, 2013.","cited_authors":"[7] RTD Quality Services USA, L.P., \"In-Ditch Validation Methodology for Determination of Defect Sizing,\" < https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=503 >, DTPH56-13-T000008","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=503","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561556,"raw_reference":"International Pipeline Conference, 2014.","cited_authors":"International Pipeline Conference","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561557,"raw_reference":"[9] Iowa State University, \"Advanced Nondestructive Characterization of Pipeline Materials,\" < http://primis.phmsa.dot.gov/matrix/prjHome.rdm?prj=511 >, DTPH56-13-H-CAAP07, 2015.","cited_authors":"[9] Iowa State University, \"Advanced Nondestructive Characterization of Pipeline Materials,\" < http://primis.phmsa.dot.gov/matrix/prjHome.rdm?prj=511 >, DTPH56-13-H-CAAP07","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/prjHome.rdm?prj=511","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561558,"raw_reference":"[10] R. B. Stonesifer, F. W. Brust and B. N. Leis, \"Stress-Intensity Factors for Long Axial Outer Surface Cracks in Large R/t Pipes,\" Fracture Mechanics: TwentySecond Symposium (Volume II), American Society for Testing and Materials (ASTM) STP 1131, Philadelphia, 1992.","cited_authors":"[10] R. B. Stonesifer, F. W. Brust and B. N. Leis, \"Stress-Intensity Factors for Long Axial Outer Surface Cracks in Large R/t Pipes,\" Fracture Mechanics: TwentySecond Symposium (Volume II), American Society for Testing and Materials (ASTM) STP 1131, Philadelphia","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561559,"raw_reference":"[11] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L, 2013. Appendix A 0533-1302 Final Battelle NPS 16Metallographic Examination Results Battelle Final Report No. 16-161","cited_authors":"[11] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L","cited_year":"2013","cited_title":"Appendix A 0533-1302 Final Battelle NPS 16Metallographic Examination Results Battelle Final Report No","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561560,"raw_reference":"NPS 16 Metallographic Examination Results of Seam Weld Anomalies Pushpendra Tomar & Bruce Nestleroth October 18, 2016 0533-1302 Intentionally blank Final Report No. 16-161 Final Report","cited_authors":null,"cited_year":null,"cited_title":"NPS 16 Metallographic Examination Results of Seam Weld Anomalies Pushpendra Tomar & Bruce Nestleroth October 18, 2016 0533-1302 Intentionally blank Final Report No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561561,"raw_reference":"OF SEAM WELD ANOMALIES BATTELLE October 18, 2016 Prepared by _______________________________ Pushpendra Tomar Engineer II Approved by _______________________________ Dyke Hicks Senior Principal Engineer Kiefner and Associates, Inc. 4480 Bridgeway Avenue, Suite D","cited_authors":null,"cited_year":null,"cited_title":"OF SEAM WELD ANOMALIES BATTELLE October 18, 2016 Prepared by _______________________________ Pushpendra Tomar Engineer II Approved by _______________________________ Dyke Hicks Senior Principal Engineer Kiefner and Associates, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561562,"raw_reference":"ASTM STP 536, American Society for Testing and Materials, pp. 461-481 (1973).","cited_authors":"ASTM STP 536, American Society for Testing and Materials, pp. 461-481","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561563,"raw_reference":"Fessler, Raymond R., and Rapp, Steve, “Method for Establishing Hydrostatic Re-Test Intervals for Pipelines with Stress-Corrosion Cracking”, Paper No. IPC2006-10163, Proceedings of IPC 2006, 6th International Pipeline Conference, September 25-29, 2006,","cited_authors":"Fessler, Raymond R., and Rapp, Steve, “Method for Establishing Hydrostatic Re-Test Intervals for Pipelines with Stress-Corrosion Cracking”, Paper No. IPC2006-10163, Proceedings of IPC","cited_year":"2006","cited_title":"6th International Pipeline Conference, September 25-29, 2006","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561564,"raw_reference":"Conference, IPC08, September 29 – October 3, 2008, Calgary, Alberta, Canada","cited_authors":"Conference, IPC08, September 29 – October 3","cited_year":"2008","cited_title":"Calgary, Alberta, Canada","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561565,"raw_reference":"Paris, P.C., and Erdogan, F., “A Critical Analysis of Crack Propagation Laws”, Transactions of ASME, Journal of Basis Engineering, Series D, Volume 85, No. 5, (1963) pp 405-09","cited_authors":"Paris, P.C., and Erdogan, F., “A Critical Analysis of Crack Propagation Laws”, Transactions of ASME, Journal of Basis Engineering, Series D, Volume 85, No. 5","cited_year":"1963","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561566,"raw_reference":"Bruno, T. V., “SSC Resistance of Pipeline Welds”, NACE Task Group T-IF-23, Materials Performance (January 1993). Kiefner and Associates, Inc. September 2012 Final Interim Report – Task 2.6 Characterizing Failure in ERW Line Pipe B. N. Leis B. N. Leis, Consultant, Inc.,","cited_authors":"Bruno, T. V., “SSC Resistance of Pipeline Welds”, NACE Task Group T-IF-23, Materials Performance (January","cited_year":"1993","cited_title":"Kiefner and Associates, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561567,"raw_reference":"Worthington OH, 43085 (with an annex by John Kiefner presenting KAI experience in characterizing failures in ERW seams) Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No. DTPH56-11-T-000003 Battelle Project No. G006084 August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Disclaimer Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and","cited_authors":null,"cited_year":null,"cited_title":"Worthington OH, 43085 (with an annex by John Kiefner presenting KAI experience in characterizing failures in ERW seams) Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561568,"raw_reference":"Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2013 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner. Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Acknowledgments Useful discussion and the assistance of current Battelle staff members in preparing this report – most notably Dr Daniel Kremser and Messrs E. B. (Ted) Clark and E. R. Beach – is gratefully acknowledged. Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Executive Summary The objectives of this report were to assess the possibility and merits of standardizing fractographic and metallographic practices for use in examining ERW seam failures. It was quickly clear that differences in the features causing failure, and the local microstructures, meant","cited_authors":null,"cited_year":null,"cited_title":"Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561569,"raw_reference":"Francaise, W B Saunders Co, 1967 4. “Failure Analysis,” Chapter 11 of Fatigue Design Handbook, 2nd Edition, AE-10, Society of Automotive Engineers, Rice, R. C., Leis, B. N., and Nelson, D. V., (Editors), 1988.","cited_authors":"Francaise, W B Saunders Co, 1967 4. “Failure Analysis,” Chapter 11 of Fatigue Design Handbook, 2nd Edition, AE-10, Society of Automotive Engineers, Rice, R. C., Leis, B. N., and Nelson, D. V., (Editors)","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561570,"raw_reference":"6. Leis, B. N. and Nestleroth, J. B., “Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications,” Battelle Interim Report, Subtask 1.4, US DoT Contract No. DTPH56-11-T-000003, September 20, 2013.","cited_authors":"6. Leis, B. N. and Nestleroth, J. B., “Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications,” Battelle Interim Report, Subtask 1.4, US DoT Contract No. DTPH56-11-T-000003, September 20","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561571,"raw_reference":"7. Kiefner, J. F. and Kolovitch, K. M., “ERW and Flash Weld Seam Failures,” KAI Interim Report on Task 1.4, September, 2012","cited_authors":null,"cited_year":null,"cited_title":"ERW and Flash Weld Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561572,"raw_reference":"9. Leis, B. N. and Nestleroth, J. B., “Time-Trending and Like-Similar Analysis for ERW-Seam Failures,” Battelle Interim Report, Subtask 4.2, US DoT Contract No. DTPH56-11-T000003, April 15, 2013. 10. Anon., Handbook of Electric-Weld Tubing, Steel and Tubes Inc, 1934","cited_authors":"9. Leis, B. N. and Nestleroth, J. B., “Time-Trending and Like-Similar Analysis for ERW-Seam Failures,” Battelle Interim Report, Subtask 4.2, US DoT Contract No. DTPH56-11-T000003, April 15","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561573,"raw_reference":"11. Johnston, G. V., “Method and Apparatus for Butt Welding Thin Gage Tubing,” US Patent 1,388,434, 23 August, 1921.","cited_authors":"11. Johnston, G. V., “Method and Apparatus for Butt Welding Thin Gage Tubing,” US Patent 1,388,434, 23 August","cited_year":"1921","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561574,"raw_reference":"US Patent 1,435,306, 14 November, 1922. 13. Colby, I. A., (assigned to Youngstown Sheet and Tube) “Method of and Apparatus for Continuous Welding of Pipes and Tubes,” US Patent 2,575,381, 20 November, 1951.","cited_authors":"US Patent 1,435,306, 14 November","cited_year":"1922","cited_title":"Method of and Apparatus for Continuous Welding of Pipes and Tubes","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561575,"raw_reference":"14. Brossia, C. S., “Selective Seam Weld Corrosion Literature Review,” DNV Interim Report, Subtask 3.1, US DoT Contract No. DTPH56-11-T-000003, April 10, 2012.","cited_authors":"14. Brossia, C. S., “Selective Seam Weld Corrosion Literature Review,” DNV Interim Report, Subtask 3.1, US DoT Contract No. DTPH56-11-T-000003, April 10","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561576,"raw_reference":"15. Yuzawich, P. M. and Hughes, C. W., “An Improved Technique for Removal of Oxide Scale from Fractured Surfaces of Ferrous Materials,” Practical Metallography, Vol 15, pp. 184194, 1978. 16. Anon., Keyence Corporate Profile, Microscopy, http://www.keyence.com/dwn/corporate_profile_gn_ka.pdf, (last accessed January 2013)","cited_authors":"15. Yuzawich, P. M. and Hughes, C. W., “An Improved Technique for Removal of Oxide Scale from Fractured Surfaces of Ferrous Materials,” Practical Metallography, Vol 15, pp. 184194","cited_year":"1978","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://www.keyence.com/dwn/corporate_profile_gn_ka.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561577,"raw_reference":"17. Killmore, C. R., Barbaro, F. J., Williams, J. G., and Rothwell, A. B., “Limitations of the Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Charpy Test for Specifying Fracture Propagation Resistance,” WTIA \\APIA \\CRC-MW Specialists Seminar on Fracture Control in Gas Pipelines, Paper 4, University of","cited_authors":null,"cited_year":null,"cited_title":"Limitations of the Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Charpy Test for Specifying Fracture Propagation Resistance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561578,"raw_reference":"Wollongong, Australia, June 1997. 18. Leis, B. N., “Charpy Impact Test and its Applications,” J Pipeline Engineering – Special Volume on Fracture, Vol. pp. September 2013 (in press)","cited_authors":"Wollongong, Australia, June","cited_year":"1997","cited_title":"Charpy Impact Test and its Applications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561579,"raw_reference":"20. Leis, B. N., “Battelle’s Experience in Predictions of Failure Pressure for ERW and Flash Weld Seams,” Interim Report on Task 2.4, Annex to Reference 19, KAI Interim Report on Task 2.4, US DoT Contract No. DTPH56-11-T-000003, January, 2013.","cited_authors":"20. Leis, B. N., “Battelle’s Experience in Predictions of Failure Pressure for ERW and Flash Weld Seams,” Interim Report on Task 2.4, Annex to Reference 19, KAI Interim Report on Task 2.4, US DoT Contract No. DTPH56-11-T-000003, January","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561580,"raw_reference":"Report, Subtask 4.1, US DoT Contract No. DTPH56-11-T-000003, May 31, 2013. 22. G. T., Quickel “Characterization of the Toughness of Pipe Containing Seam Defects,” DNV Interim Report on Task 2.3, US DoT Contract No. DTPH56-11-T-000003, February, 2013.","cited_authors":"Report, Subtask 4.1, US DoT Contract No. DTPH56-11-T-000003, May 31","cited_year":"2013","cited_title":"Characterization of the Toughness of Pipe Containing Seam Defects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561581,"raw_reference":"23. Behrens, H., “A Manual of Microchemical Analysis,” MacMillan, 1994 Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Annex A: Guidance Regarding Failure Analysis for ERW Seams with a Focus on Fractographic and Metallographic Practices This Annex discusses failure analysis of ERW seams and illustrates metallographic and fractographic practices in this application. Other interim project reports available on the","cited_authors":null,"cited_year":null,"cited_title":"A Manual of Microchemical Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561582,"raw_reference":"PHMSA website also broadly illustrate the use of these practices – particularly those for Tasks 1 and 3 of Phase One of this project. Readers interested in further review of these aspects or in the characteristic features of ERW seam failures should consult the PHMSA website. (http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390&btn=Go) Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6","cited_authors":null,"cited_year":null,"cited_title":"PHMSA website also broadly illustrate the use of these practices – particularly those for Tasks 1 and 3 of Phase One of this project","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390&btn=Go","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561583,"raw_reference":"PHMSA provides high-level guidance in regard to documenting failures in pipelines(5), which if coupled with literature guidance on processes and standard practices defines a viable starting point for any related failure report. Battelle August 5, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2.6 Scope of this Annex and Implications for Failure Analysis The purpose here is not to address the above-noted gap, as whether it is the PHMSA or the FAA the concepts are the same. More critically, such concepts have been broadly documented both in the context of the Government, as well as by the private sector. Rather, the purpose here is to selectively illustrate aspects of the susceptibilities unique to ERW seams. The objective is to provide insight into how and why such aspects should be addressed if the outcome as a “failure analysis report” is to provide value to the industry by helping to offset future incidents. The focus is direct-cause failure analysis of pipelines – specifically steel transmission pipelines. Incidents in steel pipelines, like most metallic structures, can occur by one of several modes of failure, with the mechanism of failure often dictating the mode. The primary failure modes are","cited_authors":null,"cited_year":null,"cited_title":"failure analysis report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561584,"raw_reference":"Kiefner, J. F., Mesloh, R. E., Kiefner, B. A.; “ Analysis of DOT Reportable Incidents For Gas Transmission and Gathering System Pipelines, 1985-1997”, PRCI, PR-218-9801, 1999.","cited_authors":"Kiefner, J. F., Mesloh, R. E., Kiefner, B. A.; “ Analysis of DOT Reportable Incidents For Gas Transmission and Gathering System Pipelines, 1985-1997”, PRCI, PR-218-9801","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561585,"raw_reference":"Hereth, M., Zurcher, J., and Selig, B., “Prevention Detection and Mitigation of Natural Gas Transmission Pipeline Failures,” GRI-00/193, December 2000.","cited_authors":"Hereth, M., Zurcher, J., and Selig, B., “Prevention Detection and Mitigation of Natural Gas Transmission Pipeline Failures,” GRI-00/193, December","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561586,"raw_reference":"Technology, Science Surveys Ltd., 2004, pp 1921 - 1943.","cited_authors":"Technology, Science Surveys Ltd","cited_year":"2004","cited_title":"pp 1921 - 1943","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561587,"raw_reference":"Selig, B., et al, “Natural Gas Transmission Pipeline Integrity: Prevention, Detection, and Repair Practices”, GRI-00/0193, Gas Research Institute, December 2000. Keifner & Associates, Inc., “GRI Guide for Locating and Using Pipeline Industry Research”, Gas Research Institute, May 2000.","cited_authors":"Selig, B., et al, “Natural Gas Transmission Pipeline Integrity: Prevention, Detection, and Repair Practices”, GRI-00/0193, Gas Research Institute, December","cited_year":"2000","cited_title":"GRI Guide for Locating and Using Pipeline Industry Research","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561588,"raw_reference":"Leis, B. N., and Bubenik, T. A., “Primer on Design to Avoid Failure in Steel Transmission Pipelines”, GRI 00/0229, January 2001.","cited_authors":"Leis, B. N., and Bubenik, T. A., “Primer on Design to Avoid Failure in Steel Transmission Pipelines”, GRI 00/0229, January","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561589,"raw_reference":"Leis, B. N., and Bubenik, T. A., “Periodic Re-Verification Intervals for High-Consequence Areas,” GRI Report-00/0230, January 2001.","cited_authors":"Leis, B. N., and Bubenik, T. A., “Periodic Re-Verification Intervals for High-Consequence Areas,” GRI Report-00/0230, January","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561590,"raw_reference":"Bubenik, T. A., Leis, B. N., Burgoon, D. A., Rust, S. W., Clark, E. B., Garrity, K., Veith, P. H., and van Oostendorp, D., “Direct Assessment and Validation”, GRI Report-00/0231, Gas Research Institute, December 2000: see also Haines, H. H. and Powell, D., “Guidelines for Implementing the External Corrosion Direct Assessment (ECDA) Process,” PRCI Catalog No. L52196, May 2004: see also NACE RP 0502.","cited_authors":null,"cited_year":null,"cited_title":"Direct Assessment and Validation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561591,"raw_reference":"Leis, B. N., and Parkins, R. N., “Mechanics and Material Aspects in Predicting Serviceability Limited by Stress-Corrosion Cracking”, Fatigue and Fracture of Engineering Materials & Structures 1998; Vol. 21: pp 583-601. anon., Stress-Corrosion Cracking Recommended Practices, Canadian Energy Pipeline","cited_authors":null,"cited_year":null,"cited_title":"Mechanics and Material Aspects in Predicting Serviceability Limited by Stress-Corrosion Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561592,"raw_reference":"Association, 1997. Eiber, R. J., and Leis, B. N., “Review of Pressure Retesting For Gas Transmission Pipelines,”","cited_authors":"Association","cited_year":"1997","cited_title":"Review of Pressure Retesting For Gas Transmission Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561593,"raw_reference":"GRI Report-01/02xx, February 2001. Leis, B. N., “Hydrostatic Testing Of Transmission Pipelines: When It Is Beneficial and Alternatives When It Is Not”, PRCI Catalog No. L51844, Pipeline Research Council","cited_authors":"GRI Report-01/02xx, February","cited_year":"2001","cited_title":"Hydrostatic Testing Of Transmission Pipelines: When It Is Beneficial and Alternatives When It Is Not","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561594,"raw_reference":"International, 2001. Cosham, A. and Hopkins, P., “The Pipeline Defect Assessment Manual”, Proceedings of IPC 2002: International Pipeline Conference, Calgary, IPC02-27067, October 2002.","cited_authors":"International","cited_year":"2001","cited_title":"The Pipeline Defect Assessment Manual","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561595,"raw_reference":"Eiber, R. J., and Leis, B. N., “Fracture Control Technology for Natural Gas Pipelines – Circa 2000”, PRCI Catalog No. L51846, Pipeline Research Council International, 2002.","cited_authors":"Eiber, R. J., and Leis, B. N., “Fracture Control Technology for Natural Gas Pipelines – Circa 2000”, PRCI Catalog No. L51846, Pipeline Research Council International","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561596,"raw_reference":"Rosenfeld, M. J., “Proposed New Guidelines for ASME B31.8 on Assessment of Dents and Mechanical Damage”, GRI 01/0084, 2001: see also Rosenfeld, M. J., “Investigations of Dent Re-Rounding Behavior,” Proceedings International Pipeline Conference – 1998, Volume 1, pp 299-308, ASME, 1998.","cited_authors":"Rosenfeld, M. J., “Proposed New Guidelines for ASME B31.8 on Assessment of Dents and Mechanical Damage”, GRI 01/0084, 2001: see also Rosenfeld, M. J., “Investigations of Dent Re-Rounding Behavior,” Proceedings International Pipeline Conference –","cited_year":"1998","cited_title":"Volume 1, pp 299-308, ASME, 1998","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561597,"raw_reference":"Research Council International, 2000. Leis, B. N., Chang, O. C., and Bubenik, T. A., “Leak versus Rupture Considerations for Steel Low-Stress Pipelines,” GRI Report-00/0232, Gas Research Institute, January 2001. anon., United States Department of Transportation, Transmission Pipeline Incident Databases, Office of Pipeline Safety web site, http:\\\\ops.dot.gov.","cited_authors":"Research Council International","cited_year":"2000","cited_title":"Leak versus Rupture Considerations for Steel Low-Stress Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561598,"raw_reference":"Trench, C. J. and Selig, B. J., “The Safety Performance of Natural Gas Transmission and Gathering Systems,” GTI-03/0031, April 2003.","cited_authors":"Trench, C. J. and Selig, B. J., “The Safety Performance of Natural Gas Transmission and Gathering Systems,” GTI-03/0031, April","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561599,"raw_reference":"Duffy, A. R., McClure, G. M., Maxey, W. A., and Atterbury, T. J., “Study of the Feasibility of Basing Natural Gas Pipeline Operating Pressure on Hydrostatic Test Pressure,” Pipeline Research Council International, PRCI Catalog No. L30050, 1968.","cited_authors":"Duffy, A. R., McClure, G. M., Maxey, W. A., and Atterbury, T. J., “Study of the Feasibility of Basing Natural Gas Pipeline Operating Pressure on Hydrostatic Test Pressure,” Pipeline Research Council International, PRCI Catalog No. L30050","cited_year":"1968","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561600,"raw_reference":"Leis, B. N., Brust, F. W., and Scott, P. M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,” PRCI Catalog No. L51543, Pipeline Research Council International, June 1991.","cited_authors":"Leis, B. N., Brust, F. W., and Scott, P. M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,” PRCI Catalog No. L51543, Pipeline Research Council International, June","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561601,"raw_reference":"Leis, B. N. and Ghadiali, N., “Pipe Axial Flaw Failure Criteria – PAFFC Version 4.0”, in Pipeline Failure Criteria Suite – PFC, September, 2001, supersedes all prior releases through “Pipe Axial Flaw Failure Criteria – PAFFC – Version 1.0,” Pipeline Research Committee","cited_authors":"Leis, B. N. and Ghadiali, N., “Pipe Axial Flaw Failure Criteria – PAFFC Version 4.0”, in Pipeline Failure Criteria Suite – PFC, September","cited_year":"2001","cited_title":"Pipe Axial Flaw Failure Criteria – PAFFC – Version 1.0","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561602,"raw_reference":"International, Catalog No. L 51680, May 1994. anon, ASME B31G Manual for Determining the Remaining Strength of Corroded Pipelines, American National Standards Institute /American Society of Mechanical Engineers, 1984: see also Kiefner, J.F., and Vieth, P.H., “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe,” Final Report on Project PR 3-805 to the Pipeline Research Committee of the American Gas Association, December 22, 1989.","cited_authors":"International, Catalog No. L 51680, May","cited_year":"1994","cited_title":"A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561603,"raw_reference":"Kiefner, J. F., Maxey, W. A., and Eiber, R. J., “A Study of the Causes of Failures of Defects That Have Survived a Prior Hydrostatic Test”, NG-18 Report No 111, November 1980.","cited_authors":"Kiefner, J. F., Maxey, W. A., and Eiber, R. J., “A Study of the Causes of Failures of Defects That Have Survived a Prior Hydrostatic Test”, NG-18 Report No 111, November","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561604,"raw_reference":"Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels”, International Pipeline Congress, Calgary, October 2004, ASME, IPC02-27015, 12 pages.","cited_authors":"Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels”, International Pipeline Congress, Calgary, October","cited_year":"2004","cited_title":"ASME, IPC02-27015, 12 pages","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561605,"raw_reference":"Leis, B. N., “Evolution of Line-Pipe Steel and its Implications for Transmission Pipeline Design,” International Pipeline Congress, Calgary, October 2002, ASME, IPC04-0665. anon., ASTM Standard E23-98, Notched Bar Impact Testing of Metallic Materials, ASTM Vol. 03.01.","cited_authors":"Leis, B. N., “Evolution of Line-Pipe Steel and its Implications for Transmission Pipeline Design,” International Pipeline Congress, Calgary, October","cited_year":"2002","cited_title":"ASME, IPC04-0665","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561606,"raw_reference":"Leis, B.N., and Stephens, D.R., “An Alternative Approach to Assess the Integrity of Corroded Line Pipe -- Part I: Current Status,” and “Part II: Alternative Criterion,” Volume 4, Proceedings 7th International Offshore and Polar Engineering Conference, Honolulu, May 1997, pp 624 – 634 and pp 635 – 641.","cited_authors":"Leis, B.N., and Stephens, D.R., “An Alternative Approach to Assess the Integrity of Corroded Line Pipe -- Part I: Current Status,” and “Part II: Alternative Criterion,” Volume 4, Proceedings 7th International Offshore and Polar Engineering Conference, Honolulu, May","cited_year":"1997","cited_title":"pp 624 – 634 and pp 635 – 641","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561607,"raw_reference":"Stephens, D.R., Leis, B.N., Kurre, J.D., and Rudland, D.L., “Development of an Alternative Failure Criterion for Residual Strength of Corrosion Defects in Moderate- to High-Toughness Pipe,” PRCI Catalog Number L51794, January 1999.","cited_authors":"Stephens, D.R., Leis, B.N., Kurre, J.D., and Rudland, D.L., “Development of an Alternative Failure Criterion for Residual Strength of Corrosion Defects in Moderate- to High-Toughness Pipe,” PRCI Catalog Number L51794, January","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561608,"raw_reference":"Olson, R. J., Narendran, V. K., Leis, B. N., Kilinski, T. J., Scott, P. M., and Gertler, R. C., “Full-Scale Testing to Validate PAFFC and Develop Data to Assist Evaluating the Benefits of Hydrotesting”, Appendix 7 of Reference 15, 2002","cited_authors":null,"cited_year":null,"cited_title":"Full-Scale Testing to Validate PAFFC and Develop Data to Assist Evaluating the Benefits of Hydrotesting","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561609,"raw_reference":"Brooks, L. E., “Hydrostatic Testing of Pipe Lines”, Journal of the Pipeline Division, ASCE, Vol. 83, No. PL3, September 1957.","cited_authors":"Brooks, L. E., “Hydrostatic Testing of Pipe Lines”, Journal of the Pipeline Division, ASCE, Vol. 83, No. PL3, September","cited_year":"1957","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561610,"raw_reference":"Conference, Minneapolis, MN, Preprint No. 211, May 1965.","cited_authors":"Conference, Minneapolis, MN, Preprint No. 211, May","cited_year":"1965","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561611,"raw_reference":"Leis, B. N. and Forte, T. P., “Crack Growth Analysis for Axial Defects in Pipelines: Kinetics and Revalidation Intervals,” Final Report to the Research and Special Projects Agency (RSPA) of the U.S. Department of Transportation, November 2004.","cited_authors":"Leis, B. N. and Forte, T. P., “Crack Growth Analysis for Axial Defects in Pipelines: Kinetics and Revalidation Intervals,” Final Report to the Research and Special Projects Agency (RSPA) of the U.S. Department of Transportation, November","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561612,"raw_reference":"Leis, B N. and Eiber, R. J., “Protocol to Identify Potential Areas of High pH Stress Corrosion Cracking,” 11th PRCI/EPRG Biennial Joint Technical Meeting on Line Pipe Research, pp 9.119, Arlington, 1997.","cited_authors":"Leis, B N. and Eiber, R. J., “Protocol to Identify Potential Areas of High pH Stress Corrosion Cracking,” 11th PRCI/EPRG Biennial Joint Technical Meeting on Line Pipe Research, pp 9.119, Arlington","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561613,"raw_reference":"Broek, D., Engineering Fracture Mechanics, Nordhoff, 1974","cited_authors":null,"cited_year":null,"cited_title":"Broek, D., Engineering Fracture Mechanics, Nordhoff, 1974","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561614,"raw_reference":"Rolfe, S. T., and Barsom, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall, 1977: see also Hertzberg, R. W., Deformation and Fracture Mechanics of Engineering","cited_authors":null,"cited_year":null,"cited_title":"Rolfe, S. T., and Barsom, J. M., Fracture and Fatigue Control in Structures, Prentice-Hall, 1977: see also Hertzberg, R. W., Deformation and Fracture Mechanics of Engineering","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561615,"raw_reference":"Materials, John Wiley and Sons, 1976 Stephens Mark “A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines,” GRI-00-0189, December 2001.","cited_authors":"Materials, John Wiley and Sons, 1976 Stephens Mark “A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines,” GRI-00-0189, December","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561616,"raw_reference":"Leis, B. N., Zhu, X-K., Forte, T. P. and Glenn, B. C., “Design Basis for Fracture Arrestors in Gas Transmission Pipelines”, in Volume II -Pipeline Technology, Science Surveys Ltd., 2004, pp 515 - 533.","cited_authors":"Leis, B. N., Zhu, X-K., Forte, T. P. and Glenn, B. C., “Design Basis for Fracture Arrestors in Gas Transmission Pipelines”, in Volume II -Pipeline Technology, Science Surveys Ltd","cited_year":"2004","cited_title":"pp 515 - 533","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561617,"raw_reference":"Groeneveld, T. P., Wenk, R. L., and Elsea, A. R., “Investigation of the Susceptibility of HighStrength Steels to Hydrogen-Stress Cracking”, NG-18 Report No. 37, 1972 (PRCI Proprietary)","cited_authors":null,"cited_year":null,"cited_title":"Investigation of the Susceptibility of HighStrength Steels to Hydrogen-Stress Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561618,"raw_reference":"Research, American Gas Association, Catalog No. L30174, October, 1979.","cited_authors":"Research, American Gas Association, Catalog No. L30174, October","cited_year":"1979","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561619,"raw_reference":"Groeneveld, T. P., Davis, G. O, and Williams, D. N., “Susceptibility of Resistance Welded, Flash Welded, and Induction Welded Pipe to Selective Seam Weld Corrosion,” NG-18 Report No. 199, Battelle Memorial Institute, September 1991.","cited_authors":"Groeneveld, T. P., Davis, G. O, and Williams, D. N., “Susceptibility of Resistance Welded, Flash Welded, and Induction Welded Pipe to Selective Seam Weld Corrosion,” NG-18 Report No. 199, Battelle Memorial Institute, September","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561620,"raw_reference":"Kiefner, J. F., and Clark, E. B., History of Line Pipe Manufacturing in North America, ASME Research Report CRTD-Vol.43, 1996 B. N. Leis, X. K. Zhu, and E. B. Clark, “Criteria to Assess Wrinklebend Severity for Use in Pipeline Integrity Management,” PRCI Catalog No. L52190, Pipeline Research Council","cited_authors":null,"cited_year":null,"cited_title":"Criteria to Assess Wrinklebend Severity for Use in Pipeline Integrity Management","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561621,"raw_reference":"International, August 2004. anon., Federal Power Commission Incident Database, 1950-1965. anon., Alberta Energy and Utilities Board, “Pipeline Performance in Alberta 1980-1997,” Report 98-G, December 1998. anon., Alberta Energy and Utilities Board, “Field Surveillance April 1998/March 1999 Provincial Summaries”, “Field Surveillance Provincial Summaries”, dated April 1999/March 2000, April 2000/March 2001, April 2001/March 2002, and January-December 2002, Statistical Series 57, various dates. anon., National Energy Board, “Focus on Safety, A Comparative Analysis of Pipeline Safety Performance,” April 2003. anon., Transportation Safety Board of Canada, “Commodity Pipeline Occurrences and Casualty Statistics,” published annually. anon., “European Gas Pipeline Incident Data Group - 5th EGIG Report 1970-2001”, December 2002.","cited_authors":"International, August","cited_year":"2004","cited_title":"Pipeline Performance in Alberta 1980-1997","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561622,"raw_reference":"Lyons, D., “Western European Cross-Country Oil Pipelines 30-Year Performance Statistics,” Report No. 1/02, prepared on behalf of CONCAWE oil pipeline Management Group, February 2002.","cited_authors":"Lyons, D., “Western European Cross-Country Oil Pipelines 30-Year Performance Statistics,” Report No. 1/02, prepared on behalf of CONCAWE oil pipeline Management Group, February","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561623,"raw_reference":"Kinsman, P. and Lewis, J., “Report on A Study of International Pipeline Accidents,” Contract Research Report 294/2000, 2000.","cited_authors":"Kinsman, P. and Lewis, J., “Report on A Study of International Pipeline Accidents,” Contract Research Report 294/2000","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561624,"raw_reference":"Kinsman, P. and Lewis, J., “Report on A Second Study of Pipeline Accidents Using The Health And Safety Executive’s Risk Assessment Programs MISHAP and PIPERS”, Research Report 036, 2002.","cited_authors":"Kinsman, P. and Lewis, J., “Report on A Second Study of Pipeline Accidents Using The Health And Safety Executive’s Risk Assessment Programs MISHAP and PIPERS”, Research Report 036","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561625,"raw_reference":"Greenwood, R., “UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (19612000),” Advantica Report R4798, June 2002. Advantica/anon., “UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (Up to end of 1998),” Advantica Report R4092, November 2000.","cited_authors":"Greenwood, R., “UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (19612000),” Advantica Report R4798, June","cited_year":"2002","cited_title":"UKOPA Pipeline Fault Database, Pipeline Product Loss Incidents (Up to end of 1998)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561626,"raw_reference":"Trench, C. J., “The U. S. Oil Pipeline Industry’s Safety Performance,” Report to Association of Oil Pipe Lines and the American Petroleum Institute’s Pipeline Committee, February 2003.","cited_authors":"Trench, C. J., “The U. S. Oil Pipeline Industry’s Safety Performance,” Report to Association of Oil Pipe Lines and the American Petroleum Institute’s Pipeline Committee, February","cited_year":"2003","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561627,"raw_reference":"Greenfeld, J., et al, “Pipeline Accident Effects for Hazardous Liquid Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996.","cited_authors":"Greenfeld, J., et al, “Pipeline Accident Effects for Hazardous Liquid Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561628,"raw_reference":"Greenfeld, J., et al, “Pipeline Accident Consequences for Natural Gas and Liquid Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996","cited_authors":null,"cited_year":null,"cited_title":"Pipeline Accident Consequences for Natural Gas and Liquid Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561629,"raw_reference":"Greenfeld, J., et al, “Pipeline Accident Effects for Natural Gas Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996 anon., “Review of Integrity Management for Natural Gas Transmission Pipelines,” Gas Piping Technology Committee report, ANSI Technical Report Number ANSI-GPTC-Z380-TR-1, November 2001. anon., “Gas Transmission System Integrity Performance Indicators by Incident Data Analysis,”","cited_authors":"Greenfeld, J., et al, “Pipeline Accident Effects for Natural Gas Pipelines,” New Jersey Institute of Technology report to the U. S. Department of Transportation, DTRS 56-74-C-0006, August 1996 anon., “Review of Integrity Management for Natural Gas Transmission Pipelines,” Gas Piping Technology Committee report, ANSI Technical Report Number ANSI-GPTC-Z380-TR-1, November","cited_year":"2001","cited_title":"Gas Transmission System Integrity Performance Indicators by Incident Data Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561630,"raw_reference":"URS Corporation Report to the Gas Research Institute, January 11, 2001.","cited_authors":"URS Corporation Report to the Gas Research Institute, January 11","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561631,"raw_reference":"Hovey, D. J. and Farmer, E. J., “Accident Frequency and Failure Probability of DOT Part 195 Pipelines from 1982 through 1992,”April 1993.","cited_authors":"Hovey, D. J. and Farmer, E. J., “Accident Frequency and Failure Probability of DOT Part 195 Pipelines from 1982 through","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561632,"raw_reference":"Hovey, D. J. and Farmer, E. J., “Trends in the Incidence and Cost of Liquid Pipeline Accidents from 1982 to 1991,” July 1992. anon., National Transportation Safety Board: · “High Pressure Natural Gas Pipeline, near Houston, Texas, September 9, 1969,” Report","cited_authors":"Hovey, D. J. and Farmer, E. J., “Trends in the Incidence and Cost of Liquid Pipeline Accidents from 1982 to","cited_year":"1991","cited_title":"High Pressure Natural Gas Pipeline, near Houston, Texas, September 9, 1969","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561633,"raw_reference":"PAR-71-01; · “Southern Union Gas Company, El Paso, Texas, April 22, 1973”, PAR-74-02; · “Washington Gas Light Company, Bowie, Maryland, June 23, 1973”, PAR-74-05; · “Michigan Wisconsin Pipeline Company, Monroe, Louisiana, March 2, 1974”, PAR-75-01; · “Southern Union Gas Company, Transmission Pipeline Failure, near Farmington, New","cited_authors":null,"cited_year":null,"cited_title":"Southern Union Gas Company, El Paso, Texas, April 22, 1973","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561634,"raw_reference":"Mexico, March 15, 1974”, PAR-75-03; · “Transcontinental Gas Pipeline Corp., 30 inch Transmission Line Failure, near Bealeton,","cited_authors":null,"cited_year":null,"cited_title":"Mexico, March 15, 1974”, PAR-75-03; · “Transcontinental Gas Pipeline Corp., 30 inch Transmission Line Failure, near Bealeton","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561635,"raw_reference":"Virginia, June 9, 1974”, PAR-75-02; · “Pennsylvania Gas and Water Company, Natural Gas Explosions, Williamsport,","cited_authors":null,"cited_year":null,"cited_title":"Virginia, June 9, 1974”, PAR-75-02; · “Pennsylvania Gas and Water Company, Natural Gas Explosions, Williamsport","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561636,"raw_reference":"Pennsylvania, January 25, 1977”, PAR-77-04; · “Mid-America Pipeline System Liquefied Petroleum Gas Pipeline Rupture and Fire,","cited_authors":null,"cited_year":null,"cited_title":"Pennsylvania, January 25, 1977”, PAR-77-04; · “Mid-America Pipeline System Liquefied Petroleum Gas Pipeline Rupture and Fire","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561637,"raw_reference":"Donnellson, Iowa, August 4, 1978”, PAR-79-01; · “Colonial Pipeline Company, Petroleum Products Pipeline Failures, Manassas and Locust","cited_authors":null,"cited_year":null,"cited_title":"Donnellson, Iowa, August 4, 1978”, PAR-79-01; · “Colonial Pipeline Company, Petroleum Products Pipeline Failures, Manassas and Locust","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561638,"raw_reference":"Grove, Virginia, March 6, 1980”, PAR-81-02; · “Texas Eastern, Jackson, Louisiana -- November 25, 1984”, PAR-86-01*; · “Continental Pipe Line Company Pipeline Rupture and Fire Kaycee, Wyoming, July 23, 1985,” PAR-86-01; · “Northeast Utilities Service Co. Explosion and Fire Derby, Connecticut December 6, 1985”,","cited_authors":"Grove, Virginia, March 6, 1980”, PAR-81-02; · “Texas Eastern, Jackson, Louisiana -- November 25, 1984”, PAR-86-01*; · “Continental Pipe Line Company Pipeline Rupture and Fire Kaycee, Wyoming, July 23","cited_year":"1985","cited_title":"Northeast Utilities Service Co. Explosion and Fire Derby, Connecticut December 6, 1985","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561639,"raw_reference":"PAR-86-02; · “Williams Pipe Line Company Liquid Pipeline Rupture and Fire Mounds Views, Minnesota July 8, 1986”, PAR-87-02; · “Continental Pipe Line, Kaycee, WY, July 23, 1985”, “Buckeye, Freeport, PA, March 30, 1990”, SIR-96-02; · “Hazardous Liquid Pipe Failure and Leak, Marathon Ashland Pipe Line, LLC Winchester,","cited_authors":null,"cited_year":null,"cited_title":"Williams Pipe Line Company Liquid Pipeline Rupture and Fire Mounds Views, Minnesota July 8, 1986","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561640,"raw_reference":"Kentucky, January 27, 2000”, PAR-01-02; · “Hazardous Liquid Pipe Failure and Leak, Explorer Pipeline Company, Greenville, Texas, March 9, 2000”, PAR-01-03; · “Pipeline Accident Report: Rupture of Piney Point Oil Pipeline and Release of Fuel Oil Near Chalk Point, Maryland”, PAR-02-01. Transportation Safety Board of Canada, Pipeline Investigation Reports P94H0003, P96H0008, P99H0021, and P00H0037, various dates. anon.,/Battelle, “Summary of Field Failure Investigations,” PRCI NG-18 Report 131, March 1982","cited_authors":null,"cited_year":null,"cited_title":"Hazardous Liquid Pipe Failure and Leak, Explorer Pipeline Company, Greenville, Texas, March 9, 2000","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561641,"raw_reference":"Hann, R. W., Beason, W. L., and Wellborn, M., “A Study of Natural Disasters and Pipelines,” Texas Transportation Institute, Texas A&M University System report to the U. S. Department of Transportation, June 1997.","cited_authors":"Hann, R. W., Beason, W. L., and Wellborn, M., “A Study of Natural Disasters and Pipelines,” Texas Transportation Institute, Texas A&M University System report to the U. S. Department of Transportation, June","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561642,"raw_reference":"Transportation, May 1997. anon., IGE/TD/1, “Steel Pipelines for High Pressure Gas Transmission” anon., ANSI/ASME Gas Transmission and Distribution Piping Systems, B31.8, American National Standards Institute/ American Society of Mechanical Engineers, 2001","cited_authors":"Transportation, May","cited_year":"1997","cited_title":"Steel Pipelines for High Pressure Gas Transmission","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561643,"raw_reference":"Shires, T.M. and Harrison, M.R.; “Development of The B31.8 Code And Federal Pipeline Safety Regulations: Implications For Today’s Natural-Gas Pipeline System”, Gas Research Institute Report GRI-98/0367, 1998. anon., “American Tentative Standard Code for Pressure Piping,” American Engineering Standards Committee, Sectional Committee B31, 1935.","cited_authors":"Shires, T.M. and Harrison, M.R.; “Development of The B31.8 Code And Federal Pipeline Safety Regulations: Implications For Today’s Natural-Gas Pipeline System”, Gas Research Institute Report GRI-98/0367","cited_year":"1998","cited_title":"American Tentative Standard Code for Pressure Piping","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561644,"raw_reference":"Michalopoulos, E. and Babka, S., “Evaluation of Pipeline Design Factors,” Hartford Steam Boiler Inspection and Insurance Company report to the Gas Research Institute, FRI 00/00076, February 2000.","cited_authors":"Michalopoulos, E. and Babka, S., “Evaluation of Pipeline Design Factors,” Hartford Steam Boiler Inspection and Insurance Company report to the Gas Research Institute, FRI 00/00076, February","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561645,"raw_reference":"Timoshenko, S. P. and Goodier, J. N., Theory of Elasticity, McGraw-Hill, Third Edition, 1970","cited_authors":null,"cited_year":null,"cited_title":"Timoshenko, S. P. and Goodier, J. N., Theory of Elasticity, McGraw-Hill, Third Edition, 1970","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561646,"raw_reference":"Hahn, G. T. Reid, C. N., and Gilbert, A., “The Relation between Delay-Time, Strain-Rate, and Strain-Aging Phenomena in Mild Steel,” NG-18 Report No 6, March 1962: see also W. H. L. Hooper, J. Inst. Metals, vol. 81, p. 563, 1952: see also V. A. Phillips, A. J. Swain, and R. Eborall, J. Inst. Metals, vol. 81, p. 625, 1952.","cited_authors":"Hahn, G. T. Reid, C. N., and Gilbert, A., “The Relation between Delay-Time, Strain-Rate, and Strain-Aging Phenomena in Mild Steel,” NG-18 Report No 6, March 1962: see also W. H. L. Hooper, J. Inst. Metals, vol. 81, p. 563, 1952: see also V. A. Phillips, A. J. Swain, and R. Eborall, J. Inst. Metals, vol. 81, p. 625","cited_year":"1952","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561647,"raw_reference":"Baird, J.D., “Strain aging of Steel – a Critical Review: Parts I & II”, Iron & Steel, May, 1963.","cited_authors":"Baird, J.D., “Strain aging of Steel – a Critical Review: Parts I & II”, Iron & Steel, May","cited_year":"1963","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561648,"raw_reference":"82. Kurth, R. E., and Leis, B. N., “Probabilistic Modeling of Stress-Corrosion Cracking: Part One – Model Development”, ASME PVP-Volume 386, August 1999, pp. 3-12: see also Leis, B. N., and Kurth, R. E., “Probabilistic Modeling of Stress-Corrosion Cracking: Part Two –Validation and Implications for Control”, ASME PVP-Volume 386, August 1999, pp. 13-23.","cited_authors":"82. Kurth, R. E., and Leis, B. N., “Probabilistic Modeling of Stress-Corrosion Cracking: Part One – Model Development”, ASME PVP-Volume 386, August","cited_year":"1999","cited_title":"Probabilistic Modeling of Stress-Corrosion Cracking: Part Two –Validation and Implications for Control","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561649,"raw_reference":"83. Herman, W.A., Erazo, M.A., Depatto, L.R., Sekizawa, M., Pense, A.W., “The Strain Aging Behavior of Microalloyed Steel”, Welding Research Council Research Bulletin 322, Welding Research Council, April 1987.","cited_authors":"83. Herman, W.A., Erazo, M.A., Depatto, L.R., Sekizawa, M., Pense, A.W., “The Strain Aging Behavior of Microalloyed Steel”, Welding Research Council Research Bulletin 322, Welding Research Council, April","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561650,"raw_reference":"84. Wilson, D.V., Russell, B., “The Contribution of Precipitation to Strain Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July 1960, pp 468-479.","cited_authors":"84. Wilson, D.V., Russell, B., “The Contribution of Precipitation to Strain Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561651,"raw_reference":"85. Wilson, D.V., Russell, B., “The Contribution of Atmosphere Locking to the Strain- Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July 1960, pp 36-45.","cited_authors":"85. Wilson, D.V., Russell, B., “The Contribution of Atmosphere Locking to the Strain- Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561652,"raw_reference":"Industry, November 1981, pp 118-123. 87. Rashid, M.S., “Strain Aging of Vanadium, Niobium, Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 6A, June 1975, pp. 1265-1268","cited_authors":"Industry, November","cited_year":"1981","cited_title":"Strain Aging of Vanadium, Niobium, Titanium-Strengthened High-Strength Low-Alloy Steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561653,"raw_reference":"88. Leslie, W.C., Rickett, R.L., “Influence of Aluminum and Silicon Deoxidation on the Strain Aging of Low-Carbon Steels”, Journal of Metals, August 1953.","cited_authors":"88. Leslie, W.C., Rickett, R.L., “Influence of Aluminum and Silicon Deoxidation on the Strain Aging of Low-Carbon Steels”, Journal of Metals, August","cited_year":"1953","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561654,"raw_reference":"89. Daniloff, B.N., Mehl, R.F.,Herty, C.H., “ The Influence of Deoxidation on the Aging of Mild Steels”, Transactions, American Society for Metals, Vol. 24, 1936, p 595.","cited_authors":"89. Daniloff, B.N., Mehl, R.F.,Herty, C.H., “ The Influence of Deoxidation on the Aging of Mild Steels”, Transactions, American Society for Metals, Vol. 24","cited_year":"1936","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561655,"raw_reference":"90. Gawne, D.T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, August 1985, The Institute of Metals, pp 583-592.","cited_authors":"90. Gawne, D.T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, August","cited_year":"1985","cited_title":"The Institute of Metals, pp 583-592","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561656,"raw_reference":"91. Tither, G., Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals, 1975, Vol 27, pp15-23.","cited_authors":"91. Tither, G., Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals","cited_year":"1975","cited_title":"Vol 27, pp15-23","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561657,"raw_reference":"92. Rashid, M.S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April 1976, pp. 497-503.","cited_authors":"92. Rashid, M.S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April","cited_year":"1976","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561658,"raw_reference":"93. Hundy, B.B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May 1956, pp 203-211: see also Hundy, B.B.; “Accelerated Strain Ageing of Mild Steel”, Journal of the Iron and Steel Institute, September, 1954, pp 34-38","cited_authors":"93. Hundy, B.B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May","cited_year":"1956","cited_title":"Accelerated Strain Ageing of Mild Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561659,"raw_reference":"Journa, Iron and Steel Institute, Vol. 139, 1939, pp 341-385.","cited_authors":"Journa, Iron and Steel Institute, Vol. 139","cited_year":"1939","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561660,"raw_reference":"96. Deiter, G. E., Mechanical Metallurgy, Third edition, McGraw-Hill, 1986, pp. 280-281.","cited_authors":"96. Deiter, G. E., Mechanical Metallurgy, Third edition, McGraw-Hill","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561661,"raw_reference":"97. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85, 1946.","cited_authors":"97. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85","cited_year":"1946","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561662,"raw_reference":"98. Leslie, W.C., The Physical Metallurgy Of Steels, McGraw-Hill, 1981, pp. 110-115.","cited_authors":"98. Leslie, W.C., The Physical Metallurgy Of Steels, McGraw-Hill","cited_year":"1981","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561663,"raw_reference":"Company, 1962, pp 102-103, 198-199. 100. Speich, G.R., Schwoeble, A.J., Leslie, W.C., “Elastic Constants of Binary Iron- Base Alloys”,","cited_authors":"Company","cited_year":"1962","cited_title":"Elastic Constants of Binary Iron- Base Alloys","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561664,"raw_reference":"ASM International, Metallurgical Transactions, Vol. 3, August 1971, pp 2031-2037.","cited_authors":"ASM International, Metallurgical Transactions, Vol. 3, August","cited_year":"1971","cited_title":"pp 2031-2037","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561665,"raw_reference":"101. Sinha, A.K., Ferrous Physical Metallurgy, Butterworth Publishers, 1989, pp. 45-47. 102. Van Vlack, L.H., Materials Science for Engineers, Addison-Wesley, 1970, pp. 188-190, 196198.","cited_authors":"101. Sinha, A.K., Ferrous Physical Metallurgy, Butterworth Publishers","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561666,"raw_reference":"103. Cooke, G.M.E., “An Introduction to the Mechanical Properties of Structural Steel at Elevated Temperatures”, Fire Safety Journal, 13, Elsevier, 1988, pp. 45-54.","cited_authors":"103. Cooke, G.M.E., “An Introduction to the Mechanical Properties of Structural Steel at Elevated Temperatures”, Fire Safety Journal, 13, Elsevier","cited_year":"1988","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561667,"raw_reference":"Steel, 1971, Chapter 1, pp 1-35. 105. Luerssen, G.V. et. Al, “Manufacture of Iron and Steel”, Metals Handbook, American Society for Metals, 1948, pp 315-334.","cited_authors":"Steel","cited_year":"1971","cited_title":"Manufacture of Iron and Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561668,"raw_reference":"106. McClure, G.M., Eiber, R.J., Hahn, G.T., “Research on the Properties of Line Pipe”, Battelle Memorial Institute, NG-18 Report No. 5, 1962, pp. 97-117.","cited_authors":"106. McClure, G.M., Eiber, R.J., Hahn, G.T., “Research on the Properties of Line Pipe”, Battelle Memorial Institute, NG-18 Report No. 5","cited_year":"1962","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561669,"raw_reference":"107. Gladman, T., The Physical Metallurgy of Microalloyed Steels, The Institute of Materials, 1997, pp. 1-16.","cited_authors":"107. Gladman, T., The Physical Metallurgy of Microalloyed Steels, The Institute of Materials","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561670,"raw_reference":"PR-3-9214, May 1996: see also Olson, R., Clark, T., and Odom, T., “Evaluation of the Structural Integrity of Cold Field Bent Line Pipe”, 10th Biennial Joint Technical Meeting on Line Pipe Research, EPRG/PRC, Paper 6, April 1995, Cambridge","cited_authors":"PR-3-9214, May 1996: see also Olson, R., Clark, T., and Odom, T., “Evaluation of the Structural Integrity of Cold Field Bent Line Pipe”, 10th Biennial Joint Technical Meeting on Line Pipe Research, EPRG/PRC, Paper 6, April","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561671,"raw_reference":"109. Leis, B. N. et al., “Emerging Bedding, Padding, and Related Pipeline Construction Practices,” Final Report RSPA OTA DTRS56-03-T-0005 with INGAA cost share, December 2004.","cited_authors":"109. Leis, B. N. et al., “Emerging Bedding, Padding, and Related Pipeline Construction Practices,” Final Report RSPA OTA DTRS56-03-T-0005 with INGAA cost share, December","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561672,"raw_reference":"International, 1992: see also Leis, B. N., “New Insights into Hydrostatic Testing and Retesting,” Proceedings of the 1993 A.G.A. Operating Section, American Gas Association Catalog No. X59707, pp 532-543, 1993. 111. anon., Appendix E of “Submarine Pipeline Systems”, DNV-OS-F101, Det Norske Veritas, January 2000. 112. anon., \"Panhandle Lines\", Panhandle monthly employee publication, June 1964, Volume 21, No. 11, Kansas City, Mo.","cited_authors":"International, 1992: see also Leis, B. N., “New Insights into Hydrostatic Testing and Retesting,” Proceedings of the 1993 A.G.A. Operating Section, American Gas Association Catalog No. X59707, pp 532-543","cited_year":"1993","cited_title":"Submarine Pipeline Systems","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561673,"raw_reference":"Carmichael, Mississippi, November 1, 2007,” NTSB PAR-09/01, Adopted October 2009. See http://www.ntsb.gov/investigations/summary/par0901.htm for related documentation.","cited_authors":"Carmichael, Mississippi, November 1","cited_year":"2007","cited_title":"” NTSB PAR-09/01, Adopted October 2009","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/investigations/summary/par0901.htm","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561674,"raw_reference":"[2] Dyck, R., 2008. NTSB Materials Laboratory Factual Report Draft Report No.07-122 dated 18 April 2008.","cited_authors":"[2] Dyck, R","cited_year":"2008","cited_title":"NTSB Materials Laboratory Factual Report Draft Report No.07-122 dated 18 April 2008","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561675,"raw_reference":"Leis, B. N., Zhu, H-K., Nestleroth, J. B., and Clark, E. B., 2011.“Gap Analysis and Review of NTSB Report Par 09-01,” Final Report on Project PR-218-103706 / PRCI Task IM-1-1, Pipeline Research Council International, Inc., January 2011.","cited_authors":"Leis, B. N., Zhu, H-K., Nestleroth, J. B., and Clark, E. B","cited_year":"2011","cited_title":"Gap Analysis and Review of NTSB Report Par 09-01","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561676,"raw_reference":"[4] Anon., 2009. NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA. Battelle 23 October 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_authors":"[4] Anon","cited_year":"2009","cited_title":"NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA. Battelle 23 October 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561677,"raw_reference":"Conference, Massachusetts, 2015. Attachment A Development of Linear-Elastic Stress Intensity Factors for Various Axial Corrosion and Crack-Like Defects Final Report Documentation and Development of Linear-Elastic Stress Intensity Factors for Various Axial Corrosion and Crack-Like Defects Emc2 Project Number 14-G02-01 Battelle Memorial Institute","cited_authors":"Conference, Massachusetts","cited_year":"2015","cited_title":"Attachment A Development of Linear-Elastic Stress Intensity Factors for Various Axial Corrosion and Crack-Like Defects Final Report Documentation and Development of Linear-Elastic Stress Intensity Factors for Various Axial Corrosion and Crack-Like Defects Emc2 Project Number 14-G02-01 Battelle Memorial Institute","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561678,"raw_reference":"PHMSA ERW Project – Attachment 1 “Detailed Scope of Work for Partial Fulfillment of Objectives of Phase-2, Task-3 of the DOT PHMSA ERW Project,” April, 2014.","cited_authors":"PHMSA ERW Project – Attachment 1 “Detailed Scope of Work for Partial Fulfillment of Objectives of Phase-2, Task-3 of the DOT PHMSA ERW Project,” April","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561679,"raw_reference":"[2] ABAQUS 6-13.2, SIMULIA, Providence, USA, 2014.","cited_authors":"[2] ABAQUS 6-13.2, SIMULIA, Providence, USA","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561680,"raw_reference":"[3] Sukumar, N., Moes, N., Moran, B., Belytschko, T. (2000) \"Extended finite element method for three-dimensional crack modelling,\" International Journal for Numerical Methods in","cited_authors":"[3] Sukumar, N., Moes, N., Moran, B., Belytschko, T","cited_year":"2000","cited_title":"Extended finite element method for three-dimensional crack modelling","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561681,"raw_reference":"[5] Raju, I.S. and Newman, Jr. J.C., “Stress Intensity Factors for a Wide Range of SemiElliptical Surface Cracks in Finite-Thickness Plates,” Engineering Fracture Mechanics, Vol. 11, pp. 817-829, 1979.","cited_authors":"[5] Raju, I.S. and Newman, Jr. J.C., “Stress Intensity Factors for a Wide Range of SemiElliptical Surface Cracks in Finite-Thickness Plates,” Engineering Fracture Mechanics, Vol. 11, pp. 817-829","cited_year":"1979","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561682,"raw_reference":"[6] Shivakumar, K. N., an Raju, I. S., “Treatment of Singularities in Cracked Bodies”, International Journal of Fracture, Vol. 45, No. 3, Oct. 1990, pp 159-178.","cited_authors":"[6] Shivakumar, K. N., an Raju, I. S., “Treatment of Singularities in Cracked Bodies”, International Journal of Fracture, Vol. 45, No. 3, Oct","cited_year":"1990","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561683,"raw_reference":"[7] Nishioka, T. And Atluri, S. N., “Analytical Solutions for Embedded Elliptical Cracks, and Finite Element Alternating Method for Elliptical Surface Cracks, Subjected to Arbitrary Loadings,” Engineering Fracture Mechanics, Vol. 17, No. 3, pp. 247-268, 1983.","cited_authors":"[7] Nishioka, T. And Atluri, S. N., “Analytical Solutions for Embedded Elliptical Cracks, and Finite Element Alternating Method for Elliptical Surface Cracks, Subjected to Arbitrary Loadings,” Engineering Fracture Mechanics, Vol. 17, No. 3, pp. 247-268","cited_year":"1983","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561684,"raw_reference":"[8] Stonesifer, R. B., Brust, F. W., and Leis, B. N., “Mixed-Mode Stress Intensity Factors for Interacting Semi-Elliptical Surface Cracks in a Plate,” Engineering Fracture Mechanics, Vol. 45, No. 3, pp. 357-380, 1993.","cited_authors":"[8] Stonesifer, R. B., Brust, F. W., and Leis, B. N., “Mixed-Mode Stress Intensity Factors for Interacting Semi-Elliptical Surface Cracks in a Plate,” Engineering Fracture Mechanics, Vol. 45, No. 3, pp. 357-380","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561685,"raw_reference":"[9] Brust, F. W., Zhang, T., Shim, D-J, Wilkowski, G., and Rudland, D. L., “Evaluation of Fabrication Related Indications in Reactor Upper Head Penetrations”, NRC report ML110410587, March, 2011.","cited_authors":"[9] Brust, F. W., Zhang, T., Shim, D-J, Wilkowski, G., and Rudland, D. L., “Evaluation of Fabrication Related Indications in Reactor Upper Head Penetrations”, NRC report ML110410587, March","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561686,"raw_reference":"[10] “Fitness-for-Service,” API 579-1/ASME FFS-1 (API 579 Second Edition), American Petroleum Institute and American Society of Mechanical Engineers, 2007.","cited_authors":"[10] “Fitness-for-Service,” API 579-1/ASME FFS-1 (API 579 Second Edition), American Petroleum Institute and American Society of Mechanical Engineers","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561687,"raw_reference":"[11] Raju, I.S. and Newman, Jr. J.C., “Stress Intensity Factors for Internal and External Surface Cracks in Cylindrical Vessels” Journal of Pressure Vessel Technology, Vol. 104, pp. 293298, 1982.","cited_authors":"[11] Raju, I.S. and Newman, Jr. J.C., “Stress Intensity Factors for Internal and External Surface Cracks in Cylindrical Vessels” Journal of Pressure Vessel Technology, Vol. 104, pp. 293298","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561688,"raw_reference":"[12] Zang, W., “Stress Intensity Factor Solutions for Axial and Circumferential Through-Wall Crack in Cylinders,” SINTAP/SAQ/02, SAQ Kontroll AB, Sweden, 1997.","cited_authors":"[12] Zang, W., “Stress Intensity Factor Solutions for Axial and Circumferential Through-Wall Crack in Cylinders,” SINTAP/SAQ/02, SAQ Kontroll AB, Sweden","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561689,"raw_reference":"Klechka, E. Schindelholz, E. Nordgren, D. Krop, R. Baboian, H. Hack, J. D. Flessas, D. C. Cook, “Corrosion condition assessment, mitigation, and preservation of USS Monitor artifacts,” NACE Corrosion2007, Paper No. 07239 (2007). TAOUS811CSEAN PP017533 June 24, 2013 Det Norske Veritas","cited_authors":"Klechka, E. Schindelholz, E. Nordgren, D. Krop, R. Baboian, H. Hack, J. D. Flessas, D. C. Cook, “Corrosion condition assessment, mitigation, and preservation of USS Monitor artifacts,” NACE Corrosion2007, Paper No. 07239","cited_year":"2007","cited_title":"TAOUS811CSEAN PP017533 June 24, 2013 Det Norske Veritas","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561690,"raw_reference":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since 1864, DNV has balanced the needs of business and society based on our independence and integrity. Today, we have a global presence with a network of 300 offices in 100 countries, with headquarters in Oslo, Norway. Global Impact for a Safe and Sustainable Future Learn more on www.dnv.com Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures Bruce Young Jennifer Smith Steve Nanney Brian Leis","cited_authors":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since","cited_year":"1864","cited_title":"DNV has balanced the needs of business and society based on our independence and integrity","cited_venue":null,"cited_doi":null,"cited_url":"www.dnv.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561691,"raw_reference":"ERW Seam Weld Issues San Bruno, CA - 2010","cited_authors":null,"cited_year":null,"cited_title":"ERW Seam Weld Issues San Bruno, CA - 2010","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561692,"raw_reference":"Fields, 1989: R. J. Fields, E. N. Pugh, D. T. Read, and J.H. Smith, “An Assessment of the Performance and Reliability of Older ERW Pipelines,” NISTIR 89-4136, National Institute of Standards and Technology, July 1989.","cited_authors":"Fields, 1989: R. J. Fields, E. N. Pugh, D. T. Read, and J.H. Smith, “An Assessment of the Performance and Reliability of Older ERW Pipelines,” NISTIR 89-4136, National Institute of Standards and Technology, July","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561693,"raw_reference":"Gianetto, 2002: J. A. Gianetto, D. K Mak, R. Bouchard, S. Xu, and W.R. Tyson, “Characterization of the Microstructure and Toughness of DSAW and ERW Seam Welds of Older Linepipe Steels,” Proceedings of IPC 2002, Paper 27157, 2002.","cited_authors":"Gianetto, 2002: J. A. Gianetto, D. K Mak, R. Bouchard, S. Xu, and W.R. Tyson, “Characterization of the Microstructure and Toughness of DSAW and ERW Seam Welds of Older Linepipe Steels,” Proceedings of IPC","cited_year":"2002","cited_title":"Paper 27157, 2002","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561694,"raw_reference":"Groeneveld, 1991: T. P. Groeneveld and C. R. Barnes, “Seam-weld Quality of Modern","cited_authors":null,"cited_year":null,"cited_title":"Groeneveld, 1991: T. P. Groeneveld and C. R. Barnes, “Seam-weld Quality of Modern","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561695,"raw_reference":"ERW/HFI Line Pipe,” NG-18 Report 198, American Gas Association, September 1991.","cited_authors":"ERW/HFI Line Pipe,” NG-18 Report 198, American Gas Association, September","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561696,"raw_reference":"Hashimoto, 1987: S. Hashimoto and M. Sudo, “Effects of Metallurgical Factors on Toughness of Flash Welded Joint of Sheet Steel,” Journal of the Iron and Steel Institute of Japan, Vol. 73, No. 8, p 1018, June 1987.","cited_authors":"Hashimoto, 1987: S. Hashimoto and M. Sudo, “Effects of Metallurgical Factors on Toughness of Flash Welded Joint of Sheet Steel,” Journal of the Iron and Steel Institute of Japan, Vol. 73, No. 8, p 1018, June","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561697,"raw_reference":"Limon, 2008: S. Limon and D. Katz, “A Case Study: ERW Seam Weld Failure,” Corrosion 2008, Paper 08150, NACE International, 2008.","cited_authors":"Limon, 2008: S. Limon and D. Katz, “A Case Study: ERW Seam Weld Failure,” Corrosion","cited_year":"2008","cited_title":"Paper 08150, NACE International, 2008","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561698,"raw_reference":"Mayfield, 1982: M. E. Mayfield and W. A. Maxey, “ERW Weld Zone Characteristics,” NG-18 Report No. 130, American Gas Association, June 18, 1982.","cited_authors":"Mayfield, 1982: M. E. Mayfield and W. A. Maxey, “ERW Weld Zone Characteristics,” NG-18 Report No. 130, American Gas Association, June 18","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561699,"raw_reference":"OPS, 1989: Anonymous, “Electric Resistance Weld Pipe Failures of Hazardous Liquid and Gas Transmission Pipelines,” Technical Report OPS 89-1, Office of Pipeline Safety, August 1989.","cited_authors":"OPS, 1989: Anonymous, “Electric Resistance Weld Pipe Failures of Hazardous Liquid and Gas Transmission Pipelines,” Technical Report OPS 89-1, Office of Pipeline Safety, August","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561700,"raw_reference":"Orth, 1996: F.J. Orth, et al., “Toughness Specifications of ERW Bond Lines for Line Pipe Applications,” EWI Project No. 07450CAP, Contract PR-185-9127, PRCI International,","cited_authors":null,"cited_year":null,"cited_title":"Toughness Specifications of ERW Bond Lines for Line Pipe Applications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561701,"raw_reference":"Arlington VA, December 23, 1996. Pargeter, 1992: R. J. Pargeter, “Assessment of ERW Welds in Modern High Strength Line Pipe,” International Conference on Pipeline Reliability, CanMet, Calgary, June 1992.","cited_authors":"Arlington VA, December 23","cited_year":"1996","cited_title":"Assessment of ERW Welds in Modern High Strength Line Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561702,"raw_reference":"Williams, 1984: D. N. Williams, “A Method for Evaluating the Ductility of the Seam Weld in","cited_authors":null,"cited_year":null,"cited_title":"Williams, 1984: D. N. Williams, “A Method for Evaluating the Ductility of the Seam Weld in","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561703,"raw_reference":"ERW Pipe, NG-18 Report No. 141, American Gas Association, May 18, 1984.","cited_authors":"ERW Pipe, NG-18 Report No. 141, American Gas Association, May 18","cited_year":"1984","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561704,"raw_reference":"Williams, 1985: D. N. Williams and R. J. Eiber, “Test Measures ERW Line Pipe Weld Ductility,” Oil and Gas Journal, pp. 96-106, April 8, 1985. TAOUS813GTQU PP017533 May 8, 2013","cited_authors":"Williams, 1985: D. N. Williams and R. J. Eiber, “Test Measures ERW Line Pipe Weld Ductility,” Oil and Gas Journal, pp. 96-106, April 8","cited_year":"1985","cited_title":"TAOUS813GTQU PP017533 May 8, 2013","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561705,"raw_reference":"Carmichael, Mississippi, November 1, 2007,” NTSB PAR-09/01, Adopted October 2009: see http://www.ntsb.gov/investigations/summary/par0901.htm for related documentation.","cited_authors":"Carmichael, Mississippi, November 1","cited_year":"2007","cited_title":"” NTSB PAR-09/01, Adopted October 2009: see http://www.ntsb.gov/investigations/summary/par0901.htm for related documentation","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/investigations/summary/par0901.htm","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561706,"raw_reference":"2. Dyck, R., NTSB Materials Laboratory Factual Report Draft Report No.07-122 dated 18 April 2008.","cited_authors":"2. Dyck, R., NTSB Materials Laboratory Factual Report Draft Report No.07-122 dated 18 April","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561707,"raw_reference":"NTSB Report Par 09-01,” Final Report on Project PR-218-103706 / PRCI Task IM-1-1, Pipeline Research Council International, Inc., January, 2011. 4. Anon., NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA","cited_authors":"NTSB Report Par 09-01,” Final Report on Project PR-218-103706 / PRCI Task IM-1-1, Pipeline Research Council International, Inc., January","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561708,"raw_reference":"5. Kiefner, J. F. and Kolovitch, K. M., “ERW and Flash Weld Seam Failures,” KAI Interim Report on Task 1.4, September, 2012","cited_authors":null,"cited_year":null,"cited_title":"ERW and Flash Weld Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561709,"raw_reference":"6. Kautny, T., Autogenous Welding and Cutting, (translated by Whiteford, J. F.,) McGraw-Hill (UK), 1915 7. Anon., A O Smith Corporate Documentation, including Bulletin 576 and www.aosmith.com","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"www.aosmith.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561710,"raw_reference":"8. Patterson, B. R., “The Evolution and Development of ERW Pipe,” presented at the API Committee on Standardization (Midyear Meeting), Pipe Symposium, Denver, 19 June 1989.","cited_authors":"8. Patterson, B. R., “The Evolution and Development of ERW Pipe,” presented at the API Committee on Standardization (Midyear Meeting), Pipe Symposium, Denver, 19 June","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561711,"raw_reference":"Wiley-VCH, 1999. 10. Koch, F. O. and Peters, P. A., “Distinguishing Characteristics of High-Frequency InductionWelded Pipe,” presented at API Standardization Conference, Pipe Symposium, New Orleans, 23 June 1986.","cited_authors":"Wiley-VCH","cited_year":"1999","cited_title":"Distinguishing Characteristics of High-Frequency InductionWelded Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561712,"raw_reference":"11. Baralla, E. and Tommasi, C., “Integrated System for Process Control of High Frequency Electric Resistance Welded Steel Pipe,” Proceedings PAN NDT Meeting, Rio de Janeiro, 2003 12. Anon., “Complete Inspection Solutions for ERW Tubes (including Large Diameter Pipe),” Olympus Document, see http://www.olympus-ims.com/en/erw/, accessed July 2011.","cited_authors":"11. Baralla, E. and Tommasi, C., “Integrated System for Process Control of High Frequency Electric Resistance Welded Steel Pipe,” Proceedings PAN NDT Meeting, Rio de Janeiro, 2003 12. Anon., “Complete Inspection Solutions for ERW Tubes (including Large Diameter Pipe),” Olympus Document, see http://www.olympus-ims.com/en/erw/, accessed July","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://www.olympus-ims.com/en/erw/","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561713,"raw_reference":"13. Hong, H. U., Kim, C. M., and Lee, J. B., “Characteristics of Pressure Reversal Fracture in Electric Resistance Welded Seams of API-X70 Steel,” Posco Technical Report, Vol. 10, No. 1, 2006.","cited_authors":"13. Hong, H. U., Kim, C. M., and Lee, J. B., “Characteristics of Pressure Reversal Fracture in Electric Resistance Welded Seams of API-X70 Steel,” Posco Technical Report, Vol. 10, No. 1","cited_year":"2006","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561714,"raw_reference":"14. Kim, D., Kim, T., Park, Y. W., Sung, K., Kang, M., Kim , C., Lee, C. and Rhee, S., “Estimation of Weld Quality in High-Frequency Electric Resistance Welding, with Image Processing,” Welding Journal, Research Section, March 2007, pp 71-S to 79-S.","cited_authors":"14. Kim, D., Kim, T., Park, Y. W., Sung, K., Kang, M., Kim , C., Lee, C. and Rhee, S., “Estimation of Weld Quality in High-Frequency Electric Resistance Welding, with Image Processing,” Welding Journal, Research Section, March","cited_year":"2007","cited_title":"pp 71-S to 79-S","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561715,"raw_reference":"15. Nakata, H. I., Kami, C., and Mathou, N., “Development of API X80 Grade Electric Resistance Welding Line Pipe,” JFE Technical Report No. 12, October, 2008","cited_authors":null,"cited_year":null,"cited_title":"Development of API X80 Grade Electric Resistance Welding Line Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561716,"raw_reference":"Calgary, September 2006 Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_authors":null,"cited_year":null,"cited_title":"Calgary, September 2006 Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561717,"raw_reference":"17. Choi, J.-H., Chang, Y. S., Kim, C.-M. Oh, J.-S., and Kim, Y.-S., “Penetrator Formation Mechanisms during High-Frequency Electric Resistance Welding,” Welding Journal, Research Section, January 2004, pp 27-S to 31-S.","cited_authors":"17. Choi, J.-H., Chang, Y. S., Kim, C.-M. Oh, J.-S., and Kim, Y.-S., “Penetrator Formation Mechanisms during High-Frequency Electric Resistance Welding,” Welding Journal, Research Section, January","cited_year":"2004","cited_title":"pp 27-S to 31-S","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561718,"raw_reference":"Supply, and Weld-Roll Basics,” 13 June 2002 see www.thefabricator.com for this and others on resistance welding, on-line access in July 2011.","cited_authors":"Supply, and Weld-Roll Basics,” 13 June 2002 see www.thefabricator.com for this and others on resistance welding, on-line access in July","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"www.thefabricator.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561719,"raw_reference":"19. Scott, P., “Choosing the Right HF Welding Process for API Large Pipe Mills,” Thermatool Corp Paper, 29 November 2005.","cited_authors":"19. Scott, P., “Choosing the Right HF Welding Process for API Large Pipe Mills,” Thermatool Corp Paper, 29 November","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561720,"raw_reference":"20. Scott, P., “The Effects of Frequency in High Frequency Welding,” Thermatool Corp Paper, 1996.","cited_authors":"20. Scott, P., “The Effects of Frequency in High Frequency Welding,” Thermatool Corp Paper","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561721,"raw_reference":"21. Pierson, J. and DiDonato, M., “High-Frequency Electric Resistance Welding: An Overview” June 1, 2010, see www.thefabricator.com for this and others on resistance welding, on-line access in July 2011.","cited_authors":"21. Pierson, J. and DiDonato, M., “High-Frequency Electric Resistance Welding: An Overview” June 1","cited_year":"2010","cited_title":"see www.thefabricator.com for this and others on resistance welding, on-line access in July 2011","cited_venue":null,"cited_doi":null,"cited_url":"www.thefabricator.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561722,"raw_reference":"22. Warren, L., “Skelp Edge Preparation for Manufacturing ERW Pipe,” in thefabricator.com, dated May 30, 2001. 23. Anon., “API Bulletin on Imperfection Technology,” API Bul. 5T1 (R2010), 2010","cited_authors":"22. Warren, L., “Skelp Edge Preparation for Manufacturing ERW Pipe,” in thefabricator.com, dated May 30","cited_year":"2001","cited_title":"API Bulletin on Imperfection Technology","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561723,"raw_reference":"April, 2012. 25. Lukezich, S. J., “Susceptibility of Modern ERW Pipe to Selective Weld Seam Corrosion in Wet Environments,” Project PR-15-9306, Cat #L51775, 1998","cited_authors":"April","cited_year":"2012","cited_title":"Susceptibility of Modern ERW Pipe to Selective Weld Seam Corrosion in Wet Environments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561724,"raw_reference":"26. Groeneveld, T. P., Davis, G. O., and Williams, D. N., “Susceptibility of Resistance Welded, Flash Welded, and Induction Welded Pipe to Selective Seam-Weld Corrosion,” NG-18 Report No. 199, Pipeline Research Council International (1991).","cited_authors":"26. Groeneveld, T. P., Davis, G. O., and Williams, D. N., “Susceptibility of Resistance Welded, Flash Welded, and Induction Welded Pipe to Selective Seam-Weld Corrosion,” NG-18 Report No. 199, Pipeline Research Council International","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561725,"raw_reference":"Technology, November/December, 1999 (www.eheimpeders.com/uploads/TB1011.pdf)","cited_authors":null,"cited_year":null,"cited_title":"Technology, November/December, 1999 (www.eheimpeders.com/uploads/TB1011.pdf)","cited_venue":null,"cited_doi":null,"cited_url":"www.eheimpeders.com/uploads/TB1011.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561726,"raw_reference":"29. Joosten, M. W., Kolts, J., Kiefer, J., Humble, P. G., Marlow, J. A., “Aspects of Selective Weld and HAZ Attack in CO2 Containing Production Environments,” Corrosion 96, Paper 79, 1996: see also Duran, C., Treiss, E., and Herbsleb, G., “The Resistance of High Frequency Inductive Welded Pipe to Grooving Corrosion in Salt Water,” Materials","cited_authors":null,"cited_year":null,"cited_title":"Aspects of Selective Weld and HAZ Attack in CO2 Containing Production Environments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561727,"raw_reference":"Performance, p. 41, September 1986. 30. Stonesifer, R. B., Brust, F. W., and Leis, B. N., \"Mixed Mode Stress Intensity Factors for Interacting Semi-Elliptical Surface Cracks in a Plate\", Engineering Fracture Mechanics, Vol. 45, No. 3, pp. 357-380, 1993. 31. Anon., “Specification for Line Pipe,” API Specification 5L, American Petroleum Institute,","cited_authors":"Performance, p. 41, September","cited_year":"1986","cited_title":"Mixed Mode Stress Intensity Factors for Interacting Semi-Elliptical Surface Cracks in a Plate","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561728,"raw_reference":"Dallas, 2010. 32. Broek, D., Engineering Fracture Mechanics, Nordhoff, 1974. 33. Anon., “Standard Test Method for K-R Curve Determination, ASTM E561, Vol. 03.01, 2010. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 34. Anon., “Standard Test Method for Measurement of Fracture Toughness,” ASTM E1820, Vol. 03.01, 2011 35. Anon., ASTM Standard E23-98, Notched Bar Impact Testing of Metallic Materials, ASTM Vol. 03.01.","cited_authors":"Dallas","cited_year":"2010","cited_title":"Standard Test Method for K-R Curve Determination, ASTM E561, Vol. 03.01, 2010. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 34. Anon., “Standard Test Method for Measurement of Fracture Toughness","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561729,"raw_reference":"Association, December 1983. 37. Leis, B. N., Clark, E. B., Zhu, X. K., and Galliher, R. D., “Guidelines for Assessing Corrosion Associated with Girth and Long-Seam Welds,” Gas Research Institute Report","cited_authors":"Association, December","cited_year":"1983","cited_title":"Guidelines for Assessing Corrosion Associated with Girth and Long-Seam Welds","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561730,"raw_reference":"GRI 04-0119, October 2004 38. Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels,” International Pipeline Conference, IPC04-0665, Calgary, October 2004, pp.","cited_authors":"GRI 04-0119, October 2004 38. Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels,” International Pipeline Conference, IPC04-0665, Calgary, October","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561731,"raw_reference":"39. Mayfield, M. E., and W. A. Maxey, “ERW Weld Zone Characteristics,” NG-18 Report No. 130, PRCI Catalog. No. L51427June 1982.","cited_authors":"39. Mayfield, M. E., and W. A. Maxey, “ERW Weld Zone Characteristics,” NG-18 Report No. 130, PRCI Catalog. No. L51427June","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561732,"raw_reference":"40. Masamura, K. and Matsushima, I., \"Grooving Corrosion of Electric Resistance Welded Steel Pipe in Water - Case Histories and Effects of Alloying Elements\", Paper No. 75, Corrosion 81, NACE International, 1981: see also Skvortsov, S.V. “A Calculation Method of Predicting the Corrosion Rate of Welded Joints in Hull Steels in Sea-Water,” Welding","cited_authors":null,"cited_year":null,"cited_title":"Grooving Corrosion of Electric Resistance Welded Steel Pipe in Water - Case Histories and Effects of Alloying Elements","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561733,"raw_reference":"International, Vol. 7, p. 569 , 1993 41. Peterson, R. E., Stress Concentration Factors, Wiley, 1974","cited_authors":null,"cited_year":null,"cited_title":"International, Vol","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561734,"raw_reference":"42. Leis, B. N. and Brust, F. W. “Hydrotest Strategies for Gas Transmission Pipelines Based on Ductile Flaw Growth Considerations, NG-18 Report No. 194, PRCI Cat. No. L51665, July 1992: see also Leis, B. N., and Brust, F. W., “Ductile Crack Growth Model and Its Implications With Regard to Optimum Hydrotest Strategies”, Proceedings of the Pipeline Technology Conference, Part B, Oostende, pp. 13.11-19, 1990","cited_authors":null,"cited_year":null,"cited_title":"Hydrotest Strategies for Gas Transmission Pipelines Based on Ductile Flaw Growth Considerations, NG-18 Report No. 194, PRCI Cat. No. L51665, July 1992: see also Leis, B. N., and Brust, F. W., “Ductile Crack Growth Model and Its Implications With Regard to Optimum Hydrotest Strategies","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561735,"raw_reference":"43. Clark, E. B., Leis, B. N., and Eiber, R. J., “Integrity of Vintage Pipelines,” Battelle Final Report including seven annexes to INGAA Foundation, October 2004, 44. Anon., “American Tentative Standard Code for Pressure Piping,” American Engineering Standards Committee, Sectional Committee B31, 1935. 45. Anon., Gas Transmission and Distribution Piping Systems, B31.8, American National Standards Institute/ American Society of Mechanical Engineers, 2011","cited_authors":"43. Clark, E. B., Leis, B. N., and Eiber, R. J., “Integrity of Vintage Pipelines,” Battelle Final Report including seven annexes to INGAA Foundation, October","cited_year":"2004","cited_title":"American Tentative Standard Code for Pressure Piping","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561736,"raw_reference":"46. Leis, B. N. and Bubenik, T. A., “Primer on Design to Avoid Failure in Steel Transmission Pipelines”, Gas Research Institute Report, GRI 00/0229, January 2001. 47. Anon., ASME B31.8S Managing System Integrity of Gas Pipelines, American Society for Mechanical Engineers, June 2010. 48. Anon., API Standard 1160, Managing System Integrity for Hazardous Liquid Pipelines, American Petroleum Institute, November 2001 49. Anon., Subpart O of Part 192 (Transportation of Natural and other Gas by Pipeline) of Title 49 of the CFR. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 50. Anon., Section 195.452 of Subpart F and Appendix C of Subpart H in Part 195 (Transportation of Hazardous Liquids by Pipeline) of Title 49 of the CFR.","cited_authors":"46. Leis, B. N. and Bubenik, T. A., “Primer on Design to Avoid Failure in Steel Transmission Pipelines”, Gas Research Institute Report, GRI 00/0229, January","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561737,"raw_reference":"51. Shires, T. M. and Harrison, M. R.; “Development of The B31.8 Code and Federal Pipeline Safety Regulations: Implications for Today’s Natural-Gas Pipeline System”, Gas Research Institute Report GRI-98/0367, 1998.","cited_authors":"51. Shires, T. M. and Harrison, M. R.; “Development of The B31.8 Code and Federal Pipeline Safety Regulations: Implications for Today’s Natural-Gas Pipeline System”, Gas Research Institute Report GRI-98/0367","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561738,"raw_reference":"52. Timoshenko, S. P. and Goodier, J. N., Theory of Elasticity, McGraw-Hill, 1970","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561739,"raw_reference":"53. Michalopoulos, E. and Babka, S., “Evaluation of Pipeline Design Factors,” Hartford Steam Boiler Inspection and Insurance Company Final Report to the Gas Research Institute, GRI 00/00076, February 2000.","cited_authors":"53. Michalopoulos, E. and Babka, S., “Evaluation of Pipeline Design Factors,” Hartford Steam Boiler Inspection and Insurance Company Final Report to the Gas Research Institute, GRI 00/00076, February","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561740,"raw_reference":"54. Hahn, G. T. Reid, C. N., and Gilbert, A., “The Relation between Delay-Time, Strain-Rate, and Strain-Aging Phenomena in Mild Steel,” NG-18 Report No 6, March 1962: see also","cited_authors":null,"cited_year":null,"cited_title":"The Relation between Delay-Time, Strain-Rate, and Strain-Aging Phenomena in Mild Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561741,"raw_reference":"Hooper, W. H. L., J. Inst. Metals, vol. 81, p. 563, 1952: see also Phillips ,V. A.,","cited_authors":null,"cited_year":null,"cited_title":"Hooper, W. H. L., J. Inst","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561742,"raw_reference":"Swain, A. J., and Eborall, R., J. Inst. Metals, vol. 81, p. 625, 1952.","cited_authors":"Swain, A. J., and Eborall, R., J. Inst. Metals, vol. 81, p. 625","cited_year":"1952","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561743,"raw_reference":"55. Baird, J. D., “Strain Aging of Steel – a Critical Review: Parts I & II”, Iron & Steel, May, 1963.","cited_authors":"55. Baird, J. D., “Strain Aging of Steel – a Critical Review: Parts I & II”, Iron & Steel, May","cited_year":"1963","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561744,"raw_reference":"Company, 1962, pp 102-103, 198-199. 58. Herman, W. A., Erazo, M. A., Depatto, L. R., Sekizawa, M., Pense, A. W., “The Strain Aging Behavior of Microalloyed Steel”, Welding Research Council Research Bulletin 322, Welding Research Council, April 1987.","cited_authors":"Company","cited_year":"1962","cited_title":"The Strain Aging Behavior of Microalloyed Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561745,"raw_reference":"59. Wilson, D. V. and Russell, B., “The Contribution of Precipitation to Strain Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July 1960, pp 468-479.","cited_authors":"59. Wilson, D. V. and Russell, B., “The Contribution of Precipitation to Strain Ageing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561746,"raw_reference":"60. Wilson, D. V. and Russell, B., “The Contribution of Atmosphere Locking to the StrainAgeing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July 1960, pp 36-45.","cited_authors":"60. Wilson, D. V. and Russell, B., “The Contribution of Atmosphere Locking to the StrainAgeing in Low Carbon Steels”, Acta Metallurgica, Vol. 8, July","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561747,"raw_reference":"61. Baldy, M. F. and Anney, F. W., “Strain Aging Plate for Large Diameter Line Pipe”, Pipe Line Industry, November 1981, pp 118-123.","cited_authors":"61. Baldy, M. F. and Anney, F. W., “Strain Aging Plate for Large Diameter Line Pipe”, Pipe Line Industry, November","cited_year":"1981","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561748,"raw_reference":"62. Rashid, M. S., “Strain Aging of Vanadium, Niobium, Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 6A, June 1975, pp. 1265-1268","cited_authors":"62. Rashid, M. S., “Strain Aging of Vanadium, Niobium, Titanium-Strengthened High-Strength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 6A, June","cited_year":"1975","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561749,"raw_reference":"63. Leslie, W. C. and Rickett, R. L., “Influence of Aluminum and Silicon Deoxidation on the Strain Aging of Low-Carbon Steels”, Journal of Metals, August 1953.","cited_authors":"63. Leslie, W. C. and Rickett, R. L., “Influence of Aluminum and Silicon Deoxidation on the Strain Aging of Low-Carbon Steels”, Journal of Metals, August","cited_year":"1953","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561750,"raw_reference":"64. Daniloff, B. N., Mehl, R. F., and Herty, C. H., “The Influence of Deoxidation on the Aging of Mild Steels”, Transactions, American Society for Metals, Vol. 24, 1936, p 595.","cited_authors":"64. Daniloff, B. N., Mehl, R. F., and Herty, C. H., “The Influence of Deoxidation on the Aging of Mild Steels”, Transactions, American Society for Metals, Vol. 24","cited_year":"1936","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561751,"raw_reference":"65. Gawne, D. T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, The Institute of Metals, August 1985, pp 583592.","cited_authors":"65. Gawne, D. T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, The Institute of Metals, August","cited_year":"1985","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561752,"raw_reference":"66. Tither, G. and Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals, 1975, Vol 27, pp15-23. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_authors":"66. Tither, G. and Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals","cited_year":"1975","cited_title":"Vol 27, pp15-23","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561753,"raw_reference":"67. Rashid, M. S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened HighStrength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April 1976, pp. 497-503.","cited_authors":"67. Rashid, M. S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened HighStrength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April","cited_year":"1976","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561754,"raw_reference":"68. Hundy, B. B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May 1956, pp 203-211: see also Hundy, B. B.; “Accelerated Strain Ageing of Mild Steel”, Journal of the Iron and Steel Institute, September, 1954, pp 34-38","cited_authors":"68. Hundy, B. B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May","cited_year":"1956","cited_title":"Accelerated Strain Ageing of Mild Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561755,"raw_reference":"69. Edwards, C.A., Phillips, D. L., and Jones, H. N., “A Study of Strain Age Hardening of Mild Steel”, Journal Iron and Steel Institute, Vol. 139, 1939, pp 341-385.","cited_authors":"69. Edwards, C.A., Phillips, D. L., and Jones, H. N., “A Study of Strain Age Hardening of Mild Steel”, Journal Iron and Steel Institute, Vol. 139","cited_year":"1939","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561756,"raw_reference":"71. Deiter, G. E., Mechanical Metallurgy, 3rd edition, McGraw-Hill, 1986, pp. 280-281.","cited_authors":"71. Deiter, G. E., Mechanical Metallurgy, 3rd edition, McGraw-Hill","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561757,"raw_reference":"72. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85, 1946.","cited_authors":"72. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85","cited_year":"1946","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561758,"raw_reference":"73. Leslie, W. C., The Physical Metallurgy of Steels, McGraw-Hill, 1981, pp. 110-115. 74. Anon., “Goal is Zero Incidents,” http://www.ingaa.org/6211/11460.aspx, accessed August 2011.","cited_authors":"73. Leslie, W. C., The Physical Metallurgy of Steels, McGraw-Hill","cited_year":"1981","cited_title":"Goal is Zero Incidents","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ingaa.org/6211/11460.aspx","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561759,"raw_reference":"75. Dobman, G. “Physical Analysis Methods of Magnetic Flux Leakage,” Research Techniques in NDT, Vol. IV, R. S. Sharp, Editor, 1980.","cited_authors":"75. Dobman, G. “Physical Analysis Methods of Magnetic Flux Leakage,” Research Techniques in NDT, Vol. IV, R. S. Sharp, Editor","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561760,"raw_reference":"76. Simek, J., Ludlow, J., and Tisovec, P., “Oblique Field Magnetic Flux Leakage Inline Survey Tool: Implementation and Results,” Proc. of the 8th Int. Pipeline Conference, IPC 2010,","cited_authors":"76. Simek, J., Ludlow, J., and Tisovec, P., “Oblique Field Magnetic Flux Leakage Inline Survey Tool: Implementation and Results,” Proc. of the 8th Int. Pipeline Conference, IPC","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561761,"raw_reference":"Calgary, September 2010. 77. Duckworth, N., and Sherstan, R., “System, Method and Program Product to Screen for Longitudinal Anomalies,” US Patent 7,899,628, March 2011.","cited_authors":"Calgary, September","cited_year":"2010","cited_title":"System, Method and Program Product to Screen for Longitudinal Anomalies","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561762,"raw_reference":"78. Nestleroth, J. B , Bubenik, T. A., and Davis, R. J., “Circumferential Magnetic Flux Leakage,” GRI-00/0193, Gas Research Institute, 2003","cited_authors":null,"cited_year":null,"cited_title":"Circumferential Magnetic Flux Leakage","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561763,"raw_reference":"Calgary, 1996. 80. Reber, K., Beller, M., Barbian, O.A., and Uzelac, N., “A New Generation of Ultrasonic Inspection Tools; How Defect Assessment Methods Influenced Design,” The Pipeline","cited_authors":"Calgary","cited_year":"1996","cited_title":"A New Generation of Ultrasonic Inspection Tools; How Defect Assessment Methods Influenced Design","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561764,"raw_reference":"Pigging, Integrity Assessment and Repair Conference, February 2002.","cited_authors":"Pigging, Integrity Assessment and Repair Conference, February","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561765,"raw_reference":"81. Alers, G., “A History of EMAT,” 27th Review of Quantitative Nondestructive Evaluations,” Am. Inst. of Physics, p 801, 2008.","cited_authors":"81. Alers, G., “A History of EMAT,” 27th Review of Quantitative Nondestructive Evaluations,” Am. Inst. of Physics, p 801","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561766,"raw_reference":"Houston, February 2008. 83. Yasinko, E, Veith, P., et. al. “Platte Inspection Program Supports Alternative to Hydrostatic Testing,” Oil & Gas Journal, March 26, 2001.","cited_authors":"Houston, February","cited_year":"2008","cited_title":"Platte Inspection Program Supports Alternative to Hydrostatic Testing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561767,"raw_reference":"84. Mead, R. “Non-Destructive Evaluation of Low-frequency Electric Resistance Welded (ERW) Pipe Utilizing Ultrasonic In-Line Inspection Technology,” Proceeding of the Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 European Conference on NDT, Berlin, 2006.","cited_authors":"84. Mead, R. “Non-Destructive Evaluation of Low-frequency Electric Resistance Welded (ERW) Pipe Utilizing Ultrasonic In-Line Inspection Technology,” Proceeding of the Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 European Conference on NDT, Berlin","cited_year":"2006","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561768,"raw_reference":"Conference, Calgary, September 2006. 86. Grimes, J., and Nunez de Alvarex, A., “Utilizing Circumferential MFL for the Detection of Linear and Axially Oriented Metal Loss Anomalies in Pipelines,” IPC2008-64275, 7th International Pipeline Conference, Calgary, September 2008. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003","cited_authors":"Conference, Calgary, September","cited_year":"2006","cited_title":"Utilizing Circumferential MFL for the Detection of Linear and Axially Oriented Metal Loss Anomalies in Pipelines","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561769,"raw_reference":"ANNEX A: TABULATED DATABASE Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Final Interim Report – Task 4.1 Compare - Contrast Analysis of Inspection Data and Failure Predictions versus Burst-Test Outcomes for ERW-Seam Defects B. N. Leis B N Leis, Consultant, Inc 517 Poe Avenue","cited_authors":null,"cited_year":null,"cited_title":"ANNEX A: TABULATED DATABASE Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Final Interim Report – Task 4.1 Compare - Contrast Analysis of Inspection Data and Failure Predictions versus Burst-Test Outcomes for ERW-Seam Defects B. N. Leis B N Leis, Consultant, Inc 517 Poe Avenue","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561770,"raw_reference":"Worthington, OH, 43085 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No. DTPH56-11-T-000003 Battelle Project No. G006084 June 23, 2013 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and","cited_authors":null,"cited_year":null,"cited_title":"Worthington, OH, 43085 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561771,"raw_reference":"Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2013 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner. Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.1","cited_authors":null,"cited_year":null,"cited_title":"Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561772,"raw_reference":"Nestleroth, J. B., Smith, J. M., and Leis, B. N., “Data on Pipe Collected: Inspection by in the Ditch Methods, In-Line Tools, and Hydrostatic Tests,” Battelle Interim Report, Subtask 2.1/2.2, US DoT Contract No. DTPH56-11-T-000003, May 31, 2013.","cited_authors":"Nestleroth, J. B., Smith, J. M., and Leis, B. N., “Data on Pipe Collected: Inspection by in the Ditch Methods, In-Line Tools, and Hydrostatic Tests,” Battelle Interim Report, Subtask 2.1/2.2, US DoT Contract No. DTPH56-11-T-000003, May 31","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561773,"raw_reference":"Beavers, J. A., “Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment,” KAI Interim Report on Task 1.3, US DoT Contract No. DTPH56-11-T000003, November, 2012. 4. G. T., Quickel “Characterization of the Toughness of Pipe Containing Seam Defects,” DNV Interim Report on Task 2.3, US DoT Contract No. DTPH56-11-T-000003, February, 2013.","cited_authors":"Beavers, J. A., “Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment,” KAI Interim Report on Task 1.3, US DoT Contract No. DTPH56-11-T000003, November","cited_year":"2012","cited_title":"Characterization of the Toughness of Pipe Containing Seam Defects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561774,"raw_reference":"5. Leis, B. N. and Nestleroth, J. B., “Characterizing Aspects of Failure in ERW Line Pipe,” Battelle Interim Report, Subtask 2.6, US DoT Contract No. DTPH56-11-T-000003, April 25, 2013.","cited_authors":"5. Leis, B. N. and Nestleroth, J. B., “Characterizing Aspects of Failure in ERW Line Pipe,” Battelle Interim Report, Subtask 2.6, US DoT Contract No. DTPH56-11-T-000003, April 25","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561775,"raw_reference":"7. Leis, B. N., “Time-Trending and Like-Similar Analysis for ERW-Seam Failures,” Battelle Interim Report, Subtask 4.2, US DoT Contract No. DTPH56-11-T-000003, April 15, 2013. 8. http://www.tdwilliamson.com/en/Services/PipelineIntegrity/spiral_mfl/Pages/Home.aspx 9. http://www.roseninspection.net/RosenInternet/InspectionServices/ILInspection/CrackCoatin gDetection/","cited_authors":"7. Leis, B. N., “Time-Trending and Like-Similar Analysis for ERW-Seam Failures,” Battelle Interim Report, Subtask 4.2, US DoT Contract No. DTPH56-11-T-000003, April 15","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://www.tdwilliamson.com/en/Services/PipelineIntegrity/spiral_mfl/Pages/Home.aspx","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561776,"raw_reference":"10. Leis, B. N., “Pipeline Axial Flaw Failure Criterion, PAFFC,” Release 4.5, delivered in conjunction with Leis, B. N., and Eiber, R. J., “Fracture Control Technology For Natural Gas Pipelines – Circa 2010”, PRCI Report Mat4-5, 2013.","cited_authors":"10. Leis, B. N., “Pipeline Axial Flaw Failure Criterion, PAFFC,” Release 4.5, delivered in conjunction with Leis, B. N., and Eiber, R. J., “Fracture Control Technology For Natural Gas Pipelines – Circa 2010”, PRCI Report Mat4-5","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561777,"raw_reference":"11. Katz, D. Private correspondence, 28 and 29 May, 2013 12. Anon., “Specification for Line Pipe,” API Specification 5L, American Petroleum Institute,","cited_authors":null,"cited_year":null,"cited_title":"Specification for Line Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561778,"raw_reference":"14. Ludlow, J., “Summary of Recent Seam Assessment Performance using TDW Multiple Data Set Tools,” March 2013.","cited_authors":"14. Ludlow, J., “Summary of Recent Seam Assessment Performance using TDW Multiple Data Set Tools,” March","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561779,"raw_reference":"15. Harris, C., “Summary of Recent Seam Assessment Performance using TDW Multiple DataSet Tools,” Pipeline and Gas Journal, March, 2011.","cited_authors":"15. Harris, C., “Summary of Recent Seam Assessment Performance using TDW Multiple DataSet Tools,” Pipeline and Gas Journal, March","cited_year":"2011","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561780,"raw_reference":"17. Weber, R., “EMATS Data Analysis for TCPL’s ANR 504 Pipeline,” April, 2013.","cited_authors":"17. Weber, R., “EMATS Data Analysis for TCPL’s ANR 504 Pipeline,” April","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561781,"raw_reference":"18. Gao, M., Tandon, S., Krishnamurthy, R., Kania, R., Rosca, G., and Piazza, M, “A Comprehensive Analysis of EMAT ILI and In-Ditch SCC Inspection Technologies and their Application to Pipeline Integrity Management Programs,” Paper 20, 19th Biennial Joint Technical Meeting, Sydney, May 2013.","cited_authors":"18. Gao, M., Tandon, S., Krishnamurthy, R., Kania, R., Rosca, G., and Piazza, M, “A Comprehensive Analysis of EMAT ILI and In-Ditch SCC Inspection Technologies and their Application to Pipeline Integrity Management Programs,” Paper 20, 19th Biennial Joint Technical Meeting, Sydney, May","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561782,"raw_reference":"19. Gao, M., Tandon, S., Krishnamurthy, R., “Evaluation of EMAT Tool Performance by Battelle June 23, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.1 Monitoring Industry Experience”, Paper 7, 18th Biennial Joint Technical Meeting, San","cited_authors":null,"cited_year":null,"cited_title":"Evaluation of EMAT Tool Performance by Battelle June 23, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.1 Monitoring Industry Experience","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561783,"raw_reference":"Francisco, May 2011. 20. Marr, J., Riverol, E., Weislogel, J., Tappert, S., Mann, A., Sun, J. “Validation of EMAT InLine Inspection Technology For SCC Management”, Proceedings of the 2010 International Pipeline Conference, Paper No: IPC2010-31091, Calgary, 2010.","cited_authors":"Francisco, May","cited_year":"2011","cited_title":"Validation of EMAT InLine Inspection Technology For SCC Management","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561784,"raw_reference":"21. Clark, E. B., Leis, B. N., and Eiber, R. J., “Integrity of Vintage Pipelines,” Battelle Final Report including seven annexes to INGAA Foundation, October 2004 (http://www.ingaa.org/cms/31/7306/43/678/6143.aspx).","cited_authors":null,"cited_year":null,"cited_title":"Integrity of Vintage Pipelines","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ingaa.org/cms/31/7306/43/678/6143.aspx","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561785,"raw_reference":"22. Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels,” International Pipeline Conference, IPC04-0665, Calgary, October 2004, pp. 23. Anon., API 1163, “Inline Inspection System Qualification Standard”, American Petroleum","cited_authors":"22. Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels,” International Pipeline Conference, IPC04-0665, Calgary, October","cited_year":"2004","cited_title":"Inline Inspection System Qualification Standard","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561786,"raw_reference":"Institute, 2005. 24. Anon., NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA 25. Anon., http://www.ntsb.gov/news/events/2009/carmichael_ms/index.html,","cited_authors":"Institute","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://www.ntsb.gov/news/events/2009/carmichael_ms/index.html","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561787,"raw_reference":"Partners, LP, June 1, 2010. 27. http://www.tdwilliamson.com/en/Services/PipelineIntegrity/spiral_mfl/Pages/Home.aspx; then click the pdf link to SpirALL® Magnetic Flux Leakage Technology Flyer 28. http://www.roseninspection.net/RosenInternet/InspectionServices/ILInspection/CrackCoatin gDetection/ then click the link to RoCD2 Flyer (pdf)","cited_authors":"Partners, LP, June 1","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://www.tdwilliamson.com/en/Services/PipelineIntegrity/spiral_mfl/Pages/Home.aspx","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561788,"raw_reference":"Wiley-VCH, 1999. 2. Leis, B. N. and Nestleroth, J. B., “Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications,” Battelle Interim Report, Subtask 1.4, US DoT Contract No. DTPH56-11-T-000003, September, 2013.","cited_authors":"Wiley-VCH","cited_year":"1999","cited_title":"Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561789,"raw_reference":"3. Kiefner, J. F. and Kolovitch, K. M., “ERW and Flash Weld Seam Failures,” KAI Interim Report on Task 1.4, , US DoT Contract No. DTPH56-11-T-000003, September, 2012","cited_authors":null,"cited_year":null,"cited_title":"ERW and Flash Weld Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561790,"raw_reference":"4. Scheil, M. A., Fratcher, C. E., Henry, S. L., Uecker, E. H., “Manufacture and Metallurgy of Flash-Welded Line Pipe,” The Engineering Journal, February, 1957, pp. 60-71. 5. Anon., Specification for Line Pipe: API Specification 5L, American Petroleum Institute,","cited_authors":"4. Scheil, M. A., Fratcher, C. E., Henry, S. L., Uecker, E. H., “Manufacture and Metallurgy of Flash-Welded Line Pipe,” The Engineering Journal, February","cited_year":"1957","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561791,"raw_reference":"Dallas, 2010. 6. Johnston, G. V., “Method And Apparatus For Butt Welding Thin Gage Tubing,” US Patent 1,388,434, 23 August, 1921.","cited_authors":"Dallas","cited_year":"2010","cited_title":"Method And Apparatus For Butt Welding Thin Gage Tubing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561792,"raw_reference":"9. Thomson, E., “Apparatus for Electric Welding,” US Patent 347,140, 10 August, 1886.","cited_authors":"9. Thomson, E., “Apparatus for Electric Welding,” US Patent 347,140, 10 August","cited_year":"1886","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561793,"raw_reference":"10. Thomson, E., “Method of Electric Welding,” US Patent 444,928, Jan. 20, 1891.","cited_authors":"10. Thomson, E., “Method of Electric Welding,” US Patent 444,928, Jan. 20","cited_year":"1891","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561794,"raw_reference":"11. Ries, E. E., “Method of and Means for Manufacturing Metal Tubing,” US Patent 611,222, 20 September, 1898. 12. Steel & Tubes, Inc. V. General Tube Co., Circuit Court of Appeals, Third Circuit, Nos. 4750 and 4844, before Circuit Judge Davis, 3 October, 1932.","cited_authors":"11. Ries, E. E., “Method of and Means for Manufacturing Metal Tubing,” US Patent 611,222, 20 September","cited_year":"1898","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561795,"raw_reference":"13. Parpart, O., “Electric Welding Machine,” US Patent 658,741, 25 September, 1900. 14. Gesellschaft fuer Elektrotechnische Industrie “A Method for Closing the Longitudinal Seam of Tubes using Electrical Resistance Welding,” German Patent AT 58,866D, 15 November 1912. 15. Anon., Handbook of Electric-Weld Tubing, Steel and Tubes Inc, 1934 16. Elyria Iron & Steel Co. V. Mohegan Tube Co., before Circuit Judges Hough, Manton, and","cited_authors":"13. Parpart, O., “Electric Welding Machine,” US Patent 658,741, 25 September","cited_year":"1900","cited_title":"A Method for Closing the Longitudinal Seam of Tubes using Electrical Resistance Welding","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561796,"raw_reference":"18. Johnston, G. V., (assigned to Elyria Iron & Steel Co) “Apparatus for Electrically ButtWelding Tubing,” US Patent 1.501,782, 15 July, 1924.","cited_authors":"18. Johnston, G. V., (assigned to Elyria Iron & Steel Co) “Apparatus for Electrically ButtWelding Tubing,” US Patent 1.501,782, 15 July","cited_year":"1924","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561797,"raw_reference":"19. Johnston, G. V., “Electric Tube Welding Machine,” US Patent 1,652,481, 13 December, 1927. 20. Elyria Iron and Steel Company, “Improvements In and Relating to Electric Welding,” British Patent No. GB 216,203A, 21 May 1924.","cited_authors":"19. Johnston, G. V., “Electric Tube Welding Machine,” US Patent 1,652,481, 13 December","cited_year":"1927","cited_title":"Improvements In and Relating to Electric Welding","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561798,"raw_reference":"21. Johnson, A. Z. and Johnson, N. A., “Apparatus for Butt-Welding Tubing,” US Patent 1,492,173, 29 April, 1924.","cited_authors":"21. Johnson, A. Z. and Johnson, N. A., “Apparatus for Butt-Welding Tubing,” US Patent 1,492,173, 29 April","cited_year":"1924","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561799,"raw_reference":"22. Blevins, H. G. (assigned to Republic Steel), “Method and Apparatus for Electrically Welding Pipe,” US Patent 1,982,415, 27 November, 1934.","cited_authors":"22. Blevins, H. G. (assigned to Republic Steel), “Method and Apparatus for Electrically Welding Pipe,” US Patent 1,982,415, 27 November","cited_year":"1934","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561800,"raw_reference":"23. Neckerman, W. M. (assigned to Republic Steel), “Apparatus for Manufacturing Electrically Welded Tubing,” US Patent 2,023,897, 10 December, 1935.","cited_authors":"23. Neckerman, W. M. (assigned to Republic Steel), “Apparatus for Manufacturing Electrically Welded Tubing,” US Patent 2,023,897, 10 December","cited_year":"1935","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561801,"raw_reference":"24. Crawford, W. E., (A O Smith) “Electrical Welding Apparatus,” US Patent 1,857,115, Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2 3 May, 1932.","cited_authors":"24. Crawford, W. E., (A O Smith) “Electrical Welding Apparatus,” US Patent 1,857,115, Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2 3 May","cited_year":"1932","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561802,"raw_reference":"25. Andren, B. T., Hineman W. F., and Crawford, W. E., (A O Smith) “Welding Tubular Articles,” US Patent 1,872,055, 16 August, 1932.","cited_authors":"25. Andren, B. T., Hineman W. F., and Crawford, W. E., (A O Smith) “Welding Tubular Articles,” US Patent 1,872,055, 16 August","cited_year":"1932","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561803,"raw_reference":"US Patent 1,783,411, 2 December, 1930. 27. Anon., A O Smith Corporate Website, www.aosmith.com /About/Detail.aspx?id=130 accessed 7/4/2012. 28. Anon., Logansport Pharos Tribune, May 18, 1928, Page 4 http://newspaperarchive.com/logansport-pharos-tribune/1928-05-18/page-4, accessed 7/4/2012.","cited_authors":"US Patent 1,783,411, 2 December","cited_year":"1930","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"www.aosmith.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561804,"raw_reference":"US Patent l,998,l39, 16 April, 1935. 30. Youngstown Sheet and Tube, “Improvements In or Relating to Welding Methods and Apparatus,” United Kingdom Patent GB369,431, 24 March, 1932.","cited_authors":"US Patent l,998,l39, 16 April","cited_year":"1935","cited_title":"Improvements In or Relating to Welding Methods and Apparatus","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561805,"raw_reference":"31. Mirfield, G. E., Lewis, R. E, Firth, C., and Neale, J. E., (assigned to Youngstown Sheet and Tube) “Electrical Welding Apparatus,” US Patent 2,003,118, 28 May, 1935.","cited_authors":"31. Mirfield, G. E., Lewis, R. E, Firth, C., and Neale, J. E., (assigned to Youngstown Sheet and Tube) “Electrical Welding Apparatus,” US Patent 2,003,118, 28 May","cited_year":"1935","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561806,"raw_reference":"32. Fields, R. J., Pugh, E. N., Read, D. T., and Smith J. H., “An Assessment of the Performance and Reliability of Old ERW Pipelines,” NISTIR 89-4136, National Institute of Standards and Technology, 1989.","cited_authors":"32. Fields, R. J., Pugh, E. N., Read, D. T., and Smith J. H., “An Assessment of the Performance and Reliability of Old ERW Pipelines,” NISTIR 89-4136, National Institute of Standards and Technology","cited_year":"1989","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561807,"raw_reference":"ASME CRTD-Vol 43, 1996. 34. Thomas, P. D., “Pipe – Manufacture and Use,” Iron and Steel Engineer, July, 1957, pp. 8487.","cited_authors":"ASME CRTD-Vol 43","cited_year":"1996","cited_title":"Pipe – Manufacture and Use","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561808,"raw_reference":"35. Sessions, F. L., (assigned to Elyria Iron & Steel Co), “Flying Shears,” US Patent 1,648,829, 8 November, 1927.","cited_authors":"35. Sessions, F. L., (assigned to Elyria Iron & Steel Co), “Flying Shears,” US Patent 1,648,829, 8 November","cited_year":"1927","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561809,"raw_reference":"US Patent 1,830,160, 10 November, 1931. 37. Sessions, F. L., “Welding Machine,” US Patent 1,808,261, 2 June, 1931.","cited_authors":"US Patent 1,830,160, 10 November","cited_year":"1931","cited_title":"Welding Machine","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561810,"raw_reference":"38. Blevins, H. G., (assigned to Spang Chalfont) “Apparatus for Welding,” US Patent 2,084,889, 22 June, 1937.","cited_authors":"38. Blevins, H. G., (assigned to Spang Chalfont) “Apparatus for Welding,” US Patent 2,084,889, 22 June","cited_year":"1937","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561811,"raw_reference":"US Patent 2,417,594, 18 March, 1944. 40. Babbit, C. A., (assigned to Cal-Metal Corporation) “Pipe Welding Machine,” US Patent 2,613,303, 7 October, 1952.","cited_authors":"US Patent 2,417,594, 18 March","cited_year":"1944","cited_title":"Pipe Welding Machine","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561812,"raw_reference":"41. McDowall, W. S., (assigned to Republic Steel) “Electric Weld Tube Mills Inside Spreading Rolls at Electrode,” US Patent 2,816,208, 10 December, 1957.","cited_authors":"41. McDowall, W. S., (assigned to Republic Steel) “Electric Weld Tube Mills Inside Spreading Rolls at Electrode,” US Patent 2,816,208, 10 December","cited_year":"1957","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561813,"raw_reference":"42. Colby, I. A., (assigned to Youngstown Sheet and Tube) “Method of and Apparatus for Continuous Welding of Pipes and Tubes,” US Patent 2,575,381, 20 November, 1951.","cited_authors":"42. Colby, I. A., (assigned to Youngstown Sheet and Tube) “Method of and Apparatus for Continuous Welding of Pipes and Tubes,” US Patent 2,575,381, 20 November","cited_year":"1951","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561814,"raw_reference":"43. Clark, E. B., Leis, B. N., and Eiber, R. J., “Annex E in Integrity of Vintage Pipelines,” Battelle Final Report to INGAA Foundation, October 2004.","cited_authors":"43. Clark, E. B., Leis, B. N., and Eiber, R. J., “Annex E in Integrity of Vintage Pipelines,” Battelle Final Report to INGAA Foundation, October","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561815,"raw_reference":"44. Bennett, E., (assigned to Wisconsin Alumni Research Foundation), “Method of Heating Electrically Conducting Bodies for Industrial Operations,” US Patent 2,066,668, 5 January, 1937.","cited_authors":"44. Bennett, E., (assigned to Wisconsin Alumni Research Foundation), “Method of Heating Electrically Conducting Bodies for Industrial Operations,” US Patent 2,066,668, 5 January","cited_year":"1937","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561816,"raw_reference":"45. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Seam Welding by High Frequency Resistance Heating,” US Patent 2,818,488, 31 December, Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2 1957.","cited_authors":"45. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Seam Welding by High Frequency Resistance Heating,” US Patent 2,818,488, 31 December, Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2","cited_year":"1957","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561817,"raw_reference":"46. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Tube Welding,” US Patent 2,857,503, 21 October, 1958.","cited_authors":"46. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Tube Welding,” US Patent 2,857,503, 21 October","cited_year":"1958","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561818,"raw_reference":"47. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Welding by High Frequency Resistance Heating,” US Patent 2,876,323, 3 March, 1959.","cited_authors":"47. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Welding by High Frequency Resistance Heating,” US Patent 2,876,323, 3 March","cited_year":"1959","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561819,"raw_reference":"48. Body, A. C., (assigned to The Ohio Crankshaft Company), “High Frequency InductionHeating Apparatus,” US Patent 2,654,019, 29 September, 1953.","cited_authors":"48. Body, A. C., (assigned to The Ohio Crankshaft Company), “High Frequency InductionHeating Apparatus,” US Patent 2,654,019, 29 September","cited_year":"1953","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561820,"raw_reference":"49. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Induction Welding,” US Patent 2,763,756, 18 September, 1956.","cited_authors":"49. Rudd, W. C. and Stanton, R. J., (assigned to The Magnetic Heating Corporation), “Induction Welding,” US Patent 2,763,756, 18 September","cited_year":"1956","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561821,"raw_reference":"50. Kohler, F., (assigned to The American Machine and Foundry Company), “Method and Apparatus for the Induction Welding of Tubing,” US Patent 3,037,105, 29 May, 1962.","cited_authors":"50. Kohler, F., (assigned to The American Machine and Foundry Company), “Method and Apparatus for the Induction Welding of Tubing,” US Patent 3,037,105, 29 May","cited_year":"1962","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561822,"raw_reference":"52. Haga, H., Aoki, K., and Sato, T., “Welding Phenomena and Welding Mechanisms in High Frequency Electric Resistance Welding - 1st Report,” presented at the AWS 60th Annual Meeting Detroit, 2-6 April 1979, also in Welding Research Supplement, July 1979, pp 208s – 212s.","cited_authors":"52. Haga, H., Aoki, K., and Sato, T., “Welding Phenomena and Welding Mechanisms in High Frequency Electric Resistance Welding - 1st Report,” presented at the AWS 60th Annual Meeting Detroit, 2-6 April","cited_year":"1979","cited_title":"also in Welding Research Supplement, July 1979, pp 208s – 212s","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561823,"raw_reference":"53. Kim, D., Kim, T., Park, Y. W., Sung, K., Kang, M., Kim , C., Lee, C. and Rhee, S., “Estimation of Weld Quality in High-Frequency Electric Resistance Welding, with Image Processing,” Welding Journal, Research Section, March 2007, pp 71-S to 79-S.","cited_authors":"53. Kim, D., Kim, T., Park, Y. W., Sung, K., Kang, M., Kim , C., Lee, C. and Rhee, S., “Estimation of Weld Quality in High-Frequency Electric Resistance Welding, with Image Processing,” Welding Journal, Research Section, March","cited_year":"2007","cited_title":"pp 71-S to 79-S","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561824,"raw_reference":"54. Koch, F. O. and Peters, P. A., “Distinguishing Characteristics of High-Frequency InductionWelded Pipe,” presented at API Standardization Conference, Pipe Symposium, New Orleans, 23 June 1986.","cited_authors":"54. Koch, F. O. and Peters, P. A., “Distinguishing Characteristics of High-Frequency InductionWelded Pipe,” presented at API Standardization Conference, Pipe Symposium, New Orleans, 23 June","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561825,"raw_reference":"55. Baralla, E. and Tommasi, C., “Integrated System for Process Control of High Frequency Electric Resistance Welded Steel Pipe,” Proceedings PAN NDT Meeting, Rio de Janeiro, 2003. 56. Anon., “Complete Inspection Solutions for ERW Tubes (including Large Diameter Pipe),” Olympus Document, see http://www.olympus-ims.com/en/erw/, accessed July 2011.","cited_authors":"55. Baralla, E. and Tommasi, C., “Integrated System for Process Control of High Frequency Electric Resistance Welded Steel Pipe,” Proceedings PAN NDT Meeting, Rio de Janeiro","cited_year":"2003","cited_title":"Complete Inspection Solutions for ERW Tubes (including Large Diameter Pipe)","cited_venue":null,"cited_doi":null,"cited_url":"http://www.olympus-ims.com/en/erw/","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561826,"raw_reference":"57. Nakata, H. I., Kami, C., and Mathou, N., “Development of API X80 Grade Electric Resistance Welding Line Pipe,” JFE Technical Report No. 12, October, 2008.","cited_authors":"57. Nakata, H. I., Kami, C., and Mathou, N., “Development of API X80 Grade Electric Resistance Welding Line Pipe,” JFE Technical Report No. 12, October","cited_year":"2008","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561827,"raw_reference":"58. Kawasaki, H., Toyooka, T., and Kimura, M., “High Performance Tube and Pipe,” Kawasaki Steel Technical Report No. 44 June 2001.","cited_authors":"58. Kawasaki, H., Toyooka, T., and Kimura, M., “High Performance Tube and Pipe,” Kawasaki Steel Technical Report No. 44 June","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561828,"raw_reference":"59. Koide, T., Kondo, H., and Itadani, S., “Development of High Performance ERW Pipe for Line Pipe,” JFE Technical Report, No. 7, January 2006.","cited_authors":"59. Koide, T., Kondo, H., and Itadani, S., “Development of High Performance ERW Pipe for Line Pipe,” JFE Technical Report, No. 7, January","cited_year":"2006","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561829,"raw_reference":"60. Williams, J. G., “Advances in Steels for High Strength ERW Linepipe Application in Australia,” Materials Forum, Vol. 31, 2007, pp. 1-10.","cited_authors":"60. Williams, J. G., “Advances in Steels for High Strength ERW Linepipe Application in Australia,” Materials Forum, Vol. 31","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561830,"raw_reference":"61. Kim, D., Kim, T., Park, Y. W., Sung, K., Kang, M., Kim , C., Lee, C. and Rhee, S., “Estimation of Weld Quality in High-Frequency Electric Resistance Welding, with Image Processing,” Welding Journal, Research Section, March 2007, pp 71-S to 79-S. 62. Anon., “Specification for Line Pipe: API Specification 5L,” American Petroleum Institute, 20th Edition, 1963, incorporates requirements for long seam inspection. 63. Anon., “Specification for Line Pipe: API Specification 5L,” American Petroleum Institute, 22th Edition, 1967, incorporates requirements for PWHT for Gr B, which are subsequently expanded to other grades. 64. Anon., “Rupture will not Delay Transwestern’s Line,” Oil and Gas Journal, Vol 58, No 17, April 25, 1960’ p. 105. Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2","cited_authors":"61. Kim, D., Kim, T., Park, Y. W., Sung, K., Kang, M., Kim , C., Lee, C. and Rhee, S., “Estimation of Weld Quality in High-Frequency Electric Resistance Welding, with Image Processing,” Welding Journal, Research Section, March","cited_year":"2007","cited_title":"Specification for Line Pipe: API Specification 5L","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561831,"raw_reference":"Cleanliness, ASTM STP 1361, ASTM, 1999, pp. 73-88.","cited_authors":"Cleanliness, ASTM STP 1361, ASTM","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561832,"raw_reference":"66. Gray, J. M., “An Independent View of Linepipe and Linepipe Steel for High Strength Pipelines,” API X-80 Pipeline Cost Workshop, APIA, Hobart, October 2002.","cited_authors":"66. Gray, J. M., “An Independent View of Linepipe and Linepipe Steel for High Strength Pipelines,” API X-80 Pipeline Cost Workshop, APIA, Hobart, October","cited_year":"2002","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561833,"raw_reference":"67. Morris, J. W., “The Influence of Grain Size on the Mechanical Properties of Steel,” Lawrence Berkeley National Laboratory, www.osti.gov/bridge/servlets/purl/861397tb7pb9/86139, 2001.","cited_authors":"67. Morris, J. W., “The Influence of Grain Size on the Mechanical Properties of Steel,” Lawrence Berkeley National Laboratory, www.osti.gov/bridge/servlets/purl/861397tb7pb9/86139","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"www.osti.gov/bridge/servlets/purl/861397tb7pb9/86139","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561834,"raw_reference":"International, 1991. 69. Piper, J., Morrison, B., and Fletcher, L., “The Integrity of ERW Welds in High Strength Linepipe,” WTIA / APIA Panel 7, Research Seminar Welding of High Strength ThinWalled Pipelines, Wollongong, 1995. 70. Anon., “Nippon Steel HF ERW Pipe,” Nippon Steel Corporation, Catalog #PC317, 2009.10","cited_authors":"International","cited_year":"1991","cited_title":"The Integrity of ERW Welds in High Strength Linepipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561835,"raw_reference":"71. Crawford, T. J., (assigned to The American Machine and Foundry Company), “HighFrequency Induction Tube Welding,” US Patent 2,687,465, 24 August, 1954.","cited_authors":"71. Crawford, T. J., (assigned to The American Machine and Foundry Company), “HighFrequency Induction Tube Welding,” US Patent 2,687,465, 24 August","cited_year":"1954","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561836,"raw_reference":"Material Properties, 2009, and ADB-10-03 Girth Welding Quality Issues, 2010. 74. Anon., “Use of Substandard Steel by the US Pipeline Industry,” Plains Justice, 2010.","cited_authors":"Material Properties","cited_year":"2009","cited_title":"Use of Substandard Steel by the US Pipeline Industry","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561837,"raw_reference":"75. Leis, B. N., Clark, E. B., and Flamberg, S., “Fitness-for-Purpose of the 42-inch Diameter Segments in Aspects of Boardwalk’s System,” Final Report to Boardwalk Pipeline LP, 2010.","cited_authors":"75. Leis, B. N., Clark, E. B., and Flamberg, S., “Fitness-for-Purpose of the 42-inch Diameter Segments in Aspects of Boardwalk’s System,” Final Report to Boardwalk Pipeline LP","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561838,"raw_reference":"78. Lukezich, S. J. “Susceptibility of Modern ERW Pipe to Selective Weld Seam Corrosion in Wet Environments,” Project PR-15-9306, Cat #L51775, 1998.","cited_authors":"78. Lukezich, S. J. “Susceptibility of Modern ERW Pipe to Selective Weld Seam Corrosion in Wet Environments,” Project PR-15-9306, Cat #L51775","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561839,"raw_reference":"79. Joosten, M. W., Kolts, J., Kiefer, J., Humble, P. G., Marlow, J. A., “Aspects of Selective Weld and HAZ Attack in CO2 Containing Production Environments,” Corrosion 96, Paper 79, 1996.","cited_authors":"79. Joosten, M. W., Kolts, J., Kiefer, J., Humble, P. G., Marlow, J. A., “Aspects of Selective Weld and HAZ Attack in CO2 Containing Production Environments,” Corrosion 96, Paper 79","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561840,"raw_reference":"80. Duran, C., Treiss, E., and Herbsleb, G., “The Resistance of High Frequency Inductive Welded Pipe to Grooving Corrosion in Salt Water,” Materials Performance, September 1986, p. 41.","cited_authors":"80. Duran, C., Treiss, E., and Herbsleb, G., “The Resistance of High Frequency Inductive Welded Pipe to Grooving Corrosion in Salt Water,” Materials Performance, September","cited_year":"1986","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561841,"raw_reference":"ISIJ, Vol. 26, 1986, pp. 476-483. 83. Choi, J.-H., Chang, Y. S., Kim, C.-M. Oh, J.-S., and Kim, Y.-S., “Penetrator Formation Mechanisms during High-Frequency Electric Resistance Welding,” Welding Journal, Research Section, January 2004, pp 27-S to 31-S. Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2","cited_authors":"ISIJ, Vol. 26","cited_year":"1986","cited_title":"Penetrator Formation Mechanisms during High-Frequency Electric Resistance Welding","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561842,"raw_reference":"84. Hong, H. U., Kim, C. M., and Lee, J. B., “Characteristics of Pressure Reversal Fracture in Electric Resistance Welded Seams of API-X70 Steel,” Posco Technical Report, Vol. 10, No. 1, 2006, pp. 41-48. 85. Anon., “Goal is Zero Incidents,” http://www.ingaa.org/6211/11460.aspx, accessed August 2011.","cited_authors":"84. Hong, H. U., Kim, C. M., and Lee, J. B., “Characteristics of Pressure Reversal Fracture in Electric Resistance Welded Seams of API-X70 Steel,” Posco Technical Report, Vol. 10, No. 1","cited_year":"2006","cited_title":"Goal is Zero Incidents","cited_venue":null,"cited_doi":null,"cited_url":"http://www.ingaa.org/6211/11460.aspx","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561843,"raw_reference":"Beavers, J.A. “Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment,” KAI Interim Report, Subtask 1.3, US DoT Contract No. DTPH56-11-T000003, August 22, 2012.","cited_authors":"Beavers, J.A. “Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment,” KAI Interim Report, Subtask 1.3, US DoT Contract No. DTPH56-11-T000003, August 22","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561844,"raw_reference":"Report, Subtask 4.1, US DoT Contract No. DTPH56-11-T-000003, April, 2013. Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2","cited_authors":"Report, Subtask 4.1, US DoT Contract No. DTPH56-11-T-000003, April","cited_year":"2013","cited_title":"Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561845,"raw_reference":"ANNEX A: MILL SEAM INSPECTION TECHNOLOGIES Prepared by Mr. E. B. (Ted) Clark of Battelle’s Pipeline Technology Center. Battelle June 30, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.2 Annex A: Inspection Technologies used in ERW Pipe Mills Various methods have been used in pipe mills over the years to determine the seam quality of","cited_authors":null,"cited_year":null,"cited_title":"ANNEX A: MILL SEAM INSPECTION TECHNOLOGIES Prepared by Mr","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561846,"raw_reference":"API 5L and 5LX Related Long Seam Inspection Timeline The first edition of API 5L was published in 1928. Inclusion of a general term “electric welded pipe” occurred in 1931(4th ed.). Weld seam NDT was not required at that time but the pipe was hydrotested, subjected to flattening tests, and a weld tensile test had been added. It wasn’t until the 9th edition (1944) that the term “electric welded pipe” was defined to specifically include","cited_authors":"API 5L and 5LX Related Long Seam Inspection Timeline The first edition of API 5L was published in","cited_year":"1928","cited_title":"electric welded pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561847,"raw_reference":"ERW, and mentioned the FW pipe manufacturing process. In early 1955, the 14th edition of","cited_authors":"ERW, and mentioned the FW pipe manufacturing process. In early","cited_year":"1955","cited_title":"the 14th edition of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561848,"raw_reference":"STP 536, American Society for Testing and Materials, 1974, pp. 461-481: see also Maxey, W. A., Kiefner, J. F., Eiber, R. J., and Duffy, A. R., “Ductile Fracture Initiation, Propagation and Arrest in Cylindrical Vessels,” ASTM STP 514, American Society for Testing and","cited_authors":"STP 536, American Society for Testing and Materials","cited_year":"1974","cited_title":"Ductile Fracture Initiation, Propagation and Arrest in Cylindrical Vessels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561849,"raw_reference":"Materials, Philadelphia, PA, 1972, pp. 70-81.","cited_authors":"Materials, Philadelphia, PA","cited_year":"1972","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561850,"raw_reference":"7. Kiefner, J. F., Maxey, W. A., and Eiber, R. J., “A Study of the Causes of Failures of Defects That Have Survived a Prior Hydrostatic Test”, NG-18 Report No 111, 1980.","cited_authors":"7. Kiefner, J. F., Maxey, W. A., and Eiber, R. J., “A Study of the Causes of Failures of Defects That Have Survived a Prior Hydrostatic Test”, NG-18 Report No 111","cited_year":"1980","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561851,"raw_reference":"8. Leis, B. N., Brust, F. W., and Scott, P. M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,” NG-18-193, 1991(PRCI L51543): see also Brust, F. W. and Leis, B. N., “A New Model for Characterizing Primary Creep Damage,” International Journal of Fracture, Vol 54, pp. 45-63, 1992: see also Brust, F. W. and Leis, B. N., “A Study of Primary Creep Crack Growth At Room Temperatures,” Proc. of the 5th International Conference on Numerical Methods in Fracture Mechanics, ed. A. R.","cited_authors":null,"cited_year":null,"cited_title":"Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561852,"raw_reference":"Luxmoore, and D. R. J. Owen, Freiburg, FRG, pp. 321-332, 1990.","cited_authors":"Luxmoore, and D. R. J. Owen, Freiburg, FRG, pp. 321-332","cited_year":"1990","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561853,"raw_reference":"9. Leis, B. N. and Eiber, R. J., “Fracture Control Technology for Transmission Pipelines,” Final Report on PR-003-084506, August 2008: see also Leis, B. N., “Hydrostatic Testing of Transmission Pipelines: When It Is Beneficial and Alternatives When It Is Not”, PRCI Final Report PR 3-9523, 2002. 10. Anon., “API Bulletin on Imperfection Technology,” API Bul. 5T1 (R2010), 2010","cited_authors":"9. Leis, B. N. and Eiber, R. J., “Fracture Control Technology for Transmission Pipelines,” Final Report on PR-003-084506, August 2008: see also Leis, B. N., “Hydrostatic Testing of Transmission Pipelines: When It Is Beneficial and Alternatives When It Is Not”, PRCI Final Report PR 3-9523","cited_year":"2002","cited_title":"API Bulletin on Imperfection Technology","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561854,"raw_reference":"11. Leis, B. N. and Nestleroth, J. B., “Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications,” Interim Final Report on Task 1.4, Contract No. DTPH56-11-T-000003, September 2012.","cited_authors":"11. Leis, B. N. and Nestleroth, J. B., “Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications,” Interim Final Report on Task 1.4, Contract No. DTPH56-11-T-000003, September","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561855,"raw_reference":"12. Stonesifer, R. B., Brust, F. W., and Leis, B. N., \"Mixed Mode Stress Intensity Factors for Interacting Semi-Elliptical Surface Cracks in a Plate\", Engineering Fracture Mechanics, Vol. 45, No. 3, pp. 357-380, 1993.","cited_authors":"12. Stonesifer, R. B., Brust, F. W., and Leis, B. N., \"Mixed Mode Stress Intensity Factors for Interacting Semi-Elliptical Surface Cracks in a Plate\", Engineering Fracture Mechanics, Vol. 45, No. 3, pp. 357-380","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561856,"raw_reference":"13. Hahn, G. T., Sarrate, M. and Rosenfield, A.R., “Criteria for Crack Extension in Cylindrical Pressure Vessels”, I J Frac Mech, Vol.5, 1969, pp. 187-210.","cited_authors":"13. Hahn, G. T., Sarrate, M. and Rosenfield, A.R., “Criteria for Crack Extension in Cylindrical Pressure Vessels”, I J Frac Mech, Vol.5","cited_year":"1969","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561857,"raw_reference":"14. Hart, B. O., Brongers, M. P. H., Bubenik, T., and Vieth, P. H., “Early Generation Seam Welds,” Final Report R3017-01R, DOT-OPS/PRCI, January 2004. © 2012 Battelle A PPENDIX B - T HE M ODIFIED L N S EC E QUATION AND THE R AJU /N EWMAN E QUATION Kiefner and Associates, Inc. January 2013 Modified LnSec Equation  σ  −1 − x  cos (e )/ (cos −1 (e − y )) σ fs =   MP   CVN Eπ   12 Equation ML 1 Equation ML 1a  CVN Eπ   12   d  0.8  1 −   t   Equation ML1b  8cσ   A  1      1 −  M P =   o  T    A ","cited_authors":"14. Hart, B. O., Brongers, M. P. H., Bubenik, T., and Vieth, P. H., “Early Generation Seam Welds,” Final Report R3017-01R, DOT-OPS/PRCI, January","cited_year":"2004","cited_title":"© 2012 Battelle A PPENDIX B - T HE M ODIFIED L N S EC E QUATION AND THE R AJU /N EWMAN E QUATION Kiefner and Associates, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561858,"raw_reference":"Kiefner, J.F., and Kolovich, K.M., “ERW and Flash Weld Seam Failures” Subtask 1.4 of U.S. Department of Transportation Other Transaction Agreement No. DTPH56-11-T-000003, May 30, 2012.","cited_authors":"Kiefner, J.F., and Kolovich, K.M., “ERW and Flash Weld Seam Failures” Subtask 1.4 of U.S. Department of Transportation Other Transaction Agreement No. DTPH56-11-T-000003, May 30","cited_year":"2012","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561859,"raw_reference":"Kiefner, J.F., Maxey, W.A., Eiber, R.J., and Duffy, A.R., “Failure Stress Levels of Flaws in Pressurized Cylinders”, Progress in Flaw Growth and Fracture Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp 461 – 481, 1973.","cited_authors":"Kiefner, J.F., Maxey, W.A., Eiber, R.J., and Duffy, A.R., “Failure Stress Levels of Flaws in Pressurized Cylinders”, Progress in Flaw Growth and Fracture Toughness Testing, ASTM STP 536, American Society for Testing and Materials, pp 461 – 481","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561860,"raw_reference":"Leis, B. N., Brust, F. W., and Scott, P.M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe”, Final Report to American Gas Association, NG-18, Catalog No, L51543, 1991.","cited_authors":"Leis, B. N., Brust, F. W., and Scott, P.M., “Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe”, Final Report to American Gas Association, NG-18, Catalog No, L51543","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561861,"raw_reference":"Anderson, T. L., Merrick, R. D., Yukawa, S., Bray, D. E., Kaley, L., and Van Scyoc, K., “FitnessFor-Service Evaluation Procedures For Operating Pressure Vessels, Tanks, And Piping in Refinery And Chemical Service”, FS-26, Consultants’ Report, MPC Program On Fitness-For-Service, Draft 5, The Materials Properties Council, New York, N.Y., October, 1995.","cited_authors":"Anderson, T. L., Merrick, R. D., Yukawa, S., Bray, D. E., Kaley, L., and Van Scyoc, K., “FitnessFor-Service Evaluation Procedures For Operating Pressure Vessels, Tanks, And Piping in Refinery And Chemical Service”, FS-26, Consultants’ Report, MPC Program On Fitness-For-Service, Draft 5, The Materials Properties Council, New York, N.Y., October","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561862,"raw_reference":"Harrison, R. P., Loosemore, K., and Milne, I., “Assessment of the Integrity of Structures Containing Defects.” CEGB Report R/H/R6. Central Electricity Generating Board, United Kingdom, 1976.","cited_authors":"Harrison, R. P., Loosemore, K., and Milne, I., “Assessment of the Integrity of Structures Containing Defects.” CEGB Report R/H/R6. Central Electricity Generating Board, United Kingdom","cited_year":"1976","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561863,"raw_reference":"Jaske, C. E., and Beavers, J. A., “Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines”, Proceedings of IPC 2002, 4th International Pipeline Conference, September 29-October 3, 2002, Calgary, Alberta, Canada J.C. Newman, Jr. and I.S. Raju, “An Empirical Stress-Intensity Factor Equation for the Surface Crack”. Engineering Fracture Mechanics, Vol. 15, No. 1-2, pp 185-192, 1981, printed in Great Britain. viii","cited_authors":"Jaske, C. E., and Beavers, J. A., “Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines”, Proceedings of IPC","cited_year":"2002","cited_title":"An Empirical Stress-Intensity Factor Equation for the Surface Crack","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561864,"raw_reference":"Eiber, R.J., Hein, G.M., Duffy, A.R., and Atterbury, T.J., “Investigation of the Initiation and Extent of Ductile Pipe Rupture”, Report No. BMI-1793, Progress Report for May-December, 1966, U.S. Atomic Energy Commission Contract No. w-7405-eng-92, January 1, 1967.","cited_authors":"Eiber, R.J., Hein, G.M., Duffy, A.R., and Atterbury, T.J., “Investigation of the Initiation and Extent of Ductile Pipe Rupture”, Report No. BMI-1793, Progress Report for May-December","cited_year":"1966","cited_title":"U.S. Atomic Energy Commission Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561865,"raw_reference":"Eiber, R.J., Maxey, W.A.., Duffy, A.R., and Atterbury, T.J., “Investigation of the Initiation and Extent of Ductile Pipe Rupture”, Report No. BMI-1866, U.S. Atomic Energy Commission Contract No. w-7405-eng-92, NTIS, July 1969.","cited_authors":"Eiber, R.J., Maxey, W.A.., Duffy, A.R., and Atterbury, T.J., “Investigation of the Initiation and Extent of Ductile Pipe Rupture”, Report No. BMI-1866, U.S. Atomic Energy Commission Contract No. w-7405-eng-92, NTIS, July","cited_year":"1969","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561866,"raw_reference":"Laboratories, ARL 64-174, (October 1964).","cited_authors":"Laboratories, ARL 64-174, (October","cited_year":"1964","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561867,"raw_reference":"Dugdale, D.S., “Yielding in Steel Sheets Containing Slits.”, Journal of the Mechanics and Physics of Solids, Vol. 8, 1960, pp. 100 – 104. Kiefner and Associates, Inc. January 2013","cited_authors":"Dugdale, D.S., “Yielding in Steel Sheets Containing Slits.”, Journal of the Mechanics and Physics of Solids, Vol. 8","cited_year":"1960","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561868,"raw_reference":"Kiefner, J.F., “Modified equation helps integrity management”, Oil and Gas Journal, Oct 6, 2008, pp 76-82 and “Modified Ln-Secant equation improves failure prediction” Oct 13, 2008, pp 64-66. xiii","cited_authors":"Kiefner, J.F., “Modified equation helps integrity management”, Oil and Gas Journal, Oct 6","cited_year":"2008","cited_title":"Modified Ln-Secant equation improves failure prediction","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561869,"raw_reference":"Series A, Vol. 221, 1920, pp. 163 – 198. Irwin, G.R., “Analysis of Stresses and Strains near the End of a Crack Traversing a Plate”, Journal of Applied Mechanics, Vol. 24, 1957, pp. 361 – 364.","cited_authors":"Series A, Vol. 221","cited_year":"1920","cited_title":"Analysis of Stresses and Strains near the End of a Crack Traversing a Plate","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561870,"raw_reference":"Barsom, J.M., and Rolfe, S.T., Fracture and Fatigue Control in Structures: Applications of Fracture Mechanics, Third Edition, ASTM Stock Number MNL41, 1999.","cited_authors":"Barsom, J.M., and Rolfe, S.T., Fracture and Fatigue Control in Structures: Applications of Fracture Mechanics, Third Edition, ASTM Stock Number MNL41","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561871,"raw_reference":"Kiefner, J.F., Kolovich, C.E., Zelenak, P.A., and Wahjudi, T., “Estimating Fatigue Life for Pipeline Integrity Management”, IPC04-0167, Proceedings of IPC 2004 International Pipeline","cited_authors":null,"cited_year":null,"cited_title":"Estimating Fatigue Life for Pipeline Integrity Management","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561872,"raw_reference":"Conference, Calgary, Alberta, Canada (October 4-8, 2004). Kiefner and Associates, Inc. January 2013 Bruce Young and Jennifer O’Brian Battelle Energy Resources September 28, 2016 Teleconference https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 The Comprehensive Study to Understand Longitudinal ERW Seam Failures Project Contract No. DTPH56-11-T-000003 Battelle Project No. 100004552 Objective 1. Provide an overview of the project focusing on technical accomplishments used to advance the state of the art in analytical modeling for axial crack-like defects in oil and gas pipeline. 2. Demonstrate the capabilities of PipeAssessTM which implements these analytical models to provide the owners, operators, and regulators advanced, easy-to-use tools to make decisions on safe operation, repair/replace, and re-inspection intervals. Project Review Papers • B. A. Young, S. Nanney, B. L. Leis, and J. M. Smith, “Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures” IPC2014-33226,","cited_authors":"Conference, Calgary, Alberta, Canada (October 4-8","cited_year":"2004","cited_title":"Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561873,"raw_reference":"ASME-IPC 2014, Calgary, Alberta, Canada, September 2014 • B. A. Young, S. Nanney, and J. M. O’Brian, “Review of Phase II for the Comprehensive Study to Understand Longitudinal ERW Seam Failures”, ASME International,","cited_authors":"ASME-IPC","cited_year":"2014","cited_title":"Review of Phase II for the Comprehensive Study to Understand Longitudinal ERW Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561874,"raw_reference":"IPC 2016, IPC2016-64142, Calgary, Alberta, Canada, September 2016 Outline • Project Drivers • Phase I Overview • Phase II ▪ Task 1 – Improve Hydrotesting Protocols for ERW/FW Seams ▪ Task 2 – Enhance Defect Detection and Sizing ▪ Task 3 – Defect Characterization: Type, Size, Shape ▪ Task 4 – Model Refinement / V&V • Details of PipeAssessTM (Phase II, Task 5) • Future Concepts • Demonstration of PipeAssessTM Drivers for the Project • Stemmed from the Carmichael, MS rupture in 2007 • NTSB P-09-01 Recommended Comprehensive Study • ERW pipe properties • Assess the means to assure the integrity - so they do not fail in service. • Battelle, KAI, and DNV–Columbus teamed to conduct a comprehensive study to understand longitudinal seam failures in electric resistance welded (ERW) and flash-welded pipes. • Project started in August 2011 • Phase I completed in January 2014 • Phase II completed in August 2017","cited_authors":"IPC","cited_year":"2016","cited_title":"IPC2016-64142, Calgary, Alberta, Canada, September 2016 Outline • Project Drivers • Phase I Overview • Phase II ▪ Task 1 – Improve Hydrotesting Protocols for ERW/FW Seams ▪ Task 2 – Enhance Defect Detection and Sizing ▪ Task 3 – Defect Characterization: Type, Size, Shape ▪ Task 4 – Model Refinement / V&V • Details of PipeAssessTM (Phase II, Task 5) • Future Concepts • Demonstration of PipeAssessTM Drivers for the Project • Stemmed from the Carmichael, MS rupture in 2007 • NTSB P-09-01 Recommended Comprehensive Study • ERW pipe properties • Assess the means to assure the integrity - so they do not fail in service","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561875,"raw_reference":"Phase I, Results • 17 Public Reports in Phase I (https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390) • 11 Specific Recommendations • Six (6) on Condition Assessment via ILI or Hydrotesting • Three (3) on Predictive Models • One (1) on Local Mechanical and Fracture Properties • One (1) on Aging Pipelines • 2 Presentations: 2014 PRCI Research Exchange Meeting • 5 Presentations: 2014 ASME IPC Outline • Phase II ▪ Task 1 – Improve Hydrotesting Protocols for ERW/FW Seams ▪ Task 2 – Enhance Defect Detection and Sizing ▪ Task 3 – Defect Characterization: Type, Size, Shape ▪ Task 4 – Model Refinement / V&V ▪ Task 5 – Integrity Management Software ▪ Each Task produced a report ▪ Phase II completed in August 2017 Task 1 – Hydrotest Protocols Details can be found in the following paper: R. J. Olson, B. L. Leis, and B. A. Young, “Findings from an Investigation of Hydrotest Protocols”, ASME International, IPC 2016, IPC2016-64146, Calgary, Alberta,","cited_authors":"Phase I, Results • 17 Public Reports in Phase I (https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390) • 11 Specific Recommendations • Six (6) on Condition Assessment via ILI or Hydrotesting • Three (3) on Predictive Models • One (1) on Local Mechanical and Fracture Properties • One (1) on Aging Pipelines • 2 Presentations: 2014 PRCI Research Exchange Meeting • 5 Presentations: 2014 ASME IPC Outline • Phase II ▪ Task 1 – Improve Hydrotesting Protocols for ERW/FW Seams ▪ Task 2 – Enhance Defect Detection and Sizing ▪ Task 3 – Defect Characterization: Type, Size, Shape ▪ Task 4 – Model Refinement / V&V ▪ Task 5 – Integrity Management Software ▪ Each Task produced a report ▪ Phase II completed in August 2017 Task 1 – Hydrotest Protocols Details can be found in the following paper: R. J. Olson, B. L. Leis, and B. A. Young, “Findings from an Investigation of Hydrotest Protocols”, ASME International, IPC","cited_year":"2016","cited_title":"IPC2016-64146, Calgary, Alberta","cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561876,"raw_reference":"Canada, September 2016 Task 2, ILI & ITDM • 90+ cracks deeper than 25% NWT collected Seam Weld Anomaly (SWA) #1 ➢ Traditional ITDM and IWEX used • Largest cracks installed in Battelle’s Ø16” ILI pull rig ➢ EMAT and transverse MFL used • 19 crack sets identified for validation","cited_authors":null,"cited_year":null,"cited_title":"Canada, September 2016 Task 2, ILI & ITDM • 90+ cracks deeper than 25% NWT collected Seam Weld Anomaly (SWA) #1 ➢ Traditional ITDM and IWEX used • Largest cracks installed in Battelle’s Ø16” ILI pull rig ➢ EMAT and transverse MFL used • 19 crack sets identified for validation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561877,"raw_reference":"DNV Reg. No.: ANEUS811CSEAN120206 Revision No.: 2 Date : November 11, 2012 Page 21","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561878,"raw_reference":"DNV Reg. No.: ANEUS811CSEAN120206 Revision No.: 2 Date : November 11, 2012 Page 22","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561879,"raw_reference":"MANAGING RISK K. Katoh, N. Kosuge, S. Itoh, A. Miyasaka, S. Tanioka, H. Kihira, and T. Murata, Nippon Steel Technical Report, vol. 39/40, p. 15 (1989). T. Hemmingsen, H. Hovdan, P. Sanni, and N.O. Aagones, Electrochimica Acta, vol. 47, p. 3949 (2002). A.G. Howell, \"Under-deposit corrosion at weld seams in carbon steel piping\", Paper No. 447, Corrosion97, NACE International (1997). R. Wong, Corrosion, in press (2012). J.E. Stead, J. Iron and Steel Institute, vol. 11, p. 5 (1916). T.P. Groeneveld, G.O. Davis, and D.N. Williams, \"Evaluations of the susceptibilities of electric-welded pipe to selective seam-weld corrosion\", Paper No. 14, Proceedings of Eighth Biennial Joint Technical Peeting on Line Pipe Research, European Pipeline","cited_authors":"MANAGING RISK K. Katoh, N. Kosuge, S. Itoh, A. Miyasaka, S. Tanioka, H. Kihira, and T. Murata, Nippon Steel Technical Report, vol. 39/40, p. 15","cited_year":"1989","cited_title":"Under-deposit corrosion at weld seams in carbon steel piping","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561880,"raw_reference":"Research Group, (1991). W.E. Heitmann, P.D. Sothwick, and F. Pausic, \"ERW Linepipe: The Effect of Welding and Annealing Upon the Properties, Microstructure, and Corrosion Resistance\", p. 957 in International Conferene on Technology and Application of HSLA Steels, ASM International (1984). G. Wranglen, in Sulfide Inclusions in Steel, p. 361, ASM International (1975). Z. Szklarska-Smialowska, Pitting and Crevice Corrosion, NACE International (2005). C.S. Brossia and R.G. Kelly, Corrosion Science, vol. 40, p. 1851 (1998). G. Wranglen, Corrosion Science, vol. 14, p. 331 (1974). P. Sury, Corrosion Science, vol. 16, p. 879 (1976). P. Marcus, J. Chim. Phys., vol. 88, p. 1697 (1991). C.S. Brossia and R.G. Kelly, Corrosion, vol. 54, p. 145 (1998). G.S. Eklund, J. Electrochem. Soc., vol. 121, p. 467 (1974). S.E. Lott and R.C. Alkire, J. Electrochem. Soc., vol. 136, p. 973 (1989). A. Garner, R.J. Brigham, and J.B. Gilmour, \"Predicting Localized Corrosion of Weldments with Anodic Dissolution Test\", Paper No. 62, Corrosion89, NACE International (1989). L. Tronstad and J. Sejersted, J. Iron and Steel Institute, vol. 127, p. 425 (1933). A. Miyasaka and H. Ogawa, \"Grooving Corrosion Behavior of HF-ERW Pipes and Tubes As Influenced By Petroleum Production Environments\", Paper No. 26, Corrosion91,","cited_authors":"Research Group","cited_year":"1991","cited_title":"ERW Linepipe: The Effect of Welding and Annealing Upon the Properties, Microstructure, and Corrosion Resistance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561881,"raw_reference":"NACE International (1991). C.S. Brossia and G.A. Cragnolino, Corrosion, vol. 56, p. 505 (2000). R. Kiessling, in Non-Metallic Inclusions in Steel, p. 194 The Institute of Metals (1989). A.D. Wilson, Metal Progress, vol. 121, p. 41 (1982). A.D. Wilson, \"Clean steel technology - fundamental to the development of high performance steels\", in Advances in the Production and Use of Steel with Improved","cited_authors":"NACE International","cited_year":"1991","cited_title":"Clean steel technology - fundamental to the development of high performance steels","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561882,"raw_reference":"DNV Reg. No.: ANEUS811CSEAN120206 Revision No.: 2 Date : November 11, 2012 Page 23","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561883,"raw_reference":"MANAGING RISK Internal Cleanliness, ASTM STP1361, J.K. Mahaney, Jr, Editor, ASTM International (1999). G. Krauss, Steels: Heat Treatment and Processing Principles, 2nd ed., ASM International (1990). S. Endo, M. Nagae, S. Fujita, and T. Wada, Welding International, vol. 9, p. 425 (1995). L. Malik, L.D. Parkinson, V. Mitrovic-Scepanovic, and R.J. Brigham, \"Effect of weld metal composition on weld zone 1.2%Mn Steel\", Proceedings of Intenational Conference of Offshore Mechanics and Arctic Engineering, p. 639, ASME Internatinoal (1990). J. Lee, J. Lee, S. Lim, J. Park, B. Seo, and S. Kim, Corrosion Science and Technology, vol. 31, p. 234 (2002). S. Kusaka, Y. Shinbo, Y. Sekine, S. Kojima, and J. Ohwaki, \"Quality of high power laser welded line pipe\", Paper No. OMAE98-2752, in 17th International Conference on Offshore Mechanics and Arctic Engineering, ASME International (1998). T.G. Walsh, \"Continuous On-Line Weld Corrosion Monitoring for the Oil and Gas Industry\", p. 17-1, in International Conference on Pipeline Reliabilty, CANMET (1992). J.F. Kiefner, \"Dealing with low-frequency welded ERW pipe and flash welded pipe\", Paper No. ETCE2002/PIPE-29029 in ASME Engineering Technology Conference on","cited_authors":"MANAGING RISK Internal Cleanliness, ASTM STP1361, J.K. Mahaney, Jr, Editor, ASTM International","cited_year":"1999","cited_title":"Effect of weld metal composition on weld zone 1.2%Mn Steel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561884,"raw_reference":"Energy, ASME International (2002). M. Baker, \"Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation\", Integrity Management Program Report DTRS56-02-D-70035, Revision 3, US Department of Transportation, Pipeline and Hanzardous Materials Safety Administration (2004).","cited_authors":"Energy, ASME International","cited_year":"2002","cited_title":"Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561885,"raw_reference":"DNV Reg. No.: ANEUS811CSEAN120206 Revision No.: 2 Date : November 11, 2012 Page 24","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561886,"raw_reference":"MANAGING RISK APPENDIX - o0o - DNV Reg. No.: ANEUS811CSEAN120106 Revision No.: 2 Date : November 11, 2012 Page M-1 Det Norske Veritas","cited_authors":null,"cited_year":null,"cited_title":"MANAGING RISK APPENDIX - o0o - DNV Reg","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561887,"raw_reference":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since 1864, DNV has balanced the needs of business and society based on our independence and integrity. Today, we have a global presence with a network of 300 offices in 100 countries, with headquarters in Oslo, Norway. Global Impact for a Safe and Sustainable Future - o0o - Interim Report for Phase II – Task 5 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Summary Report for an Integrity Management Software Tool” Authors","cited_authors":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since","cited_year":"1864","cited_title":"Summary Report for an Integrity Management Software Tool","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561888,"raw_reference":"Columbus, OH 43201 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No. DTPH56-11-T-000003 Battelle Contract No. G006084 Battelle Project No. 100004552 May 2017","cited_authors":null,"cited_year":null,"cited_title":"Columbus, OH 43201 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561889,"raw_reference":"Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561890,"raw_reference":"Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2: ILI and ITDM Inspection Assessment Task 3: Defect Characterization: Types, Sizes, Shapes, and Idealizations Task 4: Model Validation Task 5L: Software Development for Integrity Management of Long Seam Welds. This report focuses on the results obtained during the work completed under Phase II, Task 5 which includes the development of a software tool for integrity management. A brief overview of the software will be provided along with Appendices which include the User’s Manual and a presentation made at the 2016 DOT R&D Forum.","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 2: ILI and ITDM Inspection Assessment Task 3: Defect Characterization: Types, Sizes, Shapes, and Idealizations Task 4: Model Validation Task 5L: Software Development for Integrity Management of Long Seam Welds","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561891,"raw_reference":"Battelle Memorial Institute, 2017. [Online]. Available: http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390.","cited_authors":"Battelle Memorial Institute","cited_year":"2017","cited_title":"[Online]. Available: http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561892,"raw_reference":"[4] B. A. Young, R. Olson and J. O'Brian, \"Validation of Fatigue Models for ERW Seam Weld Cracking,\" in ASME PVP 2017, Waikoloa, 2017.","cited_authors":"[4] B. A. Young, R. Olson and J. O'Brian, \"Validation of Fatigue Models for ERW Seam Weld Cracking,\" in ASME PVP","cited_year":"2017","cited_title":"Waikoloa, 2017","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561893,"raw_reference":"GEOMETRY: V=v-groove, U=u-groove DIMENSION: 2D=two dimensional analysis model Copyright © 2017 by Battelle Memorial Institute. All Rights Reserved. 17 / 24 PipeAssess PITM User Manual","cited_authors":null,"cited_year":null,"cited_title":"GEOMETRY: V=v-groove, U=u-groove DIMENSION: 2D=two dimensional analysis model Copyright © 2017 by Battelle Memorial Institute","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561894,"raw_reference":"BS 7910 (2013 & 2015) Note 1 necessary to apply to fatigue Copyright © 2017 by Battelle Memorial Institute. All Rights Reserved. 23 / 24 PipeAssess PITM User Manual Figure 6: Example PipeAssess PI Visualization of Crack Coalesence Software Validation Pending Task 4 Report completion. Works Cited","cited_authors":"BS 7910 (2013 &","cited_year":"2015","cited_title":"Note 1 necessary to apply to fatigue Copyright © 2017 by Battelle Memorial Institute","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561895,"raw_reference":"ASTM International. 2013. E1823-13: Standard Terminology Relating to Fatigue and Fracture Testing. West Conshohocken : s.n., 2013.","cited_authors":"ASTM International","cited_year":"2013","cited_title":"E1823-13: Standard Terminology Relating to Fatigue and Fracture Testing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561896,"raw_reference":"Broek, D. 1986. Elementary Engineering Fracture Mechanics. Dordrecht, The Netherlands : Kluwer","cited_authors":"Broek, D","cited_year":"1986","cited_title":"Elementary Engineering Fracture Mechanics","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561897,"raw_reference":"Academic Publishers, 1986. Leis, B. N. and Brust, F. W. 1992. NG-18 Report No. 194: Hydrotest Strategies for Gas Transmission Pipelines Based on Ductile-Flaw-Growth Considerations. s.l. : American Gas Association, 1992.","cited_authors":"Academic Publishers","cited_year":"1986","cited_title":"Leis, B. N. and Brust, F. W. 1992","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561898,"raw_reference":"Leis, B. N., Brust, F. W. and Scott, P. M. 1991. NG-18 Report No. 193: Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe. s.l. : American Gas Association, 1991.","cited_authors":"Leis, B. N., Brust, F. W. and Scott, P. M","cited_year":"1991","cited_title":"NG-18 Report No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561899,"raw_reference":"Stonesifer, Randall B, Brust, Frederick W and Leis, Brian N. 1992. Stress-Intensity Factors for Long Axial Outer Surface Cracks in Large R/t Pipes. Philadelphia : Fracture Mechanics: Twenty-Second Symposium (Volume II) , 1992. ASTM STP 1131, pp. 29-45.","cited_authors":"Stonesifer, Randall B, Brust, Frederick W and Leis, Brian N","cited_year":"1992","cited_title":"Stress-Intensity Factors for Long Axial Outer Surface Cracks in Large R/t Pipes","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561900,"raw_reference":"Taylor, Craig. 2015. Fatigue Crack Growth of NPS20 Steel Oil Pipe at Varied Orientations. Ontario : University of Windsor, 2015.","cited_authors":"Taylor, Craig","cited_year":"2015","cited_title":"Fatigue Crack Growth of NPS20 Steel Oil Pipe at Varied Orientations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561901,"raw_reference":"Young, B. A., et al. 2014. IPC2014-33226: Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures. s.l. : International Pipeline Conference, 2014.","cited_authors":"Young, B. A., et al","cited_year":"2014","cited_title":"IPC2014-33226: Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561902,"raw_reference":"Young, Bruce, O'Brian, Jennifer and Olson, Richard. 2016. Final Interim Report for Phase II - Task 2 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures: \"Defect Characterization:","cited_authors":"Young, Bruce, O'Brian, Jennifer and Olson, Richard","cited_year":"2016","cited_title":"Final Interim Report for Phase II - Task 2 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures: \"Defect Characterization:","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561903,"raw_reference":"Types, Sizes, Shapes, and Idealizations\". Columbus : Battelle Memorial Institute, 2016. DOT PHMSA Contract No. DTPH56-11T-000003. Copyright © 2017 by Battelle Memorial Institute. All Rights Reserved. 24 / 24","cited_authors":"Types, Sizes, Shapes, and Idealizations\". Columbus : Battelle Memorial Institute","cited_year":"2016","cited_title":"DOT PHMSA Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561904,"raw_reference":"Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Appendix B Demonstration Presentation Bruce Young and Jennifer O’Brian Battelle Energy Resources November 16, 2016","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Task 5 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Appendix B Demonstration Presentation Bruce Young and Jennifer O’Brian Battelle Energy Resources November 16, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561905,"raw_reference":"Mayflower, AR - 2013 Carmichael, MS - 2007 Electric resistance welded (ERW) pipe is longitudinally welded pipe. A failure in the weld seam of this type of pipe can propagate for a distance along the pipe and can quickly release large quantities of product to the environment. Lowfrequency (LF) ERW pipe installed prior to 1970, in particular, can be susceptible to such failures. Drivers for the Project • Stemmed from the Carmichael, MS rupture in 2007 • NTSB P-09-01 Recommended Comprehensive Study • ERW pipe properties • Assess the means to assure the integrity - so they do not fail in service. • Battelle, KAI, and DNV–Columbus teamed to conduct a comprehensive study to understand longitudinal seam failures in electric resistance welded (ERW) and flash-welded pipes. • Project started in August 2011 • Phase I completed in January 2014 Project Review Papers • B. A. Young, S. Nanney, B. L. Leis, and J. M. Smith, “Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures” IPC2014-33226,","cited_authors":"Mayflower, AR - 2013 Carmichael, MS - 2007 Electric resistance welded (ERW) pipe is longitudinally welded pipe. A failure in the weld seam of this type of pipe can propagate for a distance along the pipe and can quickly release large quantities of product to the environment. Lowfrequency (LF) ERW pipe installed prior to","cited_year":"1970","cited_title":"Overview of a Comprehensive Study to Understand Longitudinal ERW Seam Failures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561906,"raw_reference":"ASME-IPC 2014, Calgary, Alberta, Canada, September 2014 • B. A. Young, S. Nanney, and J. M. O’Brian, “Review of Phase II for the Comprehensive Study to Understand","cited_authors":"ASME-IPC","cited_year":"2014","cited_title":"Calgary, Alberta, Canada, September 2014 • B. A. Young, S. Nanney, and J. M. O’Brian, “Review of Phase II for the Comprehensive Study to Understand","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561907,"raw_reference":"3. NACE SP0169-2007, NACE International, Houston (2007). 4. C. S. Brossia, Selective Seam Weld Corrosion Test Method Development, Final Report, Task 3.2, PHMSA (2013). 5. J. A. Beavers and C. L. Durr, “Corrosion of Steel Piping in Non-marine Applications,” National Cooperative Highway Research Program, NCHRP Report 408, National Academy","cited_authors":"3. NACE SP0169-2007, NACE International, Houston","cited_year":"2007","cited_title":"Corrosion of Steel Piping in Non-marine Applications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561908,"raw_reference":"Press, Washington DC, 1998. TAOUS811CSEAN PP017533 June 28, 2013 Det Norske Veritas","cited_authors":"Press, Washington DC","cited_year":"1998","cited_title":"TAOUS811CSEAN PP017533 June 28, 2013 Det Norske Veritas","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561909,"raw_reference":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since 1864, DNV has balanced the needs of business and society based on our independence and integrity. Today, we have a global presence with a network of 300 offices in 100 countries, with headquarters in Oslo, Norway. Global Impact for a Safe and Sustainable Future Learn more on www.dnv.com Interim Report for Phase II – Task 4 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Models and Mechanisms with Validation Results” Authors Richard Olson, Bruce A. Young, and Jennifer M. O’Brian Battelle Memorial Institute 505 King Avenue","cited_authors":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since","cited_year":"1864","cited_title":"Models and Mechanisms with Validation Results","cited_venue":null,"cited_doi":null,"cited_url":"www.dnv.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561910,"raw_reference":"Phase II, Task 4 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Task 4 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561911,"raw_reference":"Phase II, Task 4 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Executive Summary On November 1, 2007 a liquid propane pipeline operated by Dixie Pipeline Company ruptured near Carmichael, Mississippi, which several pipeline industry experts collaboratively indicated the origin was likely a defect in the longitudinal ERW seam, with the ensuing fracture running along that joint into portions of the adjacent pipes. These experts also noted that a seam-integrity assessment did not prevent the failure, as this failure came 2 years after an in-line inspection (ILI) with a sophisticated crackdetection tool; and 23 years after a hydrostatic test to a hoop stress level greater than 1.25 times the maximum operating hoop stress level. Following the NTSB’s public report, the","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Task 4 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Executive Summary On November 1, 2007 a liquid propane pipeline operated by Dixie Pipeline Company ruptured near Carmichael, Mississippi, which several pipeline industry experts collaboratively indicated the origin was likely a defect in the longitudinal ERW seam, with the ensuing fracture running along that joint into portions of the adjacent pipes","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561912,"raw_reference":"NTSB issued Recommendation P-09-1, which called upon the PHMSA to conduct a comprehensive study to identify actions that can be used by operators to eliminate catastrophic longitudinal seam failures in pipe, and indicated the required scope. This led to the PHMSA issued a research announcement (RA) that targeted Recommendation P09-1 in the form of BAA Solicitation DTPH56-11-RA-000001. That Solicitation sought a Comprehensive Understanding of Longitudinal ERW Seam Failures. In response to that Solicitation, Battelle, as the prime contractor, proposed a twophase project to work to develop the understanding sought by the research announcement in resolving Recommendation P-09-1. The Phase I final report was issued in January 2014 and can be found at the following website: https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390. Phase II has five tasks including: Task 1: Hydrotest protocols Task 2: ILI and ITDM Inspection Assessment Task 3: Defect Characterization: Types, Sizes, Shapes, and Idealizations Task 4: Model Validation Task 5L: Software Development for Integrity Management of Long Seam Welds. This report focuses on the results obtained during the work completed under","cited_authors":null,"cited_year":null,"cited_title":"NTSB issued Recommendation P-09-1, which called upon the PHMSA to conduct a comprehensive study to identify actions that can be used by operators to eliminate catastrophic longitudinal seam failures in pipe, and indicated the required scope","cited_venue":null,"cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561913,"raw_reference":"[4] B. Leis and D. Stephens, \"An Alternative Approach to Assess the Integrity of Corroded Line Pipe - Part One: Current Status and Part Two: Alternative Criterion,\" in 7th International Conference on Offshore Pipelines and Polar Engineering, Lisbon, Portugal, 2007.","cited_authors":"[4] B. Leis and D. Stephens, \"An Alternative Approach to Assess the Integrity of Corroded Line Pipe - Part One: Current Status and Part Two: Alternative Criterion,\" in 7th International Conference on Offshore Pipelines and Polar Engineering, Lisbon, Portugal","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561914,"raw_reference":"[6] W. Ramberg and W. Osgood, \"Description of Stress-Strain Curves by Threee Parameters,\" Technical Note No. 902, National Advisory Committee for Aeronautics, Waschington, DC, 1943.","cited_authors":"[6] W. Ramberg and W. Osgood, \"Description of Stress-Strain Curves by Threee Parameters,\" Technical Note No. 902, National Advisory Committee for Aeronautics, Waschington, DC","cited_year":"1943","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561915,"raw_reference":"[7] B. Leis, F. Brust and P. Scott, \"Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,\" PRCI Catalog L51643, 1991.","cited_authors":"[7] B. Leis, F. Brust and P. Scott, \"Development and Validation of a Ductile Flaw Growth Analysis for Gas Transmission Line Pipe,\" PRCI Catalog L51643","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561916,"raw_reference":"[8] V. Kuhnle and H. Reidel, \"Time-Dependent Deformation and Fracture of Stell between 20C and 400C,\" International Journal of Fracture, vol. 34, pp. 179-194, 1987.","cited_authors":"[8] V. Kuhnle and H. Reidel, \"Time-Dependent Deformation and Fracture of Stell between 20C and 400C,\" International Journal of Fracture, vol. 34, pp. 179-194","cited_year":"1987","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561917,"raw_reference":"[9] K. Walker, \"The Effect of Stress Ratio During Crack Propagation and Fatigue for 2024-T3 and 7075-T6 Aluminum,\" in Effect of Environment and Complex Load History on Fatigue Life: ASTM STP 462, West Conshohocken, PA, 1970.","cited_authors":"[9] K. Walker, \"The Effect of Stress Ratio During Crack Propagation and Fatigue for 2024-T3 and 7075-T6 Aluminum,\" in Effect of Environment and Complex Load History on Fatigue Life: ASTM STP 462, West Conshohocken, PA","cited_year":"1970","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561918,"raw_reference":"Wright Patterson Air Force Base, 1971.","cited_authors":"Wright Patterson Air Force Base","cited_year":"1971","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561919,"raw_reference":"[11] ASTM International, \"Standard Practice for Cycle Counting in Fatigue Analyses: ASTM E1049-85(2011),\" West Conshohocken, PA, 2011.","cited_authors":"[11] ASTM International, \"Standard Practice for Cycle Counting in Fatigue Analyses: ASTM E1049-85","cited_year":"2011","cited_title":"\" West Conshohocken, PA, 2011","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561920,"raw_reference":"[12] Rolfe S. and J. Barson, Fracture and Fatigue Control in Structures, Englewood: PrenticeHall, 1977.","cited_authors":"[12] Rolfe S. and J. Barson, Fracture and Fatigue Control in Structures, Englewood: PrenticeHall","cited_year":"1977","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561921,"raw_reference":"Engineering, Transactions of the American Society of Mechanical Engineers, pp. 528-534, 1963.","cited_authors":"Engineering, Transactions of the American Society of Mechanical Engineers, pp. 528-534","cited_year":"1963","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561922,"raw_reference":"[14] G. Irwin, \"Linear Fracture Mechanics, Fracture Transition, and Fracture Control,\" Engineering Fracture Mechanics, vol. 1, no. 2, pp. 241-257, 1968.","cited_authors":"[14] G. Irwin, \"Linear Fracture Mechanics, Fracture Transition, and Fracture Control,\" Engineering Fracture Mechanics, vol. 1, no. 2, pp. 241-257","cited_year":"1968","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561923,"raw_reference":"[15] G. Irwin, \"Plastic Zone Near a Crack Tip and Fracture Toughness,\" in Sagamore Ordinance Materials Conference, Syracuse, 1961.","cited_authors":"[15] G. Irwin, \"Plastic Zone Near a Crack Tip and Fracture Toughness,\" in Sagamore Ordinance Materials Conference, Syracuse","cited_year":"1961","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561924,"raw_reference":"[16] B. A. Young, R. Olson and J. O'Brian, \"Validation of Fatigue Models for ERW Seam Weld Cracking (Phase II, Task 3),\" in ASME PVP 2017, Waikoloa, 2017.","cited_authors":"[16] B. A. Young, R. Olson and J. O'Brian, \"Validation of Fatigue Models for ERW Seam Weld Cracking (Phase II, Task 3),\" in ASME PVP","cited_year":"2017","cited_title":"Waikoloa, 2017","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561925,"raw_reference":"[17] B. N. Leis and R. J. Eiber, \"Fracture Control Technology for Transmission Pipelines (NG18 208 Update),\" Battelle Memorial Institute, Columbus, 2009.","cited_authors":"[17] B. N. Leis and R. J. Eiber, \"Fracture Control Technology for Transmission Pipelines (NG18 208 Update),\" Battelle Memorial Institute, Columbus","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561926,"raw_reference":"[18] J. F. Kiefner, W. A. Maxey, R. J. Eiber and A. R. Duffy, \"Failure Stress Levels of Flaws in Pressurized Cylinders,\" ASTM STP 536, pp. 461-481, 1973.","cited_authors":"[18] J. F. Kiefner, W. A. Maxey, R. J. Eiber and A. R. Duffy, \"Failure Stress Levels of Flaws in Pressurized Cylinders,\" ASTM STP 536, pp. 461-481","cited_year":"1973","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561927,"raw_reference":"[19] J. F. Keifner and K. M. Kolovich, \"Models for Predicting Failure Stress Levels for Defects Affecting ERW and Flash-Welded Seams,\" KAI, Worthington, 2013.","cited_authors":"[19] J. F. Keifner and K. M. Kolovich, \"Models for Predicting Failure Stress Levels for Defects Affecting ERW and Flash-Welded Seams,\" KAI, Worthington","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561928,"raw_reference":"Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus, 2017.","cited_authors":"Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561929,"raw_reference":"Washington, DC Report No./DNV Reg No.: TAOUS811CSEAN (PP017533) July 15, 2013","cited_authors":null,"cited_year":null,"cited_title":"Washington, DC Report No./DNV Reg No.: TAOUS811CSEAN (PP017533) July 15, 2013","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561930,"raw_reference":"Dublin, OH 43017-1886, United States Tel: (614) 761-1214 Fax: (614) 761-1633 http://www.dnv.com http://www.dnvusa.com For: U.S. Department of Transportation Pipeline and Hazardous Materials Safety Admin. East Building, 2nd Floor 1200 New Jersey Avenue, SE","cited_authors":null,"cited_year":null,"cited_title":"Dublin, OH 43017-1886, United States Tel: (614) 761-1214 Fax: (614) 761-1633 http://www.dnv.com http://www.dnvusa.com For: U.S. Department of Transportation Pipeline and Hazardous Materials Safety Admin","cited_venue":null,"cited_doi":null,"cited_url":"http://www.dnv.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561931,"raw_reference":"Washington, DC 20590 Account Ref.: Date of First Issue: Report No.: Revision No.: Summary: June 28, 2013 Project No. Organization Unit: Subject Group: PP017533-3 Materials & Corrosion Technology Ctr. Please see Executive Summary. Signature Prepared by: Sean Brossia, Ph.D. Director – Technology Development Signature Verified by: John Beavers, Ph.D. Director – Failure Analysis Signature Approved by:","cited_authors":null,"cited_year":null,"cited_title":"Washington, DC 20590 Account Ref.: Date of First Issue: Report No.: Revision No.: Summary: June 28, 2013 Project No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561932,"raw_reference":"DNV after 3 years) No distribution without permission from the client or responsible organizational unit Words Strictly confidential Unrestricted distribution Rev. No. / Date: Reason for Issue: Prepared by: Approved by: Verified by © 2013 Det Norske Veritas (U.S.A.), Inc. All rights reserved. This publication or parts thereof may not be reproduced or transmitted in any form or by any means, including photocopying or recording, without the prior written consent of Det Norske Veritas (U.S.A.), Inc. TAOUS811CSEAN Q:\\TAOUS813\\ANDERSON\\2011\\JOHN BEAVERS\\BATTELLE - PHMSA (1-3G9PY8) June 17 (PP01 7533) and (PP01 7534)\\TASKS 2point3 AND 3 (1-3G9PY8) June 28 (PP01 7533)\\SEAN BROSSIA\\PHMSA Task 3.4 P-09-1 Input Final Report (PP01 7533) July 15.doc July 15, 2013","cited_authors":null,"cited_year":null,"cited_title":"DNV after 3 years) No distribution without permission from the client or responsible organizational unit Words Strictly confidential Unrestricted distribution Rev","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561933,"raw_reference":"DET NORSKE VERITAS™ Pipeline and Hazardous Materials Safety Administration (PHMSA) Task 3.4 – Input to Report: Implications for Recommendation P-09-1 Executive Summary Over the past few years, a number of high profile pipeline failures have occurred wherein fracture initiated at the longitudinal seam welds in early generation electric resistance welded (ERW) pipe. These include failure of a liquid propane pipeline operated by Dixie Pipeline Company in Carmichael, Mississippi in 2007. In some cases, it appears that seam-integrity assessments, in-line inspection (ILI), and/or mill hydrotesting did not detect the presence of significant seam weld defects.","cited_authors":"DET NORSKE VERITAS™ Pipeline and Hazardous Materials Safety Administration (PHMSA) Task 3.4 – Input to Report: Implications for Recommendation P-09-1 Executive Summary Over the past few years, a number of high profile pipeline failures have occurred wherein fracture initiated at the longitudinal seam welds in early generation electric resistance welded (ERW) pipe. These include failure of a liquid propane pipeline operated by Dixie Pipeline Company in Carmichael, Mississippi in","cited_year":"2007","cited_title":"In some cases, it appears that seam-integrity assessments, in-line inspection (ILI), and/or mill hydrotesting did not detect the presence of significant seam weld defects","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561934,"raw_reference":"Research Group, (1991). 16. W. E. Heitmann, P. D. Sothwick, and F. Pausic, “ERW Linepipe: The Effect of Welding and Annealing Upon the Properties, Microstructure, and Corrosion Resistance,” p. 957 in International Conferene on Technology and Application of","cited_authors":"Research Group","cited_year":"1991","cited_title":"ERW Linepipe: The Effect of Welding and Annealing Upon the Properties, Microstructure, and Corrosion Resistance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561935,"raw_reference":"HSLA Steels, ASM International (1984). 17. G. Wranglen, in Sulfide Inclusions in Steel, p. 361, ASM International (1975). 18. Z. Szklarska-Smialowska, Pitting and Crevice Corrosion, NACE International (2005). 19. C. S. Brossia and R. G. Kelly, Corrosion Science, vol. 40, p. 1851 (1998). 20. G. Wranglen, Corrosion Science, vol. 14, p. 331 (1974). 21. P. Sury, Corrosion Science, vol. 16, p. 879 (1976). 22. P. Marcus, J. Chim. Phys., vol. 88, p. 1697 (1991). 23. C. S. Brossia and R. G. Kelly, Corrosion, vol. 54, p. 145 (1998). 24. G.S. Eklund, J. Electrochem. Soc., vol. 121, p. 467 (1974). 25. S.E. Lott and R.C. Alkire, J. Electrochem. Soc., vol. 136, p. 973 (1989). 26. C. Duran, E. Treiss, G. Herbsleb, Materials Performance, p. 41, September (1986). 27. C. S. Brossia, Selective Seam Weld Corrosion Test Method Development, Final Report,","cited_authors":"HSLA Steels, ASM International","cited_year":"1984","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561936,"raw_reference":"PHMSA (2013). 28. C.S. Brossia, Selective Seam Weld Corrosion Effectiveness of Cathodic Protection, Final Report, PHMSA (2013). 29. C. S. Brossia, M. Yunovich, D. Hill, K. M. Lawson, R. Denzine, J. T. Schmidt, E.","cited_authors":"PHMSA","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561937,"raw_reference":"Klechka, E. Schindelholz, E. Nordgren, D. Krop, R. Baboian, H. Hack, J. D. Flessas, D. C. Cook, “Corrosion condition assessment, mitigation, and preservation of USS Monitor artifacts,” NACE Corrosion2007, Paper No. 07239 (2007). TAOUS811CSEAN PP017533 July 15, 2013 Det Norske Veritas","cited_authors":"Klechka, E. Schindelholz, E. Nordgren, D. Krop, R. Baboian, H. Hack, J. D. Flessas, D. C. Cook, “Corrosion condition assessment, mitigation, and preservation of USS Monitor artifacts,” NACE Corrosion2007, Paper No. 07239","cited_year":"2007","cited_title":"TAOUS811CSEAN PP017533 July 15, 2013 Det Norske Veritas","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561938,"raw_reference":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since 1864, DNV has balanced the needs of business and society based on our independence and integrity. Today, we have a global presence with a network of 300 offices in 100 countries, with headquarters in Oslo, Norway. Global Impact for a Safe and Sustainable Future Learn more on www.dnv.com Battelle Final Report No. 13-021 Final Report Predicting Times to Failure for ERW Seam Defects that Grow by Pressure-CycleInduced Fatigue J. F. Kiefner and K. M. Kolovich January 28, 2013 Kiefner & Associates, Inc. 585 Scherers Court","cited_authors":"DNV is an independent organization with dedicated risk professionals in more than 100 countries. Our purpose is to safeguard life, property, and the environment. DNV serves a range of industries, with a special focus on the maritime and energy sectors. Since","cited_year":"1864","cited_title":"DNV has balanced the needs of business and society based on our independence and integrity","cited_venue":null,"cited_doi":null,"cited_url":"www.dnv.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561939,"raw_reference":"OTHER TRANSACTION AGREEMENT NO. DTPH56-11-T-000003 January 28, 2013 J. F. Kiefner and K. M. Kolovich Kiefner and Associates, Inc. 585 Scherers Court","cited_authors":null,"cited_year":null,"cited_title":"OTHER TRANSACTION AGREEMENT NO. DTPH56-11-T-000003 January 28, 2013 J. F. Kiefner and K. M. Kolovich Kiefner and Associates, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561940,"raw_reference":"ASME, Journal of Basis Engineering, Series D, Volume 85, No. 5, (1963) pp 405-09 J.C. Newman, Jr. and I.S. Raju, “An Empirical Stress-Intensity Factor Equation for the Surface Crack”. Engineering Fracture Mechanics, Vol. 15, No. 1-2, pp 185-192, 1981, printed in Great Britain. iv Kiefner, J.F., “Modified equation helps integrity management”, Oil and Gas Journal, Oct 6, 2008, pp 76-82 and “Modified Ln-Secant equation improves failure prediction”Oct 13, 2008, pp 64-66.","cited_authors":"ASME, Journal of Basis Engineering, Series D, Volume 85, No. 5","cited_year":"1963","cited_title":"An Empirical Stress-Intensity Factor Equation for the Surface Crack","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561941,"raw_reference":"Jaske, C. E., and Beavers, J. A., “Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines”, Proceedings of IPC 2002, 4th International Pipeline Conference, September 29-October 3, 2002, Calgary, Alberta, Canada","cited_authors":"Jaske, C. E., and Beavers, J. A., “Development and Evaluation of Improved Model for Engineering Critical Assessment of Pipelines”, Proceedings of IPC","cited_year":"2002","cited_title":"4th International Pipeline Conference, September 29-October 3, 2002, Calgary, Alberta, Canada","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561942,"raw_reference":"Anderson, T. L., Merrick, R. D., Yukawa, S., Bray, D. E., Kaley, L., and Van Scyoc, K., “FitnessFor-Service Evaluation Procedures For Operating Pressure Vessels, Tanks, And Piping in Refinery And Chemical Service”, FS-26, Consultants’ Report, MPC Program On Fitness-For-Service, Draft 5, The Materials Properties Council, New York, N.Y., October, 1995. viii","cited_authors":"Anderson, T. L., Merrick, R. D., Yukawa, S., Bray, D. E., Kaley, L., and Van Scyoc, K., “FitnessFor-Service Evaluation Procedures For Operating Pressure Vessels, Tanks, And Piping in Refinery And Chemical Service”, FS-26, Consultants’ Report, MPC Program On Fitness-For-Service, Draft 5, The Materials Properties Council, New York, N.Y., October","cited_year":"1995","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561943,"raw_reference":"API 579-2/ASME FFS-1 – Fitness-for-Service, 2009","cited_authors":null,"cited_year":null,"cited_title":"API 579-2/ASME FFS-1 – Fitness-for-Service, 2009","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561944,"raw_reference":"Mayfield, M.E., and Maxey, W.A., “ERW Weld Zone Characteristics”. Final Report to A.G.A./PRC, A.G.A. Catalog No. L51427, June, 1982.","cited_authors":"Mayfield, M.E., and Maxey, W.A., “ERW Weld Zone Characteristics”. Final Report to A.G.A./PRC, A.G.A. Catalog No. L51427, June","cited_year":"1982","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561945,"raw_reference":"Conference, Calgary, Alberta, Canada (October 4-8, 2004). Kiefner and Associates, Inc. January 2013","cited_authors":"Conference, Calgary, Alberta, Canada (October 4-8","cited_year":"2004","cited_title":"Kiefner and Associates, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561946,"raw_reference":"Kiefner, J.F., and Kolovich, K.M., “Models for Predicting Failure Stress Levels for ERW and Flash Weld Seams” Subtask 2.4 of U.S. Department of Transportation Other Transaction Agreement No. DTPH56-11-T-000003, December 18, 2012. Kiefner and Associates, Inc. January 2013 Interim Report for Phase II – Task 1 of the Comprehensive Study to Understand Longitudinal ERW Seam Failures “Hydrostatic Testing Protocols” Authors","cited_authors":"Kiefner, J.F., and Kolovich, K.M., “Models for Predicting Failure Stress Levels for ERW and Flash Weld Seams” Subtask 2.4 of U.S. Department of Transportation Other Transaction Agreement No. DTPH56-11-T-000003, December 18","cited_year":"2012","cited_title":"Hydrostatic Testing Protocols","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561947,"raw_reference":"Phase II, Task 1 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Task 1 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561948,"raw_reference":"American Gas Association, 1991.","cited_authors":"American Gas Association","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561949,"raw_reference":"[3] R. J. Olson, B. A. Young and B. Leis, \"Findings from an Investigation of Hydrotest Protocols,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[3] R. J. Olson, B. A. Young and B. Leis, \"Findings from an Investigation of Hydrotest Protocols,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561950,"raw_reference":"[4] T. Anderson and G. Throwald, \"A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth,\" in ASME IPC 2016,","cited_authors":"[4] T. Anderson and G. Throwald, \"A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561951,"raw_reference":"[5] N. Al-Otaibi, H. Al-Muslim, W. Harper, T. Bubenik and W. A. Al-Usaimi, \"Assessing the Benefits of Hydrotests for Pipelines with SCC History PostDetection ILI Runs,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[5] N. Al-Otaibi, H. Al-Muslim, W. Harper, T. Bubenik and W. A. Al-Usaimi, \"Assessing the Benefits of Hydrotests for Pipelines with SCC History PostDetection ILI Runs,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561952,"raw_reference":"[6] M. Hilger, B. Mittelstadt and M. V. P. Piazza, \"Pipeline Oporator Perspective in Use of Hydrostatic Testing as an Integrity Management Tool,\" in ASME IPC 2016,","cited_authors":"[6] M. Hilger, B. Mittelstadt and M. V. P. Piazza, \"Pipeline Oporator Perspective in Use of Hydrostatic Testing as an Integrity Management Tool,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561953,"raw_reference":"[7] D. Warman, N. Grusdowich, H. Kleeman, S. Boardman and U. Duruike, \"De Facto Hydrostatic Test Pressures - A Study in Double Stroking,\" in ASME IPC 2016,","cited_authors":"[7] D. Warman, N. Grusdowich, H. Kleeman, S. Boardman and U. Duruike, \"De Facto Hydrostatic Test Pressures - A Study in Double Stroking,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561954,"raw_reference":"[8] J. Rau and M. Kirkwood, \"Hydrotesting and In-Line Inspection; Now and in the Future,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[8] J. Rau and M. Kirkwood, \"Hydrotesting and In-Line Inspection; Now and in the Future,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561955,"raw_reference":"[9] S. Keane, M. Rosenfeld and L. Heise, \"Hydrostatic Pressure Testing as Part of an Integrity Magagement Program: A Case Study,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[9] S. Keane, M. Rosenfeld and L. Heise, \"Hydrostatic Pressure Testing as Part of an Integrity Magagement Program: A Case Study,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561956,"raw_reference":"EMAT Inline Inspection Technology for the Integrity Managment of Stress Corrosion Cracking (SCC) in Gas Pipelines,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"EMAT Inline Inspection Technology for the Integrity Managment of Stress Corrosion Cracking (SCC) in Gas Pipelines,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561957,"raw_reference":"[11] Micheal Baker Jr., Inc., \"TTO Number 5, Intergrity Managment Program Delivery Order DTRS56-020D070036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation; Final Report - Rev 3.,\" Department of Transportation, Research and Special Programs Administration, Office of Pipeline safety, 2014.","cited_authors":"[11] Micheal Baker Jr., Inc., \"TTO Number 5, Intergrity Managment Program Delivery Order DTRS56-020D070036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation; Final Report - Rev 3.,\" Department of Transportation, Research and Special Programs Administration, Office of Pipeline safety","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561958,"raw_reference":"[12] B. N. Leis and F. W. Brust, \"Hydrotest Strategies for Gas Transmission Pipelines Based on Ductile Flaw Growth Considerations Pipelines Based on Ductile Flaw Growth Considerations,\" Pipeline Research Council International, PRCI/AGA Catalog No. L51665, 1992.","cited_authors":"[12] B. N. Leis and F. W. Brust, \"Hydrotest Strategies for Gas Transmission Pipelines Based on Ductile Flaw Growth Considerations Pipelines Based on Ductile Flaw Growth Considerations,\" Pipeline Research Council International, PRCI/AGA Catalog No. L51665","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561959,"raw_reference":"[13] D. Lombardo and J. Paul, \"Aircraft Structures Technical Memorandom 492,\" 1988. [Online]. Available: www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552.","cited_authors":"[13] D. Lombardo and J. Paul, \"Aircraft Structures Technical Memorandom 492,\"","cited_year":"1988","cited_title":"[Online]. Available: www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552","cited_venue":null,"cited_doi":null,"cited_url":"www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561960,"raw_reference":"[14] J. Willenborg, R. Engle and H. and Wood, \"A Crack Growth Retardation Model Ising an Effective Stress Approach,\" Air Force Flight Dynamics Laboratory, Wright Patterson Air Force Base, Ohio, 1971.","cited_authors":"[14] J. Willenborg, R. Engle and H. and Wood, \"A Crack Growth Retardation Model Ising an Effective Stress Approach,\" Air Force Flight Dynamics Laboratory, Wright Patterson Air Force Base, Ohio","cited_year":"1971","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561961,"raw_reference":"[15] Proprietary Data Held at Battelle, 2015.","cited_authors":"[15] Proprietary Data Held at Battelle","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561962,"raw_reference":"[16] B. Young, J. O'Brian and R. Olson, \"Defect Characterization: Types, Sizes, Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus, 2017.","cited_authors":"[16] B. Young, J. O'Brian and R. Olson, \"Defect Characterization: Types, Sizes, Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561963,"raw_reference":"[17] B. Young, J. O'Brian and R. Olson, \"Validation of Fatigue Models for ERW Seam Weld Cracking\", in ASME PVP-2017, Waikola, 2017 Final Report for Phase II of the Comprehensive Study to Understand Longitudinal ERW Seam Failures Authors","cited_authors":null,"cited_year":null,"cited_title":"Validation of Fatigue Models for ERW Seam Weld Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561964,"raw_reference":"Columbus, OH 43201 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No. DTPH56-11-T-000003 Battelle Contract No. G006084 Battelle Project No. 100004552 August 2017","cited_authors":null,"cited_year":null,"cited_title":"Columbus, OH 43201 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561965,"raw_reference":"Phase II, Final Report Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2017 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner.","cited_authors":null,"cited_year":null,"cited_title":"Phase II, Final Report Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561966,"raw_reference":"[4] R. J. Olson, B. A. Young and B. Leis, \"Findings from an Investigation of Hydrotest Protocols,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[4] R. J. Olson, B. A. Young and B. Leis, \"Findings from an Investigation of Hydrotest Protocols,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561967,"raw_reference":"[5] T. Anderson and G. Throwald, \"A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth,\" in ASME IPC 2016,","cited_authors":"[5] T. Anderson and G. Throwald, \"A Fintie Element Procedure to Model the Effect of Hydrostatic Testing on Subsequent Fatigue Crack Growth,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561968,"raw_reference":"[6] N. Al-Otaibi, H. Al-Muslim, W. Harper, T. Bubenik and W. A. Al-Usaimi, \"Assessing the Benefits of Hydrotests for Pipelines with SCC History PostDetection ILI Runs,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[6] N. Al-Otaibi, H. Al-Muslim, W. Harper, T. Bubenik and W. A. Al-Usaimi, \"Assessing the Benefits of Hydrotests for Pipelines with SCC History PostDetection ILI Runs,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561969,"raw_reference":"[7] M. Hilger, B. Mittelstadt and M. V. P. Piazza, \"Pipeline Oporator Perspective in Use of Hydrostatic Testing as an Integrity Management Tool,\" in ASME IPC 2016,","cited_authors":"[7] M. Hilger, B. Mittelstadt and M. V. P. Piazza, \"Pipeline Oporator Perspective in Use of Hydrostatic Testing as an Integrity Management Tool,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561970,"raw_reference":"[8] D. Warman, N. Grusdowich, H. Kleeman, S. Boardman and U. Duruike, \"De Facto Hydrostatic Test Pressures - A Study in Double Stroking,\" in ASME IPC 2016,","cited_authors":"[8] D. Warman, N. Grusdowich, H. Kleeman, S. Boardman and U. Duruike, \"De Facto Hydrostatic Test Pressures - A Study in Double Stroking,\" in ASME IPC","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561971,"raw_reference":"[9] J. Rau and M. Kirkwood, \"Hydrotesting and In-Line Inspection; Now and in the Future,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[9] J. Rau and M. Kirkwood, \"Hydrotesting and In-Line Inspection; Now and in the Future,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561972,"raw_reference":"[10] S. Keane, M. Rosenfeld and L. Heise, \"Hydrostatic Pressure Testing as Part of an Integrity Magagement Program: A Case Study,\" in ASME IPC 2016, Calgary, 2016.","cited_authors":"[10] S. Keane, M. Rosenfeld and L. Heise, \"Hydrostatic Pressure Testing as Part of an Integrity Magagement Program: A Case Study,\" in ASME IPC","cited_year":"2016","cited_title":"Calgary, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561973,"raw_reference":"[12] Micheal Baker Jr., Inc., \"TTO Number 5, Intergrity Managment Program Delivery Order DTRS56-020D070036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation; Final Report - Rev 3.,\" Department of Transportation, Research and Special Programs Administration, Office of Pipeline safety, 2014.","cited_authors":"[12] Micheal Baker Jr., Inc., \"TTO Number 5, Intergrity Managment Program Delivery Order DTRS56-020D070036, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation; Final Report - Rev 3.,\" Department of Transportation, Research and Special Programs Administration, Office of Pipeline safety","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561974,"raw_reference":"[13] B. Young, J. O'Brian and R. Olson, \"Validation of Fatigue Models for ERW Seam Weld Cracking\", in ASME PVP-2017, Waikola, 2017","cited_authors":null,"cited_year":null,"cited_title":"Validation of Fatigue Models for ERW Seam Weld Cracking","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561975,"raw_reference":"[14] D. Lombardo and J. Paul, \"Aircraft Structures Technical Memorandom 492,\" 1988. [Online]. Available: www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552.","cited_authors":"[14] D. Lombardo and J. Paul, \"Aircraft Structures Technical Memorandom 492,\"","cited_year":"1988","cited_title":"[Online]. Available: www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552","cited_venue":null,"cited_doi":null,"cited_url":"www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA199552","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561976,"raw_reference":"[15] J. Willenborg, R. Engle and H. and Wood, \"A Crack Growth Retardation Model Ising an Effective Stress Approach,\" Air Force Flight Dynamics Laboratory, Wright Patterson Air Force Base, Ohio, 1971.","cited_authors":"[15] J. Willenborg, R. Engle and H. and Wood, \"A Crack Growth Retardation Model Ising an Effective Stress Approach,\" Air Force Flight Dynamics Laboratory, Wright Patterson Air Force Base, Ohio","cited_year":"1971","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561977,"raw_reference":"[16] B. N. Leis, B. A. Young and e. al., \"Final Summary Report and Recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures -Phase One,\" < http://primis.phmsa.dot.gov/matrix/FilGet.rdm?fil=8501&s=EC16005513FE40EE8 67254CFB69090FD&c=1 >, DTPH56-11-T-000003, 2013.","cited_authors":"[16] B. N. Leis, B. A. Young and e. al., \"Final Summary Report and Recommendations for the Comprehensive Study to Understand Longitudinal ERW Seam Failures -Phase One,\" < http://primis.phmsa.dot.gov/matrix/FilGet.rdm?fil=8501&s=EC16005513FE40EE8 67254CFB69090FD&c=1 >, DTPH56-11-T-000003","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/FilGet.rdm?fil=8501&s=EC16005513FE40EE8","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561978,"raw_reference":"[17] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L, 2013.","cited_authors":"[17] J. F. Kiefner, K. M. Kolovich and et. al., \"Subtask 1.3: Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment\",\" < http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390 >, DTPH56-11-T000003L","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561979,"raw_reference":"[18] D.-J. Shim and et al., \"Application of Extended Finite Element Method (XFEM) to Stress Intensity Factor Calculations,\" Proceedings of the ASME 2015 Pressure Vessels & Piping Conference, Massachusetts, 2015.","cited_authors":"[18] D.-J. Shim and et al., \"Application of Extended Finite Element Method (XFEM) to Stress Intensity Factor Calculations,\" Proceedings of the ASME 2015 Pressure Vessels & Piping Conference, Massachusetts","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561980,"raw_reference":"Insititute, \"API 579-1/ASME FFS-1, Second Edition,\" 2007.","cited_authors":"Insititute, \"API 579-1/ASME FFS-1, Second Edition,\"","cited_year":"2007","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561981,"raw_reference":"[20] B. Young, J. O'Brian and R. Olson, \"Defect Characterization: Types, Sizes, Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus, 2017.","cited_authors":"[20] B. Young, J. O'Brian and R. Olson, \"Defect Characterization: Types, Sizes, Shapes, and Idealizations,\" Battelle Memorial Institute, Columbus","cited_year":"2017","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561982,"raw_reference":"[21] B. A. Young, R. J. Olson and J. M. O'Brain, \"Phase 2, Task 4 Report: Analysis Models,\" Battelle Memorial Institute, 2017. [Online]. Available: http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390.","cited_authors":"[21] B. A. Young, R. J. Olson and J. M. O'Brain, \"Phase 2, Task 4 Report: Analysis Models,\" Battelle Memorial Institute","cited_year":"2017","cited_title":"[Online]. Available: http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","cited_venue":null,"cited_doi":null,"cited_url":"http://primis.phmsa.dot.gov/matrix/PrjHome.rdm?prj=390","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}