08/2024 - NUREG-1437, Volume 3, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
Other documents for the same rulemaking (all, by stage)
References
NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2012d. Letter from NRC to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status dated March 12, 2012, regarding “Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML12056A046.
NRC (U.S. Nuclear Regulatory Commission). 2012e. Memorandum from A. Vietti-Cook to R.W.
Borchardt, dated March 9, 2012, regarding “Staff Requirements – SECY-12-0025 Proposed Orders and Requests for Information in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Tsunami.” SRM-12-0025, Washington, D.C. ADAMS Accession No. ML120690347.
NRC (U.S. Nuclear Regulatory Commission). 2012f. Policy Issue Notation Vote: Proposed Orders and Requests for Information in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Tsunami. SECY-12-0025, Washington, D.C. ADAMS Accession No. ML12039A111.
NRC (U.S. Nuclear Regulatory Commission). 2012g. State-of-the-Art Reactor Consequence Analyses (SOARCA) Report. NUREG-1935, Washington, D.C. ADAMS Accession No. ML12332A057.
NRC (U.S. Nuclear Regulatory Commission). 2012h. Letter from E. Leeds to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments, dated March 12, 2012, regarding “Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents.” EA-12-050, Washington, D.C. ADAMS Accession No. ML12054A694.
NRC (U.S. Nuclear Regulatory Agency). 2013a. Final Environmental Impact Statement Related to the Operation of Watts Bar Nuclear Plant Units Nos. 1 and 2. NUREG-0498, Supplement No. 2, Washington, D.C. ADAMS Accession Nos. ML13144A092, ML13144A093.
NRC (U.S. Nuclear Regulatory Commission). 2013b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C.
ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission). 2013c. Letter from D.L. Skeen to NRC dated February 15, 2013, regarding “Electric Power Research Institute; Seismic Evaluation Guidance.”
NRC (U.S. Nuclear Regulatory Commission). 2013d. Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications. Regulatory Guide 4.2, Supplement 1, Revision 1, Washington, D.C. ADAMS Accession No. ML13067A354.
NRC (U.S. Nuclear Regulatory Commission). 2013e. State-of-the-Art Reactor Consequence Analyses Project Volume 1: Peach Bottom Integrated Analysis. NUREG/CR-7110, Volume 1, Revision 1, Washington, D.C. ADAMS Accession No. ML13150A053.
NRC (U.S. Nuclear Regulatory Commission). 2013f. State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis. NUREG/CR-7110, Volume 2, Revision 1,
NUREG-1437, Revision 2 E-104 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2013g. Letter from E. Leeds to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments, dated June 6, 2013, regarding “Issuance of to Order Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.” EA-13-109,
NRC (U.S. Nuclear Regulatory Commission). 2014a. Consequence Study of a Beyond-DesignBasis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor.
NRC (U.S. Nuclear Regulatory Commission). 2014b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 49: Regarding Limerick Generating Station, Units 1 and 2, Chapters 1 to 12, Final Report. NUREG-1437, Supplement 49, Volumes 1 and 2,
NRC (U.S. Nuclear Regulatory Commission). 2014c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 50: Regarding Grand Gulf Nuclear Station, Unit 1, Final Report. NUREG-1437, Supplement 50, Washington, D.C. ADAMS Accession No. ML14328A171.
NRC (U.S. Nuclear Regulatory Commission). 2014d. Memorandum from R.C. Rochelle to M.A.
Satorius, dated May 23, 2014, regarding “Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel.” NRC SRM-COMSECY-130030, Washington, D.C. ADAMS Accession No. ML14143A360.
NRC (U.S. Nuclear Regulatory Commission). 2015a. Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors (10 CFR Part 50). SECY-15-0085. Washington, D.C. ADAMS Accession No. ML15022A214.
NRC (U.S. Nuclear Regulatory Commission). 2015b. Letter from W.M. Dean to All Power Reactor Licensees, dated October 27, 2015, regarding “Final Determination of Licensee Seismic Probabilistic Risk Assessments under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations (50.54(f) Regarding Recommendation 2.1 ‘Seismic’ of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML15194A015.
NRC (U.S. Nuclear Regulatory Commission). 2015c. Policy Issue Notation Vote: Evaluation of the Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors Rulemaking Activities (10 CFR Part 50) (RIN-3150-AJ26). SECY-15-0085,
NRC (U.S. Nuclear Regulatory Commission). 2016a. Probabilistic Risk Assessment and Regulatory Decisionmaking: Some Frequently Asked Questions. NUREG-2201, Washington, D.C. ADAMS Accession No. ML16245A032.
NRC (U.S. Nuclear Regulatory Commission). 2016b. State-of-the-Art Reactor Consequence Analyses Project: Uncertainty Analysis of the Unmitigated Long-Term Station Blackout of the Peach Bottom Atomic Power Station. NUREG/CR-7155, SAND2012-10702P, Washington, D.C.
NRC (U.S. Nuclear Regulatory Commission). 2017a. Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report: Final Report. NUREG-2191, Volume 1,
NRC (U.S. Nuclear Regulatory Commission). 2017b. Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking: Final Report. NUREG1855, Revision 1, Washington, D.C. ADAMS Accession No. ML17062A466.
NRC (U.S. Nuclear Regulatory Commission). 2017c. Revision to JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. JLD-ISG-2012-01, Revision 2,
NRC (U.S. Nuclear Regulatory Commission). 2017d. Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami.
NRC (U.S. Nuclear Regulatory Commission). 2017e. Draft Final Rule: Mitigation of BeyondDesign-Basis Events. SECY-16-0142, Washington, D.C. ADAMS Accession No. ML16301A005.
NRC (U.S. Nuclear Regulatory Commission). 2017f. Memorandum from V.M. McCree, Executive Director for Operations, to Chairman Svinicki, Commissioner Baran, and Commissioner Burns, dated July 24, 2017, regarding “Supplement to SECY-16-0142, Draft Final Rule - Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49).” Washington, D.C.
ADAMS Accession No. ML17194A764. NRC (U.S. Nuclear Regulatory Commission). 2017g. Policy Issue Notation Vote: Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami. SECY-17-0016, Washington, D.C. ADAMS Accession No. ML16356A045.
NRC (U.S. Nuclear Regulatory Commission). 2018a. An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis. Regulatory Guide 1.174, Revision 3, Washington, D.C. ADAMS Accession No. ML17317A256.
NRC (U.S. Nuclear Regulatory Commission). 2018b. Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. Regulatory Guide 1.160, Revision 4, Washington, D.C.
ADAMS Accession No. ML18220B281. NRC (U.S. Nuclear Regulatory Commission). 2018c. Technical Basis for the Containment Protection and Release Reduction Rulemaking for Boiling Water Reactors with Mark I and Mark
NRC (U.S. Nuclear Regulatory Commission). 2019a. SRM-M190124A: Affirmation SessionSECY-16-0142: Final Rule: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49),
NRC (U.S. Nuclear Regulatory Commission). 2019b. Final Rule: Mitigation of Beyond-DesignBasis Events, Washington, D.C. ADAMS Accession No. ML19058A006.
NUREG-1437, Revision 2 E-106 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2019c. Flexible Mitigation Strategies for BeyondDesign-Basis Events. Regulatory Guide 1.226, Revision 0, Washington, D.C. ADAMS Accession No. ML19058A012.
NRC (U.S. Nuclear Regulatory Commission). 2019d. Wide Range Spent Fuel Pool Level Instrumentation. Regulatory Guide 1.227, Revision 0, Washington, D.C. ADAMS Accession No. ML19037A443.
NRC (U.S. Nuclear Regulatory Commission). 2019e. “NRC Staff Preliminary Process for Treatment of Reevaluated Seismic and Flooding Hazard Information in Backfit Determinations,”
NRC (U.S. Nuclear Regulatory Commission). 2019f. Letter from L. Lund to The Licensees of Operating Power Reactors on the Enclosed List, dated July 3, 2019, regarding “Treatment of Reevaluated Seismic Hazard Information provided under Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML19140A307.
NRC (U.S. Nuclear Regulatory Commission). 2019g. Letter from M. J. Ross-Lee to The Licensees of Operating Power Reactors on the Enclosed List, dated August 20, 2019, regarding “Treatment of Reevaluated Flood Hazard Information provided under Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML19067A247.
NRC (U.S. Nuclear Regulatory Commission). 2019h. State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses.
NRC (U.S. Nuclear Regulatory Commission). 2020a. Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities. Regulatory Guide 1.200, Revision 3,
NRC (U.S. Nuclear Regulatory Commission). 2020b. Memorandum from M. Case to J. Donoghue and M.X. Franovich, dated May 13, 2020, regarding “Applicability of Source Term for Accident Tolerant Fuel, High Burn Up and Extended Enrichment.” Washington, D.C. ADAMS Accession No. ML20126G376.
NRC (U.S. Nuclear Regulatory Commission). 2020c. Modeling Potential Reactor Accident
NRC (U.S. Nuclear Regulatory Commission). 2021. Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results. NUREG/KM-0017,
NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2022a. U.S. NRC Level 3 Probabilistic Risk Assessment (PRA) Project, Volume 3x: Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Events and Internal Floods: Draft Report for Comment. Washington, D.C. ADAMS Accession No. ML22067A210.
NRC (U.S. Nuclear Regulatory Commission). 2022b. “Perspective on Safety Improvements for Commercial Nuclear Power Plants.” 34th Annual Regulatory Information Conference (March 8-10). Washington, D.C. ADAMS Accession No. ML22153A343.
NRC (U.S. Nuclear Regulatory Commission). 2022c. Sources of Information Cited in Appendix E, Generic Environmental Impact Statement for License Renewal of Nuclear Plants,
NRC (U.S. Nuclear Regulatory Commission). 2022d. State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Uncertainty Analysis of the Unmitigated Short-Term Station Blackout of the Surry Power Station. NUREG/CR-7262. Washington, D.C. ADAMS Accession No. ML22194A066.
NRC (U.S. Nuclear Regulatory Commission). 2022e. Summary of the Uncertainty Analyses for the State-of-the-Art Reactor Consequence Analyses Project. NUREG/CR-2254. Washington, D.C. October. ADAMS Accession No. ML22193A244.