{"document":{"doc_id":141900,"source":"docket_item","org":"NRC","doc_type":"other","title":"08/2024 - NUREG-1437, Volume 3, Revision 2, \"Generic Environmental Impact Statement for License Renewal of Nuclear Plants\" Final Report","date":"2024-10-08","url":"https://www.regulations.gov/document/NRC-2020-0101-0144","source_native_id":"NRC-2020-0101-0144","status":"fetched","abstract":null,"action":null},"dockets":["NRC-2020-0101"],"rins":["RIN 3150-AK55"],"related":[{"doc_id":144679,"source":"docket_item","org":"NRC","doc_type":"other","title":"Advanced Nuclear Reactor Generic Environmental Impact Statement","date":"2021-03-08"},{"doc_id":155609,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2020 - Scoping Summary Report for the Advanced Nuclear Reactor Generic EIS","date":"2021-03-09"},{"doc_id":144678,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20  - Scoping Meeting Slides  - Advanced Reactor Generic Environmental Impact Statement","date":"2021-03-15"},{"doc_id":155606,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Scoping Meeting Transcript Advanced Reactor GEIS","date":"2021-03-15"},{"doc_id":155608,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Summary of Scoping Meeting Conducted for Advanced Reactor Generic EIS","date":"2021-03-15"},{"doc_id":3993,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Draft Regulatory Analysis","date":"2021-12-15"},{"doc_id":128628,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"Redline Prelimiary Draft Regulatory Guide DG-4032","date":"2021-12-15"},{"doc_id":144487,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Advanced Nuclear Reactor Generic Environmental Impact Statement","date":"2021-12-15"},{"doc_id":144488,"source":"docket_item","org":"NRC","doc_type":"other","title":"SECY-21-0098:  Proposed Rule:  Advanced Nuclear Reactor Generic Environmental Impact Statement","date":"2021-12-15"},{"doc_id":155481,"source":"docket_item","org":"NRC","doc_type":"other","title":"Preliminary Draft Interim Staff Guidance COL-ISG-30:  Advanced Reactor Applications - Environmental Considerations for Advanced Nuclear Applications that Reference the GEIS (NUREG- 2249)","date":"2021-12-15"},{"doc_id":155483,"source":"docket_item","org":"NRC","doc_type":"other","title":"Clean Preliminary Draft Regulatory Guide DG-4032","date":"2021-12-15"},{"doc_id":127639,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations,” Redline/Strikeout Version to Support Public Comment","date":"2024-10-03"},{"doc_id":141918,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Draft Interim Staff Guidance, COL-ISG-030, “Environmental Considerations for New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249)","date":"2024-10-03"},{"doc_id":154695,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Energy and System Design Mitigation Alternatives White Paper Report","date":"2024-10-03"},{"doc_id":154696,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Recommendations for an Applicant to Calculate Activity Data for Greenhouse Gases Estimates White Paper","date":"2024-10-03"},{"doc_id":154697,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Draft Regulatory Guide DG-4032, “Preparation of Environmental Reports for Nuclear Power Stations”","date":"2024-10-03"},{"doc_id":2616,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2024-10-04"},{"doc_id":3986,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"09/2024 - Draft Regulatory Analysis for the 10 CFR Part 51, Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule","date":"2024-10-04"},{"doc_id":141911,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Supporting Statement for Information Collections Contained in the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule","date":"2024-10-04"},{"doc_id":141913,"source":"docket_item","org":"NRC","doc_type":"other","title":"Proposed Rule: Congressional Letters for the Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2024-10-04"},{"doc_id":141914,"source":"docket_item","org":"NRC","doc_type":"other","title":"11/2002 - NUREG-0586, Supplement 1, Vol. 1, [1:2] Cover - Appendix D, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.","date":"2024-10-04"},{"doc_id":141915,"source":"docket_item","org":"NRC","doc_type":"other","title":"11/2002 - NUREG-0586, Supplement 1, Vol. 1, [2:2] Appendix E - End, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities Regarding the Decommissioning of Nuclear Power Reactors Main Report, Appendices A through M Final Report.","date":"2024-10-04"},{"doc_id":141916,"source":"docket_item","org":"NRC","doc_type":"other","title":"04/17/24 - Staff Requirements Memorandum (SRM)-SECY-21-0098, “Proposed Rule:  Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55; NRC-2020-0101)”","date":"2024-10-04"},{"doc_id":141917,"source":"docket_item","org":"NRC","doc_type":"other","title":"04/17/24 - SRM-SECY-21-0098: Enclosure - Proposed Rule:  Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55;NRC-2020-0101)","date":"2024-10-04"},{"doc_id":141898,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2024 - Draft NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors”","date":"2024-10-08"},{"doc_id":141901,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2014 - NUREG-2157 Vol 1, \"Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report.\"","date":"2024-10-08"},{"doc_id":141902,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/2014 -NUREG-2157 Vol 2, \"Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report.\"","date":"2024-10-08"},{"doc_id":141903,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Advanced Reactor Generic Environmental Impact Statement Scoping Meeting List of Attendees","date":"2024-10-08"},{"doc_id":141904,"source":"docket_item","org":"NRC","doc_type":"other","title":"02/28/20 - SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”","date":"2024-10-08"},{"doc_id":141905,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of November 15 and 20, 2019, Public Meetings to Discuss Exploratory Process for Developing an Advanced Nuclear Reactor Generic Environmental Impact Statement, dated December 10, 2019","date":"2024-10-08"},{"doc_id":141906,"source":"docket_item","org":"NRC","doc_type":"other","title":"Workshop to Discuss the Environmental Information Needed to Develop a Generic Environmental Impact Statement for Advanced Nuclear Reactors, dated December 13, 2019","date":"2024-10-08"},{"doc_id":141907,"source":"docket_item","org":"NRC","doc_type":"other","title":"08/2024 - NUREG-1437, Volume 1, Revision 2, \"Generic Environmental Impact Statement for License Renewal of Nuclear Plants\" Final Report","date":"2024-10-08"},{"doc_id":141908,"source":"docket_item","org":"NRC","doc_type":"other","title":"09/21/20 - SRM-SECY-20-0020, “Results of Exploratory Process for Developing a Generic Environmental Impact Statement for the Construction and Operation of Advanced Nuclear Reactors”","date":"2024-10-08"},{"doc_id":141909,"source":"docket_item","org":"NRC","doc_type":"other","title":"05/28/20 - Meeting to Discuss the Scope of the Generic Environmental Impact Statement for Advanced Nuclear Reactors (Meeting Notice)","date":"2024-10-08"},{"doc_id":141910,"source":"docket_item","org":"NRC","doc_type":"other","title":"08/2024 - NUREG-1437, Volume 2, Revision 2, \"Generic Environmental Impact Statement for License Renewal of Nuclear Plants\" Final Report","date":"2024-10-08"},{"doc_id":154693,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of October 1, 2020, Advanced Reactor Stakeholder Public Meeting, dated December 22, 2020","date":"2024-10-08"},{"doc_id":154694,"source":"docket_item","org":"NRC","doc_type":"other","title":"Summary of April 15, 2021, Advanced Reactor Stakeholder Public Meeting, dated August 24, 2021","date":"2024-10-08"},{"doc_id":2624,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2024-10-17"},{"doc_id":160273,"source":"docket_item","org":"NRC","doc_type":"other","title":"NR GEIS Email from E. Schlossberg 10-17-24","date":"2024-10-22"},{"doc_id":2906,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Rule","title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-04-24"},{"doc_id":3996,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Regulatory Analysis-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)","date":"2026-05-13"},{"doc_id":139341,"source":"docket_item","org":"NRC","doc_type":"other","title":"Federal Register Notice-Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Rule (RIN 3150-AK55_NRC-2020-0101)","date":"2026-05-13"},{"doc_id":139342,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-14-2024 - Public Meeting Transcript RE  Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Page 1-31","date":"2026-05-13"},{"doc_id":139343,"source":"docket_item","org":"NRC","doc_type":"other","title":"SRM-M260413_Enclosure 2 - SECY-25-0085 - Final Rule_Generic Environmental Impact Statement For Licensing Of New Nuclear Reactors (RIN 3150-AK55_NRC-2020-0101)","date":"2026-05-13"},{"doc_id":139344,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-13-24 Public Meeting Transcript RE Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-05-13"},{"doc_id":139345,"source":"docket_item","org":"NRC","doc_type":"other","title":"COL-ISG-030 Environmental Considerations Associated with New Nuclear Reactor Applications that Reference the Generic Environmental Impact Statement (NUREG-2249) (Final Rule - GEIS for Licensing New Nuclear Reactors)","date":"2026-05-13"},{"doc_id":139346,"source":"docket_item","org":"NRC","doc_type":"other","title":"STC-24-058 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement for Advanced Nuclear Reactors (NUREG 2249)","date":"2026-05-13"},{"doc_id":139347,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-7-2024 - Public Meeting - Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Proposed Rule","date":"2026-05-13"},{"doc_id":139348,"source":"docket_item","org":"NRC","doc_type":"other","title":"M260413_ Transcript - Affirmation Session - b) SECY-25-0085 -Final Rule_  Generic Environmental Impact","date":"2026-05-13"},{"doc_id":139349,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-13-24 Public Meeting Summary RE_Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-05-13"},{"doc_id":139350,"source":"docket_item","org":"NRC","doc_type":"other","title":"STC-24-062 Issuance of Proposed Rule and Notice of Availability of the Draft Generic Environmental Impact Statement","date":"2026-05-13"},{"doc_id":139351,"source":"docket_item","org":"NRC","doc_type":"other","title":"11-14-2024 Public Meeting Summary RE_ Proposed Rule Generic Environmental Impact Statement for Licensing of New Nuclear Reactors","date":"2026-05-13"},{"doc_id":139352,"source":"docket_item","org":"NRC","doc_type":"other","title":"SRM-M260413_ SECY-24-0069 - Affirmation Session Final Rule - b) Generic Environmental Impact","date":"2026-05-13"},{"doc_id":139353,"source":"docket_item","org":"NRC","doc_type":"other","title":"NUREG-2249 Generic Environmental Impact Statement for Licensing of New Nuclear Reactors Final Report","date":"2026-05-13"},{"doc_id":153520,"source":"docket_item","org":"NRC","doc_type":"other","title":"Energy and System Design Mitigation Alternatives White Paper","date":"2026-05-13"},{"doc_id":153521,"source":"docket_item","org":"NRC","doc_type":"other","title":"Part 51 Information Collection Supporting Statement for the NRC GEIS Final Rule","date":"2026-05-13"},{"doc_id":153522,"source":"docket_item","org":"NRC","doc_type":"other","title":"10-17-24_ Email from Elena Schlossberg to Stewart Schneider (NR GEIS Proposed Rule)","date":"2026-05-13"},{"doc_id":153523,"source":"docket_item","org":"NRC","doc_type":"other","title":"STC-26-026 Letter NR GEIS Final Rule-Agreement States and State Liaison Officers","date":"2026-05-13"},{"doc_id":153524,"source":"docket_item","org":"NRC","doc_type":"other","title":"Regulatory Guide 4.2 Revision 4 Preparation of Environmental Reports for Nuclear Power Stations (Final Rule - GEIS for Licensing New Nuclear Reactors)","date":"2026-05-13"}],"references":[{"citation_id":1035798,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1996. Generic Environmental Impact Statement for License Renewal of Nuclear Plants. Volumes 1 and 2, NUREG-1437, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1996","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035799,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013. Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035800,"raw_reference":"OF OPERATING DOMESTIC NUCLEAR POWER PLANTS This appendix contains brief descriptions of each operating commercial nuclear power plant site in the United States.1 The material is intended to serve as an overview of the important characteristics of each plant and its environmental setting. The information was taken from the 1996 and 2013 Generic Environmental Impact Statement for License Renewal of Nuclear Plants (LR GEIS, NUREG-1437, Revisions 0 and 1; NRC 1996, NRC 2013) and updated with the best available information from recently published supplemental environmental impacts statements, U.S. Census Bureau population estimates (USCB 2021), U.S. Environmental Protection Agency Level III ecoregion data (EPA 2013), National Wetlands Inventory data (FWS 2022), National Land Cover Database data (USGS 2019), the 2022–2023 U.S. Nuclear Regulatory Commission Information Digest (NRC 2023a), and license renewal applications, including associated environmental reports, as docketed by the U.S. Nuclear Regulatory Commission. The scope of this revised LR GEIS is limited to nuclear power plants for which an operating license, construction permit, or combined license was issued as of June 30, 1995. Nuclear power plants not meeting these conditions (such as Vogtle Units 3 and 4 in Waynesboro, Georgia, which commenced commercial operations in July 2023 and April 2024, respectively), are not included in this appendix.","cited_authors":"OF OPERATING DOMESTIC NUCLEAR POWER PLANTS This appendix contains brief descriptions of each operating commercial nuclear power plant site in the United States.1 The material is intended to serve as an overview of the important characteristics of each plant and its environmental setting. The information was taken from the 1996 and 2013 Generic Environmental Impact Statement for License Renewal of Nuclear Plants (LR GEIS, NUREG-1437, Revisions 0 and 1; NRC","cited_year":"1996","cited_title":"NRC 2013) and updated with the best available information from recently published supplemental environmental impacts statements, U.S. Census Bureau population estimates (USCB 2021), U.S. Environmental Protection Agency Level III ecoregion data (EPA 2013), National Wetlands Inventory data (FWS 2022), National Land Cover Database data (USGS 2019), the 2022–2023 U.S. Nuclear Regulatory Commission Information Digest (NRC 2023a), and license renewal applications, including associated environmental reports, as docketed by the U.S. Nuclear Regulatory Commission","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035801,"raw_reference":"NUREG-1437, Revision 2 Appendix C ARKANSAS NUCLEAR ONE (Arkansas) Location: Pope County, Arkansas 6 mi (10 km) WNW of Russellville Latitude 35.3100°N; longitude 93.2308°W Licensee: Entergy Operations, Inc. Unit Information Unit 1 Unit 2 Docket Number: Construction Permit: Operating License: Commercial Operation: License Expiration: Licensed Thermal Power (MWt): Net Capacity (MWe): Type of Reactor: Nuclear Steam Supply System Vendor: 50-313 1968 1974 1974 2034 2,568 50-368 1972 1978 1980 2038 3,026 Cooling Water System Type: Unit 1: Once-through; Unit 2: Natural draft cooling tower Source: Dardanelle Reservoir Source Temperature Range: 40−83°F (4−28°C) Condenser Flow Rate: 762,400 gpm (48.1 m3/s) for Unit 1 422,000 gpm (26.6 m3/s) for Unit 2 Design Condenser Temperature Rise: 5°F (8.3°C) for Unit 1 30.7°F (17.1°C) for Unit 2 Intake Structure: 4,400 ft (1,340 m) canal Discharge Structure: 520 ft (158 m) canal Site Information Total Area: 1,164 ac (471 ha) Exclusion Area Distance: 0.7 mi (1 km) radius Low Population Zone: 4 mi (6.44 km) radius Nearest City: Little Rock: 2020 population: 202,591 Site Topography: Flat","cited_authors":null,"cited_year":null,"cited_title":"NUREG-1437, Revision 2 Appendix C ARKANSAS NUCLEAR ONE (Arkansas) Location: Pope County, Arkansas 6 mi (10 km) WNW of Russellville Latitude 35.3100°N; longitude 93.2308°W Licensee: Entergy Operations, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035802,"raw_reference":"EPA (U.S. Environmental Protection Agency). 2013. “Level III and IV Ecoregions of the Continental United States.” Washington, D.C. ADAMS Accession No. ML18023A341.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"2013","cited_title":"Level III and IV Ecoregions of the Continental United States","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035803,"raw_reference":"FWS (U.S. Fish and Wildlife Service). 2022. “National Wetlands Inventory, Wetlands Data Layer.” Washington, D.C. Accessed May 5, 2022, at https://www.fws.gov/program/nationalwetlands-inventory/wetlands-data.","cited_authors":"FWS (U.S. Fish and Wildlife Service)","cited_year":"2022","cited_title":"National Wetlands Inventory, Wetlands Data Layer","cited_venue":null,"cited_doi":null,"cited_url":"https://www.fws.gov/program/nationalwetlands-inventory/wetlands-data","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035804,"raw_reference":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission). 2022a. Letter from S.P. Wall to P. Oneid and K.","cited_authors":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022a","cited_title":"Letter from S.P. Wall to P. Oneid and K","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035805,"raw_reference":"Trice, dated June 28, 2022, regarding “Palisades Nuclear Plant and Big Rock Point Plant – Issuance of Amendment Nos. 129 and 273 Re: Order Approving Transfer of Licenses and Conforming Administrative License Amendments (EPIDS L-2022-LLM-0002 AND L-2020-LLM0003).” Rockville, MD. ADAMS Accession No. ML22173A179.","cited_authors":"Trice, dated June 28","cited_year":"2022","cited_title":"Palisades Nuclear Plant and Big Rock Point Plant – Issuance of Amendment Nos. 129 and 273 Re: Order Approving Transfer of Licenses and Conforming Administrative License Amendments (EPIDS L-2022-LLM-0002 AND L-2020-LLM0003)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035806,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022b. Memorandum and Order in the Matter of Exelon Generation Company, LLC (Peach Bottom Atomic Power Station, Units 2 and 3).","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022b","cited_title":"Memorandum and Order in the Matter of Exelon Generation Company, LLC (Peach Bottom Atomic Power Station, Units 2 and 3)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035807,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022c. Memorandum and Order in the Matter of Constellation Energy Generation, LLC (F/K/A Exelon Generation Company, LLC) (Peach Bottom Atomic Power Station, Units 2 and 3). CLI-22-07, Rockville, MD. ADAMS Accession No. ML22154A217.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022c","cited_title":"Memorandum and Order in the Matter of Constellation Energy Generation, LLC (F/K/A Exelon Generation Company, LLC) (Peach Bottom Atomic Power Station, Units 2 and 3)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035808,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022d. Memorandum and Order in the Matter of Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4). CLI-22-02,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022d","cited_title":"Memorandum and Order in the Matter of Florida Power & Light Co","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035809,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022e. Memorandum and Order in the Matter of Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4). CLI-22-06,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022e","cited_title":"Memorandum and Order in the Matter of Florida Power & Light Co","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035810,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023a. 2022-2023 Information Digest.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023a","cited_title":"2022-2023 Information Digest","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035811,"raw_reference":"NUREG-1437, Revision 2 Appendix C NRC (U.S. Nuclear Regulatory Commission). 2023b. Letter from B.K. Harris to P. Gerfen, dated March 2, 2023, regarding “Diablo Canyon Power Plant, Units 1 and 2 – Exemption from Requirements Related to Submission of a License Renewal Application.” Washington, D.C.","cited_authors":"NUREG-1437, Revision 2 Appendix C NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023b","cited_title":"Diablo Canyon Power Plant, Units 1 and 2 – Exemption from Requirements Related to Submission of a License Renewal Application","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035812,"raw_reference":"ADAMS Accession No. ML23026A102. USCB (U.S. Census Bureau). 2021. “Quick Facts: United States, Population Estimates.”","cited_authors":"ADAMS Accession No. ML23026A102. USCB (U.S. Census Bureau)","cited_year":"2021","cited_title":"Quick Facts: United States, Population Estimates","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035813,"raw_reference":"Washington, D.C. Accessed May 4, 2022, at https://www.census.gov/quickfacts/fact/table/US/PST045221.","cited_authors":"Washington, D.C. Accessed May 4","cited_year":"2022","cited_title":"at https://www.census.gov/quickfacts/fact/table/US/PST045221","cited_venue":null,"cited_doi":null,"cited_url":"https://www.census.gov/quickfacts/fact/table/US/PST045221","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035814,"raw_reference":"USGS (U.S. Geological Survey). 2019. “NLCD 2019 Land Cover (CONUS).” Multi-Resolution Land Characteristics Consortium Project. Sioux Falls, SD. Accessed May 11, 2023, at https://www.mrlc.gov/data/nlcd-2019-land-cover-conus.","cited_authors":"USGS (U.S. Geological Survey)","cited_year":"2019","cited_title":"NLCD 2019 Land Cover (CONUS)","cited_venue":null,"cited_doi":null,"cited_url":"https://www.mrlc.gov/data/nlcd-2019-land-cover-conus","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035815,"raw_reference":"Resources, Part 157, “Applications for Certificates of Public Convenience and Necessity and for Orders Permitting and Approving Abandonment Under Section of the Natural Gas Act.” 40 CFR Part 125. Code of Federal Regulations, Title 40, Protection of Environment, Part 125, “Criteria and Standards for the National Pollutant Discharge Elimination System.” 40 CFR Part 257. Code of Federal Regulations, Title 40, Protection of Environment, Part 257, “Criteria for Classification of Solid Waste Disposal Facilities and Practices.” 85 FR 24040. April 30, 2020. “Notice To Conduct Scoping and Prepare an Advanced Nuclear Reactor Generic Environmental Impact Statement.” Federal Register, Nuclear Regulatory Commission. 88 FR 3287. January 19, 2023. “NuScale Small Modular Reactor Design Certification.” Final","cited_authors":"Resources, Part 157, “Applications for Certificates of Public Convenience and Necessity and for Orders Permitting and Approving Abandonment Under Section of the Natural Gas Act.” 40 CFR Part 125. Code of Federal Regulations, Title 40, Protection of Environment, Part 125, “Criteria and Standards for the National Pollutant Discharge Elimination System.” 40 CFR Part 257. Code of Federal Regulations, Title 40, Protection of Environment, Part 257, “Criteria for Classification of Solid Waste Disposal Facilities and Practices.” 85 FR 24040. April 30","cited_year":"2020","cited_title":"Notice To Conduct Scoping and Prepare an Advanced Nuclear Reactor Generic Environmental Impact Statement","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035816,"raw_reference":"Rule, Federal Register, Nuclear Regulatory Commission. Clean Air Act. 42 U.S.C. § 7401 et seq. Federal Water Pollution Control Act of 1972 (commonly referred to as the Clean Water Act). 33 U.S.C. § 1251 et seq.","cited_authors":null,"cited_year":null,"cited_title":"Rule, Federal Register, Nuclear Regulatory Commission","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035817,"raw_reference":"BLM (Bureau of Land Management). 2008. Final Programmatic Environmental Impact Statement for Geothermal Leasing in the Western United States, Volume 1: Programmatic Analysis. FES08-44, Washington, D.C. October. Accessed April 12, 2023, at https://permanent.fdlp.gov/LPS123922/LPS123922/www.blm.gov/wo/st/en/prog/energy/geother mal/geothermal_nationwide/Documents/Final_PEIS.html.","cited_authors":"BLM (Bureau of Land Management)","cited_year":"2008","cited_title":"Final Programmatic Environmental Impact Statement for Geothermal Leasing in the Western United States, Volume 1: Programmatic Analysis","cited_venue":null,"cited_doi":null,"cited_url":"https://permanent.fdlp.gov/LPS123922/LPS123922/www.blm.gov/wo/st/en/prog/energy/geother","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035818,"raw_reference":"BOEM (Bureau of Ocean Energy Management). 2019. National Environmental Policy Act Documentation for Impact-Producing Factors in the Offshore Wind Cumulative Impacts Scenario on the North Atlantic Outer Continental Shelf. OCS Study, BOEM 2019-036,","cited_authors":"BOEM (Bureau of Ocean Energy Management)","cited_year":"2019","cited_title":"National Environmental Policy Act Documentation for Impact-Producing Factors in the Offshore Wind Cumulative Impacts Scenario on the North Atlantic Outer Continental Shelf","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035819,"raw_reference":"Washington, D.C. Accessed April 27, 2023, at https://www.boem.gov/sites/default/files/environmental-stewardship/EnvironmentalStudies/Renewable-Energy/IPFs-in-the-Offshore-Wind-Cumulative-Impacts-Scenario-on-the-NOCS.pdf.","cited_authors":"Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.boem.gov/sites/default/files/environmental-stewardship/EnvironmentalStudies/Renewable-Energy/IPFs-in-the-Offshore-Wind-Cumulative-Impacts-Scenario-on-the-NOCS.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.boem.gov/sites/default/files/environmental-stewardship/EnvironmentalStudies/Renewable-Energy/IPFs-in-the-Offshore-Wind-Cumulative-Impacts-Scenario-on-the-NOCS.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035820,"raw_reference":"BOEM (Bureau of Ocean Energy Management). 2020a. Comparison of Environmental Effects from Different Offshore Wind Turbine Foundations. OCS Study, BOEM 2020-041, Washington, D.C. Accessed April 27, 2023, at https://www.boem.gov/sites/default/files/documents/environment/Wind-Turbine-FoundationsWhite%20Paper-Final-White-Paper.pdf.","cited_authors":"BOEM (Bureau of Ocean Energy Management)","cited_year":"2020a","cited_title":"Comparison of Environmental Effects from Different Offshore Wind Turbine Foundations","cited_venue":null,"cited_doi":null,"cited_url":"https://www.boem.gov/sites/default/files/documents/environment/Wind-Turbine-FoundationsWhite%20Paper-Final-White-Paper.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035821,"raw_reference":"BOEM (Bureau of Ocean Energy Management, Office of Renewable Energy Programs). 2020b. Vineyard Wind 1 Offshore Wind Energy Project: Supplement to the Draft Environmental Impact Statement. OCS EIS/EA BOEM 2020-025. U.S. Department of the Interior, Washington, D.C. Accessed April 27, 2023, at https://www.boem.gov/sites/default/files/documents/renewableenergy/Vineyard-Wind-1-Supplement-to-EIS.pdf. D-47","cited_authors":"BOEM (Bureau of Ocean Energy Management, Office of Renewable Energy Programs)","cited_year":"2020b","cited_title":"Vineyard Wind 1 Offshore Wind Energy Project: Supplement to the Draft Environmental Impact Statement","cited_venue":null,"cited_doi":null,"cited_url":"https://www.boem.gov/sites/default/files/documents/renewableenergy/Vineyard-Wind-1-Supplement-to-EIS.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035822,"raw_reference":"NUREG-1437, Revision 2 Appendix D BOEM (Bureau of Ocean Energy Management). 2021. Commercial Wind Lease Issuance and Site Assessment Activities on the Atlantic Outer Continental Shelf Offshore North Carolina, Draft Supplemental Environmental Assessment. Washington, D.C. Accessed April 27, 2023, at https://www.boem.gov/renewable-energy/lease-issuance-wind-ocs-activities-north-carolinadraft-supplemental-ea.","cited_authors":"NUREG-1437, Revision 2 Appendix D BOEM (Bureau of Ocean Energy Management)","cited_year":"2021","cited_title":"Commercial Wind Lease Issuance and Site Assessment Activities on the Atlantic Outer Continental Shelf Offshore North Carolina, Draft Supplemental Environmental Assessment","cited_venue":null,"cited_doi":null,"cited_url":"https://www.boem.gov/renewable-energy/lease-issuance-wind-ocs-activities-north-carolinadraft-supplemental-ea","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035823,"raw_reference":"BOEM (Bureau of Ocean Energy Management). Undated. “Renewable Energy on the Outer Continental Shelf: Ocean Wave Energy.” Washington, D.C. Accessed April 27, 2023, at https://www.boem.gov/Renewable-Energy-Program/Renewable-Energy-Guide/Ocean-WaveEnergy.aspx.","cited_authors":"BOEM (Bureau of Ocean Energy Management). Undated. “Renewable Energy on the Outer Continental Shelf: Ocean Wave Energy.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.boem.gov/Renewable-Energy-Program/Renewable-Energy-Guide/Ocean-WaveEnergy.aspx","cited_venue":null,"cited_doi":null,"cited_url":"https://www.boem.gov/Renewable-Energy-Program/Renewable-Energy-Guide/Ocean-WaveEnergy.aspx","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035824,"raw_reference":"Ciferno, J.P., and J.J. Marano. 2002. Benchmarking Biomass Gasification Technologies for","cited_authors":"Ciferno, J.P., and J.J. Marano","cited_year":"2002","cited_title":"Benchmarking Biomass Gasification Technologies for","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035825,"raw_reference":"Fuels, Chemicals and Hydrogen Production. Washington, D.C. Accessed April 27, 2023, at https://netl.doe.gov/sites/default/files/netl-file/BMassGasFinal_0.pdf.","cited_authors":"Fuels, Chemicals and Hydrogen Production. Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://netl.doe.gov/sites/default/files/netl-file/BMassGasFinal_0.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://netl.doe.gov/sites/default/files/netl-file/BMassGasFinal_0.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035826,"raw_reference":"DOE (U.S. Department of Energy). 1997. Renewable Energy Technology Characterizations, Topical Report TR-109496. Washington, D.C. December. Accessed April 27, 2023, at https://www.nrel.gov/docs/gen/fy98/24496.pdf.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"1997","cited_title":"Renewable Energy Technology Characterizations, Topical Report TR-109496","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrel.gov/docs/gen/fy98/24496.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035827,"raw_reference":"DOE (U.S. Department of Energy). 2021. Hydrogen Shot: An Introduction. Office of Energy Efficiency and Renewable Energy, Hydrogen and Fuel Cells Technology Office. Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/eere/fuelcells/articles/hydrogen-shotintroduction.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"2021","cited_title":"Hydrogen Shot: An Introduction","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/eere/fuelcells/articles/hydrogen-shotintroduction","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035828,"raw_reference":"DOE (U.S. Department of Energy). 2022a. “Advanced Small Modular Reactors (SMRs): Office of Nuclear Energy.” Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/ne/advanced-small-modular-reactors-smrs.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"2022a","cited_title":"Advanced Small Modular Reactors (SMRs): Office of Nuclear Energy","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/ne/advanced-small-modular-reactors-smrs","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035829,"raw_reference":"DOE (U.S. Department of Energy). 2022b. Offshore Wind Energy Strategies. Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/sites/default/files/2022-01/offshore-windenergy-strategies-report-january-2022.pdf.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"2022b","cited_title":"Offshore Wind Energy Strategies","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/sites/default/files/2022-01/offshore-windenergy-strategies-report-january-2022.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035830,"raw_reference":"DOE (U.S. Department of Energy). Undated-a. “Vogtle Loan Program Office.” Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/lpo/vogtle.","cited_authors":"DOE (U.S. Department of Energy). Undated-a. “Vogtle Loan Program Office.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.energy.gov/lpo/vogtle","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/lpo/vogtle","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035831,"raw_reference":"DOE (U.S. Department of Energy). Undated-b. “WINDExchange: Wind Energy State Information.” Washington, D.C. Accessed April 27, 2023, at https://windexchange.energy.gov/states.","cited_authors":"DOE (U.S. Department of Energy). Undated-b. “WINDExchange: Wind Energy State Information.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://windexchange.energy.gov/states","cited_venue":null,"cited_doi":null,"cited_url":"https://windexchange.energy.gov/states","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035832,"raw_reference":"DOE (U.S. Department of Energy). Undated-c. “Types of Hydropower Plants.” Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/eere/water/types-hydropower-plants.","cited_authors":"DOE (U.S. Department of Energy). Undated-c. “Types of Hydropower Plants.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.energy.gov/eere/water/types-hydropower-plants","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/eere/water/types-hydropower-plants","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035833,"raw_reference":"DOE (U.S. Department of Energy). Undated-d. “Geothermal Basics: Geothermal.” Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/eere/geothermal/geothermal-basics.","cited_authors":"DOE (U.S. Department of Energy). Undated-d. “Geothermal Basics: Geothermal.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.energy.gov/eere/geothermal/geothermal-basics","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/eere/geothermal/geothermal-basics","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035834,"raw_reference":"DOE (U.S. Department of Energy). Undated-e. “Fuel Cell Basics: Hydrogen and Fuel Cell Technologies Office.” Washington, D.C. Accessed April 27, 2023, at https://www.energy.gov/eere/fuelcells/fuel-cell-basics.","cited_authors":"DOE (U.S. Department of Energy). Undated-e. “Fuel Cell Basics: Hydrogen and Fuel Cell Technologies Office.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.energy.gov/eere/fuelcells/fuel-cell-basics","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/eere/fuelcells/fuel-cell-basics","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035835,"raw_reference":"NUREG-1437, Revision 2 D-48 Appendix D DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2015a. Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015. Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/outlooks/archive/aeo15/pdf/electricity_generation_2015.pdf.","cited_authors":"NUREG-1437, Revision 2 D-48 Appendix D DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2015a","cited_title":"Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/archive/aeo15/pdf/electricity_generation_2015.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035836,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2015b. Annual Energy Outlook 2015 with Projections to 2040. DOE/EIA-0383(2015), Washington, D.C.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2015b","cited_title":"Annual Energy Outlook 2015 with Projections to 2040","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035837,"raw_reference":"ADAMS Accession No. ML16172A121. DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2017. “Today in Energy: Oil-fired Power Plants Provide Small Amounts of U.S. Electricity Capacity and Generation.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=31232.","cited_authors":"ADAMS Accession No. ML16172A121. DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2017","cited_title":"Today in Energy: Oil-fired Power Plants Provide Small Amounts of U.S. Electricity Capacity and Generation","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=31232","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035838,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Association). 2019a. “More new natural gas combined-cycle power plants are using advanced designs.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=39912.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Association)","cited_year":"2019a","cited_title":"More new natural gas combined-cycle power plants are using advanced designs","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=39912","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035839,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2019b. “Today In Energy: Demand-side Management Programs Save Energy and Reduce Peak Demand.”","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2019b","cited_title":"Today In Energy: Demand-side Management Programs Save Energy and Reduce Peak Demand","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035840,"raw_reference":"Washington, D.C. Accessed April 12, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=38872.","cited_authors":"Washington, D.C. Accessed April 12","cited_year":"2023","cited_title":"at https://www.eia.gov/todayinenergy/detail.php?id=38872","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=38872","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035841,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Association). 2020. Annual Energy Outlook 2020, with projections to 2050. AEO2020. Washington, D.C. Accessed April 12, 2023, at https://www.eia.gov/outlooks/aeo/pdf/AEO2020%20Full%20Report.pdf.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Association)","cited_year":"2020","cited_title":"Annual Energy Outlook 2020, with projections to 2050","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/pdf/AEO2020%20Full%20Report.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035842,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2021a. “Today in Energy: Less Electricity Was Generated by Coal than Nuclear in the United States in 2020.”","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2021a","cited_title":"Today in Energy: Less Electricity Was Generated by Coal than Nuclear in the United States in 2020","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035843,"raw_reference":"Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=47196.","cited_authors":"Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.eia.gov/todayinenergy/detail.php?id=47196","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=47196","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035844,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2021b. “Today in Energy: U.S. Large-Scale Battery Storage Capacity Up 35% in 2020, Rapid Growth to Continue.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=49236.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2021b","cited_title":"Today in Energy: U.S. Large-Scale Battery Storage Capacity Up 35% in 2020, Rapid Growth to Continue","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=49236","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035845,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2021c. “Today in Energy: Solar Generation Was 3% of U.S. Electricity in 2020, But We Project It Will Be 20% by 2050.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=50357.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2021c","cited_title":"Today in Energy: Solar Generation Was 3% of U.S. Electricity in 2020, But We Project It Will Be 20% by 2050","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=50357","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035846,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2021d. “Electric Power Monthly with Data for August 2021, Table 6.07.B Capacity Factors for Utility Scale Generators Primarily Using Non-Fossil Fuels.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/electricity/monthly/archive/august2021.pdf","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2021d","cited_title":"Electric Power Monthly with Data for August 2021, Table 6.07.B Capacity Factors for Utility Scale Generators Primarily Using Non-Fossil Fuels","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/electricity/monthly/archive/august2021.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035847,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022a. Electric Power Annual 2020. Washington, D.C. Accessed April 12, 2023, at https://www.eia.gov/electricity/annual/archive/2020/pdf/epa.pdf. D-49","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022a","cited_title":"Electric Power Annual 2020","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/electricity/annual/archive/2020/pdf/epa.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035848,"raw_reference":"NUREG-1437, Revision 2 Appendix D DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022b. “Today in Energy: EIA Projects That Renewable Generation Will Supply 44% of U.S. Electricity by 2050.”","cited_authors":"NUREG-1437, Revision 2 Appendix D DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022b","cited_title":"Today in Energy: EIA Projects That Renewable Generation Will Supply 44% of U.S. Electricity by 2050","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035849,"raw_reference":"Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=51698.","cited_authors":"Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.eia.gov/todayinenergy/detail.php?id=51698","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=51698","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035850,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022c. “Nuclear explained, U.S. Nuclear Industry.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022c","cited_title":"Nuclear explained, U.S. Nuclear Industry","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035851,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022d. “Today in Energy: U.S. nuclear electricity generation continues to decline as more reactors retire.”","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022d","cited_title":"Today in Energy: U.S. nuclear electricity generation continues to decline as more reactors retire","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035852,"raw_reference":"Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=51978#.","cited_authors":"Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.eia.gov/todayinenergy/detail.php?id=51978#","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=51978#","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035853,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022e. “Frequently Asked Questions (FAQS).” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/tools/faqs/faq.php?id=92&t=4.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022e","cited_title":"Frequently Asked Questions (FAQS)","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/tools/faqs/faq.php?id=92&t=4","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035854,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022f. “Annual Energy Outlook 2022.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/outlooks/aeo/narrative/electricity/sub-topic-04.php.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022f","cited_title":"Annual Energy Outlook 2022","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/narrative/electricity/sub-topic-04.php","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035855,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022g. “U.S. battery storage capacity will increase significantly by 2025.” Washington, D.C. Accessed May 1, 2023, at https://www.eia.gov/todayinenergy/detail.php?id=54939.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022g","cited_title":"U.S. battery storage capacity will increase significantly by 2025","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/todayinenergy/detail.php?id=54939","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035856,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022h. Annual Energy Outlook 2022 with Projections to 2050, Narrative. Washington, D.C. Accessed April 12, 2023, at https://www.eia.gov/outlooks/aeo/pdf/AEO2022_Narrative.pdf.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022h","cited_title":"Annual Energy Outlook 2022 with Projections to 2050, Narrative","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/pdf/AEO2022_Narrative.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035857,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022i. “Hydrogen","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022i","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035858,"raw_reference":"Explained, Use of Hydrogen.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/energyexplained/hydrogen/use-of-hydrogen.php.","cited_authors":"Explained, Use of Hydrogen.” Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.eia.gov/energyexplained/hydrogen/use-of-hydrogen.php","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/energyexplained/hydrogen/use-of-hydrogen.php","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035859,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2022j. Cost and Performance Characteristics of New Generating Technologies, Annual Energy Outlook 2021.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2022j","cited_title":"Cost and Performance Characteristics of New Generating Technologies, Annual Energy Outlook 2021","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035860,"raw_reference":"Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/outlooks/aeo/assumptions/pdf/table_8.2.pdf.","cited_authors":"Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.eia.gov/outlooks/aeo/assumptions/pdf/table_8.2.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/assumptions/pdf/table_8.2.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035861,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2023a. “What is U.S. electricity generation by energy source?” Washington, D.C. Accessed May 1, 2023, at https://www.eia.gov/tools/faqs/faq.php?id=427&t=3.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2023a","cited_title":"What is U.S. electricity generation by energy source?","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/tools/faqs/faq.php?id=427&t=3","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035862,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). 2023b. “Annual Energy Outlook 2023.” Washington, D.C. Accessed May 1, 2023, at https://www.eia.gov/outlooks/aeo/pdf/AEO2023_Narrative.pdf.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration)","cited_year":"2023b","cited_title":"Annual Energy Outlook 2023","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/outlooks/aeo/pdf/AEO2023_Narrative.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035863,"raw_reference":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). Undated-a. “Electric Power Annual, With Data for 2021, Table 1.2. Summary Statistics for the United States, 20112021. Utility Scale Capacity: Solar Photovoltaic.” Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/electricity/annual/html/epa_01_02.html.","cited_authors":"DOE/EIA (U.S. Department of Energy/Energy Information Administration). Undated-a. “Electric Power Annual, With Data for","cited_year":"2021","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/electricity/annual/html/epa_01_02.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035864,"raw_reference":"EIA-861 Annual Electric Power Industry Report Instructions. Washington, D.C. Accessed April 27, 2023, at https://www.eia.gov/survey/form/eia_861/instructions.pdf. Fiscal Responsibility Act of 2023. Public Law No. 118-5, 137 Stat. 10.","cited_authors":"EIA-861 Annual Electric Power Industry Report Instructions. Washington, D.C. Accessed April 27","cited_year":"2023","cited_title":"at https://www.eia.gov/survey/form/eia_861/instructions.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.eia.gov/survey/form/eia_861/instructions.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035865,"raw_reference":"GAO (U.S. General Accounting Office). 2015. Technology Assessment, Nuclear Reactors, Status and Challenges in Development and Deployment of New Commercial Concepts.","cited_authors":"GAO (U.S. General Accounting Office)","cited_year":"2015","cited_title":"Technology Assessment, Nuclear Reactors, Status and Challenges in Development and Deployment of New Commercial Concepts","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035866,"raw_reference":"Washington, D.C. July. Accessed April 27, 2023, at https://www.gao.gov/assets/gao-15-652.pdf.","cited_authors":"Washington, D.C. July. Accessed April 27","cited_year":"2023","cited_title":"at https://www.gao.gov/assets/gao-15-652.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.gao.gov/assets/gao-15-652.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035867,"raw_reference":"Georgia Power. 2024. “Vogtle Unit 4 Enters Commercial Operation.” Atlanta, Georgia. Accessed April 29, 2024, at https://www.georgiapower.com/company/news-hub/press-releases/vogtle-unit4-enters-commercial-operation.html.","cited_authors":"Georgia Power","cited_year":"2024","cited_title":"Vogtle Unit 4 Enters Commercial Operation","cited_venue":null,"cited_doi":null,"cited_url":"https://www.georgiapower.com/company/news-hub/press-releases/vogtle-unit4-enters-commercial-operation.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035868,"raw_reference":"Johnson, D.H., S.R. Loss, K.S. Smallwood, and W.P. Erickson. 2016. “Avian Fatalities at Wind Energy Facilities in North America: A Comparison of Recent Approaches.” Human-Wildlife Interactions 10(1):7-18. DOI:10.26077/a4ec-ed37. Logan, UT. Accessed April 28, 2023, at https://doi.org/10.26077/a4ec-ed37.","cited_authors":"Johnson, D.H., S.R. Loss, K.S. Smallwood, and W.P. Erickson","cited_year":"2016","cited_title":"Avian Fatalities at Wind Energy Facilities in North America: A Comparison of Recent Approaches","cited_venue":null,"cited_doi":"10.26077/a4ec-ed37","cited_url":"https://doi.org/10.26077/a4ec-ed37","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035869,"raw_reference":"Kagel, A., D. Bates, and K. Gawell. 2005. A Guide to Geothermal Energy and the Environment. Geothermal Energy Association, Washington, D.C. Accessed April 28, 2023, at https://doi.org/10.2172/897425.","cited_authors":"Kagel, A., D. Bates, and K. Gawell","cited_year":"2005","cited_title":"A Guide to Geothermal Energy and the Environment","cited_venue":null,"cited_doi":"10.2172/897425","cited_url":"https://doi.org/10.2172/897425","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035870,"raw_reference":"Kosciuch, K., D. Riser-Espinoza, M. Gerringer, and W. Erickson. 2020. “A Summary of Bird Mortality at Photovoltaic Utility Scale Solar Facilities in the Southwestern U.S.” PLOS ONE 15(4):e0232034. Accessed April 28, 2023, at https://doi.org/10.1371/journal.pone.0232034.","cited_authors":"Kosciuch, K., D. Riser-Espinoza, M. Gerringer, and W. Erickson","cited_year":"2020","cited_title":"A Summary of Bird Mortality at Photovoltaic Utility Scale Solar Facilities in the Southwestern U.S","cited_venue":null,"cited_doi":"10.1371/journal.pone.0232034","cited_url":"https://doi.org/10.1371/journal.pone.0232034","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035871,"raw_reference":"Kristmannsdottir, H., and H. Armannsson. 2003. “Environmental Aspects of Geothermal Energy Utilization.” Geothermics 32(4-6):451–461. DOI:10.1016/S0375-6505(03)00052-X. Amsterdam, The Netherlands. Accessed April 28, 2023, at https://doi.org/10.1016/S0375-6505(03)00052-X.","cited_authors":"Kristmannsdottir, H., and H. Armannsson","cited_year":"2003","cited_title":"Environmental Aspects of Geothermal Energy Utilization","cited_venue":null,"cited_doi":"10.1016/s0375-6505(03)00052-x","cited_url":"https://doi.org/10.1016/S0375-6505(03)00052-X","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035872,"raw_reference":"Loss, S.R., T. Will, and P.P. Marra. 2015. “Direct Mortality of Birds from Anthropogenic Causes.” Annual Review of Ecology, Evolution, and Systematics 46:99–120. DOI:10.1146/annurevecolsys-112414-054133. Palo Alto, CA. Accessed May 1, 2023, at https://doi.org/10.1146/annurev-ecolsys-112414-054133.","cited_authors":"Loss, S.R., T. Will, and P.P. Marra","cited_year":"2015","cited_title":"Direct Mortality of Birds from Anthropogenic Causes","cited_venue":null,"cited_doi":"10.1146/annurevecolsys-112414-054133","cited_url":"https://doi.org/10.1146/annurev-ecolsys-112414-054133","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035873,"raw_reference":"Maize, K. 2019. “Waste-to-Energy: A Niche Market in Decline?” POWER, Rockville, MD. Accessed May 1, 2023, at https://www.powermag.com/waste-to-energy-a-niche-market-indecline/.","cited_authors":"Maize, K","cited_year":"2019","cited_title":"Waste-to-Energy: A Niche Market in Decline?","cited_venue":null,"cited_doi":null,"cited_url":"https://www.powermag.com/waste-to-energy-a-niche-market-indecline/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035874,"raw_reference":"MASCWG (Multiagency Avian-Solar Collaborative Working Group). 2016. Multiagency AvianSolar Science Coordination Plan. Multiagency Avian-Solar Collaborative Working Group,","cited_authors":"MASCWG (Multiagency Avian-Solar Collaborative Working Group)","cited_year":"2016","cited_title":"Multiagency AvianSolar Science Coordination Plan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035875,"raw_reference":"Washington, D.C. Accessed April 14, 2023, at https://blmsolar.anl.gov/related/aviansolar/docs/Final_Avian-Solar_Science_Coordination_Plan.pdf.","cited_authors":"Washington, D.C. Accessed April 14","cited_year":"2023","cited_title":"at https://blmsolar.anl.gov/related/aviansolar/docs/Final_Avian-Solar_Science_Coordination_Plan.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://blmsolar.anl.gov/related/aviansolar/docs/Final_Avian-Solar_Science_Coordination_Plan.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035876,"raw_reference":"Michaels, T., and K. Krishnan. 2019. Energy Recovery Council, 2018 Directory of Waste-toEnergy Facilities. Washington, D.C. Accessed February 22, 2024, at https://wtert.org/2018directory-of-waste-to-energy-facilities-energy-recovery-council/#. D-51","cited_authors":"Michaels, T., and K. Krishnan","cited_year":"2019","cited_title":"Energy Recovery Council, 2018 Directory of Waste-toEnergy Facilities","cited_venue":null,"cited_doi":null,"cited_url":"https://wtert.org/2018directory-of-waste-to-energy-facilities-energy-recovery-council/#","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035877,"raw_reference":"NUREG-1437, Revision 2 Appendix D MMS (Minerals Management Service). 2007. Programmatic Environmental Impact Statement for Alternative Energy Development and Production and Alternate Use of Facilities on the Outer Continental Shelf, Volume II, Chapter 5. OCS EIS/EA, MMS 2007-046, U.S. Department of the","cited_authors":"NUREG-1437, Revision 2 Appendix D MMS (Minerals Management Service)","cited_year":"2007","cited_title":"Programmatic Environmental Impact Statement for Alternative Energy Development and Production and Alternate Use of Facilities on the Outer Continental Shelf, Volume II, Chapter 5","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035878,"raw_reference":"Interior, Washington, D.C. Accessed April 21, 2023 at https://www.boem.gov/sites/default/files/renewable-energy-program/RegulatoryInformation/Alt_Energy_FPEIS_VolIIFrontMatter.pdf. National Environmental Policy Act of 1969, as amended. 42 U.S.C. § 4321 et seq. National Historic Preservation Act of 1966, as amended. 54 U.S.C. § 300101 et seq.","cited_authors":"Interior, Washington, D.C. Accessed April 21, 2023 at https://www.boem.gov/sites/default/files/renewable-energy-program/RegulatoryInformation/Alt_Energy_FPEIS_VolIIFrontMatter.pdf. National Environmental Policy Act of","cited_year":"1969","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://www.boem.gov/sites/default/files/renewable-energy-program/RegulatoryInformation/Alt_Energy_FPEIS_VolIIFrontMatter.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035879,"raw_reference":"NETL (National Energy Technology Laboratory). 2019. Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity. NETL-PUB22638, Pittsburgh, PA. Accessed April 21, 2023, at https://www.osti.gov/biblio/1569246.","cited_authors":"NETL (National Energy Technology Laboratory)","cited_year":"2019","cited_title":"Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity","cited_venue":null,"cited_doi":null,"cited_url":"https://www.osti.gov/biblio/1569246","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035880,"raw_reference":"NETL (National Energy Technology Laboratory). Undated. “High Temperature Material Supply Chain.” Pittsburgh, PA. Accessed May 15, 2023, at https://netl.doe.gov/high_temp_materials_supply_chain.","cited_authors":"NETL (National Energy Technology Laboratory). Undated. “High Temperature Material Supply Chain.” Pittsburgh, PA. Accessed May 15","cited_year":"2023","cited_title":"at https://netl.doe.gov/high_temp_materials_supply_chain","cited_venue":null,"cited_doi":null,"cited_url":"https://netl.doe.gov/high_temp_materials_supply_chain","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035881,"raw_reference":"NPCC (Northwest Power and Conservation Council). 2010. Sixth Northwest Conservation and Electric Power Plan. Portland, OR. ADAMS Accession No. ML14093A352.","cited_authors":"NPCC (Northwest Power and Conservation Council)","cited_year":"2010","cited_title":"Sixth Northwest Conservation and Electric Power Plan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035882,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2004. “Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design (NUREG-1793, Initial Report).” Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/reading-rm/doccollections/nuregs/staff/sr1793/initial/index.html.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2004","cited_title":"Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design (NUREG-1793, Initial Report)","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reading-rm/doccollections/nuregs/staff/sr1793/initial/index.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035883,"raw_reference":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission). 2018. Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site, Draft Report for Comment.","cited_authors":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018","cited_title":"Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035884,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020. 2020–2021 Information Digest.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020","cited_title":"2020–2021 Information Digest","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035885,"raw_reference":"NRC (U.S. Regulatory Commission). 2022. “Design Certification Application for New Reactors.”","cited_authors":"NRC (U.S. Regulatory Commission)","cited_year":"2022","cited_title":"Design Certification Application for New Reactors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035886,"raw_reference":"Washington, D.C. Accessed April 28, 2023, at https://www.nrc.gov/reactors/newreactors/design-cert.html.","cited_authors":"Washington, D.C. Accessed April 28","cited_year":"2023","cited_title":"at https://www.nrc.gov/reactors/newreactors/design-cert.html","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reactors/newreactors/design-cert.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035887,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2023b. “Design Certification Application – NuScale.” Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/reactors/newreactors/smr/nuscale.html.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2023b","cited_title":"Design Certification Application – NuScale","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reactors/newreactors/smr/nuscale.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035888,"raw_reference":"NUREG-1437, Revision 2 D-52 Appendix D NRC (U.S. Nuclear Regulatory Commission). 2024. Memorandum from C.M. Safford to R.V. Furstenau, dated April 17, 2024, regarding “Staff Requirements - SECY-21-0098 – Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55; NRC-2020-0101).” Washington, D.C. ADAMS Accession No. ML24108A199.","cited_authors":"NUREG-1437, Revision 2 D-52 Appendix D NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024","cited_title":"Staff Requirements - SECY-21-0098 – Proposed Rule: Advanced Nuclear Reactor Generic Environmental Impact Statement (RIN 3150-AK55; NRC-2020-0101)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035889,"raw_reference":"NREL (National Renewable Energy Laboratory). 1997. The Environmental Costs and Benefits of Biomass Energy Use in California. NREL/SR-430-22765, UC Category 600, DE97000254,","cited_authors":"NREL (National Renewable Energy Laboratory)","cited_year":"1997","cited_title":"The Environmental Costs and Benefits of Biomass Energy Use in California","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035890,"raw_reference":"NREL (National Renewable Energy Laboratory). 2003. Biopower Technical Assessment: State of the Industry and the Technology. NREL/TP-510-33123, U.S. Department of Energy, Golden,","cited_authors":"NREL (National Renewable Energy Laboratory)","cited_year":"2003","cited_title":"Biopower Technical Assessment: State of the Industry and the Technology","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035891,"raw_reference":"CO. March. Accessed May 1, 2023, at https://www.nrel.gov/docs/fy03osti/33123.pdf.","cited_authors":"CO. March. Accessed May 1","cited_year":"2023","cited_title":"at https://www.nrel.gov/docs/fy03osti/33123.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrel.gov/docs/fy03osti/33123.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035892,"raw_reference":"NREL (National Renewable Energy Laboratory). 2004. Biomass Power and Conventional Fossil Systems with and without CO2 Sequestration – Comparing the Energy Balance, Greenhouse Gas Emissions and Economics. NREL/SR-430-22765, Golden, CO. Accessed May 1, 2023, at https://doi.org/10.2172/15006537.","cited_authors":"NREL (National Renewable Energy Laboratory)","cited_year":"2004","cited_title":"Biomass Power and Conventional Fossil Systems with and without CO2 Sequestration – Comparing the Energy Balance, Greenhouse Gas Emissions and Economics","cited_venue":null,"cited_doi":"10.2172/15006537","cited_url":"https://doi.org/10.2172/15006537","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035893,"raw_reference":"NREL (National Renewable Energy Laboratory). 2011. A Review of Operational Water Consumption and Withdrawal Factors for Electricity Generating Technologies. NREL/TP–6A20– 50900, Golden, CO. ADAMS Accession No. ML14286A088.","cited_authors":"NREL (National Renewable Energy Laboratory)","cited_year":"2011","cited_title":"A Review of Operational Water Consumption and Withdrawal Factors for Electricity Generating Technologies","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035894,"raw_reference":"NREL (National Renewable Energy Laboratory). 2012. Renewable Electricity Futures Study.","cited_authors":"NREL (National Renewable Energy Laboratory)","cited_year":"2012","cited_title":"Renewable Electricity Futures Study","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035895,"raw_reference":"NREL/TP-6A20-52409, 4 Volumes, Golden, CO. Accessed May 1, 2023, at https://www.nrel.gov/docs/fy13osti/52409-ES.pdf.","cited_authors":"NREL/TP-6A20-52409, 4 Volumes, Golden, CO. Accessed May 1","cited_year":"2023","cited_title":"at https://www.nrel.gov/docs/fy13osti/52409-ES.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrel.gov/docs/fy13osti/52409-ES.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035896,"raw_reference":"Golden, CO. Accessed May 1, 2023, at https://www.nrel.gov/csp/index.html. NuScale (NuScale Power LLC). 2022. “Frequently Asked Questions: NuScale FAQS.” Portland,","cited_authors":"Golden, CO. Accessed May 1","cited_year":"2023","cited_title":"Frequently Asked Questions: NuScale FAQS","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrel.gov/csp/index.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035897,"raw_reference":"OR. Available at https://www.youtube.com/watch?v=NWH01ImMkyk. NuScale (NuScale Power LLC). 2023. “Standard Power.” Portland, OR. Accessed November 9, 2023, at https://www.nuscalepower.com/en/projects. Orsted. Undated. “Our Offshore Wind Projects in the U.S.” Boston, MA. Accessed May 1, 2023, at https://us.orsted.com/wind-projects.","cited_authors":"OR. Available at https://www.youtube.com/watch?v=NWH01ImMkyk. NuScale (NuScale Power LLC)","cited_year":"2023","cited_title":"Standard Power","cited_venue":null,"cited_doi":null,"cited_url":"https://www.youtube.com/watch?v=NWH01ImMkyk","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035898,"raw_reference":"USGS (U.S. Geological Survey). 2008. Assessment of Moderate- and High-Temperature Geothermal Resources of the United States. Fact Sheet 2008–3082, Menlo Park, CA. Accessed May 11, 2023, at https://pubs.usgs.gov/fs/2008/3082/pdf/fs2008-3082.pdf.","cited_authors":"USGS (U.S. Geological Survey)","cited_year":"2008","cited_title":"Assessment of Moderate- and High-Temperature Geothermal Resources of the United States","cited_venue":null,"cited_doi":null,"cited_url":"https://pubs.usgs.gov/fs/2008/3082/pdf/fs2008-3082.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035899,"raw_reference":"Weaver, S.P., A.K. Jones, C.D. Hein, and I. Castro-Arellano. 2020. “Estimating bat fatality at a Texas wind energy facility: implications transcending the United States–Mexico border.” Journal of Mammalogy 101(6):1533–1541. DOI:10.1093/jmammal/gyaa132. Oxford, United Kingdom. Accessed May 11, 2023, at https://dx.doi.org/10.1093/jmammal/gyaa132.","cited_authors":"Weaver, S.P., A.K. Jones, C.D. Hein, and I. Castro-Arellano","cited_year":"2020","cited_title":"Estimating bat fatality at a Texas wind energy facility: implications transcending the United States–Mexico border","cited_venue":null,"cited_doi":"10.1093/jmammal/gyaa132","cited_url":"https://dx.doi.org/10.1093/jmammal/gyaa132","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035900,"raw_reference":"Wiser, R., and M. Bolinger. 2019. 2018 Wind Technologies Market Report. Office of Energy Efficiency and Renewable Energy, Washington, D.C. Accessed May 11, 2023, at https://www.energy.gov/eere/wind/downloads/2018-wind-technologies-market-report. D-53","cited_authors":"Wiser, R., and M. Bolinger","cited_year":"2019","cited_title":"2018 Wind Technologies Market Report","cited_venue":null,"cited_doi":null,"cited_url":"https://www.energy.gov/eere/wind/downloads/2018-wind-technologies-market-report","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035901,"raw_reference":"NUREG-1437, Revision 2 Appendix D Zimmerling, J.R., A.C. Pomeroy, M.V. d’Entremont, and C.M. Francis. 2013. “Canadian Estimate of Bird Mortality Due to Collisions and Direct Habitat Loss Associated with Wind Turbine Developments.” Avian Conservation and Ecology 8(2):10. DOI:10.5751/ACE-00609080210. Nova Scotia, Canada. Accessed May 11, 2023, at http://dx.doi.org/10.5751/ACE00609-080210.","cited_authors":"NUREG-1437, Revision 2 Appendix D Zimmerling, J.R., A.C. Pomeroy, M.V. d’Entremont, and C.M. Francis","cited_year":"2013","cited_title":"Canadian Estimate of Bird Mortality Due to Collisions and Direct Habitat Loss Associated with Wind Turbine Developments","cited_venue":null,"cited_doi":"10.5751/ace-00609080210","cited_url":"http://dx.doi.org/10.5751/ACE00609-080210","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035902,"raw_reference":"APPENDIX E ENVIRONMENTAL IMPACT OF POSTULATED ACCIDENTS Introduction Under the U.S. Nuclear Regulatory Commission’s (NRC’s) license renewal rule in Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), applicants for initial license renewal (initial LR) and subsequent license renewal (SLR) must take adequate steps to account for aging during the period of extended operation either through updating time-limited aging analyses or implementing aging management plans. Based on these activities, the NRC expects that operation during an initial LR or SLR term would continue to provide a level of safety equivalent to that during the current license term. Consequently, the following discussions of accident risk, which generally consider the additional risk posed by 20 years of additional operation, would apply to initial LR or SLR. Chapter 5 of the 1996 Generic Environmental Impact Statement for License Renewal of Nuclear","cited_authors":null,"cited_year":null,"cited_title":"APPENDIX E ENVIRONMENTAL IMPACT OF POSTULATED ACCIDENTS Introduction Under the U.S. Nuclear Regulatory Commission’s (NRC’s) license renewal rule in Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), applicants for initial license renewal (initial LR) and subsequent license renewal (SLR) must take adequate steps to account for aging during the period of extended operation either through updating time-limited aging analyses or implementing aging management plans","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035903,"raw_reference":"Specifically, in Section 5.5.2.5 of the 1996 LR GEIS, the NRC staff concluded that the generic analysis “applies to all plants and that the probability-weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts of severe accidents are of small significance for all plants.” The term probability-weighted consequences in the remainder of this revised LR GEIS refers to probability-weighted consequences to the public and environment as a result of a severe accident. The focus of the 2013 LR GEIS (NRC 2013b) was on severe accidents because the impacts of design-basis accidents are SMALL and, as stated in Section E.3 of the 2013 LR GEIS, the","cited_authors":"Specifically, in Section 5.5.2.5 of the 1996 LR GEIS, the NRC staff concluded that the generic analysis “applies to all plants and that the probability-weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts of severe accidents are of small significance for all plants.” The term probability-weighted consequences in the remainder of this revised LR GEIS refers to probability-weighted consequences to the public and environment as a result of a severe accident. The focus of the 2013 LR GEIS (NRC","cited_year":"2013b","cited_title":"was on severe accidents because the impacts of design-basis accidents are SMALL and, as stated in Section E.3 of the 2013 LR GEIS, the","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035904,"raw_reference":"SLR term. The NRC’s understanding of severe accident risk has evolved since issuance of the 1996 and 2013 LR GEISs due in part to improvements in plant safety, improved plant operational performance, and lessons learned and knowledge gained. This appendix assesses more recent information and updates the analysis presented in Chapter 4.9 and Appendix E of the 2013","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035905,"raw_reference":"LR GEIS regarding severe accidents. This revision considers how these developments would affect the Chapter 5 conclusions in the 1996 LR GEIS and provides comparative data where appropriate. The 1996 LR GEIS provided quantitative estimates of severe accident impacts with estimated population projections, meteorology, and exposure indices to support the conclusions, and the estimates remain unchanged for the purposes of this analysis. This","cited_authors":null,"cited_year":null,"cited_title":"LR GEIS regarding severe accidents","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035906,"raw_reference":"LR GEIS will have had a severe accident mitigation alternative (SAMA) or severe accident mitigation design alternative (SAMDA) analysis approved in an EIS. However, the following analysis would also apply to a plant applying for initial LR; although if the plant had not previously been the subject of a SAMA or SAMDA analysis in a National Environmental Policy Act of 1969, as amended (NEPA) (42 U.S.C. § 4321 et seq.) document, the applicant would need to submit a SAMA analysis. The format of this appendix follows a format similar to that provided in the 2013 LR GEIS, including a discussion of uncertainties and SAMAs. Nuclear Power Plant Accidents General characteristics of postulated accidents (design-basis and severe accidents) are described in Section 5.2 of the 1996 LR GEIS, which covered • the general characteristics of accidents • fission product characteristics • meteorological considerations 4 The correct terminology is “frequency-weighted consequences” because the accident consequences are multiplied by the core damage frequency. However, the 1996 LR GEIS used the term “probability-weighted consequences” when referring to frequency-weighted consequences. To avoid confusion, this LR GEIS continues use of the 1996 LR GEIS terminology but also uses these two terms interchangeably.","cited_authors":"LR GEIS will have had a severe accident mitigation alternative (SAMA) or severe accident mitigation design alternative (SAMDA) analysis approved in an EIS. However, the following analysis would also apply to a plant applying for initial LR; although if the plant had not previously been the subject of a SAMA or SAMDA analysis in a National Environmental Policy Act of","cited_year":"1969","cited_title":"frequency-weighted consequences","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035907,"raw_reference":"NUREG-1437, Revision 2 Appendix E • implementation of the NRC’s Interim Compensatory Measures (ICMs) Orders following the September 2001 terrorist attacks,5 most of which have subsequently been codified into NRC regulations6 • implementation of the NRC Orders and information requests under 10 CFR 50.54(f) (NRC 2012d) following the Fukushima Dai-ichi nuclear power plant accident initiated by the March 2011 Great Tohoku Earthquake and subsequent tsunami; the requirements for two of these Orders have subsequently been incorporated into NRC regulations7 (see discussion in","cited_authors":"NUREG-1437, Revision 2 Appendix E • implementation of the NRC’s Interim Compensatory Measures (ICMs) Orders following the September 2001 terrorist attacks,5 most of which have subsequently been codified into NRC regulations6 • implementation of the NRC Orders and information requests under 10 CFR 50.54(f) (NRC","cited_year":"2012d","cited_title":"following the Fukushima Dai-ichi nuclear power plant accident initiated by the March 2011 Great Tohoku Earthquake and subsequent tsunami; the requirements for two of these Orders have subsequently been incorporated into NRC regulations7 (see discussion in","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035908,"raw_reference":"Section E.3 of this appendix. The result of the assessment was that almost all key trends and developments for the 51 safety measures evaluated, with one exception (loss of offsite power recovery time), are either favorable (i.e., show improved plant safety or performance) or flat (i.e., show no discernible change in plant safety or performance). The assessment concluded that a large reduction in average core damage frequency (CDF) for internal events and a reduction in plant performance issues have also been observed, but external event hazards and uncertainties need to be considered when evaluating safety goal impacts. These examples of mitigation to improve severe accident risk since publication of the 1996","cited_authors":null,"cited_year":null,"cited_title":"Section E.3 of this appendix","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035909,"raw_reference":"Section B.5.b. of Commission Order EA-02-026 provide background related to the implementation of particular portions of the ICMs. As an example, the reader is referred to the safety evaluations associated with Brunswick Steam Electric Plant, Units 1 and 2 (NRC 2007d). 6 Final Rule on Power Reactor Security Requirements dated March 27, 2009 (74 FR 13926) and Final Rule on Enhancements to Emergency Preparedness Regulations dated November 23, 2011 (76 FR 72560). 7 The NRC, subsequent to issuance of the NRC Orders, amended its regulations to require mitigation strategies for beyond-design-basis events at nuclear power plants. The Final Rule on Mitigation of Beyond-Design-Basis Events, dated August 9, 2019 (84 FR 39684), makes generically applicable the requirements of Order EA-12-049 (NRC 2012c) and Order EA-12-051 (NRC 2012a). 8 Implementation of these plant improvements and guidelines is required by 10 CFR 50.155, “Mitigation of beyond-design-basis events.”","cited_authors":"Section B.5.b. of Commission Order EA-02-026 provide background related to the implementation of particular portions of the ICMs. As an example, the reader is referred to the safety evaluations associated with Brunswick Steam Electric Plant, Units 1 and 2 (NRC","cited_year":"2007d","cited_title":"Mitigation of beyond-design-basis events","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035910,"raw_reference":"SECY-11-0137, “Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned” (NRC 2011c). The Commission approved the staff’s prioritization, with comment, in the Staff Requirements Memorandum (SRM) to SECY-11-0137 (NRC 2011d). A complete discussion of the prioritization of the recommendations from the NTTF report, additional issues that were addressed subsequent to the NTTF report, and the disposition of the issues that were prioritized as Tier 2 or Tier 3 are provided in SECY-17-0016, “Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami” (NRC 2017d). The NRC undertook the following regulatory activities to address the majority of the Tier 1 recommendations: • On March 12, 2012, the NRC issued Orders EA-12-049, “Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,”","cited_authors":"SECY-11-0137, “Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned” (NRC","cited_year":"2011c","cited_title":"Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035911,"raw_reference":"EA-12-050, “Order Modifying Licenses with Regard to Reliable Hardened Containment Vents,” and EA-12-051, “Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,” and a request for information under 10 CFR 50.54(f) (hereafter referred to as the 50.54(f) letter) to licensees (NRC 2012c, NRC 2012h, NRC 2012a, and NRC 2012d, respectively). • On June 6, 2013, the NRC issued Order EA-13-109, “Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions” (NRC 2013g), which superseded Order EA-12-050, replacing its requirements with modified requirements.","cited_authors":"EA-12-050, “Order Modifying Licenses with Regard to Reliable Hardened Containment Vents,” and EA-12-051, “Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,” and a request for information under 10 CFR 50.54(f) (hereafter referred to as the 50.54(f) letter) to licensees (NRC","cited_year":"2012c","cited_title":"Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035912,"raw_reference":"NTTF report. • On January 24, 2019, the Commission, via SRM-M190124A (NRC 2019a), approved the final","cited_authors":"NTTF report. • On January 24","cited_year":"2019","cited_title":"the Commission, via SRM-M190124A (NRC 2019a), approved the final","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035913,"raw_reference":"NRC will continue to follow a site-specific approach to resolving the interaction between the hazard reevaluation and mitigation strategies using information gathered in the 50.54(f) letter process. The NRC staff made conforming changes to the final rule package (NRC 2019b) as directed by the Commission, which included changes to two regulatory guides (NRC 2019c and NRC 2019d). The final rule was published in the Federal Register on August 9, 2019 (84 FR 39684), with an effective implementation date of September 9, 2019. • Subsequent to Commission approval of the final MBDBE rule, the staff engaged with stakeholders to pursue the expeditious closure of the remaining post-Fukushima 50.54(f) letter responses on a timeframe commensurate with each item’s safety significance. • In a draft discussion paper (NRC 2019e), the NRC staff outlined the process to be used to review the reevaluated hazard and mitigation strategies assessment information provided by licensees, considering the differences between the draft final MBDBE rule and the approved final MBDBE rule. Subsequently, the NRC staff provided a screening letter (also called a “binning” letter) for both seismic and flooding hazard reevaluations (NRC 2019f and","cited_authors":"NRC will continue to follow a site-specific approach to resolving the interaction between the hazard reevaluation and mitigation strategies using information gathered in the 50.54(f) letter process. The NRC staff made conforming changes to the final rule package (NRC","cited_year":"2019b","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035914,"raw_reference":"NRC 2019g), which categorized sites based on available information and the status of any commitments made in prior reports and assessments. The NRC staff has concluded that each operating nuclear power plant has implemented the","cited_authors":"NRC","cited_year":"2019g","cited_title":"which categorized sites based on available information and the status of any commitments made in prior reports and assessments","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035915,"raw_reference":"NRC-mandated safety enhancements resulting from the lessons learned from the Fukushima Dai-ichi accident through its implementation of Orders EA-12-049 and EA-12-051. The staff further concluded that all licensees have completed their response to the 50.54(f) letter for their nuclear power plants and that no further regulatory decisionmaking is required for nuclear power plants related to the Fukushima lessons learned. In the context of the LR GEIS, the Fukushima events are considered a severe accident (i.e., a type of accident in which substantial damage is done to the reactor core) and more specifically, a severe accident initiated by an event external to the plant. The 1996 LR GEIS concluded that risks from severe accidents initiated by external events (such as an earthquake) could have potentially high consequences but found that external events are adequately addressed through a consideration of a severe accident initiated by an internal event (such as a loss of cooling water). Section E.3 assesses the impact of new information obtained in the responses to the","cited_authors":null,"cited_year":null,"cited_title":"NRC-mandated safety enhancements resulting from the lessons learned from the Fukushima Dai-ichi accident through its implementation of Orders EA-12-049 and EA-12-051","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035916,"raw_reference":"NTTF recommendations. The conclusion from these assessments of the impact of the new information is that the risk of severe accidents, specifically, probability-weighted consequences reported in the 1996 LR GEIS, remains bounding.","cited_authors":null,"cited_year":null,"cited_title":"NTTF recommendations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035917,"raw_reference":"Waste, and Reactor-Related Greater than Class C Waste.” 10 CFR Part 73. Code of Federal Regulations, Title 10, Energy, Part 73, “Physical Protection of Plants and Materials.” 10 CFR Part 100. Code of Federal Regulations, Title 10, Energy, Part 100, “Reactor Site Criteria.” 51 FR 30028. August 21, 1986. “Safety Goals for the Operation of Nuclear Power Plants; Policy Statement; Republication.” Federal Register, Nuclear Regulatory Commission. 61 FR 28467. June 5, 1996. “Environmental Review for Renewal of Nuclear Power Plant Operating Licenses.” Federal Register, Nuclear Regulatory Commission. 64 FR 38551. July 19, 1999. “Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.” Final Rule, Federal Register, Nuclear Regulatory Commission.","cited_authors":"Waste, and Reactor-Related Greater than Class C Waste.” 10 CFR Part 73. Code of Federal Regulations, Title 10, Energy, Part 73, “Physical Protection of Plants and Materials.” 10 CFR Part 100. Code of Federal Regulations, Title 10, Energy, Part 100, “Reactor Site Criteria.” 51 FR 30028. August 21","cited_year":"1986","cited_title":"Safety Goals for the Operation of Nuclear Power Plants; Policy Statement; Republication","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035918,"raw_reference":"AEC (U.S. Atomic Energy Commission). 1974a. Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors. Regulatory Guide 1.3, Revision 2, Washington, D.C. ADAMS Accession No. ML003739601.","cited_authors":"AEC (U.S. Atomic Energy Commission)","cited_year":"1974a","cited_title":"Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035919,"raw_reference":"AEC (U.S. Atomic Energy Commission). 1974b. Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Pressurized Water Reactors. Regulatory Guide 1.4, Revision 2, Washington, D.C. ADAMS Accession No. ML003739614.","cited_authors":"AEC (U.S. Atomic Energy Commission)","cited_year":"1974b","cited_title":"Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Pressurized Water Reactors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035920,"raw_reference":"Aldrich, D.C., J.L. Sprung, D.J. Alpert, K. Diegert, R.M. Ostmeyer, L.T. Ritchie, D.R. Strip, J.D. Johnson, K. Hansen, and J. Robinson. 1982. Technical Guidance for Siting Criteria Development. NUREG/CR-2239, SAND81-1549. ADAMS Accession No. ML072320420.","cited_authors":"Aldrich, D.C., J.L. Sprung, D.J. Alpert, K. Diegert, R.M. Ostmeyer, L.T. Ritchie, D.R. Strip, J.D. Johnson, K. Hansen, and J. Robinson","cited_year":"1982","cited_title":"Technical Guidance for Siting Criteria Development","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035921,"raw_reference":"ANS (American Nuclear Society). 2020. “U.S. Nuclear Capacity Factors: Resiliency and New Realities.” Nuclear NewsWire, Downers Grove, Il. Accessed November 6, 2023 at https://www.ans.org/news/article-183/us-nuclear-capacity-factors-resiliency-and-new-realities/.","cited_authors":"ANS (American Nuclear Society)","cited_year":"2020","cited_title":"U.S. Nuclear Capacity Factors: Resiliency and New Realities","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ans.org/news/article-183/us-nuclear-capacity-factors-resiliency-and-new-realities/","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035922,"raw_reference":"APS (Arizona Public Service). 2018. Letter from M.L. Lacal to NRC dated October 5, 2018, regarding “Palo Verde Nuclear Generating Station Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21.” Washington, D.C. ADAMS Accession No. ML18278A295.","cited_authors":"APS (Arizona Public Service)","cited_year":"2018","cited_title":"Palo Verde Nuclear Generating Station Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035923,"raw_reference":"Baker, D.A., W.J. Bailey, C.E. Beyer, F.C. Bold, and J.J. Tawil. 1988. Assessment of the Use of Extended Burnup Fuel in Light Water Power Reactors. NUREG/CR-5009, Pacific Northwest","cited_authors":"Baker, D.A., W.J. Bailey, C.E. Beyer, F.C. Bold, and J.J. Tawil","cited_year":"1988","cited_title":"Assessment of the Use of Extended Burnup Fuel in Light Water Power Reactors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035924,"raw_reference":"Laboratory, Richland, WA. Accessed April 24, 2023, at https://www.osti.gov/biblio/5655949.","cited_authors":"Laboratory, Richland, WA. Accessed April 24","cited_year":"2023","cited_title":"at https://www.osti.gov/biblio/5655949","cited_venue":null,"cited_doi":null,"cited_url":"https://www.osti.gov/biblio/5655949","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035925,"raw_reference":"BNL (Brookhaven National Laboratory). 1995. Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Surry, Unit 1, Summary of Results. NUREG/CR–6144,","cited_authors":"BNL (Brookhaven National Laboratory)","cited_year":"1995","cited_title":"Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Surry, Unit 1, Summary of Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035926,"raw_reference":"NUREG-1437, Revision 2 Appendix E DiNunno, J.J., F.D. Anderson, R.E. Baker, and R.L. Waterfield. 1962. Calculation of Distance Factors for Power and Test Reactor Sites. TID-14844, U.S. Atomic Energy Commission,","cited_authors":"NUREG-1437, Revision 2 Appendix E DiNunno, J.J., F.D. Anderson, R.E. Baker, and R.L. Waterfield","cited_year":"1962","cited_title":"Calculation of Distance Factors for Power and Test Reactor Sites","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035927,"raw_reference":"Ducros, G., P.P. Malgouyres, M. Kissane, D. Boulaud, and M. Durin. 2001. “Fission product release under severe accidental conditions: general presentation of the program and synthesis of VERCORS 1–6 results.” Nuclear Engineering and Design 208(2):191-203, Elsevier Academic","cited_authors":"Ducros, G., P.P. Malgouyres, M. Kissane, D. Boulaud, and M. Durin","cited_year":"2001","cited_title":"Fission product release under severe accidental conditions: general presentation of the program and synthesis of VERCORS 1–6 results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035928,"raw_reference":"EPRI (Electric Power Research Institute). 2012. Seismic Evaluation Guidance – Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic. Report 1025287, Palo Alto, CA. ADAMS Accession No. ML12333A170.","cited_authors":"EPRI (Electric Power Research Institute)","cited_year":"2012","cited_title":"Seismic Evaluation Guidance – Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035929,"raw_reference":"EPRI/NRC (Electric Power Research Institute/U.S. Nuclear Regulatory Commission). 2005a.","cited_authors":"EPRI/NRC (Electric Power Research Institute/U.S. Nuclear Regulatory Commission)","cited_year":"2005a","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035930,"raw_reference":"EPRI/NRC-RES, Fire PRA Methodology for Nuclear Power Facilities, Volume 1: Summary and Overview. EPRI - 1011989, NUREG/CR-6850, Final Report, Rockville, MD. Accessed April 24, 2023, at https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html.","cited_authors":"EPRI/NRC-RES, Fire PRA Methodology for Nuclear Power Facilities, Volume 1: Summary and Overview. EPRI - 1011989, NUREG/CR-6850, Final Report, Rockville, MD. Accessed April 24","cited_year":"2023","cited_title":"at https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035931,"raw_reference":"EPRI/NRC (Electric Power Research Institute/U.S. Nuclear Regulatory Commission). 2005b.","cited_authors":"EPRI/NRC (Electric Power Research Institute/U.S. Nuclear Regulatory Commission)","cited_year":"2005b","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035932,"raw_reference":"EPRI/NRC-RES, Fire PRA Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology. EPRI - 1011989, NUREG/CR-6850, Final Report, Rockville, MD. Accessed April 24, 2023, at https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html. Exelon Generation Company, LLC. 2012. Limerick Generating Station, Units 1 and 2. CLI-1219, 76 NRC 377. NUREG-0750. Volume 78, Book II of II. ADAMS Accession No. ML14259A584. Exelon Generation Company, LLC. 2013. Limerick Generating Station, Units 1 and 2. CLI-13-7, 78 NRC 199. NUREG-0750. Volume 78, Book II of II. ADAMS Accession No. ML15183A194.","cited_authors":"EPRI/NRC-RES, Fire PRA Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology. EPRI - 1011989, NUREG/CR-6850, Final Report, Rockville, MD. Accessed April 24","cited_year":"2023","cited_title":"at https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035933,"raw_reference":"Ghosh, T., R. Palla, and D. Helton. 2009. Perspectives on Severe Accident Mitigation Alternatives for U.S. Plant License Renewal. Organization for Economic Cooperation and Development Workshop on Severe Accident Management, Bottstein, Switzerland. ADAMS Accession No. ML092750488.","cited_authors":"Ghosh, T., R. Palla, and D. Helton","cited_year":"2009","cited_title":"Perspectives on Severe Accident Mitigation Alternatives for U.S. Plant License Renewal","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035934,"raw_reference":"Ghosh, S.T., E. Hossein, A. Hathway, N. Bixler, D. Brooks, M. Dennis, D. Osborn, K. Ross, and K. Wagner. 2021. “State-of-the-Art Reactor Consequence Analyses Project: Uncertainty Analyses for Station Blackout Scenarios.” Nuclear Technology, 207(3):441–451. Washington, D.C. Accessed May 12, 2023, at https://doi.org/10.1080/00295450.2021.1875737.","cited_authors":"Ghosh, S.T., E. Hossein, A. Hathway, N. Bixler, D. Brooks, M. Dennis, D. Osborn, K. Ross, and K. Wagner","cited_year":"2021","cited_title":"State-of-the-Art Reactor Consequence Analyses Project: Uncertainty Analyses for Station Blackout Scenarios","cited_venue":null,"cited_doi":"10.1080/00295450.2021.1875737","cited_url":"https://doi.org/10.1080/00295450.2021.1875737","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035935,"raw_reference":"ICRP (International Commission on Radiological Protection). 1991. “1990 Recommendations of the International Commission on Radiological Protection.” ICRP Publication 60, Ann. ICRP, 21(1-3). Pergamon Press, New York, NY. Accessed April 24, 2023, at https://www.icrp.org/publication.asp?id=icrp%20publication%2060. National Environmental Policy Act of 1969 (NEPA), as amended. 42 U.S.C. § 4321 et seq.","cited_authors":"ICRP (International Commission on Radiological Protection)","cited_year":"1991","cited_title":"1990 Recommendations of the International Commission on Radiological Protection","cited_venue":null,"cited_doi":null,"cited_url":"https://www.icrp.org/publication.asp?id=icrp%20publication%2060","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035936,"raw_reference":"National Research Council. 1972. The Effects on Populations of Exposure to Low Levels of Ionizing Radiation. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://inis.iaea.org/collection/NCLCollectionStore/_Public/37/004/37004410.pdf.","cited_authors":"National Research Council","cited_year":"1972","cited_title":"The Effects on Populations of Exposure to Low Levels of Ionizing Radiation","cited_venue":null,"cited_doi":null,"cited_url":"https://inis.iaea.org/collection/NCLCollectionStore/_Public/37/004/37004410.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035937,"raw_reference":"NUREG-1437, Revision 2 E-98 Appendix E National Research Council. 1980. Effects on Populations of Exposure to Low Levels of Ionizing","cited_authors":"NUREG-1437, Revision 2 E-98 Appendix E National Research Council","cited_year":"1980","cited_title":"Effects on Populations of Exposure to Low Levels of Ionizing","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035938,"raw_reference":"Radiation. 1980. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://nap.nationalacademies.org/catalog/21287/effects-on-populations-of-exposure-to-lowlevels-of-ionizing-radiation-1980.","cited_authors":"Radiation","cited_year":"1980","cited_title":"The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://nap.nationalacademies.org/catalog/21287/effects-on-populations-of-exposure-to-lowlevels-of-ionizing-radiation-1980","cited_venue":null,"cited_doi":null,"cited_url":"https://nap.nationalacademies.org/catalog/21287/effects-on-populations-of-exposure-to-lowlevels-of-ionizing-radiation-1980","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035939,"raw_reference":"National Research Council. 1990. Health Effects of Exposure to Low Levels of Ionizing Radiation: BEIR V. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://www.ncbi.nlm.nih.gov/books/NBK218704/.","cited_authors":"National Research Council","cited_year":"1990","cited_title":"Health Effects of Exposure to Low Levels of Ionizing Radiation: BEIR V. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://www.ncbi.nlm.nih.gov/books/NBK218704/","cited_venue":null,"cited_doi":null,"cited_url":"https://www.ncbi.nlm.nih.gov/books/NBK218704/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035940,"raw_reference":"National Research Council. 2006. Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase II. Washington, D.C. Accessed May 13, 2023, at https://doi.org/10.17226/11340. Natural Resources Defense Council v. U.S. Nuclear Regulatory Commission. 823 F.3d 641 (D.C. Cir. 2016). Accessed May 8, 2023, at https://cite.case.law/f3d/823/641/5921839/.","cited_authors":"National Research Council","cited_year":"2006","cited_title":"Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase II. Washington, D.C. Accessed May 13, 2023, at https://doi.org/10.17226/11340","cited_venue":null,"cited_doi":"10.17226/11340","cited_url":"https://doi.org/10.17226/11340","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035941,"raw_reference":"NEI (Nuclear Energy Institute). 2005. Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document. NEI-05-01, Revision A, Washington, D.C. ADAMS Accession No. ML060530203.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2005","cited_title":"Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035942,"raw_reference":"NEI (Nuclear Energy Institute). 2016. Diverse and Flexible Coping Strategies (FLEX) Implementation Guide. NEI 12-06 [Rev 4]. Washington, D.C. ADAMS Accession No. ML16354B42.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2016","cited_title":"Diverse and Flexible Coping Strategies (FLEX) Implementation Guide","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035943,"raw_reference":"NEI (Nuclear Energy Institute). 2018. Letter from S.J. Vaughn to NRC dated April 27, 2018, regarding “Submittal of NUMARC 93-01, Rev 4f, ‘Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants’ for NRC Endorsement.” Washington, D.C. ADAMS Accession No. ML18120A069.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2018","cited_title":"Submittal of NUMARC 93-01, Rev 4f, ‘Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants’ for NRC Endorsement","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035944,"raw_reference":"NEI (Nuclear Energy Institute). 2019. Model SLR New and Significant Assessment Approach for","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2019","cited_title":"Model SLR New and Significant Assessment Approach for","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035945,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1975. An Assessment of Accidents Risks in U.S. Commercial Nuclear Power Plants. NUREG-75/014, Washington, D.C. ADAMS Accession No. ML083570090.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1975","cited_title":"An Assessment of Accidents Risks in U.S. Commercial Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035946,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1978. Liquid Pathway Generic Study Impacts of Accidental Radioactive Releases to the Hydrosphere from Floating and Land-Based Nuclear Power Plants. (NUREG-0440), Washington, D.C. Accessed May 12, 2023, at https://babel.hathitrust.org/cgi/pt?id=mdp.39015095094713&view=page&seq=3.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1978","cited_title":"Liquid Pathway Generic Study Impacts of Accidental Radioactive Releases to the Hydrosphere from Floating and Land-Based Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":"https://babel.hathitrust.org/cgi/pt?id=mdp.39015095094713&view=page&seq=3","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035947,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1982a. Final Environmental Statement Related to the Operation of Seabrook Station, Units 1 and 2. NUREG-0854. Docket No. 50-443 and 50-444. Washington, D.C. ADAMS Accession No. ML102290543.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1982a","cited_title":"Final Environmental Statement Related to the Operation of Seabrook Station, Units 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035948,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1982b. Final Environmental Statement Related to the Operation of Byron Station, Units 1 and 2. NUREG-0848. Docket No. STN 50-454 and STN 50-455. Washington, D.C. ADAMS Accession No. ML13269A184. E-99","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1982b","cited_title":"Final Environmental Statement Related to the Operation of Byron Station, Units 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035949,"raw_reference":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission). 1982c. Final Environmental Statement Related to the Operation of Clinton Power Station, Unit No. 1. NUREG-0854. Docket No. 50-461.","cited_authors":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1982c","cited_title":"Final Environmental Statement Related to the Operation of Clinton Power Station, Unit No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035950,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1982d. The Development of Severe Reactor Accident Source Terms: 1957–1981. NUREG-0773. U.S. Nuclear Regulatory Commission,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1982d","cited_title":"The Development of Severe Reactor Accident Source Terms: 1957–1981","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035951,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1989a. Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2. NUREG-0775 Supplement. Docket Nos. 50-445 and 50-446. Washington, D.C. ADAMS Accession No. ML19332D079.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1989a","cited_title":"Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035952,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1989b. Final Environmental Statement related to the operation of Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353, Philadelphia Electric Company. NUREG-0974, Supplement. Washington, D.C. August. ADAMS Accession No. ML11221A204.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1989b","cited_title":"Final Environmental Statement related to the operation of Limerick Generating Station, Units 1 and 2 Docket Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035953,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1989c. Regulatory Analysis for the Resolution of Generic Issue 82, “Beyond Design Basis Accidents in Spent Fuel Pools.” NUREG-1353.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1989c","cited_title":"Beyond Design Basis Accidents in Spent Fuel Pools","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035954,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1990. Severe Accident Risks: An Assessment for","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1990","cited_title":"Severe Accident Risks: An Assessment for","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035955,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1993. Shutdown and Low Power Operation at Commercial Nuclear Power Plants in the United States, Final Report. NUREG-1449.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1993","cited_title":"Shutdown and Low Power Operation at Commercial Nuclear Power Plants in the United States, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035956,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1994. Revised Livermore Seismic Hazard Estimates for 69 Nuclear Power Plant Sites East of the Rocky Mountains, Final Report.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1994","cited_title":"Revised Livermore Seismic Hazard Estimates for 69 Nuclear Power Plant Sites East of the Rocky Mountains, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035957,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1995a. Accident Source Terms for Light-Water Nuclear Power Plants. NUREG-1465, Washington, D.C. ADAMS Accession No. ML041040063.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1995a","cited_title":"Accident Source Terms for Light-Water Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035958,"raw_reference":"NRC (U.S. Nuclear Regulatory Agency). 1995b. Final Environmental Impact Statement Related to the Operation of Watts Bar Nuclear Plant Units Nos. 1 and 2. NUREG-0498, Supplement No. 1, Washington, D.C. ADAMS Accession No. ML18023A204.","cited_authors":"NRC (U.S. Nuclear Regulatory Agency)","cited_year":"1995b","cited_title":"Final Environmental Impact Statement Related to the Operation of Watts Bar Nuclear Plant Units Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035959,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997a. Individual Plant Examination Program: Perspectives on Reactor Safety and Plant Performance. Volume 1, Part 1 Final Summary Report and Volume 2, Parts 2-5, Final Report, NUREG-1560, Washington, D.C. Accessed April 24, 2023, at https://www.osti.gov/biblio/569125.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997a","cited_title":"Individual Plant Examination Program: Perspectives on Reactor Safety and Plant Performance","cited_venue":null,"cited_doi":null,"cited_url":"https://www.osti.gov/biblio/569125","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035960,"raw_reference":"NUREG-1437, Revision 2 E-100 Appendix E NRC (U.S. Nuclear Regulatory Commission). 1997b. A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown Nuclear Power Plants. NUREG/CR-6451,","cited_authors":"NUREG-1437, Revision 2 E-100 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997b","cited_title":"A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035961,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997c. Memorandum from L.J. Callan to The","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997c","cited_title":"Memorandum from L.J. Callan to The","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035962,"raw_reference":"Commissioners, dated July 30, 1997, regarding “Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation.” SECY-97-168,","cited_authors":"Commissioners, dated July 30","cited_year":"1997","cited_title":"Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035963,"raw_reference":"Washington, D.C. Available at: https://www.nrc.gov/reading-rm/doccollections/commission/secys/1997/secy1997-168/1997-168scy.pdf.","cited_authors":null,"cited_year":null,"cited_title":"Washington, D.C. Available at: https://www.nrc.gov/reading-rm/doccollections/commission/secys/1997/secy1997-168/1997-168scy.pdf","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/reading-rm/doccollections/commission/secys/1997/secy1997-168/1997-168scy.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035964,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997d. Memorandum from J.C. Hoyle to L.J.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997d","cited_title":"Memorandum from J.C. Hoyle to L.J","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035965,"raw_reference":"Callan, dated December 11, 1997, regarding “Staff Requirements - SECY-97-168 - Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation.” SRM-97-168, Washington, D.C. ADAMS Accession No. ML003752569.","cited_authors":"Callan, dated December 11","cited_year":"1997","cited_title":"Staff Requirements - SECY-97-168 - Issuance for Public Comment of Proposed Rulemaking Package for Shutdown and Fuel Storage Pool Operation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035966,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997e. Reassessment of Selected Factors Affecting Siting of Nuclear Power Plants. NUREG/CR-6295, BNL-NUREG-52442. ADAMS Accession No. ML20135F947.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997e","cited_title":"Reassessment of Selected Factors Affecting Siting of Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035967,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1997f. Regulatory Analysis Technical Evaluation Handbook. NUREG/BR–0184, Washington, D.C. ADAMS Accession No. ML050190193.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1997f","cited_title":"Regulatory Analysis Technical Evaluation Handbook","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035968,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1999. Generic Environmental Impact Statement for License Renewal of Nuclear Plants Addendum to Main Report, NUREG-1437, Volume 1, Addendum 1. Washington, D.C. ADAMS Accession No. ML040690720.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1999","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants Addendum to Main Report, NUREG-1437, Volume 1, Addendum 1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035969,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2000. Alternative Radiological Source Terms for Evaluating Design-Basis Accidents at Nuclear Power Reactors. Regulatory Guide 1.183,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2000","cited_title":"Alternative Radiological Source Terms for Evaluating Design-Basis Accidents at Nuclear Power Reactors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035970,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2001. Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. NUREG-1738, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2001","cited_title":"Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035971,"raw_reference":"ADAMS Accession No. ML010430066. NRC (U.S. Nuclear Regulatory Commission). 2002a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Supplement 6 Regarding Surry Power Station, Units 1 and 2. Final Report. NUREG-1437, Supplement 6, Washington, D.C. ADAMS Accession No. ML023310717.","cited_authors":"ADAMS Accession No. ML010430066. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Supplement 6 Regarding Surry Power Station, Units 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035972,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2002b. “In the Matter of All Operating Power Reactor Licensees. Order Modifying Licenses (Effective Immediately).” 7590-01-P. EA-02-026.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002b","cited_title":"In the Matter of All Operating Power Reactor Licensees. Order Modifying Licenses (Effective Immediately)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035973,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2002c. Perspectives Gained from the Individual Plant Examination of External Events (IPEEE), Final Report. NUREG-1742, Vols. 1 and 2.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2002c","cited_title":"Perspectives Gained from the Individual Plant Examination of External Events (IPEEE), Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035974,"raw_reference":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2003. Review Standard for Extended Power Uprates. RIS-001, Revision 0. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation. Washington, D.C. ADAMS Accession No. ML033640024.","cited_authors":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2003","cited_title":"Review Standard for Extended Power Uprates","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035975,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2004. Protecting Our Nation Since 9-11-01: A Report of the U.S. Nuclear Regulatory Commission. NUREG/BR-0314. ADAMS Accession No. ML042650352.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2004","cited_title":"Protecting Our Nation Since 9-11-01: A Report of the U.S. Nuclear Regulatory Commission","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035976,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2005a. Memorandum from F. Eltawila, Director Office of Nuclear Regulatory Research, to M.E. Mayfield, Director, Office of Nuclear Reactor","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2005a","cited_title":"Memorandum from F. Eltawila, Director Office of Nuclear Regulatory Research, to M.E. Mayfield, Director, Office of Nuclear Reactor","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035977,"raw_reference":"Regulation, dated June 9, 2005, regarding “Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States.” Washington, D.C. ADAMS Accession No. ML051600272.","cited_authors":"Regulation, dated June 9","cited_year":"2005","cited_title":"Generic Issue 199, Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035978,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2005b. Policy Issue: Staff Review of the National Academies Study of the Health Risks from Exposure to Low Levels of Ionizing Radiation (BEIR VII). SECY-05-0202, Washington, D.C. ADAMS Accession No. ML052640532.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2005b","cited_title":"Policy Issue: Staff Review of the National Academies Study of the Health Risks from Exposure to Low Levels of Ionizing Radiation (BEIR VII)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035979,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2006. Frequently Asked Questions on License Renewal of Nuclear Power Reactors, Final Report. NUREG-1850, Washington, D.C. March.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2006","cited_title":"Frequently Asked Questions on License Renewal of Nuclear Power Reactors, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035980,"raw_reference":"ADAMS Accession No. ML061110022. NRC (U.S. Nuclear Regulatory Commission). 2007a. A Pilot Probabilistic Risk Assessment Of a Dry Cask Storage System At a Nuclear Power Plant. NUREG-1864. Washington, D.C. ADAMS Accession No. ML071340012.","cited_authors":"ADAMS Accession No. ML061110022. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2007a","cited_title":"A Pilot Probabilistic Risk Assessment Of a Dry Cask Storage System At a Nuclear Power Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035981,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2007b. Nuclear Regulatory Commission Issuances. Opinions and Decisions of the Nuclear Regulatory Commission with Selected Orders January 1, 2007 - June 30, 2007. NUREG-0750. Volume 65. ADAMS Accession No. ML090860385.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2007b","cited_title":"Nuclear Regulatory Commission Issuances","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035982,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2007c. 2007-2008 Information Digest.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2007c","cited_title":"2007-2008 Information Digest","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035983,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2007d. Memorandum from S.N. Bailey, Senior Project Manager, NRC, to J. Scarola, Vice President, Brunswick Steam Electric Plant, dated August 9, 2007, regarding “Brunswick Steam Electric Plant, Units 1 and 2—Conforming License Amendments to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 and the Radiological Protection Mitigation Strategies Required by Commission Order EA-06-137 (TAC Nos. MD4516 and MD4517).” Washington, D.C. ADAMS Accession No. ML072070375.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2007d","cited_title":"Brunswick Steam Electric Plant, Units 1 and 2—Conforming License Amendments to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 and the Radiological Protection Mitigation Strategies Required by Commission Order EA-06-137 (TAC Nos. MD4516 and MD4517)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035984,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2008. Letter from M.K. Gamberoni to Entergy Nuclear Operations, Inc., dated May 13, 2008, regarding “Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report. Nos. 05000003/2007010 and 05000247/2007010 - Docket Nos. 50-003 and 50-247.” Washington, D.C. ADAMS Accession No. ML081340425.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2008","cited_title":"Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report. Nos. 05000003/2007010 and 05000247/2007010 - Docket Nos. 50-003 and 50-247","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035985,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2009. Generic Environmental Impact Statement for License Renewal of Nuclear Plants—Supplement 35 Regarding Susquehanna Steam Electric Station Units 1 and 2. Final Report. NUREG-1437, Supplement 35, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2009","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants—Supplement 35 Regarding Susquehanna Steam Electric Station Units 1 and 2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035986,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2010a. Memorandum from R.W. Borchardt to Chairman Jaczko, Commissioner Klein, Commissioner Svinicki, dated February 4, 2010, regarding “Documentation of Evolution of Security Requirements at Commercial Nuclear Power Plants With Respect to Mitigation Measures for Large Fires and Explosions.” SECY-2008-0648,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2010a","cited_title":"Documentation of Evolution of Security Requirements at Commercial Nuclear Power Plants With Respect to Mitigation Measures for Large Fires and Explosions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035987,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2010b. Generic Aging Lessons Learned (GALL)","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2010b","cited_title":"Generic Aging Lessons Learned (GALL)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035988,"raw_reference":"Report, Final Report. NUREG-1801, Rev. 2. Washington, D.C. ADAMS Accession No. ML103490041.","cited_authors":null,"cited_year":null,"cited_title":"Report, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035989,"raw_reference":"NRC (U.S. Regulatory Commission). 2010c. The Evolution of Mitigating Measures for Large Fire and Explosions, A Chronological History From September 11, 2001 Through October 7, 2009.","cited_authors":"NRC (U.S. Regulatory Commission)","cited_year":"2010c","cited_title":"The Evolution of Mitigating Measures for Large Fire and Explosions, A Chronological History From September 11, 2001 Through October 7, 2009","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035990,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2011a. Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. SECY-11-0093, NRC Task Force, Washington, D.C. ADAMS Accession No. ML11186A950.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2011a","cited_title":"Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035991,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2011b. Resolution of Generic Safety Issues.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2011b","cited_title":"Resolution of Generic Safety Issues","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035992,"raw_reference":"NUREG-0933, Main Report with Supplements 1-35, Washington, D.C. Accessed May 12, 2023, at https://www.nrc.gov/sr0933/index.html.","cited_authors":"NUREG-0933, Main Report with Supplements 1-35, Washington, D.C. Accessed May 12","cited_year":"2023","cited_title":"at https://www.nrc.gov/sr0933/index.html","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nrc.gov/sr0933/index.html","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035993,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2011c. Prioritization of Recommended Actions to Be Taken in Response to Fukushima Lessons Learned. SECY-11-0137, NRC Task Force,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2011c","cited_title":"Prioritization of Recommended Actions to Be Taken in Response to Fukushima Lessons Learned","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035994,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2011d. Staff Requirements – SECY-11-0137 – Prioritization of Recommended Actions to Be Taken in Response to Fukushima Lessons Learned. SRM-SECY-11-0137, Washington, D.C. ADAMS Accession No. ML113490055.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2011d","cited_title":"Staff Requirements – SECY-11-0137 – Prioritization of Recommended Actions to Be Taken in Response to Fukushima Lessons Learned","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035995,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012a. “In the Matter of All Power Reactor Licensees and Holders of Construction Permits in the Active or Deferred Status. Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately).” 7590-01-P, EA-12-051, NRC-2012-0067, Washington, D.C. ADAMS Accession No. ML12056A044.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012a","cited_title":"In the Matter of All Power Reactor Licensees and Holders of Construction Permits in the Active or Deferred Status. Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035996,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012b. “In the Matter of All Power Reactor Licensees and Holders of Construction Permits in the Active or Deferred Status. Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond-DesignBasis External Events (Effective Immediately).” 7590-01-P, EA-12-049, NRC-2012-0068,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012b","cited_title":"In the Matter of All Power Reactor Licensees and Holders of Construction Permits in the Active or Deferred Status. Order Modifying Licenses with Regard to Requirements For Mitigation Strategies For Beyond-DesignBasis External Events (Effective Immediately)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035997,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012c. Letter from E. Leeds and M. Johnson to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, dated March 12, 2012, regarding “Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.” EA-12-049,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012c","cited_title":"Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035998,"raw_reference":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2012d. Letter from NRC to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status dated March 12, 2012, regarding “Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML12056A046.","cited_authors":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012d","cited_title":"Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1035999,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012e. Memorandum from A. Vietti-Cook to R.W.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012e","cited_title":"Memorandum from A. Vietti-Cook to R.W","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036000,"raw_reference":"Borchardt, dated March 9, 2012, regarding “Staff Requirements – SECY-12-0025 Proposed Orders and Requests for Information in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Tsunami.” SRM-12-0025, Washington, D.C. ADAMS Accession No. ML120690347.","cited_authors":"Borchardt, dated March 9","cited_year":"2012","cited_title":"Staff Requirements – SECY-12-0025 Proposed Orders and Requests for Information in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Tsunami","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036001,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012f. Policy Issue Notation Vote: Proposed Orders and Requests for Information in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Tsunami. SECY-12-0025, Washington, D.C. ADAMS Accession No. ML12039A111.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012f","cited_title":"Policy Issue Notation Vote: Proposed Orders and Requests for Information in Response to Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Tsunami","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036002,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012g. State-of-the-Art Reactor Consequence Analyses (SOARCA) Report. NUREG-1935, Washington, D.C. ADAMS Accession No. ML12332A057.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012g","cited_title":"State-of-the-Art Reactor Consequence Analyses (SOARCA) Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036003,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012h. Letter from E. Leeds to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments, dated March 12, 2012, regarding “Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents.” EA-12-050, Washington, D.C. ADAMS Accession No. ML12054A694.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012h","cited_title":"Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036004,"raw_reference":"NRC (U.S. Nuclear Regulatory Agency). 2013a. Final Environmental Impact Statement Related to the Operation of Watts Bar Nuclear Plant Units Nos. 1 and 2. NUREG-0498, Supplement No. 2, Washington, D.C. ADAMS Accession Nos. ML13144A092, ML13144A093.","cited_authors":"NRC (U.S. Nuclear Regulatory Agency)","cited_year":"2013a","cited_title":"Final Environmental Impact Statement Related to the Operation of Watts Bar Nuclear Plant Units Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036005,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013b","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants [GEIS]. NUREG-1437, Revision 1, Washington, D.C","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036006,"raw_reference":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission). 2013c. Letter from D.L. Skeen to NRC dated February 15, 2013, regarding “Electric Power Research Institute; Seismic Evaluation Guidance.”","cited_authors":"ADAMS Package Accession No. ML13107A023. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013c","cited_title":"Electric Power Research Institute; Seismic Evaluation Guidance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036007,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013d. Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications. Regulatory Guide 4.2, Supplement 1, Revision 1, Washington, D.C. ADAMS Accession No. ML13067A354.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013d","cited_title":"Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036008,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013e. State-of-the-Art Reactor Consequence Analyses Project Volume 1: Peach Bottom Integrated Analysis. NUREG/CR-7110, Volume 1, Revision 1, Washington, D.C. ADAMS Accession No. ML13150A053.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013e","cited_title":"State-of-the-Art Reactor Consequence Analyses Project Volume 1: Peach Bottom Integrated Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036009,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013f. State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis. NUREG/CR-7110, Volume 2, Revision 1,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013f","cited_title":"State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036010,"raw_reference":"NUREG-1437, Revision 2 E-104 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2013g. Letter from E. Leeds to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments, dated June 6, 2013, regarding “Issuance of to Order Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.” EA-13-109,","cited_authors":"NUREG-1437, Revision 2 E-104 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013g","cited_title":"Issuance of to Order Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036011,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014a. Consequence Study of a Beyond-DesignBasis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014a","cited_title":"Consequence Study of a Beyond-DesignBasis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036012,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 49: Regarding Limerick Generating Station, Units 1 and 2, Chapters 1 to 12, Final Report. NUREG-1437, Supplement 49, Volumes 1 and 2,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014b","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 49: Regarding Limerick Generating Station, Units 1 and 2, Chapters 1 to 12, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036013,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 50: Regarding Grand Gulf Nuclear Station, Unit 1, Final Report. NUREG-1437, Supplement 50, Washington, D.C. ADAMS Accession No. ML14328A171.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014c","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 50: Regarding Grand Gulf Nuclear Station, Unit 1, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036014,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2014d. Memorandum from R.C. Rochelle to M.A.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2014d","cited_title":"Memorandum from R.C. Rochelle to M.A","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036015,"raw_reference":"Satorius, dated May 23, 2014, regarding “Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel.” NRC SRM-COMSECY-130030, Washington, D.C. ADAMS Accession No. ML14143A360.","cited_authors":"Satorius, dated May 23","cited_year":"2014","cited_title":"Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036016,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2015a. Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors (10 CFR Part 50). SECY-15-0085. Washington, D.C. ADAMS Accession No. ML15022A214.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2015a","cited_title":"Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors (10 CFR Part 50)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036017,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2015b. Letter from W.M. Dean to All Power Reactor Licensees, dated October 27, 2015, regarding “Final Determination of Licensee Seismic Probabilistic Risk Assessments under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations (50.54(f) Regarding Recommendation 2.1 ‘Seismic’ of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML15194A015.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2015b","cited_title":"Final Determination of Licensee Seismic Probabilistic Risk Assessments under the Request for Information Pursuant to Title 10 of the Code of Federal Regulations (50.54(f) Regarding Recommendation 2.1 ‘Seismic’ of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036018,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2015c. Policy Issue Notation Vote: Evaluation of the Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors Rulemaking Activities (10 CFR Part 50) (RIN-3150-AJ26). SECY-15-0085,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2015c","cited_title":"Policy Issue Notation Vote: Evaluation of the Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors Rulemaking Activities (10 CFR Part 50) (RIN-3150-AJ26)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036019,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2016a. Probabilistic Risk Assessment and Regulatory Decisionmaking: Some Frequently Asked Questions. NUREG-2201, Washington, D.C. ADAMS Accession No. ML16245A032.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2016a","cited_title":"Probabilistic Risk Assessment and Regulatory Decisionmaking: Some Frequently Asked Questions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036020,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2016b. State-of-the-Art Reactor Consequence Analyses Project: Uncertainty Analysis of the Unmitigated Long-Term Station Blackout of the Peach Bottom Atomic Power Station. NUREG/CR-7155, SAND2012-10702P, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2016b","cited_title":"State-of-the-Art Reactor Consequence Analyses Project: Uncertainty Analysis of the Unmitigated Long-Term Station Blackout of the Peach Bottom Atomic Power Station","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036021,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017a. Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report: Final Report. NUREG-2191, Volume 1,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017a","cited_title":"Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report: Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036022,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017b. Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking: Final Report. NUREG1855, Revision 1, Washington, D.C. ADAMS Accession No. ML17062A466.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017b","cited_title":"Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decisionmaking: Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036023,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017c. Revision to JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. JLD-ISG-2012-01, Revision 2,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017c","cited_title":"Revision to JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036024,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017d. Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017d","cited_title":"Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036025,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017e. Draft Final Rule: Mitigation of BeyondDesign-Basis Events. SECY-16-0142, Washington, D.C. ADAMS Accession No. ML16301A005.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017e","cited_title":"Draft Final Rule: Mitigation of BeyondDesign-Basis Events","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036026,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2017f. Memorandum from V.M. McCree, Executive Director for Operations, to Chairman Svinicki, Commissioner Baran, and Commissioner Burns, dated July 24, 2017, regarding “Supplement to SECY-16-0142, Draft Final Rule - Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49).” Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017f","cited_title":"Supplement to SECY-16-0142, Draft Final Rule - Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036027,"raw_reference":"ADAMS Accession No. ML17194A764. NRC (U.S. Nuclear Regulatory Commission). 2017g. Policy Issue Notation Vote: Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami. SECY-17-0016, Washington, D.C. ADAMS Accession No. ML16356A045.","cited_authors":"ADAMS Accession No. ML17194A764. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2017g","cited_title":"Policy Issue Notation Vote: Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036028,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018a. An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis. Regulatory Guide 1.174, Revision 3, Washington, D.C. ADAMS Accession No. ML17317A256.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018a","cited_title":"An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036029,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018b. Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. Regulatory Guide 1.160, Revision 4, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018b","cited_title":"Monitoring the Effectiveness of Maintenance at Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036030,"raw_reference":"ADAMS Accession No. ML18220B281. NRC (U.S. Nuclear Regulatory Commission). 2018c. Technical Basis for the Containment Protection and Release Reduction Rulemaking for Boiling Water Reactors with Mark I and Mark","cited_authors":"ADAMS Accession No. ML18220B281. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018c","cited_title":"Technical Basis for the Containment Protection and Release Reduction Rulemaking for Boiling Water Reactors with Mark I and Mark","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036031,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019a. SRM-M190124A: Affirmation SessionSECY-16-0142: Final Rule: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49),","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019a","cited_title":"SRM-M190124A: Affirmation SessionSECY-16-0142: Final Rule: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036032,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019b. Final Rule: Mitigation of Beyond-DesignBasis Events, Washington, D.C. ADAMS Accession No. ML19058A006.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019b","cited_title":"Final Rule: Mitigation of Beyond-DesignBasis Events, Washington, D.C. ADAMS Accession No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036033,"raw_reference":"NUREG-1437, Revision 2 E-106 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2019c. Flexible Mitigation Strategies for BeyondDesign-Basis Events. Regulatory Guide 1.226, Revision 0, Washington, D.C. ADAMS Accession No. ML19058A012.","cited_authors":"NUREG-1437, Revision 2 E-106 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019c","cited_title":"Flexible Mitigation Strategies for BeyondDesign-Basis Events","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036034,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019d. Wide Range Spent Fuel Pool Level Instrumentation. Regulatory Guide 1.227, Revision 0, Washington, D.C. ADAMS Accession No. ML19037A443.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019d","cited_title":"Wide Range Spent Fuel Pool Level Instrumentation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036035,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019e. “NRC Staff Preliminary Process for Treatment of Reevaluated Seismic and Flooding Hazard Information in Backfit Determinations,”","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019e","cited_title":"NRC Staff Preliminary Process for Treatment of Reevaluated Seismic and Flooding Hazard Information in Backfit Determinations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036036,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019f. Letter from L. Lund to The Licensees of Operating Power Reactors on the Enclosed List, dated July 3, 2019, regarding “Treatment of Reevaluated Seismic Hazard Information provided under Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML19140A307.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019f","cited_title":"Treatment of Reevaluated Seismic Hazard Information provided under Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036037,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019g. Letter from M. J. Ross-Lee to The Licensees of Operating Power Reactors on the Enclosed List, dated August 20, 2019, regarding “Treatment of Reevaluated Flood Hazard Information provided under Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML19067A247.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019g","cited_title":"Treatment of Reevaluated Flood Hazard Information provided under Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036038,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019h. State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019h","cited_title":"State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Sequoyah Integrated Deterministic and Uncertainty Analyses","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036039,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020a. Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities. Regulatory Guide 1.200, Revision 3,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020a","cited_title":"Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036040,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020b. Memorandum from M. Case to J. Donoghue and M.X. Franovich, dated May 13, 2020, regarding “Applicability of Source Term for Accident Tolerant Fuel, High Burn Up and Extended Enrichment.” Washington, D.C. ADAMS Accession No. ML20126G376.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020b","cited_title":"Applicability of Source Term for Accident Tolerant Fuel, High Burn Up and Extended Enrichment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036041,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2020c. Modeling Potential Reactor Accident","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020c","cited_title":"Modeling Potential Reactor Accident","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036042,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021. Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results. NUREG/KM-0017,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021","cited_title":"Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036043,"raw_reference":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission). 2022a. U.S. NRC Level 3 Probabilistic Risk Assessment (PRA) Project, Volume 3x: Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Events and Internal Floods: Draft Report for Comment. Washington, D.C. ADAMS Accession No. ML22067A210.","cited_authors":"NUREG-1437, Revision 2 Appendix E NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022a","cited_title":"U.S. NRC Level 3 Probabilistic Risk Assessment (PRA) Project, Volume 3x: Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Events and Internal Floods: Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036044,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022b. “Perspective on Safety Improvements for Commercial Nuclear Power Plants.” 34th Annual Regulatory Information Conference (March 8-10). Washington, D.C. ADAMS Accession No. ML22153A343.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022b","cited_title":"Perspective on Safety Improvements for Commercial Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036045,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022c. Sources of Information Cited in Appendix E, Generic Environmental Impact Statement for License Renewal of Nuclear Plants,","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022c","cited_title":"Sources of Information Cited in Appendix E, Generic Environmental Impact Statement for License Renewal of Nuclear Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036046,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022d. State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Uncertainty Analysis of the Unmitigated Short-Term Station Blackout of the Surry Power Station. NUREG/CR-7262. Washington, D.C. ADAMS Accession No. ML22194A066.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022d","cited_title":"State-of-the-Art Reactor Consequence Analyses (SOARCA) Project: Uncertainty Analysis of the Unmitigated Short-Term Station Blackout of the Surry Power Station","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036047,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022e. Summary of the Uncertainty Analyses for the State-of-the-Art Reactor Consequence Analyses Project. NUREG/CR-2254. Washington, D.C. October. ADAMS Accession No. ML22193A244.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022e","cited_title":"Summary of the Uncertainty Analyses for the State-of-the-Art Reactor Consequence Analyses Project","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036048,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2024. Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications. Regulatory Guide 4.2, Supplement 1, Revision 2, Washington, D.C. ADAMS Accession No. ML23201A144.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024","cited_title":"Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036049,"raw_reference":"NUMARC (Nuclear Management and Resources Council). 1991. Guidelines for Industry Actions to Assess Shutdown Management. NUMARC 91-06, Washington, D.C. ADAMS Accession No. ML14365A203.","cited_authors":"NUMARC (Nuclear Management and Resources Council)","cited_year":"1991","cited_title":"Guidelines for Industry Actions to Assess Shutdown Management","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036050,"raw_reference":"PG&E (Pacific Gas & Electric). 2008. Diablo Canyon Power Plant Independent Spent Fuel Storage Installation. CLI-08-26, 68 NRC 509. NUREG-0750. Volume 68, Book II of II. ADAMS Accession No. ML120440826.","cited_authors":"PG&E (Pacific Gas & Electric)","cited_year":"2008","cited_title":"Diablo Canyon Power Plant Independent Spent Fuel Storage Installation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036051,"raw_reference":"PG&E (Pacific Gas & Electric). 2011. Diablo Canyon Power Plant Independent Spent Fuel Storage Installation. CLI-11-11, 74 NRC 427. NUREG-0750. Volume 74, Book II of II. ADAMS Accession No. ML14028A565.","cited_authors":"PG&E (Pacific Gas & Electric)","cited_year":"2011","cited_title":"Diablo Canyon Power Plant Independent Spent Fuel Storage Installation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036052,"raw_reference":"PG&E (Pacific Gas & Electric). 2015. Letter from Barry S. Allen, Vice President, Nuclear Services to Document Control Desk, U.S. Nuclear Regulatory Commission, dated July 1, 2015, regarding “Diablo Canyon Units 1 and 2 - Diablo Canyon Power Plant License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results.” Avila","cited_authors":"PG&E (Pacific Gas & Electric)","cited_year":"2015","cited_title":"Diablo Canyon Units 1 and 2 - Diablo Canyon Power Plant License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036053,"raw_reference":"Ramsdell, J.V. Jr., C.E. Beyer, D.D. Lanning, U.P. Jenquin, R.A. Schwarz, D.L. Strenge, P.M. Daling, and R.T. Dahowski. 2001. Environmental Effects of Extending Fuel Burnup Above 60 GWd/MTU. NUREG/CR-6703, Pacific Northwest Laboratory, Richland, WA. ADAMS Accession No. ML010310298. San Luis Obispo Mothers for Peace v. Nuclear Regulatory Commission, 449 F.3d 1016 (9th Cir. 2006). Accessed May 10, 2023, at https://cite.case.law/f3d/449/1016/.","cited_authors":"Ramsdell, J.V. Jr., C.E. Beyer, D.D. Lanning, U.P. Jenquin, R.A. Schwarz, D.L. Strenge, P.M. Daling, and R.T. Dahowski","cited_year":"2001","cited_title":"Environmental Effects of Extending Fuel Burnup Above 60 GWd/MTU. NUREG/CR-6703, Pacific Northwest Laboratory, Richland, WA. ADAMS Accession No","cited_venue":null,"cited_doi":null,"cited_url":"https://cite.case.law/f3d/449/1016/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036054,"raw_reference":"SN (Southern Nuclear). 2021. Letter from C.A. Gayheart to NRC dated October 26, 2021, regarding “Edwin I. Hatch Nuclear Plant - Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B.” Washington, D.C.","cited_authors":"SN (Southern Nuclear)","cited_year":"2021","cited_title":"Edwin I. Hatch Nuclear Plant - Units 1 and 2 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036055,"raw_reference":"ADAMS Accession No. ML21300A153. SNL (Sandia National Laboratories). 1992. Integrated Risk Assessment for the LaSalle Unit 2 Nuclear Power Plant. NUREG/CR–5305, SAND90-2765, Volume 1, RX, Albuquerque, NM.","cited_authors":"ADAMS Accession No. ML21300A153. SNL (Sandia National Laboratories)","cited_year":"1992","cited_title":"Integrated Risk Assessment for the LaSalle Unit 2 Nuclear Power Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036056,"raw_reference":"ADAMS Accession No. ML20105C763. SNL (Sandia National Laboratories). 1995. Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Grand Gulf, Unit 1, Summary of Results. NUREG/CR– 6143, SAND93-2440, Volume 1, Albuquerque, NM. ADAMS Accession No. ML20087K369.","cited_authors":"ADAMS Accession No. ML20105C763. SNL (Sandia National Laboratories)","cited_year":"1995","cited_title":"Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Grand Gulf, Unit 1, Summary of Results","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036057,"raw_reference":"SNL (Sandia National Laboratories). 2006. Mitigation of Spent Fuel Pool Loss of Coolant Inventory Accidents and Extension of Reference Plant Analyses to Other Spent Fuel Pools. Sandia Letter Report, Revision 2, Albuquerque, NM. November. ADAMS Accession No. ML120970086.","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2006","cited_title":"Mitigation of Spent Fuel Pool Loss of Coolant Inventory Accidents and Extension of Reference Plant Analyses to Other Spent Fuel Pools","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036058,"raw_reference":"SNL (Sandia National Laboratories). 2010. Synthesis of VERCORS and Phebus Data in Severe Accident Codes and Applications. SAND2010-1633, Albuquerque, NM. April. Accessed May 12, 2023, at https://doi.org/10.2172/983685.","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2010","cited_title":"Synthesis of VERCORS and Phebus Data in Severe Accident Codes and Applications","cited_venue":null,"cited_doi":"10.2172/983685","cited_url":"https://doi.org/10.2172/983685","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036059,"raw_reference":"SNL (Sandia National Laboratories). 2011. Accident Source Terms for Light-Water Nuclear Power Plants Using High-Burnup or MOX Fuel. SAND2011-0128, Unlimited Release,","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2011","cited_title":"Accident Source Terms for Light-Water Nuclear Power Plants Using High-Burnup or MOX Fuel","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036060,"raw_reference":"Albuquerque, NM. Accessed April 24, 2023, at https://www.osti.gov/biblio/1010412.","cited_authors":"Albuquerque, NM. Accessed April 24","cited_year":"2023","cited_title":"at https://www.osti.gov/biblio/1010412","cited_venue":null,"cited_doi":null,"cited_url":"https://www.osti.gov/biblio/1010412","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036061,"raw_reference":"SNL (Sandia National Laboratories). 2021. MACCS Theory Manual. SAND2021-11535,","cited_authors":"SNL (Sandia National Laboratories)","cited_year":"2021","cited_title":"MACCS Theory Manual","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036062,"raw_reference":"USCB (U.S. Census Bureau). 2021. “2017 National Population Projections Tables: Main Series.” Washington, D.C. Accessed April 24, 2023, at https://www.census.gov/data/tables/2017/demo/popproj/2017-summary-tables.html. E-109","cited_authors":"USCB (U.S. Census Bureau)","cited_year":"2021","cited_title":"2017 National Population Projections Tables: Main Series","cited_venue":null,"cited_doi":null,"cited_url":"https://www.census.gov/data/tables/2017/demo/popproj/2017-summary-tables.html","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036063,"raw_reference":"NUREG-1437, Revision 2 Appendix F and cultural, health and safety, transportation, and other concerns. Generally, these laws and regulations are relevant to how the work involved in performing a proposed action would be conducted to protect workers, the public, and environmental resources. Some of these laws and regulations require permits or consultation with other Federal agencies or State, Tribal, or local governments. The Federal laws and regulations that are identified and briefly discussed in this section are presented in alphabetical order. American Indian Religious Freedom Act of 1978 (42 United States Code [U.S.C.] § 1996) – The American Indian Religious Freedom Act protects Native Americans’ rights of freedom to","cited_authors":"NUREG-1437, Revision 2 Appendix F and cultural, health and safety, transportation, and other concerns. Generally, these laws and regulations are relevant to how the work involved in performing a proposed action would be conducted to protect workers, the public, and environmental resources. Some of these laws and regulations require permits or consultation with other Federal agencies or State, Tribal, or local governments. The Federal laws and regulations that are identified and briefly discussed in this section are presented in alphabetical order. American Indian Religious Freedom Act of 1978 (42 United States Code [U.S.C.] §","cited_year":"1996","cited_title":"– The American Indian Religious Freedom Act protects Native Americans’ rights of freedom to","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036064,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2024a. Standard Review Plans for Environmental Reviews for Nuclear Power Plants, Supplement 1: Operating License Renewal, Final Report.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024a","cited_title":"Standard Review Plans for Environmental Reviews for Nuclear Power Plants, Supplement 1: Operating License Renewal, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036065,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2024b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Final Report. NUREG-1437, Revision 2, Washington, D.C. ADAMS Package Accession No. ML24087A133. F-29","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024b","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036066,"raw_reference":"NUREG-1437, Revision 2 Appendix F NRC (U.S. Nuclear Regulatory Commission). 2024c. Regulatory Guide 4.2 - Supplement 1, Revision 2 to Regulatory Guide 4.2 Preparation of Supplemental Environmental Reports for Applications to Renew Nuclear Power Plant Operating Licenses, Final Report. Washington, D.C. ADAMS Accession No. ML ML23201A144. Nuclear Waste Policy Act of 1982, as amended. 42 U.S.C. § 10101 et seq. Occupational Safety and Health Act of 1970, as amended. 29 U.S.C. § 651 et seq. Pollution Prevention Act of 1990. 42 U.S.C. § 13101 et seq. Price-Anderson Act of 1957, as amended. 42 U.S.C. § 2210 et seq. Resource Conservation and Recovery Act of 1976 (RCRA). 42 U.S.C. § 6901 et seq.","cited_authors":"NUREG-1437, Revision 2 Appendix F NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2024c","cited_title":"Regulatory Guide 4.2 - Supplement 1, Revision 2 to Regulatory Guide 4.2 Preparation of Supplemental Environmental Reports for Applications to Renew Nuclear Power Plant Operating Licenses, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036067,"raw_reference":"Robert T. Stafford Disaster Relief and Emergency Assistance Act of 1988. 42 U.S.C. § 5121 et seq. Safe Drinking Water Act of 1974, as amended. 42 U.S.C. § 300f et seq. Toxic Substances Control Act, as amended. 15 U.S.C. § 2601 et seq.","cited_authors":"Robert T. Stafford Disaster Relief and Emergency Assistance Act of","cited_year":"1988","cited_title":"42 U.S.C. § 5121 et seq","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036068,"raw_reference":"Bromirski, P.D., D.R. Cayan, N. Graham, R.E. Flick, and M. Tyree. 2012. Coastal Flooding Potential Projections: 2000-2100. CEC-500-2012-011, California Energy Commissions,","cited_authors":"Bromirski, P.D., D.R. Cayan, N. Graham, R.E. Flick, and M. Tyree","cited_year":"2012","cited_title":"Coastal Flooding Potential Projections: 2000-2100","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036069,"raw_reference":"Sacramento, CA. Accessed April 27, 2023, at https://escholarship.org/uc/item/8887j9br.","cited_authors":"Sacramento, CA. Accessed April 27","cited_year":"2023","cited_title":"at https://escholarship.org/uc/item/8887j9br","cited_venue":null,"cited_doi":null,"cited_url":"https://escholarship.org/uc/item/8887j9br","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036070,"raw_reference":"CDC (Centers for Disease Control and Prevention). 2022. “What Noises Cause Hearing Loss?”","cited_authors":"CDC (Centers for Disease Control and Prevention)","cited_year":"2022","cited_title":"What Noises Cause Hearing Loss?","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036071,"raw_reference":"Atlanta, GA. Accessed May 12, 2023, at https://www.cdc.gov/nceh/hearing_loss/what_noises_cause_hearing_loss.html#:~:text=A%20w hisper%20is%20about%2030,immediate%20harm%20to%20your%20ears.","cited_authors":"Atlanta, GA. Accessed May 12","cited_year":"2023","cited_title":"at https://www.cdc.gov/nceh/hearing_loss/what_noises_cause_hearing_loss.html#:~:text=A%20w hisper%20is%20about%2030,immediate%20harm%20to%20your%20ears","cited_venue":null,"cited_doi":null,"cited_url":"https://www.cdc.gov/nceh/hearing_loss/what_noises_cause_hearing_loss.html#:~:text=A%20w","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036072,"raw_reference":"CEC (Commission for Environmental Cooperation). 1997. Ecological Regions of North America, Toward a Common Perspective. Montreal, Quebec, Canada. Accessed April 24, 2023, at http://www.cec.org/files/documents/publications/1701-ecological-regions-north-america-towardcommon-perspective-en.pdf.","cited_authors":"CEC (Commission for Environmental Cooperation)","cited_year":"1997","cited_title":"Ecological Regions of North America, Toward a Common Perspective","cited_venue":null,"cited_doi":null,"cited_url":"http://www.cec.org/files/documents/publications/1701-ecological-regions-north-america-towardcommon-perspective-en.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036073,"raw_reference":"CEQ (Council on Environmental Quality). 1997. Environmental Justice Guidance under the National Environmental Policy Act. Washington, D.C. ADAMS Accession No. ML103430030.","cited_authors":"CEQ (Council on Environmental Quality)","cited_year":"1997","cited_title":"Environmental Justice Guidance under the National Environmental Policy Act","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036074,"raw_reference":"CEQ and ACHP (Council on Environmental Quality and Advisory Council on Historic Preservation). 2013. NEPA and NHPA: A Handbook for Integrating NEPA and Section 106.","cited_authors":"CEQ and ACHP (Council on Environmental Quality and Advisory Council on Historic Preservation)","cited_year":"2013","cited_title":"NEPA and NHPA: A Handbook for Integrating NEPA and Section 106","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036075,"raw_reference":"NUREG-1437, Revision 2 Appendix G Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of Wetlands and Deepwater Habitats of the United States. FWS/OBS-79/31, Fish and Wildlife Service,","cited_authors":"NUREG-1437, Revision 2 Appendix G Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe","cited_year":"1979","cited_title":"Classification of Wetlands and Deepwater Habitats of the United States","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036076,"raw_reference":"DOE (U.S. Department of Energy). 2002. A Graded Approach for Evaluating Radiation Doses to Aquatic and Terrestrial Biota. DOE-STD-1153-2002, Washington, D.C. ADAMS Accession No. ML21140A436.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"2002","cited_title":"A Graded Approach for Evaluating Radiation Doses to Aquatic and Terrestrial Biota","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036077,"raw_reference":"DOE (U.S. Department of Energy). 2004. RESRAD-BIOTA: A Tool for Implementing a Graded Approach to Biota Dose Evaluation. ISCORS Technical Report 2004-02, Interagency Steering Committee on Radiation Standards, Washington, D.C. ADAMS Accession No. ML21140A412.","cited_authors":"DOE (U.S. Department of Energy)","cited_year":"2004","cited_title":"RESRAD-BIOTA: A Tool for Implementing a Graded Approach to Biota Dose Evaluation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036078,"raw_reference":"DOT (U.S. Department of Transportation). 2017. Highway Traffic Noise Analysis and Abatement Policy and Guidance. Federal Highway Administration, Washington, D.C. ADAMS Accession No. ML13023A373.","cited_authors":"DOT (U.S. Department of Transportation)","cited_year":"2017","cited_title":"Highway Traffic Noise Analysis and Abatement Policy and Guidance","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036079,"raw_reference":"EPA (U.S. Environmental Protection Agency). 2013. Level III and IV Ecoregions of the Continental United States. Washington, D.C. ADAMS Accession No. ML18023A341.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"2013","cited_title":"Level III and IV Ecoregions of the Continental United States","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036080,"raw_reference":"EPA (U.S. Environmental Protection Agency). 2016. Climate Change Indicators in the United States 2016. Fourth Edition, EPA 430-R-16-004, Washington, D.C. Accessed May 12, 2023, at https://www.epa.gov/sites/default/files/2016-08/documents/climate_indicators_2016.pdf.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"2016","cited_title":"Climate Change Indicators in the United States 2016","cited_venue":null,"cited_doi":null,"cited_url":"https://www.epa.gov/sites/default/files/2016-08/documents/climate_indicators_2016.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036081,"raw_reference":"EPA (U.S. Environmental Protection Agency). 2022. Inventory of U.S. Greenhouse Gas Emissions and Sinks, 1990-2020. EPA 430-R-22-003. Washington, D.C. Accessed May 12, 2023, at https://www.epa.gov/system/files/documents/2022-04/us-ghg-inventory-2022-maintext.pdf.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"2022","cited_title":"Inventory of U.S. Greenhouse Gas Emissions and Sinks, 1990-2020","cited_venue":null,"cited_doi":null,"cited_url":"https://www.epa.gov/system/files/documents/2022-04/us-ghg-inventory-2022-maintext.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036082,"raw_reference":"EPA (U.S. Environmental Protection Agency). 2023. EPA History: Noise and the Noise Control Act. Washington, D.C. Accessed May 12, 2023, at https://www.epa.gov/history/epa-historynoise-and-noise-control-act. Fiscal Responsibility Act of 2023. Public Law No. 118-5, 137 Stat. 10.","cited_authors":"EPA (U.S. Environmental Protection Agency)","cited_year":"2023","cited_title":"EPA History: Noise and the Noise Control Act","cited_venue":null,"cited_doi":null,"cited_url":"https://www.epa.gov/history/epa-historynoise-and-noise-control-act","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036083,"raw_reference":"FGDC (Federal Geographic Data Committee). 2013. Classification of Wetlands and Deepwater Habitats of the United States. FGDC-STD-004-2013, Second Edition. Wetlands Subcommittee, Federal Geographic Data Committee and U.S. Fish and Wildlife Service. Washington, D.C. Accessed April 24, 2023, at https://www.fgdc.gov/standards/projects/wetlands/nwcs-2013.","cited_authors":"FGDC (Federal Geographic Data Committee)","cited_year":"2013","cited_title":"Classification of Wetlands and Deepwater Habitats of the United States","cited_venue":null,"cited_doi":null,"cited_url":"https://www.fgdc.gov/standards/projects/wetlands/nwcs-2013","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036084,"raw_reference":"FWS (U.S. Fish and Wildlife Service). 2022. National Wetlands Inventory, Wetlands Data Layer.","cited_authors":"FWS (U.S. Fish and Wildlife Service)","cited_year":"2022","cited_title":"National Wetlands Inventory, Wetlands Data Layer","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036085,"raw_reference":"Washington, D.C. Accessed May 5, 2022, at https://www.fws.gov/program/national-wetlandsinventory/wetlands-data.","cited_authors":"Washington, D.C. Accessed May 5","cited_year":"2022","cited_title":"at https://www.fws.gov/program/national-wetlandsinventory/wetlands-data","cited_venue":null,"cited_doi":null,"cited_url":"https://www.fws.gov/program/national-wetlandsinventory/wetlands-data","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036086,"raw_reference":"IAEA/IUR (International Atomic Energy Agency & International Union of Radioecologists). 2020. “Wildlife Transfer Parameter Database.” Accessed May 12, 2023, at https://www.wildlifetransferdatabase.org/mainpage.asp.","cited_authors":"IAEA/IUR (International Atomic Energy Agency & International Union of Radioecologists)","cited_year":"2020","cited_title":"Wildlife Transfer Parameter Database","cited_venue":null,"cited_doi":null,"cited_url":"https://www.wildlifetransferdatabase.org/mainpage.asp","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036087,"raw_reference":"ICRP (International Commission on Radiological Protection). 2008a. “Environmental Protection – the Concept and Use of Reference Animals and Plants.” ICRP Publication 108, Annals of the","cited_authors":"ICRP (International Commission on Radiological Protection)","cited_year":"2008a","cited_title":"Environmental Protection – the Concept and Use of Reference Animals and Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036088,"raw_reference":"ICRP 38(4-6), Ottawa, Canada. Accessed May 12, 2023 at https://www.icrp.org/publication.asp?id=icrp%20publication%20108.","cited_authors":null,"cited_year":null,"cited_title":"ICRP 38(4-6), Ottawa, Canada","cited_venue":null,"cited_doi":null,"cited_url":"https://www.icrp.org/publication.asp?id=icrp%20publication%20108","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036089,"raw_reference":"NUREG-1437, Revision 2 G-38 Appendix G ICRP (International Commission on Radiological Protection). 2008b. “Nuclear Decay Data for Dosimetric Calculations.” ICRP Publication 107, Ann. ICRP 38(3):7-96, Ottawa, Canada. Accessed April 24, 2023, at https://www.icrp.org/publication.asp?id=ICRP%20Publication%20107.","cited_authors":"NUREG-1437, Revision 2 G-38 Appendix G ICRP (International Commission on Radiological Protection)","cited_year":"2008b","cited_title":"Nuclear Decay Data for Dosimetric Calculations","cited_venue":null,"cited_doi":null,"cited_url":"https://www.icrp.org/publication.asp?id=ICRP%20Publication%20107","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036090,"raw_reference":"ICRP (International Commission on Radiological Protection). 2017. “Dose Coefficients for Nonhuman Biota Environmentally Exposed to Radiation.” ICRP Publication 136, Ann. ICRP 46(2).","cited_authors":"ICRP (International Commission on Radiological Protection)","cited_year":"2017","cited_title":"Dose Coefficients for Nonhuman Biota Environmentally Exposed to Radiation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036091,"raw_reference":"Ottawa, Canada. Accessed April 24, 2023, at https://www.icrp.org/publication.asp?id=ICRP%20Publication%20136.","cited_authors":"Ottawa, Canada. Accessed April 24","cited_year":"2023","cited_title":"at https://www.icrp.org/publication.asp?id=ICRP%20Publication%20136","cited_venue":null,"cited_doi":null,"cited_url":"https://www.icrp.org/publication.asp?id=ICRP%20Publication%20136","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036092,"raw_reference":"Marston, L., Y. Ao, M. Konar, M.M. Mekonnen, and A.Y. Hoekstra. 2018. High-Resolution Water Footprints of Production of the United States. Water Resources Research 54:2288-2316, American Geophysical Union, Washington, D.C. Accessed May 12, 2023, at https://doi.org/10.1002/2017WR021923. National Environmental Policy Act of 1969, as amended. 42 U.S.C. § 4321 et seq. National Historic Preservation Act of 1966, as amended. 54 U.S.C. § 300101 et seq.","cited_authors":"Marston, L., Y. Ao, M. Konar, M.M. Mekonnen, and A.Y. Hoekstra","cited_year":"2018","cited_title":"High-Resolution Water Footprints of Production of the United States","cited_venue":null,"cited_doi":"10.1002/2017wr021923","cited_url":"https://doi.org/10.1002/2017WR021923","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036093,"raw_reference":"NEI (Nuclear Energy Institute). 2015a. Economic Impacts of the Davis-Besse Nuclear Power Station. Washington, D.C. Accessed April 21, 2023, at https://www.nei.org/resources/reportsbriefs/economic-impacts-davis-besse-nuclear-powerstation#:~:text=Davis%2DBesse's%20operation%20results%20in,local%2C%20state%20and% 20federal%20governments.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2015a","cited_title":"Economic Impacts of the Davis-Besse Nuclear Power Station","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nei.org/resources/reportsbriefs/economic-impacts-davis-besse-nuclear-powerstation#:~:text=Davis%2DBesse's%20operation%20results%20in,local%2C%20state%20and%","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036094,"raw_reference":"NEI (Nuclear Energy Institute). 2015b. Economic Impacts of the R.E. Ginna Nuclear Power Plant. Washington, D.C. Accessed April 21, 2023, at http://large.stanford.edu/courses/2018/ph241/green1/docs/nei-feb15.pdf.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2015b","cited_title":"Economic Impacts of the R.E. Ginna Nuclear Power Plant","cited_venue":null,"cited_doi":null,"cited_url":"http://large.stanford.edu/courses/2018/ph241/green1/docs/nei-feb15.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036095,"raw_reference":"NEI (Nuclear Energy Institute). 2015c. The Economic Benefits of Texas’ Nuclear Power Plants.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2015c","cited_title":"The Economic Benefits of Texas’ Nuclear Power Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036096,"raw_reference":"Washington, D.C. Accessed April 21, 2023, at https://silo.tips/download/the-economic-benefitsof-texas-nuclear-power-plants.","cited_authors":"Washington, D.C. Accessed April 21","cited_year":"2023","cited_title":"at https://silo.tips/download/the-economic-benefitsof-texas-nuclear-power-plants","cited_venue":null,"cited_doi":null,"cited_url":"https://silo.tips/download/the-economic-benefitsof-texas-nuclear-power-plants","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036097,"raw_reference":"NEI (Nuclear Energy Institute). 2018. Economic Impacts of the Cooper Nuclear Station an Analysis by the Nuclear Energy Institute. Washington, D.C. Accessed April 21, 2023, at https://www.nei.org/resources/reports-briefs/%E2%80%8Beconomic-impacts-of-the-coopernuclear-station.","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2018","cited_title":"Economic Impacts of the Cooper Nuclear Station an Analysis by the Nuclear Energy Institute","cited_venue":null,"cited_doi":null,"cited_url":"https://www.nei.org/resources/reports-briefs/%E2%80%8Beconomic-impacts-of-the-coopernuclear-station","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036098,"raw_reference":"NOAA (National Oceanic and Atmospheric Administration). 2013a. Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 2. Climate of the Southeast U.S. Technical Report NESDIS 142-2. Washington, D.C. Accessed April 24, 2023, at https://scenarios.globalchange.gov/sites/default/files/NOAA_NESDIS_Tech_Report_142-2Climate_of_the_Southeast_U.S_0.pdf.","cited_authors":"NOAA (National Oceanic and Atmospheric Administration)","cited_year":"2013a","cited_title":"Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 2","cited_venue":null,"cited_doi":null,"cited_url":"https://scenarios.globalchange.gov/sites/default/files/NOAA_NESDIS_Tech_Report_142-2Climate_of_the_Southeast_U.S_0.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036099,"raw_reference":"NOAA (National Oceanic and Atmospheric Administration). 2013b. Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 9. Climate of the Contiguous United States. Technical Report NESDIS 142-9. Washington, D.C. Accessed April 24, 2023, at https://nesdis-prod.s3.amazonaws.com/migrated/NOAA_NESDIS_Tech_Report_142-9Climate_of_the_Contiguous_United_States.pdf. G-39","cited_authors":"NOAA (National Oceanic and Atmospheric Administration)","cited_year":"2013b","cited_title":"Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 9","cited_venue":null,"cited_doi":null,"cited_url":"https://nesdis-prod.s3.amazonaws.com/migrated/NOAA_NESDIS_Tech_Report_142-9Climate_of_the_Contiguous_United_States.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036100,"raw_reference":"NUREG-1437, Revision 2 Appendix G NOAA (National Oceanic and Atmospheric Administration). 2013c. Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 3. Climate of the Midwest U.S. Technical Report NESDIS 142-3. Washington, D.C. Accessed April 24, 2023, at https://scenarios.globalchange.gov/sites/default/files/NOAA_NESDIS_Tech_Report_142-3Climate_of_the_Midwest_U.S_0.pdf.","cited_authors":"NUREG-1437, Revision 2 Appendix G NOAA (National Oceanic and Atmospheric Administration)","cited_year":"2013c","cited_title":"Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 3","cited_venue":null,"cited_doi":null,"cited_url":"https://scenarios.globalchange.gov/sites/default/files/NOAA_NESDIS_Tech_Report_142-3Climate_of_the_Midwest_U.S_0.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036101,"raw_reference":"NOAA (National Oceanic and Atmospheric Administration). 2013d. Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 5. Climate of the Southwest U.S. Technical Report NESDIS 142-5. Washington, D.C. Accessed April 24, 2023, at https://scenarios.globalchange.gov/sites/default/files/NOAA_NESDIS_Tech_Report_142-5Climate_of_the_Southwest_U.S_0.pdf. Noise Control Act of 1972. 42 U.S.C. § 4901 et seq.","cited_authors":"NOAA (National Oceanic and Atmospheric Administration)","cited_year":"2013d","cited_title":"Regional Climate Trends and Scenarios for the U.S. National Climate Assessment, Part 5","cited_venue":null,"cited_doi":null,"cited_url":"https://scenarios.globalchange.gov/sites/default/files/NOAA_NESDIS_Tech_Report_142-5Climate_of_the_Southwest_U.S_0.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036102,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1991a. Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No. 1). NUREG-1301, Washington, D.C. ADAMS Accession No. ML091050061.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1991a","cited_title":"Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Pressurized Water Reactors (Generic Letter 89-01, Supplement No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036103,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1991b. Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Boiling Water Reactors (Generic Letter 89-01, Supplement No. 1). NUREG-1302, Washington, D.C. ADAMS Accession No. ML091050059.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1991b","cited_title":"Offsite Dose Calculation Manual Guidance: Standard Radiological Effluent Controls for Boiling Water Reactors (Generic Letter 89-01, Supplement No","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036104,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 1994. Letter from I. Selin to The President dated March 31, 1994, regarding “…Executive Order 12898 and the accompanying Memorandum For the Heads of all Departments and Agencies…” Washington, D.C. ADAMS Accession No. ML033210526.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"1994","cited_title":"…Executive Order 12898 and the accompanying Memorandum For the Heads of all Departments and Agencies…","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036105,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2012. Letter from D. Morey, Chief, to A. Javorik, Vice President, dated April 6, 2012, regarding “Notice of Availability of the Final Plant-Specific Supplement 47, Volume 1 and 2, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station (TAC No. ME3121).”","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2012","cited_title":"Notice of Availability of the Final Plant-Specific Supplement 47, Volume 1 and 2, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station (TAC No. ME3121)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036106,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2013. Generic Environmental Impact Statement for License Renewal of Nuclear Plants. NUREG-1437, Revision 1, Washington, D.C. ADAMS Package Accession No. ML13107A023.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2013","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036107,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2015. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 46: Regarding Seabrook Station, Final Report. NUREG-1437, Supplement 46, Volumes 1 and 2, Washington, D.C. ADAMS Accession Nos. ML15209A575, ML15209A870.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2015","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 46: Regarding Seabrook Station, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036108,"raw_reference":"NUREG-1437, Revision 2 G-40 Appendix G NRC (U.S. Nuclear Regulatory Commission). 2016. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56: Regarding Fermi 2 Nuclear Power","cited_authors":"NUREG-1437, Revision 2 G-40 Appendix G NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2016","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56: Regarding Fermi 2 Nuclear Power","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036109,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 58: Regarding River Bend Station, Unit 1 Final. NUREG-1437, Supplement 58, Washington, D.C. ADAMS Accession No. ML18310A072.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 58: Regarding River Bend Station, Unit 1 Final","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036110,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 59: Regarding Waterford Steam Electric","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018b","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 59: Regarding Waterford Steam Electric","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036111,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38: Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final. NUREG-1437, Supplement 38, Volume 5, Washington, D.C. ADAMS Accession No. ML18107A759.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018c","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38: Regarding Indian Point Nuclear Generating Unit Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036112,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2018d. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 59: Regarding Waterford Steam Electric","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2018d","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 59: Regarding Waterford Steam Electric","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036113,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station, Units 2 and 3, Draft Report for Comment. NUREG-1437, Supplement 10, Second Renewal, Washington, D.C.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station, Units 2 and 3, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036114,"raw_reference":"ADAMS Accession No. ML19210D453. NRC (U.S. Nuclear Regulatory Commission). 2019b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4.","cited_authors":"ADAMS Accession No. ML19210D453. NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019b","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036115,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 6, Second Renewal: Regarding Subsequent License Renewal for Surry Power Station, Units 1 and 2, Draft Report for Comment. NUREG1437, Supplement 6, Second Renewal, Washington, D.C. ADAMS Accession No. ML19274C676.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019c","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 6, Second Renewal: Regarding Subsequent License Renewal for Surry Power Station, Units 1 and 2, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036116,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2019d. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating, Unit Nos. 3 and 4, Final Report. NUREG-1437, Supplement 5, Second Renewal, Washington, D.C. ADAMS Accession No. ML19290H346. G-41","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2019d","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating, Unit Nos","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036117,"raw_reference":"NUREG-1437, Revision 2 Appendix G NRC (U.S. Nuclear Regulatory Commission). 2020. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 6, Second Renewal: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2, Final Report. NUREG1437, Supplement 6, Second Renewal, Washington, D.C. ADAMS Accession No. ML20071D538.","cited_authors":"NUREG-1437, Revision 2 Appendix G NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2020","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 6, Second Renewal: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2, Final Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036118,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021a. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 23: Second Renewal Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2, Draft Report for Comment. NUREG-1437, Supplement 23, Second Renewal, Washington, D.C. ADAMS Accession No. ML21306A226.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021a","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 23: Second Renewal Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036119,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2021b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 7, Second Renewal: Regarding Subsequent License Renewal for North Anna Power Station, Units 1 and 2, Draft Report for Comment. NUREG-1437, Supplement 7, Second Renewal, Washington, D.C. ADAMS Accession No. ML21228A084.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2021b","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 7, Second Renewal: Regarding Subsequent License Renewal for North Anna Power Station, Units 1 and 2, Draft Report for Comment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036120,"raw_reference":"NRC (U.S. Nuclear Regulatory Commission). 2022. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2020, Fifty-Third Annual Report.","cited_authors":"NRC (U.S. Nuclear Regulatory Commission)","cited_year":"2022","cited_title":"Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2020, Fifty-Third Annual Report","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036121,"raw_reference":"OSU (Oregon State University). 2022. “PRISM Climate Data.” PRISM Climate Group, Oregon State University, Corvallis, OR. Accessed July 24, 2023, at https://www.prism.oregonstate.edu/.","cited_authors":"OSU (Oregon State University)","cited_year":"2022","cited_title":"PRISM Climate Data","cited_venue":null,"cited_doi":null,"cited_url":"https://www.prism.oregonstate.edu/","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036122,"raw_reference":"Partridge, T.F., J.M. Winter, E.C. Osterberg, D.W. Hyndman, A.D. Kendall, and F.J. Magilligan. 2018. “Spatially Distinct Seasonal Patterns and Forcings of the U.S. Warming Hole.” Geophysical Research Letters 45(4):2055–2063. DOI: 10.1002/2017GL076463. Washington, D.C. Accessed May 17, 2023, at https://doi.org/10.1002/2017GL076463.","cited_authors":"Partridge, T.F., J.M. Winter, E.C. Osterberg, D.W. Hyndman, A.D. Kendall, and F.J. Magilligan","cited_year":"2018","cited_title":"Spatially Distinct Seasonal Patterns and Forcings of the U.S. Warming Hole","cited_venue":null,"cited_doi":"10.1002/2017gl076463","cited_url":"https://doi.org/10.1002/2017GL076463","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036123,"raw_reference":"RESRAD (RESRAD Family of Codes). 2016. “RESRAD-BIOTA.” Version 1.8, Argonne National","cited_authors":"RESRAD (RESRAD Family of Codes)","cited_year":"2016","cited_title":"RESRAD-BIOTA","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036124,"raw_reference":"Laboratory, Lemont, IL. Accessed October 16, 2023, at https://resrad.evs.anl.gov/codes/resradbiota/.","cited_authors":"Laboratory, Lemont, IL. Accessed October 16","cited_year":"2023","cited_title":"at https://resrad.evs.anl.gov/codes/resradbiota/","cited_venue":null,"cited_doi":null,"cited_url":"https://resrad.evs.anl.gov/codes/resradbiota/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036125,"raw_reference":"Smith, J. 1999. “Zapus hudsonius Meadow Jumping Mouse.” Animal Diversity Web, Ann Arbor,","cited_authors":"Smith, J","cited_year":"1999","cited_title":"Zapus hudsonius Meadow Jumping Mouse","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036126,"raw_reference":"MI. Accessed May 12, 2023, at https://animaldiversity.org/accounts/Zapus_hudsonius/.","cited_authors":"MI. Accessed May 12","cited_year":"2023","cited_title":"at https://animaldiversity.org/accounts/Zapus_hudsonius/","cited_venue":null,"cited_doi":null,"cited_url":"https://animaldiversity.org/accounts/Zapus_hudsonius/","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036127,"raw_reference":"Thorne, J.H., R. Boynton, L. Flint, A. Flint, and T. N’goc Le. 2012. Development and Application of Downscale Hydroclimatic Predictor Variable for Use in Climate Vulnerability and Assessment Studies. CEC-500-2012-010. California Energy Commission, Sacramento, CA. Accessed May 11, 2023, at https://escholarship.org/uc/item/160016sh.","cited_authors":"Thorne, J.H., R. Boynton, L. Flint, A. Flint, and T. N’goc Le","cited_year":"2012","cited_title":"Development and Application of Downscale Hydroclimatic Predictor Variable for Use in Climate Vulnerability and Assessment Studies","cited_venue":null,"cited_doi":null,"cited_url":"https://escholarship.org/uc/item/160016sh","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036128,"raw_reference":"USCB (U.S. Census Bureau). 2023a. American Community Survey; Ratio of Income to Poverty Level in the Past 12 Months, Table B17002. Washington, D.C. Accessed May 12, 2023, at https://data.census.gov/cedsci/table?text=b17002.","cited_authors":"USCB (U.S. Census Bureau)","cited_year":"2023a","cited_title":"American Community Survey; Ratio of Income to Poverty Level in the Past 12 Months, Table B17002","cited_venue":null,"cited_doi":null,"cited_url":"https://data.census.gov/cedsci/table?text=b17002","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036129,"raw_reference":"USCB (U.S. Census Bureau). 2023b. American Community Survey; Ratio of Income to Poverty Level in the Past 12 Months, Table C17002. Washington, D.C. Accessed May 12, 2023, at https://data.census.gov/cedsci/table?text=c17002.","cited_authors":"USCB (U.S. Census Bureau)","cited_year":"2023b","cited_title":"American Community Survey; Ratio of Income to Poverty Level in the Past 12 Months, Table C17002","cited_venue":null,"cited_doi":null,"cited_url":"https://data.census.gov/cedsci/table?text=c17002","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036130,"raw_reference":"NUREG-1437, Revision 2 G-42 Appendix G USGCRP (U.S. Global Change Research Program). 2009. Global Climate Change Impacts in the United States. T.R. Karl, J.M. Melillo, and T.C. Peterson (editors). Cambridge University","cited_authors":"NUREG-1437, Revision 2 G-42 Appendix G USGCRP (U.S. Global Change Research Program)","cited_year":"2009","cited_title":"Global Climate Change Impacts in the United States","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036131,"raw_reference":"USGCRP (U.S. Global Change Research Program). 2014. Climate Change Impacts in the United States: The Third National Climate Assessment. J.M. Melillo, T.C. Richmond, and G.W. Yohe (eds.). U.S. Government Printing Office, Washington, D.C. ADAMS Accession No. ML14129A233.","cited_authors":"USGCRP (U.S. Global Change Research Program)","cited_year":"2014","cited_title":"Climate Change Impacts in the United States: The Third National Climate Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036132,"raw_reference":"USGCRP (U.S. Global Change Research Program). 2017. Climate Science Special Report: Fourth National Climate Assessment. Volume I. D.J. Wuebbles, D.W. Fahey, K.A. Hibbard, D.J.","cited_authors":"USGCRP (U.S. Global Change Research Program)","cited_year":"2017","cited_title":"Climate Science Special Report: Fourth National Climate Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036133,"raw_reference":"USGCRP (U.S. Global Change Research Program). 2018. Impacts, Risks, and Adaptation in the United States: Fourth National Climate Assessment. Volume II. D.R. Reidmiller, C.W. Avery, D.R. Easterling, K.E. Kunkel, K.L.M. Lewis, T.K. Maycock, and B.C. Stewart (eds.). Washington, D.C. ADAMS Accession No. ML19008A414.","cited_authors":"USGCRP (U.S. Global Change Research Program)","cited_year":"2018","cited_title":"Impacts, Risks, and Adaptation in the United States: Fourth National Climate Assessment","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036134,"raw_reference":"USGS (U.S. Geological Survey). 2019a. “Withdrawal and Consumption of Water by Thermoelectric Power Plants in the United States, 2015.” M.A. Harris and T.H. Diehl (eds). Scientific Investigations Report 2019–5103, Reston, VA. Accessed May 12, 2023, at https://pubs.usgs.gov/sir/2019/5103/sir20195103.pdf.","cited_authors":"USGS (U.S. Geological Survey)","cited_year":"2019a","cited_title":"Withdrawal and Consumption of Water by Thermoelectric Power Plants in the United States, 2015","cited_venue":null,"cited_doi":null,"cited_url":"https://pubs.usgs.gov/sir/2019/5103/sir20195103.pdf","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036135,"raw_reference":"USGS (U.S. Geological Survey). 2019b. “NLCD 2019 Land Cover (CONUS).” Multi-Resolution Land Characteristics Consortium Project. Sioux Falls, SD. Accessed May 12, 2023, at https://www.mrlc.gov/data/nlcd-2019-land-cover-conus.","cited_authors":"USGS (U.S. Geological Survey)","cited_year":"2019b","cited_title":"NLCD 2019 Land Cover (CONUS)","cited_venue":null,"cited_doi":null,"cited_url":"https://www.mrlc.gov/data/nlcd-2019-land-cover-conus","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036136,"raw_reference":"Wiken, E., F. Jiménez Nava, and G. Griffith. 2011. North American Terrestrial Ecoregions-Level","cited_authors":"Wiken, E., F. Jiménez Nava, and G. Griffith","cited_year":"2011","cited_title":"North American Terrestrial Ecoregions-Level","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036137,"raw_reference":"III. Commission for Environmental Cooperation, Montreal, Canada. Accessed May 12, 2023 at http://www3.cec.org/islandora/en/item/10415-north-american-terrestrial-ecoregionslevel-iiien.pdf. G-43","cited_authors":null,"cited_year":null,"cited_title":"III. Commission for Environmental Cooperation, Montreal, Canada","cited_venue":null,"cited_doi":null,"cited_url":"http://www3.cec.org/islandora/en/item/10415-north-american-terrestrial-ecoregionslevel-iiien.pdf","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036138,"raw_reference":"https://doi.org/10.1146/annurev-ecolsys-112414-054133.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.1146/annurev-ecolsys-112414-054133","cited_url":"https://doi.org/10.1146/annurev-ecolsys-112414-054133","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036139,"raw_reference":"Golden, CO. Accessed May 1, 2023, at https://doi.org/10.2172/481490.","cited_authors":"Golden, CO. Accessed May 1","cited_year":"2023","cited_title":"at https://doi.org/10.2172/481490","cited_venue":null,"cited_doi":"10.2172/481490","cited_url":"https://doi.org/10.2172/481490","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036140,"raw_reference":"Turbine Developments.” Avian Conservation and Ecology 8(2):10. DOI:10.5751/ACE-00609080210. Nova Scotia, Canada. Accessed May 11, 2023, at http://dx.doi.org/10.5751/ACE00609-080210.","cited_authors":"Turbine Developments.” Avian Conservation and Ecology 8(2):10. DOI:10.5751/ACE-00609080210. Nova Scotia, Canada. Accessed May 11","cited_year":"2023","cited_title":"at http://dx.doi.org/10.5751/ACE00609-080210","cited_venue":null,"cited_doi":"10.5751/ace00609-080210","cited_url":"http://dx.doi.org/10.5751/ACE00609-080210","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036141,"raw_reference":"Press, Cambridge, MA. Available at https://doi.org/10.1016/S0029-5493(01)00376-4.","cited_authors":null,"cited_year":null,"cited_title":"Press, Cambridge, MA. Available at https://doi.org/10.1016/S0029-5493(01)00376-4","cited_venue":null,"cited_doi":"10.1016/s0029-5493(01)00376-4","cited_url":"https://doi.org/10.1016/S0029-5493(01)00376-4","ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1036142,"raw_reference":"ML19008A410. DOI: 10.7930/J0J964J6.","cited_authors":null,"cited_year":null,"cited_title":null,"cited_venue":null,"cited_doi":"10.7930/j0j964j6","cited_url":null,"ref_kind":"journal_article","section":"doi","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}