08/2024 - NUREG-1437, Volume 3, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
Other documents for the same rulemaking (all, by stage)
References
USGS (U.S. Geological Survey). 2008. Assessment of Moderate- and High-Temperature Geothermal Resources of the United States. Fact Sheet 2008–3082, Menlo Park, CA. Accessed May 11, 2023, at https://pubs.usgs.gov/fs/2008/3082/pdf/fs2008-3082.pdf.
Weaver, S.P., A.K. Jones, C.D. Hein, and I. Castro-Arellano. 2020. “Estimating bat fatality at a Texas wind energy facility: implications transcending the United States–Mexico border.” Journal of Mammalogy 101(6):1533–1541. DOI:10.1093/jmammal/gyaa132. Oxford, United Kingdom. Accessed May 11, 2023, at https://dx.doi.org/10.1093/jmammal/gyaa132.
Wiser, R., and M. Bolinger. 2019. 2018 Wind Technologies Market Report. Office of Energy Efficiency and Renewable Energy, Washington, D.C. Accessed May 11, 2023, at https://www.energy.gov/eere/wind/downloads/2018-wind-technologies-market-report. D-53
NUREG-1437, Revision 2 Appendix D Zimmerling, J.R., A.C. Pomeroy, M.V. d’Entremont, and C.M. Francis. 2013. “Canadian Estimate of Bird Mortality Due to Collisions and Direct Habitat Loss Associated with Wind Turbine Developments.” Avian Conservation and Ecology 8(2):10. DOI:10.5751/ACE-00609080210. Nova Scotia, Canada. Accessed May 11, 2023, at http://dx.doi.org/10.5751/ACE00609-080210.
APPENDIX E ENVIRONMENTAL IMPACT OF POSTULATED ACCIDENTS Introduction Under the U.S. Nuclear Regulatory Commission’s (NRC’s) license renewal rule in Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), applicants for initial license renewal (initial LR) and subsequent license renewal (SLR) must take adequate steps to account for aging during the period of extended operation either through updating time-limited aging analyses or implementing aging management plans. Based on these activities, the NRC expects that operation during an initial LR or SLR term would continue to provide a level of safety equivalent to that during the current license term. Consequently, the following discussions of accident risk, which generally consider the additional risk posed by 20 years of additional operation, would apply to initial LR or SLR. Chapter 5 of the 1996 Generic Environmental Impact Statement for License Renewal of Nuclear
Specifically, in Section 5.5.2.5 of the 1996 LR GEIS, the NRC staff concluded that the generic analysis “applies to all plants and that the probability-weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to ground water, and societal and economic impacts of severe accidents are of small significance for all plants.” The term probability-weighted consequences in the remainder of this revised LR GEIS refers to probability-weighted consequences to the public and environment as a result of a severe accident. The focus of the 2013 LR GEIS (NRC 2013b) was on severe accidents because the impacts of design-basis accidents are SMALL and, as stated in Section E.3 of the 2013 LR GEIS, the
SLR term. The NRC’s understanding of severe accident risk has evolved since issuance of the 1996 and 2013 LR GEISs due in part to improvements in plant safety, improved plant operational performance, and lessons learned and knowledge gained. This appendix assesses more recent information and updates the analysis presented in Chapter 4.9 and Appendix E of the 2013
LR GEIS regarding severe accidents. This revision considers how these developments would affect the Chapter 5 conclusions in the 1996 LR GEIS and provides comparative data where appropriate. The 1996 LR GEIS provided quantitative estimates of severe accident impacts with estimated population projections, meteorology, and exposure indices to support the conclusions, and the estimates remain unchanged for the purposes of this analysis. This
LR GEIS will have had a severe accident mitigation alternative (SAMA) or severe accident mitigation design alternative (SAMDA) analysis approved in an EIS. However, the following analysis would also apply to a plant applying for initial LR; although if the plant had not previously been the subject of a SAMA or SAMDA analysis in a National Environmental Policy Act of 1969, as amended (NEPA) (42 U.S.C. § 4321 et seq.) document, the applicant would need to submit a SAMA analysis. The format of this appendix follows a format similar to that provided in the 2013 LR GEIS, including a discussion of uncertainties and SAMAs. Nuclear Power Plant Accidents General characteristics of postulated accidents (design-basis and severe accidents) are described in Section 5.2 of the 1996 LR GEIS, which covered • the general characteristics of accidents • fission product characteristics • meteorological considerations 4 The correct terminology is “frequency-weighted consequences” because the accident consequences are multiplied by the core damage frequency. However, the 1996 LR GEIS used the term “probability-weighted consequences” when referring to frequency-weighted consequences. To avoid confusion, this LR GEIS continues use of the 1996 LR GEIS terminology but also uses these two terms interchangeably.
NUREG-1437, Revision 2 Appendix E • implementation of the NRC’s Interim Compensatory Measures (ICMs) Orders following the September 2001 terrorist attacks,5 most of which have subsequently been codified into NRC regulations6 • implementation of the NRC Orders and information requests under 10 CFR 50.54(f) (NRC 2012d) following the Fukushima Dai-ichi nuclear power plant accident initiated by the March 2011 Great Tohoku Earthquake and subsequent tsunami; the requirements for two of these Orders have subsequently been incorporated into NRC regulations7 (see discussion in
Section E.3 of this appendix. The result of the assessment was that almost all key trends and developments for the 51 safety measures evaluated, with one exception (loss of offsite power recovery time), are either favorable (i.e., show improved plant safety or performance) or flat (i.e., show no discernible change in plant safety or performance). The assessment concluded that a large reduction in average core damage frequency (CDF) for internal events and a reduction in plant performance issues have also been observed, but external event hazards and uncertainties need to be considered when evaluating safety goal impacts. These examples of mitigation to improve severe accident risk since publication of the 1996
Section B.5.b. of Commission Order EA-02-026 provide background related to the implementation of particular portions of the ICMs. As an example, the reader is referred to the safety evaluations associated with Brunswick Steam Electric Plant, Units 1 and 2 (NRC 2007d). 6 Final Rule on Power Reactor Security Requirements dated March 27, 2009 (74 FR 13926) and Final Rule on Enhancements to Emergency Preparedness Regulations dated November 23, 2011 (76 FR 72560). 7 The NRC, subsequent to issuance of the NRC Orders, amended its regulations to require mitigation strategies for beyond-design-basis events at nuclear power plants. The Final Rule on Mitigation of Beyond-Design-Basis Events, dated August 9, 2019 (84 FR 39684), makes generically applicable the requirements of Order EA-12-049 (NRC 2012c) and Order EA-12-051 (NRC 2012a). 8 Implementation of these plant improvements and guidelines is required by 10 CFR 50.155, “Mitigation of beyond-design-basis events.”
SECY-11-0137, “Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned” (NRC 2011c). The Commission approved the staff’s prioritization, with comment, in the Staff Requirements Memorandum (SRM) to SECY-11-0137 (NRC 2011d). A complete discussion of the prioritization of the recommendations from the NTTF report, additional issues that were addressed subsequent to the NTTF report, and the disposition of the issues that were prioritized as Tier 2 or Tier 3 are provided in SECY-17-0016, “Status of Implementation of Lessons Learned from Japan’s March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami” (NRC 2017d). The NRC undertook the following regulatory activities to address the majority of the Tier 1 recommendations: • On March 12, 2012, the NRC issued Orders EA-12-049, “Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,”
EA-12-050, “Order Modifying Licenses with Regard to Reliable Hardened Containment Vents,” and EA-12-051, “Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,” and a request for information under 10 CFR 50.54(f) (hereafter referred to as the 50.54(f) letter) to licensees (NRC 2012c, NRC 2012h, NRC 2012a, and NRC 2012d, respectively). • On June 6, 2013, the NRC issued Order EA-13-109, “Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions” (NRC 2013g), which superseded Order EA-12-050, replacing its requirements with modified requirements.
NTTF report. • On January 24, 2019, the Commission, via SRM-M190124A (NRC 2019a), approved the final
NRC will continue to follow a site-specific approach to resolving the interaction between the hazard reevaluation and mitigation strategies using information gathered in the 50.54(f) letter process. The NRC staff made conforming changes to the final rule package (NRC 2019b) as directed by the Commission, which included changes to two regulatory guides (NRC 2019c and NRC 2019d). The final rule was published in the Federal Register on August 9, 2019 (84 FR 39684), with an effective implementation date of September 9, 2019. • Subsequent to Commission approval of the final MBDBE rule, the staff engaged with stakeholders to pursue the expeditious closure of the remaining post-Fukushima 50.54(f) letter responses on a timeframe commensurate with each item’s safety significance. • In a draft discussion paper (NRC 2019e), the NRC staff outlined the process to be used to review the reevaluated hazard and mitigation strategies assessment information provided by licensees, considering the differences between the draft final MBDBE rule and the approved final MBDBE rule. Subsequently, the NRC staff provided a screening letter (also called a “binning” letter) for both seismic and flooding hazard reevaluations (NRC 2019f and
NRC 2019g), which categorized sites based on available information and the status of any commitments made in prior reports and assessments. The NRC staff has concluded that each operating nuclear power plant has implemented the
NRC-mandated safety enhancements resulting from the lessons learned from the Fukushima Dai-ichi accident through its implementation of Orders EA-12-049 and EA-12-051. The staff further concluded that all licensees have completed their response to the 50.54(f) letter for their nuclear power plants and that no further regulatory decisionmaking is required for nuclear power plants related to the Fukushima lessons learned. In the context of the LR GEIS, the Fukushima events are considered a severe accident (i.e., a type of accident in which substantial damage is done to the reactor core) and more specifically, a severe accident initiated by an event external to the plant. The 1996 LR GEIS concluded that risks from severe accidents initiated by external events (such as an earthquake) could have potentially high consequences but found that external events are adequately addressed through a consideration of a severe accident initiated by an internal event (such as a loss of cooling water). Section E.3 assesses the impact of new information obtained in the responses to the
NTTF recommendations. The conclusion from these assessments of the impact of the new information is that the risk of severe accidents, specifically, probability-weighted consequences reported in the 1996 LR GEIS, remains bounding.
Waste, and Reactor-Related Greater than Class C Waste.” 10 CFR Part 73. Code of Federal Regulations, Title 10, Energy, Part 73, “Physical Protection of Plants and Materials.” 10 CFR Part 100. Code of Federal Regulations, Title 10, Energy, Part 100, “Reactor Site Criteria.” 51 FR 30028. August 21, 1986. “Safety Goals for the Operation of Nuclear Power Plants; Policy Statement; Republication.” Federal Register, Nuclear Regulatory Commission. 61 FR 28467. June 5, 1996. “Environmental Review for Renewal of Nuclear Power Plant Operating Licenses.” Federal Register, Nuclear Regulatory Commission. 64 FR 38551. July 19, 1999. “Monitoring the Effectiveness of Maintenance at Nuclear Power Plants.” Final Rule, Federal Register, Nuclear Regulatory Commission.
AEC (U.S. Atomic Energy Commission). 1974a. Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors. Regulatory Guide 1.3, Revision 2, Washington, D.C. ADAMS Accession No. ML003739601.
AEC (U.S. Atomic Energy Commission). 1974b. Assumptions Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Pressurized Water Reactors. Regulatory Guide 1.4, Revision 2, Washington, D.C. ADAMS Accession No. ML003739614.
Aldrich, D.C., J.L. Sprung, D.J. Alpert, K. Diegert, R.M. Ostmeyer, L.T. Ritchie, D.R. Strip, J.D. Johnson, K. Hansen, and J. Robinson. 1982. Technical Guidance for Siting Criteria Development. NUREG/CR-2239, SAND81-1549. ADAMS Accession No. ML072320420.
ANS (American Nuclear Society). 2020. “U.S. Nuclear Capacity Factors: Resiliency and New Realities.” Nuclear NewsWire, Downers Grove, Il. Accessed November 6, 2023 at https://www.ans.org/news/article-183/us-nuclear-capacity-factors-resiliency-and-new-realities/.
APS (Arizona Public Service). 2018. Letter from M.L. Lacal to NRC dated October 5, 2018, regarding “Palo Verde Nuclear Generating Station Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Response to Request for Additional Information for Risk-Informed Completion Times Supplemental Responses for Items 17.f and 21.” Washington, D.C. ADAMS Accession No. ML18278A295.
Baker, D.A., W.J. Bailey, C.E. Beyer, F.C. Bold, and J.J. Tawil. 1988. Assessment of the Use of Extended Burnup Fuel in Light Water Power Reactors. NUREG/CR-5009, Pacific Northwest
Laboratory, Richland, WA. Accessed April 24, 2023, at https://www.osti.gov/biblio/5655949.
BNL (Brookhaven National Laboratory). 1995. Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Surry, Unit 1, Summary of Results. NUREG/CR–6144,
NUREG-1437, Revision 2 Appendix E DiNunno, J.J., F.D. Anderson, R.E. Baker, and R.L. Waterfield. 1962. Calculation of Distance Factors for Power and Test Reactor Sites. TID-14844, U.S. Atomic Energy Commission,
Ducros, G., P.P. Malgouyres, M. Kissane, D. Boulaud, and M. Durin. 2001. “Fission product release under severe accidental conditions: general presentation of the program and synthesis of VERCORS 1–6 results.” Nuclear Engineering and Design 208(2):191-203, Elsevier Academic
EPRI (Electric Power Research Institute). 2012. Seismic Evaluation Guidance – Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic. Report 1025287, Palo Alto, CA. ADAMS Accession No. ML12333A170.
EPRI/NRC (Electric Power Research Institute/U.S. Nuclear Regulatory Commission). 2005a.
EPRI/NRC-RES, Fire PRA Methodology for Nuclear Power Facilities, Volume 1: Summary and Overview. EPRI - 1011989, NUREG/CR-6850, Final Report, Rockville, MD. Accessed April 24, 2023, at https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html.
EPRI/NRC (Electric Power Research Institute/U.S. Nuclear Regulatory Commission). 2005b.
EPRI/NRC-RES, Fire PRA Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology. EPRI - 1011989, NUREG/CR-6850, Final Report, Rockville, MD. Accessed April 24, 2023, at https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6850/index.html. Exelon Generation Company, LLC. 2012. Limerick Generating Station, Units 1 and 2. CLI-1219, 76 NRC 377. NUREG-0750. Volume 78, Book II of II. ADAMS Accession No. ML14259A584. Exelon Generation Company, LLC. 2013. Limerick Generating Station, Units 1 and 2. CLI-13-7, 78 NRC 199. NUREG-0750. Volume 78, Book II of II. ADAMS Accession No. ML15183A194.
Ghosh, T., R. Palla, and D. Helton. 2009. Perspectives on Severe Accident Mitigation Alternatives for U.S. Plant License Renewal. Organization for Economic Cooperation and Development Workshop on Severe Accident Management, Bottstein, Switzerland. ADAMS Accession No. ML092750488.
Ghosh, S.T., E. Hossein, A. Hathway, N. Bixler, D. Brooks, M. Dennis, D. Osborn, K. Ross, and K. Wagner. 2021. “State-of-the-Art Reactor Consequence Analyses Project: Uncertainty Analyses for Station Blackout Scenarios.” Nuclear Technology, 207(3):441–451. Washington, D.C. Accessed May 12, 2023, at https://doi.org/10.1080/00295450.2021.1875737.
ICRP (International Commission on Radiological Protection). 1991. “1990 Recommendations of the International Commission on Radiological Protection.” ICRP Publication 60, Ann. ICRP, 21(1-3). Pergamon Press, New York, NY. Accessed April 24, 2023, at https://www.icrp.org/publication.asp?id=icrp%20publication%2060. National Environmental Policy Act of 1969 (NEPA), as amended. 42 U.S.C. § 4321 et seq.
National Research Council. 1972. The Effects on Populations of Exposure to Low Levels of Ionizing Radiation. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://inis.iaea.org/collection/NCLCollectionStore/_Public/37/004/37004410.pdf.
NUREG-1437, Revision 2 E-98 Appendix E National Research Council. 1980. Effects on Populations of Exposure to Low Levels of Ionizing
Radiation. 1980. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://nap.nationalacademies.org/catalog/21287/effects-on-populations-of-exposure-to-lowlevels-of-ionizing-radiation-1980.
National Research Council. 1990. Health Effects of Exposure to Low Levels of Ionizing Radiation: BEIR V. The National Academies Press, Washington, D.C. Accessed April 24, 2023, at https://www.ncbi.nlm.nih.gov/books/NBK218704/.
National Research Council. 2006. Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII Phase II. Washington, D.C. Accessed May 13, 2023, at https://doi.org/10.17226/11340. Natural Resources Defense Council v. U.S. Nuclear Regulatory Commission. 823 F.3d 641 (D.C. Cir. 2016). Accessed May 8, 2023, at https://cite.case.law/f3d/823/641/5921839/.
NEI (Nuclear Energy Institute). 2005. Severe Accident Mitigation Alternatives (SAMA) Analysis Guidance Document. NEI-05-01, Revision A, Washington, D.C. ADAMS Accession No. ML060530203.
NEI (Nuclear Energy Institute). 2016. Diverse and Flexible Coping Strategies (FLEX) Implementation Guide. NEI 12-06 [Rev 4]. Washington, D.C. ADAMS Accession No. ML16354B42.
NEI (Nuclear Energy Institute). 2018. Letter from S.J. Vaughn to NRC dated April 27, 2018, regarding “Submittal of NUMARC 93-01, Rev 4f, ‘Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants’ for NRC Endorsement.” Washington, D.C. ADAMS Accession No. ML18120A069.
NEI (Nuclear Energy Institute). 2019. Model SLR New and Significant Assessment Approach for
NRC (U.S. Nuclear Regulatory Commission). 1975. An Assessment of Accidents Risks in U.S. Commercial Nuclear Power Plants. NUREG-75/014, Washington, D.C. ADAMS Accession No. ML083570090.
NRC (U.S. Nuclear Regulatory Commission). 1978. Liquid Pathway Generic Study Impacts of Accidental Radioactive Releases to the Hydrosphere from Floating and Land-Based Nuclear Power Plants. (NUREG-0440), Washington, D.C. Accessed May 12, 2023, at https://babel.hathitrust.org/cgi/pt?id=mdp.39015095094713&view=page&seq=3.
NRC (U.S. Nuclear Regulatory Commission). 1982a. Final Environmental Statement Related to the Operation of Seabrook Station, Units 1 and 2. NUREG-0854. Docket No. 50-443 and 50-444. Washington, D.C. ADAMS Accession No. ML102290543.